HomeMy WebLinkAbout2021-03-24 CPC PacketSiillwater
THE B I R T H P L A C E O F M I N N E S OT A
PLEASE NOTE (NEW FOR 2021):
Planning Commission meetings are streamed live on the city website and available to view on Channel
16. Public can participate by logging into https://www.zoomgov.com or by calling 1-646-828-7666 and
enter the meeting ID number: 160 877 9021
PLANNING COMMISSION MEETING
March 24th, 2021
REGULAR MEETING 7:00 P.M.
I. CALL TO ORDER
II. ROLL CALL
III. APPROVAL OF MINUTES
1. Possible approval of minutes of February 24th, 2021 regular meeting minutes
IV. OPEN FORUM - The Open Forum is a portion of the Commission meeting to address subjects
which are not a part of the meeting agenda. The Chairperson may reply at the time of the
statement or may give direction to staff regarding investigation of the concerns expressed. Out
of respect for others in attendance, please limit your comments to 5 minutes or less.
V. CONSENT AGENDA (ROLL CALL) - All items listed under the consent agenda are considered to
be routine by the Planning Commission and will be enacted by one motion. There will be no
separate discussion on these items unless a commission member or citizen so requests, in which
event, the items will be removed from the consent agenda and considered separately.
2. Resolution CPC 2021-02: Adopting Written Statement of Reasons for Denial CPC Case No.
2020-01.- Tabled from the February meeting
VI. PUBLIC HEARINGS - The Chairperson opens the hearing and will ask city staff to provide
background on the proposed item. The Chairperson will ask for comments from the applicant,
after which the Chairperson will then ask if there is anyone else who wishes to comment.
Members of the public who wish to speak will be given 5 minutes and will be requested to step
forward to the podium and must state their name and address. At the conclusion of all public
testimony the Commission will close the public hearing and will deliberate and take action on
the proposed item.
3. Case No. 2021-06: Consideration of a Variance to the front yard setback to build a larger
front stoop on the property. Property located at 1221 1st St S in the RB district. Traci Post,
property owner.
4. Case No. 2021-08: Consideration of a Variance to the lot's impervious surface coverage, in
order to install a pool. Property located at 1910 Oak Glen trail in the RA district. Jennine
Lundquist, property owner.
5. Case No. 2021-09: Consideration of a Special Use Permit for outdoor dining on an exterior
patio and its proposed addition. Property located at 102 2nd Street N in the CDB district. Tim
Siegfried, applicant and 102 2nd LLC, property owner.
6. Case No. 2021-11: Consideration of a Variance to the exterior side yard setback. Property
located at 1312 Broadway St N in the RA district. Richard and Colleen Muske, property
owners.
7. Case No. 2021-12: Consideration of a Special Use Permit for outside storage. Property
located at 127 Main St S in the CBD district. Buettner Real Estate, property owner.
8. Case No. 2021-13: Consideration of a 6 lot Preliminary Plat and Rezoning. Property located
at 8483 Marylane Ave N in the AP district. JAM Freedom LLC, applicant and Mark and
Marlene Pavlick, property owners.
VII. DISCUSSION
VIII. FYI — STAFF UPDATES
IX. ADJOURNMENT
The Birthplace of Minnesota
216 4th Street N, Stillwater, MN 55082
651-430-8800
www.ci.stillwater.mn.us
PLANNING COMMISSION MEETING MINUTES
February 24th, 2021
REGULAR MEETING 7:00 P.M.
Chairman Dybvig called the meeting to order via Zoom at 7:00 p.m.
Present: Chair Dybvig, Commissioners Hansen, Kocon, Steinwall, Councilmember Odebrecht
Absent: Commissioner Meyhoff and Lauer
Staff: City Planner Wittman and Bill Turnblad
APPROVAL OF MINUTES
Possible approval of minutes of January 27th, 2021 regular meeting
Motion by Councilman Odebrecht, seconded by Commissioner Kocon, to approve the minutes
of the January 27th, 2021 meeting as amended. All in favor, 5-0.
OPEN FORUM
There were no public comments.
CONSENT AGENDA
Resolution CPC 2021-02: Adopting Written Statement of Reasons for Denial CPC Case No.
2020-01.
Staff and Commissioners had questions regarding how to handle the vote regarding this
resolution. They would like to table this item to the next meeting so they can confer with the
City Attorney. Motion to table by Chairman Dybvig, seconded by Steinwall. All in favor, 5-0.
PUBLIC HEARINGS
Case No. 2020-60: Consideration of a Conditional Use Permit and associated Variances for a
residential building in the Central Business Height Overlay Historic District. Property located at
200 Chestnut St. Joel Hauck, applicant and Chestnut Partners, LLC, property owner.
City Planner Wittman reviewed the application from 200 Chestnut Partners LLC, owner of
the property at 200 Chestnut East and is proposing to redevelop the site with a four-story,
61-unit apartment building with 73 underground parking spaces. In addition to holding a
neighborhood meeting prior to the application submittal, the applicant participated in a
Technical Review meeting with local agencies and organizations to gain insight on how the
proposed project conforms to local regulations. The project proposed to the Planning
commission (PC) reflects those regulations; where variations occur or conditions are
recommended for conformance, they are outlined within the report.
Ms. Wittman explained that residential uses, as well as Large Building Projects, in the
Central Business District (CBD) require a Conditional Special Use Permit. The proposed
fourth story, jointly with the building's overall 48.5' height, exceeds the maximum allowable
Planning Commission February 24, 2021
three -stories and 37' height in the Historic Height Overlay District. The applicant is
requesting variances to the City's CBD Setbacks, the Height Overlay standards, and the Off -
Street Parking and Loading requirements. Given the scope and location of the project as well
as the proposed height is 10% greater than the maximum allowable limit, City Code requires
the PC make recommendation for City Council (Council).
Ms. Wittman went on to report that approval of a Heritage Preservation Commission (HPC)
Design Permit is required prior to Council consideration. On December 16, 2020 the HPC
reviewed a Design Permit application for the property that contained a recessed fourth story
that included a mix of residential units, enclosed common space, and rooftop terracing. Citing
the project's need to conform to the mass and scale of buildings in its vicinity (including the
adjacent Stillwater Commercial Historic District), the HPC tabled consideration of the design,
requesting modifications to the scale of the fourth story - if not full removal. On January 20,
2021 the applicant obtained conditional approval of a Design Permit application from the HPC
though the HPC's conditioned the approval with no fourth story. The applicant has appealed the
HPC's decision to the City Council. The design presented to the PC contains a fourth story though
the vertical improvements are recessed from most right-of-ways.
On February 18, 2021 the applicant met with the Downtown Parking Commission (DTPC), and
advisory body to the Council, to discuss the request for a parking variance. The applicant is
proposing to create 73 off-street spaces, leaving a 35 space deficit, and utilizing an on -street
parking space for loading and unloading. As a reminder to the PC, City Code allows for mitigation
of parking (by payment in lieu of parking creation) in areas with zero lot lines or similar
conditions. The DTPC indicated that, with certain conditions, they believe the development
could still conform to the intent of the Off -Street Parking and Loading regulations. They
recommend Council allow the developer to pay a fee in lieu of creating 35 parking spaces. Their
conditions surrounded around requiring off-street spaces to be dedicated to the residential
units so that only guests are utilizing the public parking system.
The applicant is requesting consideration of a (1) Conditional Use Permit for 61 multi -family
residences in a Large building project in the CBD Zoning District; (2) A 35 space variance to
the Off -Street Parking and Loading requirements; (3) A one-story variance to the three-
story maximum height in the Central Business District Historic Height Overlay District; (4)
A 11.5' variance to the 37' maximum allowable height in the Central Business District
Historic Height Overlay District; (5) Variances to the 20' (Combined) Side Yard and 20' Rear
Yard Setback in the Central Business District.
Commissioner Hansen asked whether there is a condition regarding outdoor noise. Ms.
Wittman responded traditionally we add conditions to commercial Conditional Use Permits
with outside events, however, it is unlikely in this situation.
Commissioner Steinwall requested Ms. Wittman provide more explanation regarding the
requested Variance to the parking regulations; and Ms. Wittman explained the proposed
building is required to have 108 parking spaces, but is only proposing 73. The conditions
would require the developer to build the 73 underground parking spaces and assign 1 to
each unit. They would then be required to pay a fee for the 35 parking space deficit.
Commissioner Hansen questioned if there was any proposed change to Union Alley as a one-
way street, and would the open parking on that street be changed? Ms. Wittman responded
that no consideration was given to using Union Alley as a parking permit zone only in the
downtown lots. The traffic study from SRF found that the traffic would not be negatively
Page 2 of 13
Planning Commission February 24, 2021
affected by the change. The proposed project would have 12 excess parking spots to
accommodate the units that have more than one car.
Mr. Nick Walton, President of Reuter Walton Development, owner of the site, gave some
background how they received feedback regarding this project and have effectively
addressed negative aspects. He addressed Commissioner Hansen concerns regarding
outdoor noise, and was open to the idea of an additional condition, but also stated they
would have management rules in place as well to help mitigate the noise.
Mr. Bob Loken gave a presentation and pointed out the parking study was based on the
larger building, so the 35 parking space deficit would be less. The context of the building
design was based on the industrial aesthetic buildings, which are common on building
further from Main Street. Mr. Loken added that while they are proposing a fourth story,
there are other buildings with similar heights within the downtown.
Mr. Walton expressed they have put as many parking spots within the basement as they
could. As the water table is directly under the property, they were not able to build any
additional going down.
Mr. Walton discussed the new addition at the Water Street Inn and pointed out the various
heights of that building compared to their proposed building. He also stated that without
the three units on the fourth floor the project cannot proceed due to financial reasons.
Mr. Loken went through and summarized the changes to the proposal since the December
16th, 2020 and January 20th, 2021 meetings.
Councilmember Odebrecht agreed with Staff on the need for housing and he thought the
parking situation was resolved. He questioned the Short Term Home Rental number used,
and thought a higher number, such as ten would better support the community via tourism
and building.
Mr. Walton responded that the they were open to the number Short Term Home Rental units
allowed. They would be comfortable with 2-6 units, or 10% of the total number of units.
Councilmember Odebrecht asked the applicants to explain why they need the fourth story;
and Mr. Walton explained the suites on the fourth floor are an essential financial reasons.
Councilmember Odebrechet asked Ms. Wittman to clarify whether the elevator bump out
could exceed the height regulations; and she stated as the elevator is an integral part of the
building it would be allowed to exceed the height restriction.
Commissioner Steinwall requested that the height of the elevator and stairwells will still be
higher than the fourth story; and Mr. Loken explained the life safety reasoning behind the
layout of the fourth story.
Mr. Walton indicated that the prior meetings had not shown the detail of the glass hallway.
Chairman Dybvig opened the public hearing.
Ms. Kim Nelson representing the North Central States Regional Council of Carpenters
(NCSRCC), stated the project and current design is reasonable and the construction of this
project will provide jobs for laborers, many of whom live in Minnesota and the Stillwater
community. During the COVID pandemic a project this size would provide jobs for the
Page 3 of 13
Planning Commission February 24, 2021
community. She asked the Commission to approve this application in its current state with
the fourth floor.
Mr. Hunter Sanders, Emerson Ave, stated as a construction worker himself during the COVID
pandemic, this project would provide much needed jobs for many community members.
Mr. Matthew Wolf owner of 107 Chestnut St E, pointed out the Height Overlays are there for
a reason and the other buildings within the district were made to comply.
Mr. Steve and Mrs. Diane Middleton, Newgate Ave N. questioned the applicant on whether
they were going to provide a dog relief area for those living within the complex; and Mr.
Loken replied that there is not a plan at this point, but they would prefer the residents to
use the neighborhood to better interact with the community.
Mr. Walton said they could be flexible if need be to accommodate that, including bags in the
lobby.
Chairman Dybvig closed the public hearing.
Commissioner Kocon is okay with the setback requests it fits with the character of the
downtown, is okay with the use permit for multifamily. He feels the issues lie with the
request for the extra story, the height variance for the fourth story, and parking. He was
surprised by the lack of outcry from the neighbors regarding parking. As the Parking
Commission believes they have resolved the parking issue, his main issues are the extra
story and the height Variance.
Commissioner Hansen stated there are tall buildings within the downtown and we are
trying to avoid that so that 10-20 years down the road we don't regret approving them. His
main issue is parking. He does not think 1 spot per unit is enough. If we were to add this
large of a project downtown, it might strain the already strained parking downtown. He
would like to see this project go through, however is not comfortable with the parking
variance. He stated he is in support of the Use Permit as long as the project fits in well.
Commissioner Steinwall praised the applicant and developer for working with the
community members, taking the character of the town into account when designing the
building. She stated this project would be a good addition to the downtown and help keep
the downtown alive and vibrant. She agreed with the exploration of the pet relief area.
Steinwall also agreed the setback variances were not a concern for her, however, the fourth
floor and height were a concern. She did not believe the applicant made a case for practical
difficulty aside from economics. She stated she would consider increase in the Short Term
Home Rental allowance.
Councilmember Odebrecht agreed the height and fourth story are the most concerning. He
asked Ms. Wittman to clarify the parking requirements again; and Ms. Wittman clarified the
parking study was based a higher number of units then now proposed, and the proposed
project meets the low end of the threshold range suggested in the parking study. The project
will also provide an additional 12 spaces, and mitigating the remaining deficit through the
parking system.
Councilmember Odebrecht stated then he does not have a concern with parking. There are
very few places within the downtown where younger families and younger people will be
able to rent and therefore this property presents a unique opportunity for that aspect. He
Page 4 of 13
Planning Commission February 24, 2021
stated Slide 15 demonstrated this was not going to change the character of downtown. He
suggested the Short Term Home Rental number increased to 6 units.
Chairman Dybvig echoed the comments of the others, the concerns are the height and the
extra story. He does not see the practical difficulty for those. He asked Ms. Wittman to clarify
the parking variance; and Ms. Wittman stated if the parking variance is approved, they will
not need to mitigate the deficit of parking. Instead, if the Planning Commission were to
approved the parking mitigation plan, they will need to follow the conditions suggested by
the Downtown Parking Commission.
Chairman Dybvig suggested they go with the parking mitigation plan, rather than the
variance to the parking.
Commissioner Kocon agreed the building is well designed aesthetically. He pointed out the
building is up against a bluff so there is a difference in view regarding that.
Motion by Commissioner Kocon, seconded by Commissioner Steinwall, to approve a
Conditional Use Permit for a 58-unit residential building, a 3 story/ 2.5' Variance, Variances to
the setbacks, the Parking mitigation plan as proposed, and raising the Short Term Home Rental
to 6 units.
Commissioner Hansen stated there is no noise ordinance conditions listed. He is concerned
about the economic considerations and affects regarding the development. As affordable
housing is needed within Stillwater, if there is no fourth story allowed, would the prices of
the units jump too high and become unaffordable. He stated perhaps this is a greater
discussion that should be had.
Commissioner Kocon stated based on the location of the building, he does not think there
will be anything but market based apartments.
Commissioner Hansen clarified that he did not mean low priced apartments, however, a
jump of approximately $400 more a month in rent is a large amount and could make it
unaffordable for most.
Councilmember Odebrecht agreed and he trusts the developers number are correct and the
motion as it stands could effectively kill the project.
Chairman Dyvbig suggested finding a middle ground by allowing 61-units, but no fourth
story.
Commissioner Kocon agreed to the amendment of 61-units.
Commissioner Steinwall as the seconder also agreed to the amendment.
Chairman Dybvig and Ms. Wittman discussed the general conditions added to permits. No
amplified music being a condition often used.
Commissioner Kocon amended the motion to list 10 p.m. City quiet hours and no outdoor
amplified music allowed.
Commissioner Steinwall agreed with the motion amendment.
Ms. Wittman repeated the current motion stating recommendation of approval of a
Conditional Use Permit for a 61-unit residential multifamily building, a 3 story/ 2.5'
Variance, Variances to the setbacks, with staff recommended conditions which includes the
Page 5 of 13
Planning Commission February 24, 2021
Parking mitigation plan as proposed. Condition #3 to listed up to 10% of the unit allowed
for Short Term Home Rental, and an additional condition to read City quiet hours at 10 p.m.
and no outside amplified music allowed.
Councilmember Odebrehct question if they are not allowed a fourth story, how could they
have a roof top terrace.
Ms. Wittman said those are allowed to project above a roof line. Roof top terraces are
common downtown.
Chairman Dybvig stated it would be similar to the Water Street Inn.
Motion passes 4-1. Commissioner Hansen voting nay.
Commissioner Hansen wanted the record to reflect that he was in favor of the project, but
does not think the parking was adequately addressed and therefore he voting against the
motion.
Case No. 2021-02: Consideration of a Variance associated with a future re -subdivision for the
property located at 819 William St N in the RB district. Michael Russ, property owner.
Chairman Dybvig stated that his residence was within the noticing parameters and
therefore asked the applicant if he would prefer the Chair recuse himself from the
discussion and vote.
Mr. Michael Russ, applicant, stated he had no objection to the Chair remaining in the
discussion and vote.
Ms. Wittman stated that Mr. Russ owns the 15,000 sf property at 819 William St North and
is looking to split his lot into two 7,500 sf lots. However, if the lot were to be split, the existing
house would then fall within the newly created 25' rear yard setback. While the house would
meet all the other setbacks, a variance to the rear yard setback would have to be approved
prior the City Council's consideration of a re -subdivision. The applicant is requesting a 3.5'
variance to City Code Section 31-308. (b)(1) to allow a house to be setback 21.5' from the rear
yard lot line, whereas the required setback is 25 feet.
Ms. Wittman stated staff talked with neighbor Dana Jackson who has concerns about storm
water and run off. Ms. Wittman stated that if this re -subdivision is approved and a home is
built, it would be required to adhere to the Middle St. Croix Watershed's impervious surface
and infiltration requirements. Those requirements could potentially improve the current
drainage situation.
Mr. Michael Russ, property owner stated he did not have comments or questions for staff.
Commissioner Kocon inquired if the large tree was on the current property or will it be a
part of the proposed new lot; and Mr. Russ replied that the large tree is located within the
current home's lot and no removal would be necessary. The side yard setback on the new
lot should not affect the tree.
Chairman Dybvig opened the public hearing. There were no public comments.
Chairman Dybvig closed the public hearing.
Motion by Commissioner Hansen, seconded by Councilmember Odebrecht, to approve Case No.
2021-02, a 3.5' variance to City Code Section 31-308. (b). (1). to allow a house to be setback
Page 6 of 13
Planning Commission February 24, 2021
21.5' from the rear yard lot line, with the staff recommended conditions. All in favor. Motion
passes 5-0.
Case No. 2021-03: Consideration of a Preliminary Plat, Concept PUD, and Zoning Map
Amendment and variances associated thereto for the property located at 13187 Dellwood Rd
N, in the AP district. Integrity Land Development, applicant, and Gary and June Jorgensen,
property owners.
Community Development Director Turnblad stated Todd Ganz, Integrity Land
Development, LLC, is proposing to develop 4.19 acres of land that currently includes two
parcels with a home on each. These parcels are located at 13187 Dellwood Road North (State
Hwy 96) and 2384 Oak Glen Trail. About half of the property (2.02 acres) lies within the Natural
Environment Shoreland District of South Twin Lake (see Map A). On these 2.02 acres,
development must either be on one acre lots or must occur as a Shoreland Planned Unit
Development (PUD). A shoreland PUD allows increased density if: 1) at least 50% of the site
remains in commonly owned permanent open space; 2) densities are shifted away from the
protected lake; 3) emphasis is placed on protecting the natural resources of the site, such as
trees and water basins; and 4) no more than 25% of the site is improved with impervious
surfaces. The developer has chosen to develop the entire site as a PUD, and the western 2.02
acres according to Shoreland PUD standards. In order to develop the property as proposed, the
applicant has requested approval of the following: (1) Rezone the property at 13187 Dellwood
Road from AP, Agricultural Preservation to RB, Two -Family Residential; (2) Concept PUD for a
12-lot development plan (includes both existing parcels); (3) Preliminary Plat of HEIFORT
HILLS ESTATE 2nd ADDITION, an 11-lot residential development (not including the existing lot
at 2384 Oak Glen Trail, which is already platted); (4) Variance from the minimum allowed
setback distance from State Highway 96 in order to build new houses as close as 45 feet from
the standardized right-of-way, rather than the 100 feet required.
Commissioner Steinwall asked if we needed to obtain an easement for the private driveway
that intersects with Highway 96; and Mr. Turnblad answered that it should be added to the
list of conditions.
Councilmember Odebrecht requested clarification on the rezoning. He noted the proposed
zoning/density is not in line with the Oak Glen Neighborhood but is more consistent with the
original Heifort Hills Development to the west. However, the road will not go that direction, it
will go through the Oak Glen Neighborhood. He asked if there was a different zoning district
that could be used which would fit the Oak Glen Neighborhood better; and Mr. Turnblad
responded that the proposed zoning district is not consistent with the development to the west,
Heifort Hills. There are other zoning districts, however, the Comp Plan guides for higher
densities.
Councilmember Odebrecht asked would we have made different decisions in the past
regarding the Comp Plan if we have known this high density area would connect to a low
density neighborhood; and Mr. Turnblad stated he did not know for sure. However, due to
the Shoreland district requirements the eastern portion of the proposed development must
have greater open space.
Commissioner Steinwall wanted clarification to the concept plan shown; and Mr. Turnblad
explained the cross hatching to be ponds and the 'Y' turn around to be "grass-crete."
Page 7 of 13
Planning Commission February 24, 2021
Commissioner Hansen asked if we needed a condition stating a 15' requirement between
homes as recommended; and Mr. Turnblad stated a condition requiring 15' between homes
should be added to the condition list.
Commissioner Hansen also noted, condition number 4 requires a minimum of 10 feet from
back of curb to home, and asked if that was met by the current PUD; and Mr. Turnblad
replied that the 10' from back of curb requirement has been met or could be met by shifting
the buildings to the west and be accommodated.
Commission Hansen then asked if the PUD met the 'y' turn around requirements for a fire
truck to turn around in; and Mr. Turnblad stated that the Deputy Fire chief has not looked
at the revised plan, however, he did provide the template of what is required. If this plan
does not meet the requirements, the final plat will not be approved.
Commissioner Hansen asked if we can add a condition for the "grass-crete" be maintained;
and Mr. Turnblad answered that we can add that condition and that the homeowner's
association will be required to maintain the road and grass-crete, except for the area in Lot
8, where the property owner will be responsible for maintaining that portion. The developer
and his engineer suggested we use pervious concrete or pervious bituminous in these areas.
It is easier to maintain grass-crete, but the pervious concrete of permious bituminous is
harder to monitor if is being maintained.
Commissioner Hansen asked who will be included in the private road easement agreement;
and Mr. Turnblad explained that everything in the outlot that will be owned by the HOA.
Across the HOA outlot and the property at 2384 Oak Glen Trail there will be an easement
for the private road and for maintenance agreement.
Commissioner Hansen asked for clarification on private utilities; and Mr. Turnblad replied
that water and sewer lines for the Heifort Hills Estate first addition, will come across the
south portion of the property and loop into the Oak Glen Neighborhood. From that line,
private water and sewer lines will be run to access the neighborhood. The private lines will
be taken care of by the homeowner's association and the public lines will have an easement.
The water and the sewer will be municipal water and sewer.
Commissioner Kocon clarified that the existing house at 13187 (Lot 7) and Lot 8 will utilize
a shared driveway that accesses 96 right onto a right turn lane. The other 9 will be utilizing
the shared road. He questioned by not add an impervious road that connects to the driveway
with a knock down barrier, which would seem easier for emergency vehicles and safer; and
Mr. Turnblad stated the Deputy Fire Chief must have a minimum of a 25 feet wide roadway
to get out of the neighborhood and the driveway for 13187 is skinny to save on impervious
surfacing.
Councilmember Odebrecht asked whether the home at 2384 Oak Glen Trail would be
moved; and Mr. Turnblad stated if the private road stays where it is currently proposed, the
home would stay in its location. If the road where to split the lot, the home would need to
be moved. He stated some developers in the past have done successful house moves.
Councilmember Odebrecht asked if it were possible to create a buffer between this new
proposed neighborhood and the Oak Glen Neighborhood; and Mr. Turnblad stated due to
the Shoreland District requirements and the Comp Plan's encouraged densities, there is no
way to create buffer.
Page 8of13
Planning Commission February 24, 2021
Councilmember Odebrecht asked what the minimum number of houses required by the
Comp Plan; and Mr. Turnblad answered the Comp Plan is calling for 4.4 homes.
Councilmember Odebrecht asked if Mr. Turnblad has ever seen a messier development than
this; and Mr. Turnblad stated infill projects are always difficult. This proposed project is
infill on three sides which makes it even harder.
Mr. Todd Ganz, applicant, pointed out that the plans have been revised to include greater
distances between houses, but they are not being shown tonight. Houses 9,10, 11 have been
spread out to allow more room for snow storage. The driveway for house 1 was moved south
and there is a wider distance between the houses on Lots 3-6. Initially Heifort Hills Estate
First Addition included the street to Neal Ave, however MNDOT would only allow 2 houses
to use the driveway. Development Director Turnblad suggested we work to get access
through Oak Glen trail.
Mr. Ganz noted that he plans to use as many trees as possible around perimeter to buffer
between development and Oak Glen Neighborhood. Along Highway 96 he would like to use
a 6' fence and trees to buffer. Regarding the ponds that is behind Lots 9-11, catches the water
and infiltrates, and if it floods, it overflows into the pond closer to the Heifort Hills. MnDOT
did not allow for emergency access out onto Hwy 96, therefore the use of the `grass-crete' is
necessary.
He continued that Lots 2-6 will either be slab on grade or full basements, and Lots 9-11 are
going to be walk -out full basements. Initially the thought was doing twin homes to get more
in, but he insisted on single family detached to keep the value of the homes similar to the
Oak Glen Neighborhood. The Homeowners association will be the same as the Heifort Hills
1st addition.
Councilmember Odebrecht stated he was not sure how they could increase the space
between the homes on Lots 3-6; and Mr. Ganz showed the new layout with approximately
15' between units.
Councilmember Odebrecht encouraged the developer do neighborhood meetings to reduce
concern and comments, and reminded Mr. Ganz to wear a mask going door to door.
Chairman Dybvig opened the public hearing.
Beth Harrison, Oak Glen Trail (directly across the street) requested denial of the Preliminary
Plan, the private street, Hwy 96 setback easement. She listed 9 codes they are requesting to
set aside and read comments submitted to the Planning Commission on 2/24/2021.
Mrs. and Mr. Dianna and Steve Middleton, Newgate Avenue North, stated they support
everything Beth Harrison has said. They asked the Commission to deny the development.
They own the property between this development and the highway that will affect the
drivability of Oak Glen Trail. They asked where the construction fencing would go, the berm
they mentioned, the holding ponds. They have property located the west of that strip, so
this development would affect their development potential in the future.
Mrs. and Mr. Caitlin and Dario Mejia, Oak Glen Trail stated they concur with Beth and are
asking the commission to deny this request. They stated they have concerns for the safety
of their small family. They questioned if the Comp Plan took into account the fact that this
Page 9 of 13
Planning Commission February 24, 2021
property would cut off access and perhaps the Comp Plan needs to be revised. They
suggested that the City create a clear plan for development in the future.
Mr. Gary Gerds, stated he was disappointed that Community Development Director
recommended approval. He was led to believe this was 'an open question' and the decision
on this development had not already been made. Mr. Gerds asked Director Turnblad is he
knew of any other street in within Stillwater that was cut through a residential development
to meet the needs of a developer; and Mr. Turnblad stated no. Mr. Gerds added that this sets
an unbelievable precedent. If allowed, why not allowed anywhere else in Stillwater? He
noted that the developer cut down trees between the homes and ponds on the 1st Addition.
He questions what will happen to the existing home and its setback. He was told the project
met engineering requirements, but does not see how.
Mrs. and Mr. Amy and Dan Stoffer, Swenson Street, asked Mr. Ganz if the houses were
constructed already; and Mr. Ganz answered there are only eight homes left to be
constructed in Heifort Hills First addition, but not for this project. He expressed he moved
here for the open space, and it appears cut and clear trees and put up as many houses as
possible. He appreciates the fencing and tree buffer, but would prefer no development.
Combining a new high density development to an older single family neighborhood is not
right. He questioned why we would you allow houses closer than the highway then allowed.
He indicated that the developer Mr. Stoffer stated that the Developer came to the meeting
unprepared and not preparing the City and its Commissioners properly is not right. He
hopes for denial, protecting the citizens of Oak Glen.
Mr. and Mrs. Paul and Rose Giordano, expressed that they live right next door to the
proposed road and fears it is going to devalue the home and cause accidents. They
questioned, if they did not widen the street to 32', where are people going to park.
Furthermore, there is no walkway to this development, so people will walk through their
yards. He is concerned about the children within the neighborhood with a blind left -turn
onto this road. He questions if civil engineering requirements and plan are being met.
Easements to private road He stated that naming the road Oak Glen Lane makes it appear
as an addition to Oak Glen. If so, then requirements and zoning of the Oak Glen
Neighborhood should be followed.
Mr. Peter Mayer, Oak Glen, stated that none of neighbors want this road. They settled in this
neighborhood which has an established feel. When they bought their property there was
no open land across the street it was surrounded by homes. Had they known this was a
possibility they would not have purchased their property. This neighborhood has no
sidewalks, and therefore all the residents use the streets. Connecting this road to a busy
street would add traffic and problems. The only ones benefitting are those who do not live
here. He quoted from Stillwater City Code, Chapter 2, Subd 6. Mr. Mayer asked that they do
not practice 'development at all cost' and request 'say no' to this proposal.
Mr. Tom Ash, Swenson Street, stated that Beth and Pete did a great job representing
problems. Tom stated the removal of snow at 26' does not seem possible and cannot be
done right. He wondered if the turnaround at the end of the street will occur in someone's
driveway, and the Fire Department will have difficulty getting equipment in there. He
questions delivery trucks and their use of the turnaround. He stated there are a lot of
children in the neighborhood riding bikes, it is hard to see them so low to the ground. Great
Page 10 of 13
Planning Commission February 24, 2021
care is needed in this neighborhood and this would greatly affect their safety. They
recommend against the project and believe it would change the standards of the community.
Mr. Bryce Urban, 2241 Oak Glen Trail, lives kiddie -corner and down the street. He stated
that nine additional homes pouring out of essentially one driveway will create an additional
112 occurrences. This poses a lot of safety concerns for neighborhoods. When developed,
this neighborhood was created with small streets and no sidewalks. If approved this would
be setting a precedent and safety concern.
Mrs. Caitlin Mejia stated Gary and June Jorgensen had been trying to purchase property
along this roadway for years. The home at 2384 Oak Glen was a rental property and was
not maintained. They have concerns about grass and snow plowing maintenance if this
were to go through.
Mrs. Diana Middleton wanted to add that the current owner does not maintain the property.
Some possessions were stored on their property. Trees were removed and some were left
on their property. She asked if the commission even have the plans updated and showed in
the meeting.
Chairman Dybvig summarized the process that they were just considering the Preliminary
Plat with more details to follow if approved.
Mr. Tom Ash asked about the next steps and the process going forward; and Ms. Wittman
clarified the process and the next steps regarding this application.
Chairman Dybvig closed the public hearing.
Councilmember Odebrecht stated that he did have the correct plans and he simply
misinterpreted what Ganz had said. He also stated the packet is publicly available.
Commissioner Kocon stated there are a lot of moving parts and a lot of neighborhood
concerns and questions. He stated the variance for setbacks is dramatic and the house would
need to be moved or torn down. He stated that the City does have a Comp Plan that has been
in place for a while a that plan includes this property. Mr. Kocon suggested that the
developer have a plan for the home at 2384, whether that be tear it down or move it. He
stated he could not embrace this plan at this point.
Commissioner Hansen agreed with Commissioner Kocon and stated many of the questions
the public have are good questions and many of theirs answers can be found in the City
Code. He stated the PUD requirements are different then City Code. He stated he can cannot
move forward with the plan as it currently sits. He questions why the Comp Plan would
allow Low to Medium Density Zoning within the South Twin Lake Shoreland overlay district.
Commissioner Steinwall stated she also has concerns regarding this proposal. Her concerns
include the 100' setback Variance, which she will not support. She questioned how tabling
would affect the 60-day rule; and Mr. Turnblad stated the Preliminary Plat has a 120-day
rule, while the Rezone and Variance have a 60-day rule. He also stated that the City can
extend that review period and additional 60 days if the Commission would like to table and
review this application again.
Councilmember Odebrecht thanked the neighborhood for their feedback. He stated the test
is whether this will change the essential character of the neighborhood. He stated that the
60-day rule is a piece that we have to follow as, if we do not, it is automatically approved.
Page 11 of 13
Planning Commission February 24, 2021
He stated the Comprehensive plan is the overall plan that should guide the City. However,
this portion sticks out like a sore thumb in the Comp Plan. He understands there is increased
pressure on Hwy 96 and this would create a significant burden on the Oak Glen
Neighborhood, especially 2444 Oak Glen. He feels this is unpreceded in Stillwater.
Motion by Councilmember Odebrecht, seconded by Commissioner Steinwall to deny the Case
No. 2021-03, Preliminary Plat, Concept PUD, Rezoning and Setback Variance to the property
located at 13187 Dellwood Rd.
Councilmember Odebrecht clarified he feels tabling will not change the fact that this
development will change the essential character of the neighborhood. He feels all
boundaries have been pushed to get this development in there.
Commissioner Kocon asked to discuss the rezoning portion. He questioned whether the
rezoning from AP to RA should be done at this time and asked for an amendment to the
motion to include the approval of the rezoning.
Councilmember Odebrecht agreed to amend the motion to include the recommendation of
approval for the rezoning; and Commissioner Steinwall seconded that amendment.
Commissioner Hansen suggested that if they rezoned it at this time it may be inconsistent
with future development and he believes it's better to leave it off the table.
Councilmember Odebrecht agreed the original motion should include no change to the
underlying Zoning; and Commissioner Steinwall agreed and seconded.
Mr. Turnblad commented that you should never rezone a property until you are approving
a plat.
Chairman Dybvig summarized the motion to read: Motion by Councilmember Odebrecht,
seconded by Commissioner Steinwall, to deny the Variance request and recommend denial
to the City Council of the Preliminary Plat, Concept PUD and Rezoning for the property
located at 13187 Dellwood Rd and 2384 Oak Glen Trail, Case No. 2021-03.
All in favor. Motion passed 5-0.
Case No. 2021-05: Consideration of a Variance to the exterior side yard setback to install a
deck on the property located at 1002 4th Ave S in the RB district. Brian Smith, applicant and
Margaret M. Georgi, property owner.
City Planner Wittman explained Mrs. Georgi owns the property at 1002 4th Avenue South,
and is looking to construct a 14' X 8' deck off the second story on the front of her house. The
house is on a long but narrow corner property, and is setback far from the road, overlooking
the St. Croix River. While the proposed deck is outside of the required front yard setbacks,
the existing house and the proposed deck are within the exterior side yard setback;
therefore, this deck will be an expansion of this existing legal nonconformity.
The applicant is requesting a 10' variance to City Code Section 31-308. (b). (1). to allow a
deck to be setback 10' from the exterior side yard lot line, whereas the required setback is
20 feet.
Chairman Dybvig opened the public hearing. No public comments.
Page 12 of 13
Planning Commission February 24, 2021
Chairman Dybvig closed the public hearing.
Commissioner Kocon stated there are practical difficulties. The way the home sits on the lot
forces a Variance and the neighborhood would support the Variance.
Motion by Commissioner Kocon, seconded by Commissioner Hansen to approve Case No.
2021-05, a 10' variance to City Code Section 31-308. (b). (1). to allow a deck to be setback 10'
from the exterior side yard lot line. All in favor. Motion passed 5-0.
DISCUSSION
There were no discussion items.
FYI STAFF UPDATES
Ms. Wittman gave an update on Jon Whitcomb's appeal Variance to the City Council.
Ms. Wittman reminded the Commission about considering a second meeting due to case
load volume.
ADJOURNMENT
Motion by Commissioner Hansen, seconded by Commissioner Kocon, to adjourn the meeting at
10:50 p.m. All in favor.
ATTEST:
Abbi Wittman, City Planner
John Dybvig, Chair
Page 13 of 13
Planning Report
MEMO DATE: February 17, 2021
MEETING DATE: February 24, 2021
LANDOWNER: Jon and Ann Whitcomb
Robert G. and Mary K. Lohmer Trust
DEVELOPER: Jon Whitcomb of Browns Creek West LLC
REQUEST: Adopting written statement of reasons for denial
LOCATION: 12950 75th Street North
REPORT BY: Abbi Jo Wittman, City Planner
CASE NO.: 2021-01
INTRODUCTION
At the Commission's last regularly -scheduled meeting the Commission considered a request for a 20' variance
to the 100' 75' Street North right-of-way setback for one lot to be located in the future White Pine Ridge
residential subdivision. In a 4-3 vote, the Commission denied the variance on the basis the applicant had not
established practical difficulty and that the request was purely economic. Pursuant to State law, the
Commission must adopt a written statement of reasons for the denial.
SPECIFIC REOUEST
Adopt written statement of reasons for denial of the 75t' Street North right-of-way setback variance requested as
part of the future White Pine Ridge development.
RECOMMENDATION
City staff recommends adoption of the attached Planning Commission Resolution No. 2021-02.
cc Jon and Ann Whitcomb
Bob and Mary Lohmer
RESOLUTION NO. CPC 2021-02
CITY OF STILLWATER
PLANNING COMMISSION
RESOLUTION ADOPTING WRITTEN STATEMENT OF REASONS FOR
DENIAL PURSUANT TO MINNESOTA STATUTES, § 15.99, SUBD. 2, FOR A
RIGHT-OF-WAY SETBACK VARIANCE APPLICATION TO FOR THE
PROPERTY LOCATED AT 12950 75TH STREET NORTH
CPC CASE NO. 2021-01
WHEREAS, the City of Stillwater received a request from the Applicant Jon and
Ann Whitcomb a 20' variance to the 100' right-of-way setback from 75th Street right-of-
way to allow for the future construction of a home at 12950 75th Street North (PID
3003020140012), legally described as follows:
The south 1373.77 feet of the East Half of the East Half of the Northeast Quarter of
Section 30, Township 30, Range 20, Washington County, Minnesota; excepting
therefrom the north 58.61 feet of the west 268.95 feet of the south 1373.77 feet thereof;
also excepting therefrom the west 80.00 feet of the south 720.00 feet thereof; also
excepting therefrom the east 245.00 feet thereof; and also excepting therefrom all that
part which lies southerly of "line 3" as described as follows:
"Line 3" is 75.00 feet northerly of and parallel with the following described centerline:
Commencing at the Southwest corner of said Northeast Quarter; thence North 01°04'48"
West, assumed bearing, along the north -south quarter line of said Section 30 a distance of
38.03 feet to the beginning of said centerline; thence North 81°50'36" East, a distance of
1,395.68 feet; thence Easterly a distance of 1,279.97 feet along a tangential curve
concave to the South, having a radius of 5,729.58 feet and a central angle of 12°47'59"
and a chord bearing of North 88°14'36" East to a point on the East line of said Section 30,
said point being 262.54 feet Northerly of the east quarter corner of said Section 30, and
said centerline terminating at said point
WHEREAS, City Code Section 31-302 allows for the construction of new
structures to be setback 100' from the right-of-way; and
WHEREAS, the Applicant had a future structure to be located 80' from the right-
of-way; and
WHEREAS, the Planning Commission reviewed and considered the request
based on the related documents shown in the Applicants' Application at their regular
meeting on January 27, 2021; and
WHEREAS, at the January 27, 2021, Planning Commission meeting, a motion
was made by Commissioner Dyvbig and seconded by Commissioner Steinwall to deny
the right-of-way setback variance request. The Commission voted 4 in favor, with
Commissioners Hansen, Kocon, and Councilmember Odebrecht e opposing, and the
motion passed; and
WHEREAS, the Minnesota Statutes, § 15.99, Subd. 2(c), provides that "[i]f a
multimember governing body denies a request, it must state the reasons for denial on the
record and provide the applicant in writing a statement of the reasons for the denial. If the
written statement is not adopted at the same time as the denial, it must be adopted at the
next meeting following the denial of the request but before the expiration of the time
allowed for making a decision under this section. The written statement must be consistent
with the reasons stated in the record at the time of the denial. The written statement must
be provided to the applicant upon adoption."
NOW THEREFORE BE IT RESOLVED that the Planning Commission of the
City of Stillwater hereby adopts the following written statement of the reasons for denial
stated on the record at the January 27, 2021, regular Planning Commission meeting by
Commissioners voting to deny the 20' right-of-way setback variance:
1. The requested Variance was not consistent with all the standards for granting
a Variance as described in Section 31-208. More specifically, the Planning
Commission members voting against the requested Variance stated on the
record at the January 27, 2021, regular Planning Commission meeting that the
request was not justified for the following reasons:
a. The owner had not provided evidence practical difficulty had been
established; and
b. The reason for the request was solely economic.
Adopted by the Planning Commission of the City of Stillwater this 24th day of February,
2021.
Chris Lauer, Chair
Attest:
Abbi Jo Wittman, City Planner
ilwater
THE BIRTH P L A C E OF MINSOA
PLANNING REPORT
TO: Planning Commission CASE NO.: 2021-06
REPORT DATE: March 16, 2021
MEETING DATE: March 24, 2021
APPLICANT: Traci Post
LANDOWNER: Traci Post
REQUEST: Variance to the front yard setback, in order to construct a front stoop.
LOCATION: 1221 l st St S
ZONING: RB, Two -Family Residential
REPORT BY: Graham Tait, City Zoning Administrator
INTRODUCTION
Mrs. Post owns the property at 1221 1st Street South, and is looking tear out the existing front
stoop and to construct a new 8' X 4' stoop on the front of her house. The wooden stoop will be
roughly two feet in height with no railings, and connects to the house's front door. This house
was built in 1880 and is positioned towards the front of this lot. The new stoop is being proposed
to be located within the required front yard setback.
SPECIFIC REQUEST
The applicant is requesting an eight foot variance to City Code Section 31-308. (b). (1). to allow
a front stoop to be setback 12 feet from the front yard lot line, whereas the required setback is 20
feet.
ANALYSIS
The State of Minnesota enables a City to grant variances when they meet the review criteria
below.
1. No variance may be granted that would allow any use that is prohibited in the zoning
district in which the subject property is located.
The property is zoned RB, Two -Family Residential; a single-family house with a front stoop,
is permitted in this zoning district.
CPC Case 2021-05
Page 2 of 4
2. The variance must be in harmony with the Zoning Code and the Comprehensive Plan.
a. What is the purpose of the regulation for which the variance is being requested?
The purpose of the front yard setback is for uniform neighborhood development
pattern and to allow for onsite drainage.
b. If granted, would the proposed variance be out of harmony with the Zoning Code?
The existing stoop is legal nonconforming and already sits within the front yard
setback. Rebuilding this stoop will expand this nonconformity and it will
encroach slightly further into the setback. That being said, the property owner is
still proposing to retain an open, unencumbered area in the front of the home,
even though the setback is not consistent with the zoning code. Also, the lot is
long and narrow, and like the other properties on this block, the house is situated
in the front portion of the lot, right at the required setback. Adding a slightly
larger stoop to this property will still maintain a uniform neighborhood
development pattern, due to the proximity of the existing houses to their front
yard lot line (this can be seen in the image on page 3). Lastly, the proposed stoop
is not overly large and will not adversely impact drainage in any way.
c. If granted, would the proposed variance be out of harmony with the Comprehensive Plan?
No, it would not be out of harmony with the Comprehensive Plan.
3. A variance may be granted when the applicant establishes that there are "practical
difficulties" in complying with the Zoning Code. A practical difficulty means that the
property owner proposes to use the property in a reasonable manner not permitted by
the Zoning Code; the plight of the landowner is due to circumstances unique to the
property not created by the landowner; and the variance, if granted, will not alter the
essential character of the locality. Economic considerations alone do not constitute a
"practical difficulty".
a. Is the property proposed to be used in a reasonable manner?
A property with single-family home with a front stoop is reasonable in the RB zoning
district.
b. Is the plight of the landowner due to circumstances unique to the property?
During the original construction, in 1880, the house was built in the front portion of
the lot. Had the house been situated further back on the lot (to which there is room to
do so), this would not be an issue.
c. Are the circumstances created by the landowner?
As stated above, this issue was created when the house was originally built so close to
the front property line. The landowner isn't asking for a grand front porch, but rather
a modest sized stoop. These circumstances were in no way created by the landowner.
d. If granted, would the variance alter the essential character of the locality?
CPC Case 2021-05
Page 3 of 4
If granted, this variance would not have negative impacts to the surrounding
neighborhood. The addition of a font stoop will not negatively impact the
neighborhood character because the development pattern of this block has the front of
houses at or within the required front setbacks of properties. As you can see in the
image below, the neighborhood development pattern is fairly close to the streets in
this block.
e. Have practical
difficulties been
established
independent of
economic
considerations?
The applicant's
desire is for the
variance does
not reflect
economic
considerations.
The applicant is
simply seeking
to construct a
front stoop that
is a bit larger
than the existing
stoop.
4. This variance is not in conflict with any engineering, fire or building requirements or
codes.
There are no conflicts with any other City department's requirements or codes.
POSSIBLE ACTIONS
The Planning Commission has the following options:
A. Approve the requested variance with the following conditions:
1. Plans shall be substantially similar to those found on file with CPC Case No. 2021-
06, except as modified by the conditions herein.
2. Building permit plans will need to be approved by applicable engineering, fire and
building officials before the issuance of a building permit.
3. All changes to the approved plans will need to be reviewed and approved by the
Community Development Director. Any major changes will need to go to the
Planning Commission for review and approval.
CPC Case 2021-05
Page 4 of 4
B. Deny the requested variance. With a denial, findings of fact supporting the decision
must be provided. With a denial, the basis of the action is required to be given.
Furthermore, a denial without prejudice would prohibit the applicant from resubmittal
of a substantially similar application within one year.
C. Table the request for additional information.
FINDINGS AND RECOMMENDATION
Staff finds the proposed stoop meets the standards set forth for the issuance of a variance.
Practical difficulties have been established, such as the house being constructed so close to the
front yard lot line. Furthermore, staff puts forth that this variance would not negatively impact
the visual character of the neighborhood as a whole. Therefore, staff recommends approval of the
variances for CPC Case No. 2021-06 with all of the conditions identified in Alternative A.
Attachments: Site Location Map
Applicant Narrative
Site Plan
cc: Traci Post
MI MOO'
:111111inetkw
II SEASONS
Nolir Construction I Concrete I Landscaping
216 Myrtle St W #292
Stillwater, MN 55082
651-342-0813
MN Lic Number 8C754569
WI Lic Number DC082000839
To whom it may concern,
II Seasons is requesting a variance as a representative of, property owners, Traci Post at the
property of 1221 1st St South. The property owners propose to use the land in a reasonable
manner for a use permitted in the zone where the land is located, but the proposal is not
permitted by other official controls.
The plight of the landowner is due to circumstances unique to the property and that are not
created by the landowner. Traci would like to tear out existing steps and front walk and
build 8' x 4' stoop, with two 3' wide steps, and pour a new concrete front sidewalk & 2 steps
toward the street.
The variance, if granted, will not alter the essential character of the neighborhood. We
appreciate your consideration. Please let us know if there is any additional information you
would like or need to assist in the processing of this variance.
Best Regards,
Jennifer Belisle
ilwater
THE BIRTH P L A C E OF MINSOA
PLANNING REPORT
TO: Planning Commission CASE NO.: 2021-08
REPORT DATE: March 16, 2021
MEETING DATE: March 24, 2021
APPLICANT: Jennine Lundquist
LANDOWNER: Jennine Lundquist
REQUEST: Variance to the impervious surface coverage, in order to construct a semi -
in -ground pool.
LOCATION: 1910 Oak Glen Trail
ZONING: RA, One -Family Residential
REPORT BY: Graham Tait, City Zoning Administrator
REVIEWED BY: Abbi Wittman, City Planner
INTRODUCTION
Mrs. Lundquist owns the property at 1910 Oak Glen Trail, and is looking to install a 21' round
semi -in -ground pool in the rear yard. This property is located within the Shorleand Management
District, where the maximum allowed impervious surface coverage is 25%. Currently, with all
structures and manmade improvements, the property is right at the 25% threshold, therefor any
further improvements would require a variance.
SPECIFIC REQUEST
The applicant is requesting a variance to City Code Section 31-305. (b). (1). to allow the
impervious coverage to be 27.7% (or 3,531sf), whereas the maximum impervious surface
coverage is 25%.
ANALYSIS
The State of Minnesota enables a City to grant variances when they meet the review criteria
below.
1. No variance may be granted that would allow any use that is prohibited in the zoning
district in which the subject property is located.
CPC Case 2021-08
Page 2 of 4
The property is zoned RA, One -Family Residential; a single-family house with a pool in the
rear yard, is permitted in this zoning district.
2. The variance must be in harmony with the Zoning Code and the Comprehensive Plan.
a. What is the purpose of the regulation for which the variance is being requested?
One of the specific purposes of the maximum impervious surface coverage is to
maintain open, unencumbered space to provide for adequate storm water
infiltration. Furthermore, the purpose of the Shoreland Management Overlay
District is "the protection of lakes, streams and water courses within its
boundaries is critical for the health, safety, order and general welfare of its
citizens and to preserve and enhance the quality of surface water and
preserve the economic and natural environmental values of shoreland".
b. If granted, would the proposed variance be out of harmony with the Zoning Code?
This property is on the very fringe of the Shoreland Management District and is
located approximately 800 feet as the crow flies from South Twin Lake
(displayed in the map below). When looking just two properties to the east,
one will notice it is no longer in the Shoreland Management District, and the
total allowable coverage is now 30%, as opposed to 25%. If approved, the
total coverage will still be capped at 27.7%, which will be in harmony with
the intentions of the zoning code. Furthermore, while the pool is considered
impervious surface, it is retaining storm water and not redirecting it other
parts of the property. The retention of this storm water, should not adversely
impact drainage or create any storm water management issues.
��
j
j
�
Il
24 F%
to
water
I.
j®.«R
ar��
9Q {
8
t
�
'Yi ` FOND f:EFi6/✓"/`"
2403 �.74.
�
The e:moi.�wti,'�....m
j/
Y
1�
24PIt
/
N'yy��;/
JYJL
YJ
2318
d,4,�(
4 Ii_ /
If7f
A .F"P}I
{ 2.
VVV
231fi
•
"�
'
2314 '
.^�
p
8753
2312 ,-„
Shoreland Management District
9
Fes"
,
6]51
'
2316
.tera
r
(_H €
f=•
`•
r - -
1910 Oak Glen Trail
2640.4 .r
j�•e"
'I.
1114 %
-
-
i_L li1Si
8740
nos!
2307
-2e20
8745
, /, 600
12560
2500 ,8'
60 r24 a('9'400YY
IV2303
, E
t t 4
6741
2301
N
WI-il"TF PINE WAY
-
2625
2605 4i•r2rl
.4
2565
2535
2505
<465 2435
2405
-P
,.
I I St. Croix River Overlay District
...4.4
,�"
'
-
'.
Creek and Tribute district
1860
0♦"'
(
.y�
r7 ✓
. 7".
- i
Lake Shoreland Management District
1855
1845 . 183]
1i� jl -
`1881 t
,b5i
..
N' '
,,i
IV
1850
.r
183q 1.
H'.
i4
r
! ,
0 85 130
reel
12850,E
1t
N4B"
1846
`:I
1840
1836
II
j
•
1830 1820
1
1818 • 1
c. If granted, would the proposed variance be out of harmony with the Comprehensive Plan?
CPC Case 2021-08
Page 3 of 4
No, it would not be out of harmony with the Comprehensive Plan. Adding a pool
and increasing the impervious surface coverage by 2.7% will not adversely
impact the environmental goals presented in the Comprehensive Plan.
3. A variance may be granted when the applicant establishes that there are "practical
difficulties" in complying with the Zoning Code. A practical difficulty means that the
property owner proposes to use the property in a reasonable manner not permitted by
the Zoning Code; the plight of the landowner is due to circumstances unique to the
property not created by the landowner; and the variance, if granted, will not alter the
essential character of the locality. Economic considerations alone do not constitute a
"practical difficulty".
a. Is the property proposed to be used in a reasonable manner?
A property with single-family home with a pool in the rear yard is reasonable in the
RA zoning district.
b. Is the plight of the landowner due to circumstances unique to the property?
This property is on the edge of the Shoreland Management District; in fact, the
southeast comer of the property is outside of this district. If this house were located
just slightly more east the maximum impervious coverage would be 30%, and a
variance would not be needed.
c. Are the circumstances created by the landowner?
The circumstances were not created by the owner. The owner has not excessively
built out the property, but rather the property is limited by being located in the
Shoreland Management District.
d. If granted, would the variances alter the essential character of the locality?
If granted, this variance would not have negatives impacts to the surrounding
neighborhood. The pool will be located in the rear yard and will not have any visual
impacts.
e. Have practical difficulties been established independent of economic considerations?
The applicant's desire is for the variance does not reflect economic considerations.
The applicant is simply seeking to install a pool on their property, for personal
enjoyment.
4. This variance is not in conflict with any engineering, fire or building requirements or
codes.
The Browns Creek Watershed District reached out to the City to find out how and when the pool
was being emptied, to ensure there would be no adverse impacts to the stormwater ponds at The
Ponds at Heifort Hills. The applicant has answered this question by explaining that it is a 10,000
gallon pool that does "not use backflush filters. Only cartridge so [there is] no draining of the
pool on a given year. When liner is replaced (15 years later) we neutralize chemicals and drain to
the street with a hose. No draining to neighbor's property or your own."
CPC Case 2021-08
Page 4 of 4
This variance was not in conflict with any other City Department's requirements or codes.
POSSIBLE ACTIONS
The Planning Commission has the following options:
A. Approve the requested variance with the following conditions:
1. Plans shall be substantially similar to those found on file with CPC Case No. 2021-
08, except as modified by the conditions herein.
2. Building permit plans will need to be approved by applicable engineering, fire and
building officials before the issuance of a building permit.
3. The swimming pool must be provided with safeguards to prevent children under the
age of five from gaining uncontrolled access, in accordance with Section 33-2. Sub.
14.
4. All changes to the approved plans will need to be reviewed and approved by the
Community Development Director. Any major changes will need to go to the
Planning Commission for review and approval.
B. Deny the requested variance. With a denial, findings of fact supporting the decision
must be provided. With a denial, the basis of the action is required to be given.
Furthermore, a denial without prejudice would prohibit the applicant from resubmittal
of a substantially similar application within one year.
C. Table the request for additional information.
FINDINGS AND RECOMMENDATION
Staff finds the proposed pool meets the standards set forth for the issuance of a variance.
Practical difficulties have been established, such as the property having stricter coverage
requirements, because it is located on the very edge of the Shoreland Management District.
Furthermore, staff puts forth that this variance would not negatively impact the visual character
of the neighborhood as a whole. Therefore, staff recommends approval of the variances for CPC
Case No. 2021-08 with all of the conditions identified in Alternative A.
Attachments: Site Location Map
Applicant Narrative
Site Plan
cc: Jenine Lundquist
February 3, 2021
RE: Variance Request for a pool located at 1910 Oak Glen Trail
This letter and the attachments are asking for your consideration and approval for adding a
pool to the above -mentioned property.
1) I understand that the property only allows a limited amount of permeable surface space
and that this request will exceed this. However, it will not be by an extreme amount nor
will it impact any degradation of the land.
2) I have worked with Performance Pools & Spas to create a plan that is naturally
conducive to the area and neighborhood. It will be a small 21' round semi-inground
pool which will increase the value of the property and the housing area as well. In
addition, will not alter the neighborhood environment whatsoever.
3) The pool will collect rainfall and therefore will not add to storm water runoff which is
environmentally friendly. Also, please note in the supporting documents. There was a
pool previously on this property and there are three homes as shown in the satellite
photo that also have pools.
I am asking this request to be approved to create an environmentally sound and family friendly
space for myself and my daughter. I understand that each variance request is different and
reviewed independently.
Thank you in advance for your consideration.
Best regards,
ft (Vill,
.JennineLundquist
iliwater
THE B{ R T H P L A I; E OF MINNF
PLANNING REPORT
TO:
REPORT DATE:
MEETING DATE:
APPLICANT:
LAND OWNER:
REQUEST:
LOCATION:
ZONING:
PREPARED BY:
Planning Commission
March 16, 2021
March 24, 2021
Tim Siegfried of Siegfried Construction
102 2nd LLC
CASE NO.: 2021-09
A Special Use Permit for Outdoor Dinging on an existing patio and patio
additions
102 2nd Street North
CBD: Central Business District.
Abbi Wittman, City Planner
INTRODUCTION
In October, 2020 the Lowell Inn received approval from the Heritage Preservation Commission
for the partial demolition of single -story improvements location on the south facade of the
building. Representatives for the Lowell Inn are now requesting a Special Use Permit to have
outdoor dining on their patio and proposed two -tiered patio extension at 102 2nd Street North.
The patio extension will include and at -grade area that will accommodate four additional tables;
raised patio will be accessed from an internal meeting room and be used in conjunction with
rental of that space.
SPECIFIC REQUEST
Consideration of a Special Use Permit amendment for outdoor dining on a two -tiered patio.
ANALYSIS
City Code Section 31-207, Special Use Permits, identifies the city may grant a Special Use
Permit or amendments when the following findings are made:
The proposed structure or use conforms to the requirements and the intent of this [Zoning]
chapter, and of the comprehensive plan, relevant area plans and other lawful regulations. Any
additional conditions necessary for the public interest have been imposed or use and/or
Case no. 2021-09
PC 3/24/2021
Page 2
structure will not constitute a nuisance or be detrimental to the public welfare of the
community.
Conformance to the Zoning Code generally surrounds around whether or not the proposed use
will be compatible with its surrounding uses. The Lowell Inn's existing patio has been able to
operate without issue; adding additional at -grade tables and outdoor space associated with the
meeting room does not raise issues with planning staff. In staff's review of the request, the
following items were reviewed:
Exterior Improvements: On March 17, 2021 the Heritage Preservation Commission
conditionally approved the design of the two -tiered patio system.
Parking: On March 18, 2021 the Downtown Parking Commission reviewed the Lowell
Inn's request. The Commission was reminded that, in 2008, the Lowell Inn gave the City
property to construct portions of the municipal parking ramp. As part of the development
agreement, the Lowell Inn's guest use agreed to pay the City 1% of its gross sales for their
customer use of the parking ramp. On average, the Lowell Inn has paid the City $15,708 a
year over the past 10 years. This deposit is well in excess of the standard mitigation
required for the business's current and future parking needs.
Comprehensive Plan Chapter 6, Downtown Stillwater Plan, identifies the following goal:
"Encourage a viable and compatible mix of community and visitor -serving activities that builds
on the assets of Downtown as a desirable placed to live, work, shop, recreate and visit consistent
with the capacity of public services and facilities and the natural resources. Promote a diverse
range of uses, a welcoming and engaging atmosphere, and unique activities and events oriented
to a range of ages and cultures". Additionally, Chapter 7, Economic Development, identifies the
following goal: "Support business expansion in the downtown commercial district..." The
Lowell Inn and its patio will help the city achieve these goals.
POSSIBLE ACTIONS
The Planning Commission has the following options:
A. Approve the requested use permit and associated variances with the following
conditions:
1. This Special Use Permit is in all ways a Conditional Use Permit as the term is used
in Minnesota Statue Section 462.3595.
2. Plans shall be substantially similar to those found on file with CPC Case No. 2021-
09, except as modified by the conditions herein.
3. Abutting sidewalks must be kept clean of cigarette butts and other debris.
4. No exterior amplification, pipe music, or entertainment is permitted. If these uses
are desired, an amendment to this Special Use Permit shall be obtained prior to the
activity commencing.
5. Plans and the use will need to be approved by the applicable engineering, fire and
building officials before the issuance of a building permit and/or Certificate of
Occupancy.
Case no. 2021-09
PC 3/24/2021
Page 3
6. All changes to the approved plans will need to be reviewed and approved by the
Community Development Director. Any major changes will need to go to the
Planning Commission for review and approval.
B. Deny the requested use permit and associated variances. With a denial, findings of fact
supporting the decision must be provided.
C. Table the request for additional information.
FINDINGS AND RECOMMENDATION
As noted in the Analysis section, above, the use conforms to the standards set forth for the
issuance of use permits. Therefore, staff would recommend conditional approval of CPC Case
No. 2021-09 with those conditions outlined in Alternative A, above.
Attachments: Site Location Map
Site Photos (2 pages)
Site Plan
cc: Tim Siegfried
Lowell Inn
222 V
4=1114-.." rugt.. .111111110171:41"
IIIE Illli nll i f
IN ,fit" �, .►:=-� :- ••
1,41111._
111' lrr i_
EXISTING PATIO
ri-
ir MN
tiara
�a�rwr^rir
illffaliffrIgi
Mr MT& jar
1 limn
PATIO AREA (1)
FUTURE RAISED PATIO AREA
li
I I I Illld4111111
'Lliiloll ![l
1111111111111 l[! I.1!! 11
rIR5T CONCF;RT WITH BALCONY AJ A ANb IRON FFNCE5
RxistInq tinq Room
D 00 OD
a RxMMt•lnq Medial poom D
II x25 ('OBsf)
000 00
J
D 0
D
New Outdoor f3.4con:.Rat.po Space
404 sf
F;xistlnq Ramp I7n.
11
0
J
l;xpanslon of I%xlstlnq Front Poch
302 sf additional
0
Props
Q 7L—= ()
■
fl
MW1U 51.
ilwater
THE BIRTH P L A C E OF MINSOA
PLANNING REPORT
TO:
REPORT DATE:
MEETING DATE:
APPLICANT:
LANDOWNER:
REQUEST:
LOCATION:
ZONING:
REPORT BY:
Planning Commission
March 16, 2021
March 24, 2021
Richard & Colleen Muske
Richard & Colleen Muske
CASE NO.: 2021-011
Variance to the exterior yard setback, in order to construct a new detached
garage.
1312 Broadway St. N
RA, One -Family Residential
Graham Tait, City Zoning Administrator
INTRODUCTION
Mr. and Mrs. Muske own the property
at 1312 Broadway Street North, and
are looking to construct a 1,000sf
garage in their exterior side yard. This
property is extremely unique in its
layout; it is comprised of two separate
lots that meet perpendicularly and both
front different streets, though neither
of them is a corner lot (see image on
right).
SPECIFIC REQUEST
The applicant is requesting a 20'
variance to City Code Section 31-305.
(b). (1). to allow a detached to be
setback 10' from the exterior side yard
lot line', whereas the required setback
is 30 feet.
SAINT CROIX AVE E
•
lj
324
"`Property outlined in Red"
1 The RA District puts forth that "corner" lots have a 30' setback. While, this property is not a corner lot, this section
of the property is an exterior side yard lot line and must follow the setbacks of a corner lot.
CPC Case 2021-11
Page 2 of 4
ANALYSIS
The State of Minnesota enables a City to grant variances when they meet the review criteria
below.
1. No variance may be granted that would allow any use that is prohibited in the zoning
district in which the subject property is located.
The property is zoned RA, One -Family Residential; a single-family house with a 1,000sf2
garage, is permitted in this zoning district.
2. The variance must be in harmony with the Zoning Code and the Comprehensive Plan.
a. What is the purpose of the regulation for which the variance is being requested?
The purpose of the exterior side yard setback is for uniform neighborhood
development, to create and maintain "front" yards, and to encourage storm water
infiltration around the home.
b. If granted, would the proposed variance be out of harmony with the Zoning Code?
This property is comprised of two separate lots that meet to form an "L" shape.
This unique arrangement makes it so the garage must be located within this lot
and situated closer to St Croix Avenue East (the exterior side lot line) than the
house. Also the garage must be located south of an existing below -grade garage
that is being filled in. So this location on the lot, where an existing above -grade
garage is located, is the only feasible location for the garage. The applicant
would like to expand the new garage to the maximum allowed 1,000sf, and since
this lot is only 40' wide, expansion towards the front of the lot is the only option.
Furthermore, the placement of this garage will not break the uniformity of this
block, because the property to the east has a garage that hugs the lot line and the
property to the west also contains an exterior side yard facing garage. Lastly,
while the proposed garage is larger and closer to the street than the existing
garage, there will not be an increase in overall surface coverage, because the new
garage will be replacing existing gravel. So the proposed variance would not
worsen the drainage conditions at this property; in fact, it gives the property
owner a chance to address any existing drainage issues.
c. If granted, would the proposed variance be out of harmony with the Comprehensive Plan?
No, it would not be out of harmony with the Comprehensive Plan.
3. A variance may be granted when the applicant establishes that there are "practical
difficulties" in complying with the Zoning Code. A practical difficulty means that the
property owner proposes to use the property in a reasonable manner not permitted by
the Zoning Code; the plight of the landowner is due to circumstances unique to the
z This property had previously had two garages. However, the below -grade garage had a cracked foundation and was
unstable. The City has allowed the property owner to completely fill in this garage, and it will no longer count
towards total accessory structure square footage.
CPC Case 2021-11
Page 3 of 4
property not created by the landowner; and the variance, if granted, will not alter the
essential character of the locality. Economic considerations alone do not constitute a
"practical difficulty".
a. Is the property proposed to be used in a reasonable manner?
A property with single-family home with a detached garage is reasonable in the RA
zoning district.
b. Is the plight of the landowner due to circumstances unique to the property?
The plight of the landowner is due to the unique lot configurations of this property.
The odd shape of the lot, combined with the filled in below -grade garage, really limits
the locations that a garage can be placed.
c. Are the circumstances created by the landowner?
The unique lot configurations, which lends itself to needing a variance in order to put
in a larger garage, is not created by the landowner. However, the landowners are
contributing to the extent of the variance, by proposing such a large garage. The
owners are proposing a garage that is 41.5' deep; proposing a smaller garage would
lessen the size of the variance needed.
d. If granted, would the variances alter the essential character of the locality?
If granted, this variance would not have negative impacts to the surrounding
neighborhood. This property is right on the edge of the boundary between the RB and
RA zoning district. In this neighborhood you have a matchless mix of houses that
range from very close to the front lot line to meeting the setbacks. Many of the
garages in this neighborhood are in front of the houses, and many garages encroach
into the setbacks. With such a mix of housing, this proposed garage would not
juxtapose the existing character of the locality.
e. Have practical difficulties been established independent of economic considerations?
The applicant's desire is for the variance does not reflect economic considerations.
The applicant is simply seeking to construct a new and larger detached garage.
4. This variance is not in conflict with any engineering, fire or building requirements or
codes.
There are no conflicts with any other City department's requirements or codes.
POSSIBLE ACTIONS
The Planning Commission has the following options:
A. Approve the requested variance with the following conditions:
1. Plans shall be substantially similar to those found on file with CPC Case No. 2021-
11, except as modified by the conditions herein.
CPC Case 2021-11
Page 4 of 4
2. Building permit plans will need to be approved by applicable engineering, fire and
building officials before the issuance of a building permit.
3. The two lots must be combined prior to the issuance of a building permit.
4. All changes to the approved plans will need to be reviewed and approved by the
Community Development Director. Any major changes will need to go to the
Planning Commission for review and approval.
B. Deny the requested variance. With a denial, findings of fact supporting the decision
must be provided. With a denial, the basis of the action is required to be given.
Furthermore, a denial without prejudice would prohibit the applicant from resubmittal
of a substantially similar application within one year.
C. Table the request for additional information.
FINDINGS AND RECOMMENDATION
Staff finds the proposed garage meets the standards set forth for the issuance of a variance.
Practical difficulties have been established, such as the configuration of this property and the
existing below -garage garage proposed to be filled in, makes this location the only feasible spot
to locate a detached garage. Furthermore, staff puts forth that this variance would not negatively
impact the visual character of the neighborhood as a whole. Therefore, staff recommends
approval of the variances for CPC Case No. 2021-11 with all of the conditions identified in
Alternative A.
Attachments: Site Location Map
Applicant Narrative
Existing Conditions Site Plan
Site plans for Proposal (Two Pgs)
cc: Richard & Colleen Muske
7111::1:
�� ����� �' i
.
IIIEIllli nll �?" °'� --
:Ikii'i[JiTP. ® ,i T 1
February 24, 2021
Stillwater Planning Department
216 4th Street N.
Stillwater, MN 55082
Dear Sir or Madam:
Enclosed find a Planning Application, proposed garage plan, elevations, survey and
$225.00 fee for review by the Planning Commission. There currently is a two car
garage on the property, however the garage slab is below street level and has cracked,
tilted and failed and the garage trusses have pulled apart at the peak as the structure has
sagged. The existing garage in our estimation, cannot be repaired.
We are proposing to replace the existing garage and slab with a larger one story two
car garage with storage to meet our needs. We will add fill to the lot to stabilize the
building site and raise the building site to prevent what happened to the existing
garage. The replacement garage would also be centered on the lot.
The property also contains an underground cement walled bunker with a dirt floor
and low ceiling that the City deems a garage. I have proposed to fill in the bunker to
stabilize the structure and render it unusable.
We are seeking a variance to more the garage closer to the street. I believe the new 11/
story garage to the west of the proposed garage received such a variance. The garage
and house to the east are currently closer the street than my requested variance. The
variance requested is consistent with the current garages of my neighbors. The
proposed garage is located in the middle of the block and if the variance is granted the
garage will not affect line of sight for oncoming traffic. Allowing the variance will
also allow us to keep away from the underground bunker.
Tha • c yo for your consideration.
S
Iti"r rd uske
131'. Iir. dway Street N
Stillwater, MN 55082
/V/
4072
,p.
5W
CO,e.
7-
Z
287
e‘o
44/1944 I
77,FEW
4-'01
21,
22 .4
- - /17 9' "/9 'Z 7
if
4499 a / /..5-•.2
9.
ZZ..
74,
Enererzz.9
2 STD/e ga.
k-4. Pt4w 4 c.
Laa./A4.5,[4.
Z /A76- 7Y7-0
/,Y
4.e;74- /MP/ed
22,
ZZ
22.Z
g, AZ ,
.22 ..7.5C.7.Lit .2/.4
-1
Z2, I
22.0
2Z . 5
1 ZZ.0
•C)
*-
/-lt/A 72.3Z Z84,
.,4"71A/4
67.2,4,1P. 4-4, ,...)....
I /, 3 28, 9
/ i4: Z9.9 1 1
,
K
v14
3i • 9
371/
40 73
33 -7
29.
Row. zz .0
ecve.
Roo,c•
VvNt 4-2M/C",
ai4k
\ JI
1423
ZZ.
0
;
,e,
/v, /19, -
2 17-
e.
e7. 7 ' P
GO,e.
/Va
47P492, Af047
//,- ..5";& le 7- -I.
R/7/eci-z 7-/9//v-5
_4/
z -7- )
ALL
/ 7.
5
/ 7:
• 8 ./".a 1, 79
/
- a20 7 /1 A/ /1 9, 79 -
zhir
2Z 0 I
.‘ 25. 3 '
/ 2. 0
(4q4misr
"/-,/e7)
zC.9
24,9
5-0 E
/2,vf
0E4.
26
29.
0\
29.
3/. 3
3/. Z
A / 7e- C,TL" .Z;1/29. eX/
a wc .227 //v 7 z //tz4--5-
2.6 . 9
la 7 3 Z-3(C.
Ca4/2, 1 I
s/.15Vz.
tZ4
3Z .9
ix-
34,
C e
tiV, 44%)
347
7
3D.9
5-48 Fez/
3a. /
Coivc Cc -Age
/17;
e. /5,9
/4-440., fr/V,
Afaiv, //z5"
, /6"
Cew
, 23
0
4/4e,rie-,/
SURVEY MADE
DESCRIPTION:
CERTIFICATE OF SURVEY
BARRETT M. STACK
STILLWATER, MINN. 55082
MINNESOTA REGISTERED
LAND SURVEYOR
(651) 439-5630
EXCLUSIVELYFOR: Mark Balay, Architec
10 Myrtle Street, Stillwater, MN 55082
Per Doc -NO. 4230199, MaSh.:CO:'Re0Ords:
The South 1/2 of Lot 2 and the West 40 feet of Lot 3, Block 23, .CARLI AND
SCHULENBURG'S ADDITION to Stillwater, Washington County, Minnesota.
Notes: o Indicates 1/2" I. D. Iron pipe set marked. STACK LS 13774.
• Indicates iron found in place as noted.
"M." Indicates field measured value.
"R." Indicates plat record value.
Orientation of this bearing system is an assumed datum.
"B.Z.M." Indicates BENCHMARK: Magnail in conc. joint in concrete pavement. Project
Elevation = 22.13. Add. 800.00 to. Benchmark and other spot elevation shown to convert
same to NAVD 88 Datum.
Underground or overhead, public or private utilities, on or adjacent the parcels,
were not located in conjunction with this survey, unless noted otherwise.
Roof and Eave Elevations noted are averages of same due to irregular vertical align.
Offsets shown to existing structures are measured to the outside building wall lines,
unless noted otherwise. Any projections from said wall lines such as eaves, sills,
steps, etc., will impact indicated offsets accordingly.
The westerly walls of the existing concrete garage -are irregular in horizontal and
vertical alignment. Offsets shown are measured to the generall wall alignment and
can vary.
Overall Parcel area is computed to the described parcel boundary.
Existing improvements location is as directed by Mark Balay. No other existing
improvements were to be located other than as shown.
2 Story Frame House No. 1312 location shown is approximate.
I hereby certify that this survey, plan, or report was
prepared by me or under my direct supervision and that
I am a duly Registered Land Surveyor under the laws of
the State of Minnesota.
Date
9-28-2020 Reg.No 13774
8'-01I
76
mOrVY LINO 40 FT,
1119 gdn9 MAN
♦
°!r-
- z
0 77
O O
-7 G
77
77
24 -OI
l'
}
\
r 1
ASnON QNV OU-Vd 01
Sd AJS QNN DAQ MAN
011Vd 510,1O9A,g1 V d\O UO
UOOd Alld9NO9 JNIISIXA
'1A 96'66 ANI'I /lI-dAdOdd
( 110S W-IM QAT1H 11 01)
TTVM NINId1Ad t flO J MAN
(CIAAOWAd Al 01)
A'ddN115IX1
4d119 0119M115161 ,10-, 9Z
8' -V
PULPING HFIGHT 19'-01I
1
JkVMQWOW N Z 11
19NAQISAd JNII5IX1
8'-01I
76
mOrVY LINO 40 FT,
1119 gdn9 MAN
♦
°!r-
- z
0 77
O O
-7 G
77
77
24 -OI
l'
}
\
r 1
ASnON QNV OU-Vd 01
Sd AJS QNN DAQ MAN
011Vd 510,1O9A,g1 V d\O UO
UOOd Alld9NO9 JNIISIXA
'1A 96'66 ANI'I /lI-dAdOdd
( 110S W-IM QAT1H 11 01)
TTVM NINId1Ad t flO J MAN
(CIAAOWAd Al 01)
A'ddN115IX1
4d119 0119M115161 ,10-, 9Z
8' -V
PULPING HFIGHT 19'-01I
1
JkVMQWOW N Z 11
19NAQISAd JNII5IX1
iliwater
THE B f FIT H P L A C E OF MINNESOIA
Planning Report
MEMO DATE: March 17, 2021 CASE NO.: 2021-12
MEETING DATE: March 24, 2021
LANDOWNER: Buettner Real Estate LLC
APPLICANT: Cory Buettner
REQUEST: Consideration of a Special Use Permit for outside storage
LOCATION: 127/131 Main Street South
COMPREHENSIVE PLAN: Downtown Mixed Use
ZONING: CBD, Central Business District
Flood Fringe Overlay
REPORT BY: Abbi Jo Wittman, City Planner
INTRODUCTION
The owners of Leo's Grill and Malt Shop (127 Main Street South) have obtained approval from
the City to remodel their patio. The approved design includes a trash enclosure to be located on
the northern side of the patio. While a portion of the patio enclosure's roof will include customer
dining, another portion has been proposed to remain vacant. The property owner is seeking
approval to place a walk-in freezer on top of the trash enclosure.
SPECIFIC REQUEST
The applicant is requesting consideration of a Special Use Permit for outside storage of a walk-in
freezer
ANALYSIS
City Code Section 31-207, Special Use Permits, identifies the city may grant a Special Use
Permit or amendments when the following findings are made:
The proposed structure or use conforms to the requirements and the intent of this [Zoning]
chapter, and of the comprehensive plan, relevant area plans and other lawful regulations. Any
additional conditions necessary for the public interest have been imposed or use and/or
CPC 2021-12
PC 03/24/2021
Page 2 of 3
structure will not constitute a nuisance or be detrimental to the public welfare of the
community.
Conformance to the Zoning Code generally surrounds around whether or not the proposed use
will be compatible with its surrounding uses. Generally speaking, second -story storage is not
typically contemplated in the downtown core. This situation is a little unique in that the
improvement might not have been able to be accommodated as part of the trash enclosure
addition given the site is located in the floodplain. However, business expansion onto the patio
should be done with care and caution as to not set precedent. Simply put, we want to promote
business expansion but in a way that does not spill out of traditional building footprints nor have
a negative impact on the surrounding area.
City Code Section 31-325 indicates outside storage is a Specially Permitting Use in the Central
Business District; a footnote of the Allowable uses in non-residential districts indicates "[a]11
outside storage shall be screened by a solid wall or fence and landscaping for public view". The
applicant is not proposing to screen the improvement. On March 17, 2021 the Heritage
Preservation Commission reviewed the proposed improvement. The Commission conditionally
approved a Design Permit for the walk-in freezer. A condition of their approval is that the
freezer must be screened on the south side, on top of the stairwell, to a height of the freezer.
While the trash enclosure's eastern parapet is not the height of the freezer, staff asserts it will still
be visible from Water Street and users of the Water Street Inn. Given the intentional reflectivity
of the improvement, solid wall screening on the east side should be contemplated by the
Planning Commission.
With regard to noise, the elevation of the cooler will project sound coming from the condensing
unit, compressor and evaporator fan. The adjacent property's second story has three windows
along their western (shared) property line. As the freezer will be located within close proximity
to second story windows on the building to the north, this could be of a concern to the adjacent
neighbors. While this is a commercial area and the neighboring 2nd story use is also commercial,
the noise could impact their enjoyment of the property.
Lastly, in discussions with Washington County Department of Public Heath, there is concern that
the improvement may not be able to be placed in this location. To the date of memo
development,
POSSIBLE ACTIONS
The Planning Commission has the following options:
A. Approve the requested flood fringe Conditional Use Permit and setback variance with
the following conditions:
1. Plans shall be substantially compliant with those on file with the Community
Development Department's case file 2021-55 except as modified herein.
2. Solid wall/panel screening shall be required on all street -facing sides.
CPC 2021-12
PC 03/24/2021
Page 3 of 3
3. Plans will need to be reviewed and approved by the applicable Engineering, Fire and
Building Inspections departments prior to project commencement.
4. All changes to the approved plans will need to be reviewed and approved by the
Community Development Director. Any major changes will need to go to the
Planning Commission for review and approval.
B. Deny the request. With a denial, findings of fact supporting the decision must be
provided. With a denial, the basis of the action is required to be given. Furthermore, a
denial without prejudice would prohibit the applicant from resubmittal of a
substantially similar application within one year.
C. Table the request for additional information.
FINDINGS AND RECOMMEDATION
The proposed improvement generally conforms to the intention of the Comprehensive Plan and
the Zoning Code. However, public interest conditions, including the requirement for opaque
screening on all street -facing sides, should be considered. That said, in lieu of having approvals
from the Public Health Department, staff would recommend the Commission table consideration
until such time as approvals have been granted.
Attachments: Site Location Map
Narrative
Site Plan(s)
Elevations
Specifications
Cc: Cory Buettner
Jen Noden, Seven Edges Design
�AI�
�i ■� !aft �''- i
��114 i0:r , i. �..�. �1A1a.\ .jC ��.
P•:7111.:1.1111 l���I,►` �` ��
I�
i:�"..e�yI1%hj it It?I► ®- T 1
\
Buettner Real Estate, LLC
437 Broadway St S
Stillwater, MN 55082
City of Stillwater
Planning Commission
216 4th St N
Stillwater, MN 55082
February 25, 2021
RE: Letter to Planning Commission for Conditional Use Permit for Outdoor Storage
To Whom It May Concern,
Leo's Grill and Malt shop would like to take advantage of the unused space on the roof of the
new trash enclosure in order to expand the limited freezer storage for the restaurant. We would like to
install a single 8' wide x 6' deep x 6'-7" high walk in cooler, similar to installations of mechanical on
rooftops, that would be accessible to employees only.
This cooler would be placed so as not to block the views of the neighbor's windows to the north.
Due to the heights of the east trash enclosure parapet wall and the stair walls/railings, the cooler will be
at a level where there would be minimal view, if any, from pedestrians on the street. Please see 3D's
for visual sightlines.
Thank you for your consideration of this matter,
Cory Buettner
Buettner Real Estate, LLC
STRUCTURAL
COLUMN
REVERSE TO
RH DOOR SWING
2X6 FRAMING
ON ALL WALLS
W/ P.T.LUMBER
McNICHOLS® FIBERGLASS
GRATING
Pultruded, Wide T-Ber,
MS-WT-1810 - DURAGRID
2X6 FRAMING WITH —
P.T. LUMBER
BATHROOM
SLAB
ELEVATION
691.05
02B
S
C
FLOOR MOP SINK
WITH FAUCET
RUCTURAL
LUMN DENOTES
ROOF LINE
STRUCTURAL
COLUMN
ij
n1
TRASH
ENCLOSURE
1 FT-1-1-1-T71-ri'
1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1
.I —
COVERED
PATIO SEATING
• 4 T •
P
POWER POLE FOR
GLORIA'S TO GO
'm
a
STRUCTURAL
COLUMN
GRADE LEVEL IRRIGATED PLANTER
BED WITH FUTURE TRELLIS
AND LANDSCAPE LIGHTING
IRRIGATED
PLANTER WALL
BY OTHERS
LOW PLANTER
BED FLUSH WITH PATIO
TO ACCEPT STORMWATER
RUNOFF
TRELLIS N.I.C.
ELM
OPEN PATIO
SEATING
DISTANCE BETWEEN
STRUCTURES >= 2"
STRUCTURAL
COLUMN
NON-STRUCTURAL
COLUMN
METAL RAILING
NIC
REMOVABLE ` LANDSCAPE GRATE HOSTESS ` FLAG POLE WITH LANDSCAPE
QUEUE TO ACCEPT STORM STATION GRATE TO ACCEPT STORM WATER
DIVIDER NIC WATER RUNOFF: NIC RUNOFF: COORDINATE LOCATION
COORDINATE WITH PLUMBER WITH PLUMBER
SEVEN EDGES
COMMERCIAL. HOSPITALITY
INTERIOR DESIGN
501 MAIN STREET NORTH #216
STILLWATER, MN 55082
JENNI FER@7EDGESDESIGN. COM
6 1 2 . 7 5 9. 1 9 3 6
PROJECT:
L E 0' S GRILL
1 2 7 MAIN STREET S
STILLWATER, MN
D A T E
3-5-2021
SHEET
TRASH
ENCLOSURE/PATIO PLAN
SCALE g"=1'-0"
OUT OF SCOPE
FOR ROOF DRAINAGE
DETAIL SEE 2/A-102
30'
13 -9"
21
SP
UP
I I
IGOT FOR
ER DECK
LEANING
IS
GLORIA'S ON THE GO
BELOW
17' 3"
OPEN PATIO
SEATING
30' 32"
6' 1
1
12 -3"
10'-4"
METAL RAILING
BY OTHERS
rA
SEVEN EDGES
COM M ER CIAL• HOSPITALITY
INTERIOR DESIGN
501 MAIN STREET NORTH #216
STILLWATER, MN 55082
JENNIFER@7EDGESDESIGN.COM
6 1 2 . 7 5 9. 1 9 3 6
PROJECT:
L E 0' S GRILL
1 2 7 MAIN STREET S
STILLWATER, MN
D A T E
3-5-2021
S HEE T
TRASH
ENCLOSURE/PATIO PLAN
SCALE g"=1'-0"
i ill l IN II 11. •MIS
LEO'S WALK IN FREEZER SPECS.
Walk -In Freezer: 8'-0" X 6'-0" X 6'-7" - 4" extruded polystyrene, stucco
embossed galvalume 26 gauge exterior, stucco embossed galvalume 26
gauge interior, nsf approved.
Floor: 8'-0" X 6'-0" - 4" extruded insulation, 22 gauge stainless steel
interior, stucco embossed galvalume 26 gauge exterior
U.S. Cooler floors are not designed for the use of Forklifts, Pallet Jacks,
or Hard Wheeled Carts. Damage caused by this usage will void the panel
warranty
Door, 34 in. X 64 in.; low temp inside, with floor, threshold, Vert -Ergo
handle, LED light, LED thermometer switch, door closure and adjustable
spring -loaded hinges, hinge left centered on left width wall , with U.S.
Cooler Logo
1 Pressure relief (usc 9644) installed
Refrigeration
1 x Condensing Unit
• Manufacturer: Tecumseh
• Description: Pre -assembled Remote Low Temp R404A Air Cooled
Outdoor Condensing Unit
• Model: ASHR2460ZNAMSI
• Compressor: 1-1/2 hp, Hermetic
• Extras: Liquid line Filter Drier, Sight Glass - Included
• Electrical: 208-230/1 Phase/60Hz RLA: 9.4 MOPD: 0 MCA: 0
• Conditions: BTUH: 4310 Room Temp: -10°F Cond Ambient: 95°F
• Sizing Room: 4348 BTUH Needed for 8'-0" X 6'-0" X 6'-7"
• Sizing Product: 316Lbs of Misc Product Entering at 20°F
• Warranty:
Parts: 1-year Standard Manufacturer (Optional extended parts
warranties available)
Labor: Not Included (Optional labor warranties available)
1 x Evaporator (Unit Cooler)
• Manufacturer: Russell
• Description: Pre -assembled Electric Defrost Low Profile Coil
• Model: RL6E042DDAA
• Extras: Expansion Valve (ERSE-1/2-ZP), Solenoid Valve (E3S120) -
Mounted
• Electrical: 208-230/1 Phase/60Hz Fan Amps: 0.5 Defrost Amps:
4.9
• Warranty:
Parts: 1-year Standard Manufacturer
Labor: Not Included (Optional labor warranties available)
Total weight of box, roof, and refrigeration 1090 lbs.
LEO'S WALK IN FREEZER SPECS.
Walk -In Freezer: 8'-0" X 6'-0" X 6'-7" - 4" extruded polystyrene, stucco
embossed galvalume 26 gauge exterior, stucco embossed galvalume 26
gauge interior, nsf approved.
•
i w ► a * i
ma IIvJ '- w' f
`• � i ' � t a% .:N �` ., ft , .m. op,.• - ../ �/ / +
61' a•
a a + R
la
■ `'NM y y 4.w
5� N...1 .• ... ti p' .•
- — r
4...1 `\ • .tea — • r. '
tip~
. w
R
\ • t IL `5
••
•
h1
•
4.
1j w
f ° ?;
•x I1,f"5 t ' 1 F:1
r-� r ..
., -
f f r r
r * pl. 4 - - • ..
40
.' r� f /e ..ter;
K w
.
�, ' J `.,
* .. a
•
- * r
%
4104
414 AD
. 5 a
.-
•
Floor: 8'-0" X 6'-0" - 4" extruded insulation, 22 gauge stainless steel
interior, stucco embossed galvalume 26 gauge exterior
U.S. Cooler floors are not designed for the use of Forklifts, Pallet Jacks,
or Hard Wheeled Carts. Damage caused by this usage will void the panel
warranty
Door, 34 in. X 64 in.; low temp inside, with floor, threshold, Vert -Ergo
handle, LED light, LED thermometer switch, door closure and adjustable
spring -loaded hinges, hinge left centered on left width wall , with U.S.
Cooler Logo
W9 W10 W11
1'-51„
0
3'-
1 '-52"
1C1
34"
HPR
F1
C2
F2
C3
F3
6'
To aid in packing, please indicate with
an X the corner where installation will
be starting.
9M
17M £M
8'
QUOTE DRAWING
Sign below for acceptance
X
By signing here, you agree to our terms and conditions as outlined on
www.uscooler. Panel configuration subject to U.S. Cooler final approval. A
facsimile or emailed approval of this drawing 526193-0 shall have the same force and
effect as a signed original and shall, upon receipt by U.S. Cooler, be binding on both
Parties.
Materials: Legend
ExtMetal:Galvalume Ceiling — — — — —
Floor — —
IntMetal:Galvalume
Foam:Extruded 4in.
Freezer: 8'-0" x 6'-0" x 6'-7"
Scale: 1/2"= 1'
U.S. COOLER
401 DELAWARE ST. * QUINCY, IL 62301
TEL 217-228-2421 " 800-521-2665 * FAX 217-228-2424
CUSTOMER
Eichten Sales Company
Refrigeration Specifications
Qtyl Manufacturer I Model
I HP I Electrical I MCA I CmpRLAI CmpLRA I Dimensions DxWxH
Pre assembled Remote Low Temp R404A Air Cooled Outdoor Condensing Unit
JOB# P.O.#
DATE 02/08/2021 DRAWN C.G.S. 3.0
Tecumseh
Russell
ASHR2460ZNAMS111.5
RL6E042DDAA
208-230/1 Phase/60Hz
208-230/1 Phase/60Hz
5.4
9.4 156
26.6"x28.4"x18.5"
15.5"x27.125"x 18.125"
DWG. REF
526193-0
APV.
liwater
THE BIRTH P L A C E OF MINNESOTA
Planning Commission
REPORT DATE:
HEARING DATES:
DEVELOPER:
REQUEST:
March 18, 2021
CASE NO.: 2021-13
Planning Commission March 24, 2021
Jeff and Missy Hause representing JAM Freedom, LLC
1) Vacation of Drainage and Utility Easements
2) Zoning Map Amendment (ZAM) from AP, Agricultural Preservation, to
RB, Two Family
3) Preliminary Plat approval for Marylane Gateway Addition, a six -lot,
single-family residential subdivision
LOCATION: 8483 Marylane Avenue North
COMPREHENSIVE PLAN: LMDR, Low/Medium Density Residential
ZONING:
AP, Agricultural Preservation
REVIEWED BY: Reabar Abdullah, Assistant City Engineer; Tom Ballis, Deputy Fire Chief;
Taylor Stockert, Natural Resources Technician; Karen Kill, Administrator,
Brown's Creek Watershed District
REPORT BY: Abbi Jo Wittman, City Planner
BACKGROUND
Jeff and Missy Hause, JAM Freedom LLC, plan to develop a 2.57-acre parcel at 8384 Marylane
Avenue North. The preliminary plat for the project, to be known as Marylane Gateway Addition,
shows six (6) single family lots, one of which will contain the existing residence. In addition to
consideration of the preliminary plat, the applicant is requesting the City's consideration to rezone
the property from AP — Agricultural Preservation to RB — Two Family Residential and vacation of
the existing property's drainage and utility easements.
SPECIFIC REQUEST
The applicant has requested the Planning Commission recommend to the City Council approval of:
1. A Vacation for existing drainage and utility easements;
2. A Zoning Map Amendment for 8384 Marylane Avenue North to be changed from AP —
Agricultural Preservation to RB — Two Family Residential; and
3. A Preliminary Plat for Marylane Gateway Addition.
CPC 2021-13
March 24, 2021
Page 2
EVALUATION OF REQUEST
I. REZONING
JAM Freedoms, LLC proposes to have the property rezoned from AP, Agricultural Preservation, to
RB, Two -Family Residential. The 2040 Comprehensive Plan's Future Land Use Map guides the
property is for Low/Medium Density Residential development. The RB district corresponds to the
guided LMDR density. Therefore, RB is an appropriate zoning district for this situation. It is
customary for the City to condition the rezoning upon final plat approval.
II. PRELIMINARY PLAT
The 2.57-acre parcel is proposed to be subdivided into six single family lots. One home currently
exists at the northern edge of the property; this structure would remain onsite on a newly -platted lot.
A. Minimum Dimensional Standards: RB District
Massing Standards
RB Standard
Min. requirement
Proposed
Lot area: single-family
7,500 sf
17,267 sf min.
Lot area: two-family
10,000 sf
17,267 sf min.
Lot width: single-family'
50'
64.22' min.
Lot wide: two-family'
75'
64.22' min.
Lot depth2
100'
238.16' min.
Lot frontage on public road
25'
64' min.
Front setback: house
20'
30' min.
Front setback: garage
30'
30' min.
Side setback
5/15'3
7.5' min
Rear yard setback
25'
140' min.
Maximum lot coverage
50% (25% bldg.; 25% other)
TBD
The proposed development plan conforms to the RB District's dimensional standards which are
incorrectly noted on the enclosed plans. When building permits are issued, each new residence
will be reviewed against the setback and lot coverage requirements. Proposed residences that do
not conform to the standards will not be allowed.
B. Civil Engineering
City Engineering staff have reviewed the development. Generally speaking, the proposed
development, including the drainage and utility easement vacation, is in conformance to the
City's Engineering design standards. However, there are two areas of concern:
1. A storm sewer pipe is proposed to be located between Lot 5 and Lot 6. Drainage and utility
easements for Lot 5's southern lot line and Lot 6's northern lot line will each need to be
1 Width is measured between side lot lines at right angles to lot depth at a point midway between front and rear lot lines
2 Average distance between front and rear lot lines.
3 Total of both side setbacks must be a minimum of 15 feet, with a minimum of 5 feet on each side.
CPC 2021-13
March 24, 2021
Page 3
increased to 10' for a total of 20' between the two. Additionally, a 10' drainage and utility
easement will be required for the southern lot line for Lot 6.
2. The stormwater treatment pond outlet will cause some issues to the properties to the east of
the proposed development. In 2018 the City of Stillwater, in coordination with the Browns
Creek Watershed (BCWD), constructed the "Marylane Drainage Improvements," to alleviate
stormwater problem getting close to the properties on the east of the proposed Marylane
Gateway development. The project included creating a swale filled with river rocks to carry
the water south between the proposed development and these properties to the drainage area.
Adding an outlet will block this drainage swale and cause the water to move east toward the
backyard of the properties to the east. The City will not allow this and other options will
have to be investigated; City staff is open to meet and discuss other options. Therefore, a
condition of approval is recommended to ensure the stormwater design is updated prior to
final plat submittal.
Additionally, City engineering staff has advised the following conditions of approval should be
considered:
• All of the preliminary civil engineering plans shall be found satisfactory to the City
Engineer, or revised to his satisfaction, prior to release of the final plat from City offices for
filing with Washington County.
• All electrical and communication utility lines are required to be buried.
• The vacation of the existing drainage and utility easements shall not become effective until
after final plat approval. The easement vacation documents shall be reviewed and approved
by the City Attorney. The easement vacation shall be recorded with Washington County
prior to the recording of the final plat.
• The existing home will be required to pay water and sewer hook-up charges. The fees will
be payable prior to release of the final plat for recording with Washington County. At the
time of memo development, those fees are:
o Water Hookup: $4,588.37/unit
o Sanitary Sewer Hookup: $4,588.37/unit
• The developer will be responsible for paying development impact fees based upon the net
developable acreage of the project, which is 1.98 acres (2.57 gross minus 0.59 for the
existing home's proposed lot coverage). The fees will be payable prior to release of the final
plat for recording with Washington County. At the time of memo development, the
following development impact fees are required:
o 2021 Trout Stream Mitigation ("AUAR") fee: $3,787.07/acre - Total of $7,498.40
o 2021 Trunk sewer and water fees: $11,671/acre - Total of $23,108.58
C. Tree Preservation & Landscaping
Two applicable development standards exist for trees on this project: 1) tree preservation and 2)
street trees.
1. Tree preservation: The City's conservation regulations indicate private development may
not reduce the existing tree cover by an area greater than 35% and the canopy cover by no
more than 50%. While the development is proposing to remove trees to accommodate the
CPC 2021-13
March 24, 2021
Page 4
building sites and stormwater facilities, no greater than 35% of the significant trees nor 50%
of the canopy cover will be removed.
2. Street trees: The subdivision code requires an average of three trees per lot along the street,
though they are to be planted outside of the platted right-of-way4. A total of five trees, one
for each new home created, are proposed for the development but, fifteen trees are required.
So, an updated landscape plan showing the 10 tree deficit will be required prior to the
release of the final plat. The landscaping plan should be developed in consultation with the
City's Natural Resources Technician to ensure species diversity is achieved.
The subdivision code allows a tree replacement fee to be paid if they cannot be planted on
site. The fee would be based upon the retail cost of a 2" DBH deciduous tree. If this is the
desirable approach for the developer, this will be outlined in the Development Agreement to
be considered by the City Council at the time of final plat.
Applicable conditions of approval include:
• The size of the replacement trees must be an average of 2 inches diameter at about four
feet above ground. Conifers must be at least 6 feet tall.
D. Environmental Considerations
1. Floodplain — The property includes no FEMA identified floodplains.
2. Shoreland Overlay District — The property does not lie within a shoreland overlay district.
3. Wetlands — The property has no wetlands.
4. BCWD — A Brown's Creek Watershed District permit will be required for the development.
While the applicant has submitted for BCWD review, BCWD has determined their
application incomplete. A condition of the City's preliminary plat approval is that a BCWD
permit shall be obtained prior to the submittal of a final plat.
E. Park & Trail Dedication
When future developments are contemplated, review for conformance to the adopted Sidewalk
and Trail plan, Park and Open Space plan, and the subdivision ordinance, which requires
sidewalks on all through streets, must be considered. The developer is not proposing any park,
trails or sidewalks to be associated with Marylane Gateway Addition.
Upon review of the City's Trails and Sidewalks plan, no trails or sidewalks are being proposed
in this area. A trail does run along the western side of Marylane Avenue North, connecting the
Rutherford Station neighborhood to the Browns Creek State Trail. Additionally, when the
property to the south — Marylane Meadows — was platted, the City required connection from
Manning Avenue to Settler's Glenn 2nd Addition.
The Parks and Open Space plan does not envision any public parks on or near the proposed
subdivision. That said, however, the far northwestern corner of this property is located outside
the mile park service area. With only a small land area outside of the service area and this
4 City Code Ch. 32, Subd. 6(3)q
CPC 2021-13
March 24, 2021
Page 5
area being — essentially — the front yard to the existing residence, staff has determined it is not
appropriate to require land dedication for this development.
On March 22, 2021 the Parks and Recreation Commission (PRC) will be reviewing the plat and
providing recommendation regarding Park and Trail land dedication. Staff is recommending
that, in lieu of land dedication, $2,000 park and $500 trail fee should be considered for each new
lot created. A condition of approval, memorializing staff's recommendation is included; staff
will provide the Planning Commission with a verbal update of the PRC's March 22 discussion.
ACTION REQUESTED
The developer requests the Planning Commission to review and recommend approval of the
preliminary plat.
ALTERNATIVES
The Planning Commission has several available alternatives:
1. Recommend approval — If the Planning Commission finds that the information submitted
is sufficient and that the preliminary plat is consistent with the Comprehensive Plan,
compliant with City code, and is not detrimental to the neighborhood, then the Planning
Commission could recommend that the City Council approve the preliminary plat.
2. Recommend denial — If the Planning Commission does not find that the preliminary plat
is consistent with the Comprehensive Plan, compliant with City code, and is detrimental
to the neighborhood, the Planning Commission could recommend that the City Council
deny it.
3. Table for more information.
RECOMMENDATION
City staff recommends approval of the preliminary plat with the following conditions:
1. The site shall be developed in substantial conformance with the following plans on file with
the Community Development Department, except as may be modified by the conditions
herein:
• Preliminary plat Sheet C-001 Dated 2/25/2021
• Demolition plan Sheet C-010 Dated 2/26/2021
• Site, grading, erosion & sediment control plan Sheet C-201 Dated 2/26/2021
2. The rezoning shall not become effective until after the approval of the final plat.
3. The stormwater management plan must be revised and found satisfactory to the City Engineer
prior to the submittal of the final plat application.
4. All civil engineering plans shall be found satisfactory to the City Engineer, or revised to his
satisfaction, prior to release of the final plat from City offices for filing with Washington
County.
CPC 2021-13
March 24, 2021
Page 6
5. Drainage and utility easements for Lot 5's southern lot line and Lot 6's northern lot line will
each need to be increased to 10' for a total of 20' between the two. Additionally, a 10'
drainage and utility easement will be required for the southern lot line for Lot 6.
6. The drainage and utility easement vacation approval shall not be effective until the final plat is
approved. Such vacation request shall be submitted with the final plat for review and approval
by the City Attorney prior to release of the final plat from City offices for recording with
Washington County.
7. The developer shall obtain a Browns Creek Watershed District prior to ground disturbance.
Any permit conditions that the City Engineer finds necessary to include in the final plan set
shall be included in the final plat application package.
8. An updated landscape plan showing the 10 tree deficit, will be required to be submitted prior
to the release of the final plat. The landscaping plan should be developed in consultation with
the City's Natural Resources Technician to ensure species diversity is achieved. The size of
the trees must be an average of 2 inches diameter at about four feet above ground. Conifers
must be at least 6 feet tall. If paying a fee in -lieu of tree installation is the desirable approach
for the developer, this will be outlined in the Development Agreement to be considered by the
City Council at the time of final plat.
9. Materials may not be stored in the critical root zone of trees to be saved, nor may equipment or
materials be leaned or stacked against trunks of trees identified to be saved.
10. All electrical and communications utility lines shall be buried. This shall be specified in the
plans submitted for final plat approval.
11. The existing home will be required to pay the $4,588.37/unit water and $4,588.37/unit sanitary
sewer hook-up charges. The fees will be payable prior to release of the final plat for recording
with Washington County. At the time of memo development, those fees are:
12. The developer will be responsible for paying development impact fees based upon the net
developable acreage of the project, which, for 2021, is $7,498.40 for Trout Stream Mitigation
("AUAR") and $23,108.58 for Trunk sewer and water. If the fees are not paid in 2021, the
fees will be adjusted annually. The fees will be payable prior to release of the final plat for
recording with Washington County.
13. In lieu of park and trail land dedication, the developer shall be required to pay a $2,000 park
and a $500 trail dedication fee for each new home lot created. The fees will be payable prior
to release of the final plat for recording with Washington County.
14. If the Developer desires to have a neighborhood entrance monument for the subdivision, plans
for it must be included within the final plat application materials. Otherwise, such a sign will
not be permitted in the future.
15. A Development Agreement found satisfactory to the City Attorney and City Engineer must be
approved by the City Council prior to commencing any tree removal or grading on the site,
and prior to holding a pre -construction meeting with the City Engineer for the project.
Attachments: Site Location Map
Development Plans
cc Jeff and Missy Hause
1. ...., ..., 12191 3 1 3490 ''
" -
,________, 3
'> ir 489
-f
IIIwater
"�.OF
2054
12
-, COUNTY
g }��
# F `►':'�
as'1
1221
M
r
t' 9
.---ROAD 64 -
4 3484 34
3487 j)
Lt s�
3481 87TF�
•
3483 3481 34
_MCKUsICK ROA]
The Birthplace of Minnesota
Site Location
.„
_ __- __.il,,,, +4°h , -v _ - -ti
"- __ d-N� ..=��a��'���.". �
8483 Marylane
Ave N
1472 1478 1484 _Z49
k
1498i
1465 �
1479 1497
y
8483
P "a
•4
1468 Iv 1474� 1 14
1462
COURT
1456
1465 11475-
Ce
'1450
it
��
1460
1465
0 125 250
50Feet
1445 1491
I_I.'. 1452
1445
0 1447
Z, ' m •
General Site Location
1435
1435 _•
1
1444 0\�. _ �°444 -G
1429
' J.
IIP
�
I ■.►
■A1r
—111
ae.. .
3690
1425 8399 1
I 3650 r ' 1436 '��
•14t3B,
�11i��
NIE.6
� �,
1111 i nLt 11
, e�IIP
... �O
/
1 � ►.__,
` ., 'V"
.,I
0 363
K 14251428
142 f 1426 /
ifiii�
�Ij
J vi
ri ":
��
\�•
�:
®®®
3710 �,
365
3702 / ,'�
$ 7 1420
�•��
1���
�1190"
��.,II i�
.ni. r�, .��`I
..4.1" �� `�•ih
,F
T
®® C+�/ I
,; 1,
I _ 362 .It.
3694 1 ..
,, ate;;,
8
.`0111
l ��
rl1��-
®m�`
memeam
®�i N,
'1615
3686 ,,�,. "3611 36?
\\-
4T: -*
.
�J
` tl7411��+A 1
■e
— 8337 /336
3678
m
.1is alewhi
•Q1.ii
a�I ipli
� tl
3632 3610 ;3604 •
3620 1330 :. p -: _
M-
^'
.
` �� 11/�� �.. .. �,�11 '` i�!
M.Mif �I 1 L..--
o = ,
y
A.
3650 -8325 , 10
3 �"
.
-1.
CO
o
MCKUSICK ROAD N. C.S.A.H
VICINITY MAP
X
1-
I
L
7
-
_ I
II II
�T
I I
II I
2
L
- I t
3
/"-Thr----N,•
•
4
i
5
L
O
1
6
o
MARYLANE AVE. N.
NOT TO SCALE
LOCATION MAP
DELLWOOD ROAD
MCKUSICK ROAD N
w
w
Z
z
w
a
w
J
>-
SITE
80TH STREET N
75TH STREET N
z
w
w
a
J
w
O
PROJECT CONTACTS
OWNER
MARK AND MARLENE PAVLICK
613 155TH AVENUE
SOMERSET, WI 54026
MARK PAVLICK
T (651) 353-8113
DEVELOPER
JAM FREEDOM LLC
613 155TH AVENUE
SOMERSET, WI 54026
JEFF HAUSE
T (651) 442-6555
CIVIL ENGINEER
ELAN DESIGN LAB, INC.
901 N 3rd STREET SUITE 120
MINNEAPOLIS, MN 55401
STEVE JOHNSTON, PE
T (612) 260-7982
LANDSCAPE
ARCHITECT
ELAN DESIGN LAB, INC.
901 N 3rd STREET SUITE 120
MINNEAPOLIS, MN 55401
PILAR SARAITHONG, RLA
T (612) 260-7982
LAND SURVEYOR
CORNERSTONE LAND SURVEYING, INC.
6750 STILLWATER BLVD. N. SUITE 1
STILLWATER, MN 55082
DAN THURMES, LS
T (651) 275-8969
COMMUNITY
DEVELOPMENT
CITY PLANNER
CITY OF STILLWATER
216 FOURTH ST N
STILLWATER, MN 55082
ABBI JO WITTMAN
T (651) 430-8822
PUBLIC WORKS
CITY ENGINEER
CITY OF STILLWATER
216 FOURTH ST N
STILLWATER, MN 55082
SHAWN SANDERS, PE
T (651) 430-8835
SHEET INDEX
C-000 COVER SHEET
C-001 PRELIMINARY PLAT BY CORNERSTONE SURVEYING
C-002 EXISTING CONDITIONS BY CORNERSTONE SURVEYING
C-010 DEMOLITION PLAN
C-201 GRADING PLAN
C-202 SWPPP
C-203 EROSION CONTROL PLAN
C-301 UTILITY PLAN
C-501 DETAILS
C-502 DETAILS
C-503 DETAILS
L-010 TREE PRESERVATION PLAN
MARYLANE
GATEWAY
STILLWATER - MINNESOTA
PRELIMINARY PLAT
APPLICATION
FEBRUARY 26, 2021
MISSY HAUSE
JEFF HAUSE
JAM FREEDOM, LLC
613 155TH AVE
SOMERSET, WI 54025
651-442-6555
Civil Engineering I Landscape Architecture I Construction Services
901 N 3rd STREET, SUITE 120
MINNEAPOLIS, MN 55401
p 612.260.7980
f 612.260.7990
www.elanlab.com
P��
P� 0041 FO ON
CO
SHEET
COVER SHEET
0-000
NOT TO SCALE
PROJECT NO.
CLS20020
TREE TAG #
`n
w_
U
LLJ
0_
V)
CONDITION
w
1-
0
Z
I A / A ee• / / / A //, -/- / A /
1/1/ /I /--///\//-, / / / / \ /
/ / // / / \ / /
v
r , A
/ F r / Y / I /
l 1 / V
r, / A -/-
I- / / / I /
I L _ / I /
MCKUSIK ROAD N. C.S.A.H. NO. 64
A /
\ /
I5
EXISITNG LEGAL DESCRIPTION:
TYP.
DECIDUOUS
TREE
#3307
1 Spruce, white
2 Spruce, white
3 Spruce, white
4 Spruce, white
5 Spruce, white
6 Spruce, white
7 Maple, silver
8 Aspen, quacking
9 Boxelder
10 Ash, green
11 Elm, american
12 Elm, american
13 Elm, american
14 Elm, american
15 Apple
16 Apple
17 Cherry, black
18 Ash, green
19 Cottonwood, easterl
20 Walnut, black
21 Maple, silver
22 Ash, green
23 Maple, silver
24 Maple, silver
25 Basswood, american
26 Oak, red
27 Spruce, white
28 Elm, american
29 Maple, silver
30 Spruce, white
31 Cherry, black
32 Elm, american
33 Elm, american
34 Oak, bur
35 Oak, red
36 Cherry, black
37 Aspen, quacking
38 Aspen, quacking
39 Cherry, black
40 Cherry, black
41 Oak, red
42 Elm, american
TYP.
CONIFEROUS
TREE
#3307
TREE TAG 1
SEE
TABULATION
ON THIS
SHEET
0
0or0
0 or ❑
TREES:
/ery
Fair
Fair
Fair
Fair
Fair
Fair
Fair
Good
Fair
Fair
Fair
Good
Fair
Fair
Fair
Fair
Fair
Fair
Good
Good
Fair
Fair
Fair
Fair
Fair
Good
Fair 9
Fair 18
Fair 30
Fair 10
Good 10
Fair 16
Fair 19
Fair 9
Good 16
Good 6
Fair 17
Good 14
Good 13
Fair 8
Good
Fair
10
12
10
16
13
12
51
16
22
18
10
15
7
8
11
12 2x
23 2x
15
21
21
66 3x 22 22 22
33 3x 20 7 6
30
51 2x 26 25
28 2x 26 25
22
extra parcel
extra parcel
extra parcel
extra parcel
extra parcel
extra parcel
extra parcel
19 extra parcel
14 extra parcel
DENOTES TREES AS IDENTIFIED AND LOCATED BY:
Mark Rehder
President & CEO
Rehder Forestry Consulting
www.rehderforestryconsulting .com
612-760-3519
City of Stillwater Tree Preservation Definitions -
Significant Tree: a tree measuring at least 6 inches in
diameter at 54 inches above ground (dbh). Cottonwood,
silver maple, and box elder are protected at a size of 20
inches (dbh). Buckthorn and Siberian elm are not
considered significant trees at any size.
A 2x in the notes section denotes a tree with 2 stems, etc.
20 boxelder trees averaging about 12" in diameter that
were not captured and make up the majority of the south
lot, plus some siberian elm
0
✓
IAC
IEPI
ET
FOUND MONUMENT 1/2" IP
MARKED RLS 1 5480
SET 1 /2" IRON PIPE
MARKED RLS NO. 25718
CABLE TV PEDESTAL
AIR CONDITIONER
ELECTRIC MANHOLE
ELECTRIC METER
ELECTRIC PEDESTAL
ELECTRIC TRANSFORMER
LIGHT POLE
GUY WIRE
-0- POWER POLE
O GAS MANHOLE
O GAS METER
• TELEPHONE MANHOLE
▪ TELEPHONE PEDESTAL
co SANITARY CLEANOUT
SANITARY MANHOLE
CATCH BASIN
STORM DRAIN
O
IMBI
O
x 950.0
WATER VALVE
BOLLARD
FLAG POLE
MAIL BOX
TRAFFIC SIGN
UNKNOWN MANHOLE
SOIL BORING
SPOT ELEVATION
TRAFFIC SIGNAL
CONIFEROUS TREE
DECIDUOUS TREE
FLARED END SECTION
O STORM MANHOLE
FIRE DEPT. CONNECTION
HYDRANT
CURB STOP
WATER WELL
WATER MANHOLE
WATER METER
POST INDICATOR VALVE
90.
WM
UE UNDERGROUND ELECTRIC
u v UNDERGROUND CABLE TV
OF UNDERGROUND FIBER OPTIC
UT UNDERGROUND TELEPHONE
ou OVERHEAD UTILITY
UG UNDERGROUND GAS
> SANITARY SEWER
>> STORM SEWER
WATERMAIN
x x FENCE
CURB [TYPICAL]
1230 - CONTOURS
/////////////// BUILDING LINE
BITUMINOUS SURFACE
CONCRETE SURFACE
a4
/
/
/
»»
v61
V
9/4
ID
9/2
V
30"RCP
X 919.6
911.0 -
Z
V
909.2
V
61 ---
v
909.
909.4-
V
I A /
/ 1 / / 1
Y V / I
9090 S
OX c-,
ro
0
X
'0
0
0
` / / / A / / ,
/ / / / V \
A /
/ \ / / /
/ V \,
-/- / , A /
/ / / / \ /
/ \ / / V
r 7 / \
/ / / /
/ / \�
I0" DRAINAGE AND UTILITY EA
UE
#27
UG
UT
UE Ic
UG
t �
- 909.6
X908.2
X 9 06.5
J X905.9
r--905.7
905.2
5H
RI v=909.3
X904.8
9095 9 �9 STMH
909.7 I 08, 1 6 "BURRIED
RIM=906.6 PLAN
X909.0
1�
INV=901.6 N PLAN
-`FLOOR
=912.2
911.1 X
906
X906.4
16
132.1
#26
UG
/ / A / -/- \ /
/ / / / / / \ / / Y
V /
0T
r, / /, / / -1-
r" / / -/ /- -1
\
r , r , / , I A / A / / ..
/- < /- r / / 1 / 1 /
L J / I \/ Y Y / V /
#31--
0,0- S8
917.8- ' 9
PER PEAT>7.7
UG
#2q
915.8 X
9/
s
ql4
4/a
aU 90q\X 7%�Y. 4
X907.6
5SI3
g06.7- X905.8
7.5 ' D+U EASE
7.5 ' D+U EASE
°
UE
4"E
x FENCE
r ; #3
INGRESS AND EGRESS
EASEMENT PER
DESCRIPTION "AI' -------
/- -
/ / /- -
\ / /
r, r- r /
/ Fr /-- /-- /-
\ / / I L - L - / \
4
UG -59-
#30
17.4
EM G 1
/////////X 917.5
EXISTING
HOUSE
/ FLOOR
\ =918.8
DECK
L r
WELL
917 OTW
915.38W
= 915.8: W
-916.9TW
9157SW
�rG.9TW
c�
Q
a
C5
VFLOOR
=911.1
j////4=911/////x 9OG.3
911.�2T V
-909.IBW
--911.2TW XPO
•95 909.0BW
Ivy 911.2TW
-909.IBW
FOUND 1/2 INCH'
IRON PIPE
MARKED 0.1' N.
AND 0.2' E. OF
PARCEL CORNER
X 004.0
X907.0
X 905.3
TSB
0105.43
907.0
4X4
POST
X 905.8
904.7 X
DRAINAGE AND UTILITY EASEMENT PER PLAT
X906.7
>> 27"X44"RC
908.7X X908.2
XG109.8 .08.1
FLOOR
L/ =908.9
EXISTING
HOUSE
907.9
909.3 k
r,
68.66 0�
N89°14 12 w
�
Y /
r/-
X907.5
X
I A / A \ / r, / A -
I/1/ / I Y /-- / 1 / I /
V V / I / / L_ I/ I /
r, A I I
/ /- r /_I / /
/ 1 / 1 / L _
FENCE
X
uu
BB- -
HOOP y
#32
X 905.8
X905.4
X907.5
9\
q06
X907.1 X905.6 / � X906.8
X905.5 p� 4-XP06.7
40 GCB
RIM=906.0
NV=901.5 PLAN
16.1
o2
#33
#42-
SHEr'
#34-
907.0 -1
907.3 -
X(1106.1
D+U
EASE
SB PRIMARY
q �4.q0
E)<906.8
- 917.6
21
" FOUND 1/2 INCH
IRO 'IPE
KED RLS
0.5' N
RCEL
ER
X
FOUND 1/2 INCH
IRON PIPE
MARKED 0.I'
AND 0.2'
// PARCELS•
/ #40 -
907.8
J --#3q
1
D+U
EASE
#I9
D+U
EASE
/I
X907.3 X906.5
X907.I
/
1/1/
0
0
0
X
0
X
FOUND 1/2 INCH
IRON PIPE
0.1' N.
OF
AND 0.1'
PARCEL CO
X ,
0
0
6
BURRIED
06.3 X
906
51-1H -2 X905.0
N
906.01
+ X 905.3
90
RIM=906.7 a/J
INV=P01.1 W PLAN
0
�9
0
9/4
he following Legal Description is as shown on the St. Croix Title as agent for Old
Republic National Title Insurance Company Title Commitment No. P22405-2 1 -P2579,
dated January 25th, 2021.
Lot One (1), Block One (1), Rivards Addition, according to the recorded Plat thereof
on file and of record in the office of the Register of Deeds in and for said County and
State;
also
that portion of the Northwest Quarter (NW 1 /4) of the Southwest Quarter (SW 1 /4) of
Section 19, Township 30 North, Range 20 West, described as follows: Commencing
at the intersection of the Southerly line of right-of-way of Stillwater and Saint Paul
Railroad Company with the Westerly line of township road running Northerly and
Southerly along the East side of the West One-half (W 1 /2) of the Southwest Quarter
(SW 1 /4) of said Section 19 as said township road is now located; thence Southerly
along the Westerly line of said township road One Hundred Twenty-five feet (1 25') to
a point; thence Westerly and parallel with the Southerly line of right-of-way above
mentioned One Hundred Twenty-five feet (1 25') to a point; thence Northerly and
parallel to the westerly line of the said township road One Hundred Twenty-five feet
(1 25') to a point on the Southerly line of the said right-of-way; thence Easterly along
the Southerly line of said right-of-way One Hundred Twenty-five feet (1 25') to the
place of beginning.
EASEMENT NOTES:
The following survey related exceptions appear on the St. Croix Title as agent for
Old Republic National Title Insurance Company Title Commitment No.
P22405-21 -P2579, dated January 25th, 2021.
7. Subject to the Slope Easement per Doc No. 728080. (DOES NOT EFFECT
PARCEL)
8. Subject to the Highway/Drainage Easement per Doc. No. 728081. (DOES NOT
EFFECT PARCEL)
9. Subject to the Washington County Highway Right of Way Plat No. 83 - Co. Rd.
64, per Doc. No. 71 41 83. (DOES NOT EFFECT PARCEL)
10. Subject to the terms and conditions of a Vacation, vacating the public drainage
easement per Document No. 42221 91. (AS SHOWN ON SURVEY)
1 1. Subject to the Resolution of Zoning Ordinance Amendment - Washington
County Ordinance No. 89, per Doc. No. 670563. (NOT SHOWN ON SURVEY)
EASEMENT "A"
And also an easement for ingress and egress described as follows: A strip of land
Thirty-three (33) feet in width lying Thirty-three (33) feet Westerly of the following
described line, to -wit: Commencing at the Northeast corner of the Northwest
Quarter of the Southwest Quarter (NW 1 /4 of SW 1 /4) of Section Nineteen (1 9),
Township Thirty (30) North, Range Twenty (20) West which is the point of
beginning of the easement line to be described; thence Southerly along the East
line of said Northwest Quarter of the Southwest Quarter (NW 1 /4 of SW 1 /4) a
distance of Thirteen and four -tenths (13.4) feet and there terminating.
EASEMENT "B"
And reserving an easement for ingress and egress described as follows: A strip of
land Thirty-three (33) feet in width lying Thirty-three (33) feet, Westerly of the
following described line, to -wit: Commencing at the Northeast corner of the
Northwest Quarter of the Southwest Quarter (NW 1 /4 of SW 1 /4) of Section
Nineteen (19), Township Thirty (30) North, Range Twenty (20) West; thence
Southerly along the East line of said Northwest Quarter of the Southwest Quarter
(NW 1 /4 of SW 1 /4) a distance of One Hundred Thirteen and four -tenths (1 1 3.4)
feet to the point of beginning of the easement line to be described; thence
continuing Southerly along said East line of the Northwest Quarter of the Southwest
Quarter (NW 1 /4 of SW 1 /4) for One Hundred Twenty-five (1 25) feet and there
terminating.
AREA:
TOTAL AREA AS SHOWN = 1 1 1,756 SQ.FT. / 2.57 ACRES
SURVEY NOTES:
BEARINGS ARE BASED ON COORDINATES SUPPLIED
BY THE WASHINGTON COUNTY SURVEYORS OFFICE.
NAD 83
2. UNDERGROUND UTILITIES SHOWN PER GOPHER
ONE LOCATES AND AS-BUILTS PLANS PROVIDED BY
THE CITY OF STILLWAER PUBLIC WORKS
DEPARTMENT.
3. THERE MAY SOME UNDERGROUND UTILITIES, GAS,
ELECTRIC, ETC. NOT SHOWN OR LOCATED.
UNDERGROUND UTILITIES NOTES:
THE UNDERGROUND UTILITIES SHOWN HAVE BEEN
LOCATED FROM FIELD SURVEY INFORMATION AND
EXISTING DRAWINGS. THE SURVEYOR MAKES NO
GUARANTEE THAT THE UNDERGROUND UTILITIES SHOWN
COMPROMISE ALL SUCH UTILITIES IN THE AREA, EITHER IN
SERVICE OR ABANDONED. THE SURVEYOR FURTHER DOES
NOT WARRANT THAT THE UNDERGROUND UTILITIES
SHOWN ARE IN THE EXACT LOCATION INDICATED
ALTHOUGH HE DOES CERTIFY THAT THEY ARE LOCATED
AS ACCURATELY AS POSSIBLE FROM THE INFORMATION
AVAILABLE. THIS SURVEY HAS NOT PHYSICALLY LOCATED
THE UNDERGROUND UTILITIES. GOPHER STATE ONE CALL
LOCATE TICKET NUMBER 210190165. SOME MAPS WERE
RECEIVED, WHILE OTHER UTILITIES DID NOT RESPOND TO
THE LOCATE REQUEST. ADDITIONAL UTILITIES OF WHICH
WE ARE UNAWARE MAY EXIST.
CALL BEFORE YOU DIG!
Gopher State One CaII
TWIN CITY AREA: 651-454-0002
TOLL FREE: 1-800-252-1166
SEPTIC/WELL
EXISTING SEPTIC AREA TO THE WEST OF THE HOUSE
NOT LOCATED. NO ADDITIONAL INFORMATION
ABOUT THE SEPTIC SYSTEM WAS PROVIDED.
WELL SHOWN EAST OF THE HOUSE.
MARYLAN E
GATEWAY
ADDITION
CONTACT:
JAM FREEDOM, LLC
C/O JEFF HAUSE
613 1 55TH AVE
SOMERSET, WI 54025
651-439-0189
COUNTY/CITY:
WASH 1 NGTDN
CO U I J
S i 1 L LWAT E R
NORTH
0 30 60
REVISIONS:
DATE REVISION
1-23-21 INITIAL ISSUE
CERTIFICATION:
I hereby certify that this plan was prepared by
me, or under my direct supervision, and that lam
a duly Licensed Land Surveyor under the laws of
the state of Minnesota.
Daniel L. Thurmes Registtation Number: 25718
Date: 1-23-21
PROJECT LOCATION:
8483
MARY LANE N.
PID#1 903020320050
1
Suite #200
1970 Northwestern Ave.
Stillwater, MN 55082
Phone 651.275.8969
dan@cssurvey
.net
CORNERSTONE
LAND SURVEYING, INC.
FILE NAME
PROJECT NO.
SURVJH36
JH1 9036
EXISTING CONDITIONS
C-002
I, 1,/ / I /--/ / / \ / / -. / / / / \ /
VA / ♦ / l / / / V \ / / l / l V
/ / // / / / \ / /
r l / I A/ r\ / .1 -I-
/-r / I/I/ /-- / , I /
/ 1/ V V l L_ / 1 /
A /
/ \ / / /
/ V l i ,
EXISITNG LEGAL DESCRIPTION:
PRELIMINARY PLAT
\„
/
/
/
---v61 -1
/6�
9/4
9/2
V
v
X 919.6
91I.0- -\
v
909.6-
30"RCP »_
» 9�6
909.2 -
6
v
909
909.4 -
V
v
0
X
I A / A i / 1/ A//\
/ I /--/ / / \ / / -,
V V / I / / / / / V \
x909.0
9
9,5
909.7
0
I=
1�
MCKUSIK ROAD N. C.S.A.H. NO. 64
-/ i \ A /
/ / / / \ /
/ \ / / V
\ i\ 1 / A / -/ \ /
\ / \ / \ / / V / /
/„/ /-/-
/- r / / -, /- -/ /
/ I / \ / / / /
INGRESS AND EGRESS 91E3
EASEMENT PER
DESCRIPTION I'A1" -_ __
i\ r-
/ / /- -
\. /
A / i \
/\/ / /
/ V \ / ,
- 918.7
10' DRAINAGE
UE
#27
UG
909.6
X908.2
X906.5
X905.9
-905.7
/ r 7 / \
/ / / /
/ / \
- 132.2
r, r, ., I A / A /
I A / A 1 /
I / I / / I Y
V V / I /
, 1 A
/ / / /_1
L _ / I
I-< F r / / I/I/ / \ /
L / / 1 \ / V V / V ♦ /
0,0
8
917.8
/ / / /
PER "AT
UG
915.8 X
r
4"E
9
UE
0
9? 1
ai 1 DECK
\ r, r- r- /
/ / r /- - /- - i-
- S'LY LINE OF
FORME
x FENCE
r-#3
UG
#30-�-uG u \
EM GM 917.5
EXISTING
0 % HOUSE
FLO R
=9I8.8
I
GM .6T i 10
6W V/ O
//q�l . • •� P••/(.5(
Q
OL
/ Q
9/ / I' / C5
ql I 9; 7 rIe0 . FLOOR
Vs X911.81 .con • / =911.1
q\
I
238.16
9/j
917,3rw
9.
2 w-909.IBW
9J12T11L
'31-9yet-911I.2TW.OBW
I 909.IBW
FENCE
//
g16g16.1
i
U
-,- r , A / /
/ /-r / I / /
/ L _
25.00 DESC.
WELL
-917.OTW
-915.8:Wg15.3BW
W
ar .9TW
00
BB -
HOOP
#32
16. I
I- - 917.6
//
o
#42
FOUND 1/2 INCH
20 IRE
if i r KED RLS
R'� 0.5" N.
Ng
I RCEL
(i��'• ER
a/ -O.q
iiiia fs 4l 1
SHE
I #34Pi 1 \.."
." 4. #3
o2� I
#33
MYX s_/L ///
q08 FOUND 1/2 INCH'/ 2 /
IRON PIPE X907.0
X907.6 MARKED 0.1" N.
AND 0.2' E. OF X 905.8
PARCEL CORNER
g'ss
g06.7- X905.8
X 904.9
270.66
N89°14'12"W
X 905.3
3
BLOCK 1
akSB
g05.43
270.16
N89°14'12"W
N89°14'12"W
269.66
905.2 ------ --
EASEMENT VACATED
-221r7°13
DOC. N0. 42221g1
/ _ _ -
X904.8
0,0
'3 1
+90 L STMH
96 '- BURRED
7.5 ' D+U EASE
7.5 ' D+U EASE
g08.7X X908.2
X909.8 g08.1
21M=906.6 PLAN
INV=901.6 N PLAN
FL00R
=912.2
LFLOOR
908.9
A
EXISTING
HOUSE
269.16
89°14'12"W
DRAINAGE AND UTILITY EASEMENT PER PLAT
----�9a6.T
/'1/ /
907.9---
909.3 .
�68.66 0
N89°14 +12 W
90
8'
X9075
X 905.8
X907.5
X907.1 X905.6
X905.5
/'li/ 1- /
L_
906
L/
X906.1
D+U
EASE
S�RIMARY
04.g0
g �4.g0
FOUND 1/2 INCH
IRON PIPE
MARKED 0.1
AND 0.2"
// PARCEL
/ #40
908.1-
D+U
EASE
#I9
D+U
EASE
X907.3 X906
X907.1
X. 906.8
c, Xg06.7
10 CB
rn` RIM=906.0
INV=901.5 PLAN
I A /
/;/ ..
+ X905.3
90
/
0
0
FOUND 1/2 INCH
IRON PIPE
0.1" N.
OF-
AND
0.1
PARCEL CO
0
0
X
0
„
06.3 X
906
/
STMH X905.0
BURRIED R
RIM=906.7 a`)
NV=901.1 W PLAN
904.1
904.0
0
\9
0
9/6,
9/4
0
r�
ACI
EM
ET
7
O
0
0
O
or
or
MANNING AVE
FOUND MONUMENT 1/2" IP
MARKED RLS 15480
SET 1/2" IRON PIPE
MARKED RLS NO. 25718
CABLE TV PEDESTAL
AIR CONDITIONER
ELECTRIC MANHOLE
ELECTRIC METER
ELECTRIC PEDESTAL
ELECTRIC TRANSFORMER
LIGHT POLE
GUY WIRE
POWER POLE
GAS MANHOLE
GAS METER
TELEPHONE MANHOLE
TELEPHONE PEDESTAL
SANITARY CLEANOUT
SANITARY MANHOLE
CATCH BASIN
STORM DRAIN
O
red
X 950.0
O
UNDERGROUND
UNDERGROUND
UNDERGROUND
WATER VALVE
BOLLARD
FLAG POLE
MAIL BOX
TRAFFIC SIGN
UNKNOWN MANHOLE
SOIL BORING
SPOT ELEVATION
TRAFFIC SIGNAL
CONIFEROUS TREE
DECIDUOUS TREE
FLARED END SECTION
STORM MANHOLE
FIRE DEPT. CONNECTION
HYDRANT
CURB STOP
WATER WELL
WATER MANHOLE
WATER METER
POST INDICATOR VALVE
ELECTRIC
CABLE TV
FIBER OPTIC
UNDERGROUND TELEPHONE
OVERHEAD UTILITY
UNDERGROUND GAS
SANITARY SEWER
STORM SEWER
WATERMAIN
FENCE
CURB [TYPICAL]
1230 CONTOURS
/////////////// BUILDING LINE
BITUMINOUS SURFACE
CONCRETE SURFACE
VICINITY MAP
S.T.H. NO• 616
DELLW000 RD•
CREEK
(CO. RD. N0. 64)
MCKUSIK RD.
SITE
BOUTWELL RD N
NOT TO
SCALE
SEC. 19, TWP. 30, RNG. 20,
WASHINGTON COUNTY, MN
PROPOSED
DRAINAGE AND UTILITY EASEMENTS
ARE SHOWN AS THUS:
(NOT TO SCALE)
UNLESS OTHERWISE
NOTED
D+U EASE
f
DEVELOPEMENT DATA
TOTAL PARCEL AREA = 1 1 1 ,756 SQ. FT.
LOT 1, BLOCK 1
LOT 2, BLOCK 1
LOT 3, BLOCK 1
LOT 4, BLOCK 1
LOT 5, BLOCK 1
LOT 6, BLOCK 1
= 25,635 SQ. FT.
= 16,859 SQ. FT.
= 1 7,364 SQ. FT.
= 17,332 SQ. FT.
= 1 7,299 SQ. FT.
= 1 7,267 SQ. FT.
EASEMENT VACATION
BUILDING SETBACKS:
FRONT = 30'
SIDE = 10'
REAR = 25'
MAX 30% LOT COVERAGE
THE FOLLOWING REQUEST TO VACATE ALL EXISTING DRAINAGE AND
UTILITY EASEMENTS COVERING THE EXISTING LOT 1, BLOCK 1,
RIVARD ADDITION. NEW EASEMENTS WILL BE DEDICATED ON THE
PROPOSED PLAT OF MARYLANE GATEWAY ADDITION.
Those particular Drainage and Utility Easements over all of Lot 1,
Block 1, as dedicated on the plat of RIVARD ADDITION, Washington
County, Minnesota.
SEPTIC/WELL
EXISTING SEPTIC AREA TO THE WEST OF THE HOUSE
NOT LOCATED. NO ADDITIONAL INFORMATION
ABOUT THE SEPTIC SYSTEM WAS PROVIDED.
WELL SHOWN EAST OF THE HOUSE.
CALL BEFORE YOU DIG!
Gopher State One CaII
TWIN CITY AREA: 651-454-0002
TOLL FREE: 1-800-252-1166
The following Legal Description is as shown on the St. Croix Title
as agent for Old Republic National Title Insurance Company Title
Commitment No. P22405-21-P2579, dated January 25th, 2021.
Lot One (1), Block One (1), Rivards Addition, according to the
recorded Plat thereof on file and of record in the office of the
Register of Deeds in and for said County and State;
also
that portion of the Northwest Quarter (NW 1/4) of the
Southwest Quarter (SW 1/4) of Section 19, Township 30 North,
Range 20 West, described as follows: Commencing at the
intersection of the Southerly line of right-of-way of Stillwater
and Saint Paul Railroad Company with the Westerly line of
township road running Northerly and Southerly along the East
side of the West One-half (W 1/2) of the Southwest Quarter
(SW 1/4) of said Section 19 as said township road is now
located; thence Southerly along the Westerly line of said
township road One Hundred Twenty-five feet (1 25') to a point;
thence Westerly and parallel with the Southerly line of
right-of-way above mentioned One Hundred Twenty-five feet
(125') to a point; thence Northerly and parallel to the westerly
line of the said township road One Hundred Twenty-five feet
(125') to a point on the Southerly line of the said right-of-way;
thence Easterly along the Southerly line of said right-of-way
One Hundred Twenty-five feet (125') to the place of
beginning.
EASEMENT NOTES:
The following survey related exceptions appear on the St.
Croix Title as agent for Old Republic National Title
Insurance Company Title Commitment No.
P22405-21-P2579, dated January 25th, 2021.
7. Subject to the Slope Easement per Doc No. 728080.
8. Subject to the Highway/Drainage Easement per Doc. No.
728081.
9. Subject to the Washington County Highway Right of Way
Plat No. 83 - Co. Rd. 64, per Doc. No. 7141 83.
10. Subject to the terms and conditions of a Vacation,
vacating the public drainage easement per Document
No. 4222191.
1 1 . Subject to the Resolution of Zoning Ordinance
Amendment - Washington County Ordinance No. 89,
per Doc. No. 670563.
EASEMENT "A"
And also an easement for ingress and egress described as
follows: A strip of land Thirty-three (33) feet in width lying
Thirty-three (33) feet Westerly of the following described
line, to -wit: Commencing at the Northeast corner of the
Northwest Quarter of the Southwest Quarter (NW 1/4 of SW
1/4) of Section Nineteen (19), Township Thirty (30) North,
Range Twenty (20) West which is the point of beginning of
the easement line to be described; thence Southerly along
the East line of said Northwest Quarter of the Southwest
Quarter (NW 1/4 of SW 1/4) a distance of Thirteen and
four -tenths (13.4) feet and there terminating.
EASEMENT "B"
And reserving an easement for ingress and egress described
as follows: A strip of land Thirty-three (33) feet in width
lying Thirty-three (33) feet, Westerly of the following
described line, to -wit: Commencing at the Northeast corner
of the Northwest Quarter of the Southwest Quarter (NW 1/4
of SW 1/4) of Section Nineteen (19), Township Thirty (30)
North, Range Twenty (20) West; thence Southerly along the
East line of said Northwest Quarter of the Southwest
Quarter (NW 1/4 of SW 1/4) a distance of One Hundred
Thirteen and four -tenths (113.4) feet to the point of
beginning of the easement line to be described; thence
continuing Southerly along said East line of the Northwest
Quarter of the Southwest Quarter (NW 1/4 of SW 1/4) for
One Hundred Twenty-five (125) feet and there terminating.
AREA:
TOTAL AREA AS SHOWN = 1 1 1 ,756 SQ.FT. / 2.57 ACRES
SURVEY NOTES:
1 . BEARINGS ARE BASED ON COORDINATES SUPPLIED
BY THE WASHINGTON COUNTY SURVEYORS OFFICE.
NAD 83
2. UNDERGROUND UTILITIES SHOWN PER GOPHER
ONE LOCATES AND AS-BUILTS PLANS PROVIDED BY
THE CITY OF STILLWAER PUBLIC WORKS
DEPARTMENT.
3. THERE MAY SOME UNDERGROUND UTILITIES, GAS,
ELECTRIC, ETC. NOT SHOWN OR LOCATED.
UNDERGROUND UTILITIES NOTES:
THE UNDERGROUND UTILITIES SHOWN HAVE BEEN
LOCATED FROM FIELD SURVEY INFORMATION AND
EXISTING DRAWINGS. THE SURVEYOR MAKES NO
GUARANTEE THAT THE UNDERGROUND UTILITIES SHOWN
COMPROMISE ALL SUCH UTILITIES IN THE AREA, EITHER IN
SERVICE OR ABANDONED. THE SURVEYOR FURTHER DOES
NOT WARRANT THAT THE UNDERGROUND UTILITIES
SHOWN ARE IN THE EXACT LOCATION INDICATED
ALTHOUGH HE DOES CERTIFY THAT THEY ARE LOCATED
AS ACCURATELY AS POSSIBLE FROM THE INFORMATION
AVAILABLE. THIS SURVEY HAS NOT PHYSICALLY LOCATED
THE UNDERGROUND UTILITIES. GOPHER STATE ONE CALL
LOCATE TICKET NUMBER 210190165. SOME MAPS WERE
RECEIVED, WHILE OTHER UTILITIES DID NOT RESPOND TO
THE LOCATE REQUEST. ADDITIONAL UTILITIES OF WHICH
WE ARE UNAWARE MAY EXIST.
Suite #200
1970 Northwestern Ave.
Stillwater, MN 55082
Phone 651.275.8969
dan@cssurvey
MARYLAN E
GATEWAY
ADDITION
CONTACT:
JAM FREEDOM, LLC
C/O JEFF HAUSE
613 1 55TH AVE
SOMERSET, WI 54025
651-439-0189
COUNTY/CITY:
!!!f!,
NORTH
30 60
DATE REVISION
2-12-21 INITIAL ISSUE
2-25-21 PRELIMINARY PLAT
CERTIFICATION:
I hereby certify that this plan was prepared by
me, or under my direct supervision, and that I am
a duly Licensed Land Surveyor under the laws of
the state of Minnesota.
Daniel L. Thurmes Regist ation Number: 25718
2-12-21
Date:
PROJECT LOCATION:
E3
PID#1 903020320050
1
CORNERSTONE
LAND SURVEYING, INC.
FILE NAME
PROJECT NO.
PRELIMINARY PLAT
0
m
DEMOLITON NOTES
1. BACKGROUND INFORMATION AND TOPOGRAPHIC SURVEY TAKEN
FROM SURVEY PERFORMED BY CORNERSTONE LAND SURVEYING,
INC., ON JANUARY 23, 2021 EXPRESSLY FOR THIS PROJECT. ELAN
DESIGN LAB CANNOT GUARANTY THE ACCURACY OR
COMPLETENESS OF THIS INFORMATION. VERIFY ALL FIELD
CONDITIONS AND UTILITY LOCATIONS PRIOR TO
EXCAVATION/CONSTRUCTION. IF ANY DISCREPANCIES OR
UNKNOWN UTILITIES ARE FOUND THAT IMPACT DESIGN OR IMPAIR
CONSTRUCTION, THE ENGINEER AND OWNER SHOULD BE
IMMEDIATELY NOTIFIED.
2. CONTRACTOR SHALL BRING ANY CHANGED OR UNFORESEEN
CONDITIONS THAT COULD RESULT IN ADDITIONAL COST TO THE
ATTENTION OF THE OWNER AND ENGINEER AS SOON AS THEY ARE
DISCOVERED SO THAT THEY CAN BE PROPERLY DOCUMENTED.
FAILURE TO NOTIFY OR COVERING UN -WITNESSED WORK SHALL
RESULT IN REJECTION OF CLAIMS FOR ADDITIONAL
COMPENSATION.
3. PROTECT ALL STRUCTURES AND LANDSCAPE NOT LABELED FOR
DEMOLITION FROM DAMAGE DURING CONSTRUCTION. ANY ON -SITE
OR OFF -SITE AREAS DISTURBED DIRECTLY OR INDIRECTLY DUE TO
CONSTRUCTION SHALL BE RETURNED TO A CONDITION EQUAL TO
OR BETTER THAN THE EXISTING CONDITION. CONTRACTOR IS
SOLELY RESPONSIBLE FOR ANY CIVIL PENALTIES RESULTING FROM
THEIR WORK UNDER THIS CONTRACT.
4. NO DEMOLITION MATERIALS SHALL BE DISPOSED OF ON -SITE. ALL
DEBRIS SHALL BE HAULED OFF -SITE TO A DISPOSAL AREA
APPROVED BY APPROPRIATE GOVERNMENTAL AUTHORITIES FOR
THE HANDLING OF DEMOLITION DEBRIS. WORK SITE SHALL BE LEFT
IN A CONDITION THAT MINIMIZES EROSION POTENTIAL ON A
NIGHTLY BASE.
5. LIMIT CONSTRUCTION ACTIVITIES TO THE CONSTRUCTION LIMITS
SHOWN ON THE PLAN. IF WORK NEEDS TO EXTEND TO PUBLIC
STREETS OR RIGHT OF WAY IT IS THE CONTRACTOR'S
RESPONSIBILITY TO APPLY FOR ALL PERMITS, PREPARE ALL
DRAWING AND PAY ALL FEES AND COST. ALL CONSTRUCTION
ACTIVITIES SHALL COMPLY WITH LOCAL ORDINANCES.
6. CONSTRUCTION ENTRANCE SHALL BE IN PLACE PRIOR TO
COMMENCEMENT OF DEMOLITION OPERATIONS. SEE SHEET C-202
AND C-203 FOR ALL EROSION CONTROL MEASURES AND
APPROPRIATE STAGING AND SEQUENCING.
7. PROVIDE NECESSARY BARRICADES, SUFFICIENT LIGHTS, SIGNS
AND OTHER TRAFFIC CONTROL METHODS AS MAY BE NECESSARY
FOR THE PROTECTION AND SAFETY OF THE PUBLIC AND MAINTAIN
THROUGHOUT THE LIFE OF THE PROJECT.
8. REMOVE ALL VEGETATION WITHIN CONSTRUCTION LIMITS EXCEPT
AS NOTED.
LEGEND
/
REMOVE BITUMINOUS
TREES & VEGETATION CLEARING
REMOVE CURB & GUTTER
REMOVE TREE
SEE L-010 FOR TREE PRESERVATION PLAN
TREE PROTECTION FENCE
C.S.A.H. NO.64
u
w
0
z
w
w
0
z
w
w
cP
x
x
Iw
0
I N
5
I
/ / / /
7 i / /7 /
/ 7
/ 7 / /
i i , y , / /
i /
i
i vv i vy
7
i
i
i
r�
i II
� II
L 4
a_
0
CO
CO
7
7
7
7
6
0
\-
#30
7
Si
29
In
1 I \ INV= 91 1.5 -- I 15>'5M
\ /
7
7
i
7
/ / /
/
\ \-
REMOVE OR RELOCATE SHED
COORDINATE WITH OWNER
/
\ \
�\ \\ \ \ 32\\ \
#7 \ \ \ \
\ w \ \ \\
\ \
\ I
1 I
\
I\ \ I
\ \ \ \
1
/
i
/
#25 /
/ / 1
/ I 1
I /
t— fi——---7-- i —
\ In 1,� in 7 In / 2'
\ W \
REMOVE BITUMINOUS TO
MAKE UTILITY CONNECTION
6„
#2
/
/
/
/ — // /
/ A / /
_ /
' /— — —7,— /—
/— / / / /
/
l
L
i '
7 �,
II / \
REMOVE CULVERT
•
REMOVE RETAINING WALL
2
REMOVE CONCRETE
PAVEMENT
#24\
■I_■*
ce
PROTECT TREES
TREE PROTECTION
FENCE (TYP)
REMOVE TREES
Iif
Nsn
L�
REMOVE TREE
PROTECT UNDERGROUND
\TELEPHONE
rt
REMOVE BITUMIOUS \
J
♦
•
\
/
7
�-9194
7
906
---------
PROTECT
TREE
B
COO\
s
�In
#10
3�— n 3n
1
PROTECT UNDERGROUND
ELECTRIC
PROTECT UTILITY SERVICES
PROTECT UTILITY SERV-I-6ES-
PROTECT
TREES
TREE PROTECTION
FENCE (TYP)
TREE PROTECTION
FENCE (TYP)
REMOVE TREE
REMOVE TREE
PROTECT TREES & VEGETATION
PROTECT GAS
REMOVE TREE
REMOVE STORM SEWiR FE=902.1
& FLARED END SECTION„ -
PROTECT
WATERMAIN
MARYLANE AVE. N.
REMOVE BITUMINOUS TO
MAKE UTILITY CONNECTION
N- PROTECT UTILITY SERVICES
Lu
Lu
o co
NMI* ir
PROTECT STORM SEWER
MANHOLE, AND FLARED
END SECTION
STM
BURRED
RIM=906.7
INV=901 .1
W PLAN
CB
INV=901 .5
PLAN
EXISTING
STMH
BURRIED
RIM=906.6 PLAN
INV=901 .6 N PLAN
20 60
MISSY HAUSE
JEFF HAUSE
JAM FREEDOM, LLC
613 155TH AVE
SOMERSET, WI 54025
651-442-6555
PROJECT
MARYLANE
GATEWAY
STILLWATER, MINNESOTA
SHEET INDEX
PRELIMINARY
PLAT APPLICATION
02/26/2021
REVISION DATE
Civil Engineering I Landscape Architecture I Construction Services
901 N 3rd STREET, SUITE 120
MINNEAPOLIS, MN 55401
p 612.260.7980
f 612.260.7990
CERTIFICATION
I hereby certify that this plan s e ' Xon or report
was prepared by me, fil i ct supervision,
Stephen M. Johnston
REGISTRATION NO. 18914
DATE
02/26/2021
SHEET
DEMOLITION PLAN
C-0 1 0
DEMOLITION PLAN
Know what's below.
Call before you dig.
SCALE IN FEET
PROJECT NO.
951.0
FBWO
f 95, 1
959.0
GRADING NOTES
1. VERIFY ALL FIELD CONDITIONS AND UTILITY LOCATIONS PRIOR TO EXCAVATION/CONSTRUCTION. IF
ANY DISCREPANCIES OR UNKNOWN UTILITIES ARE FOUND THAT IMPACT DESIGN OR IMPAIR
CONSTRUCTION, THE ENGINEER AND OWNER SHOULD BE IMMEDIATELY NOTIFIED.
2. ALL WORK TO COMPLY WITH CURRENT MINNESOTA DEPARTMENT OF TRANSPORTATION (MNDOT)
STANDARD SPECIFICATIONS FOR CONSTRUCTION UNLESS NOTED.
3. FOLLOW ALL RECOMMENDATIONS IN THE GEOTECHNICAL REPORT PREPARED FOR THIS PROJECT BY
HAUGO GEOTECHNICAL SERVICES DATED FEBRUARY 8, 2021.
4. ALL UNDOCUMENTED FILL, AND TOPSOIL SHALL BE REMOVED FROM WITHIN THE PROPOSED BUILDING
PADS. A GEOTECHNICAL ENGINEER OR THEIR DESIGNATED REPRESENTATIVE SHALL OBSERVE THE
PROJECT EXCAVATIONS TO VERIFY THAT UNSUITABLE MATERIALS HAVE BEEN PROPERLY REMOVED
FROM PROPOSED STRUCTURAL AREAS, THAT ADEQUATE BEARING SUPPORT IS PROVIDED BY THE
EXPOSED SOILS AND THAT STRUCTURAL FILL IS PLACED APPROPRIATELY. THE EXPOSED SOIL AT THE
BASE OF FOOTINGS SHALL BE COMPACTED TO 98 PERCENT PROCTOR DRY DENSITY (ASTM D698).
5. ON -SITE NON -ORGANIC SOIL IS GENERALLY SUITABLE FOR STRUCTURAL FILL. SILTY OR ORGANIC SOILS
SHALL NOT BE USED FOR STRUCTURAL FILL. PLACEMENT OF STRUCTURAL FILL SHALL BE OBSERVED
AND TESTED BY AN EXPERIENCED TECHNICIAN R EN ENGINEER TOVERIFY THAT PROPERCOMPACTION
S C0 G 0
HAS BEEN ACHIEVED. STRUCTURAL FILL SHALL BE MOISTURE CONDITIONED (DRIED OR WETTED) AS
APPROPRIATE PRIOR TO PLACEMENT. MOISTURE CONDITIONED ENGINEERED FILL SHALL BE PLACED
AND COMPACTED IN LOOSE LIFTS OF 8 INCHES OR LESS. EACH LIFT OF FILL SHOULD BE COMPACTED
BY LARGE VIBRATORY EQUIPMENT UNTIL THE IN -PLACE SOIL DENSITY IS EQUAL TO OR GREATER THAN
THE CRITERIA ESTABLISHED WITHIN THE FOLLOWING TABULATION.
TYPE OF CONSTRUCTION
NON -ENGINEERED FILL (GREEN SPACE)
ENGINEERED FILL BELOW FOUNDATIONS
ENGINEERED FILL BELOW FLOOR SLABS
ENGINEERED FILL PLACED AS PAVEMENT
AGGREGATE BASE
ENGINEERED FILL PLACED
BELOW PAVEMENT AGGREGATE BASE
COMPACTION
CRITERIA
90
98
98
95
100
MOISTURE CONTENT
-5 TO +5%,
-3 TO +3% FOR SOILS WITH <12% P200,
-1 TO +3% FOR ALL OTHER SOILS
-3 TO +3% FOR SOILS WITH <12% P200,
-1 TO +3% FOR ALL OTHER SOILS
-3 TO +3% FOR SOILS WITH <12% P200,
-1 TO +3% FOR ALL OTHER SOILS
-3 TO +3% FOR SOILS WITH <12% P200,
-1 TO +3% FOR ALL OTHER SOILS
INFILTRATION BASIN TESTING
CONTRACTOR MUST CONDUCT A POST CONSTRUCTION TEST ON ALL INFILTRATION BASINS IN
CONFORMANCE WITH BROWNS CREEK WATERSHED DISTRICT RULES.
CONTRACTOR SHALL NOTIFY ENGINEER, CITY ENGINEER AND BROWNS CREEK WATERSHED DISTRICT
48 HOURS PRIOR TO THE TEST TO FACILITATE OBSERVATION OF TEST RESULTS.
6. SIDEWALLS SHALL BE BENCHED OR SLOPED TO PROVIDE SAFE WORKING CONDITIONS AND STABILITY
FOR ENGINEERED FILL PLACEMENT. THE CONTRACTOR IS SOLELY RESPONSIBLE FOR ASSESSING THE
STABILITY OF AND EXECUTING PROJECT EXCAVATIONS USING SAFE METHODS. THE CONTRACTOR IS
ALSO RESPONSIBLE FOR NAMING THE "COMPETENT INDIVIDUAL" AS PER SUBPART P
OF 29 CFR 1926.6 (FEDERAL REGISTER - OSHA). IF SOIL CORRECTION IS REQUIRED IT SHALL EXTEND 3
FEET OUTSIDE OF THE PAVEMENT OR BUILDING LIMITS PLUS ONE FOOT HORIZONTAL FOR EVERY
VERTICAL FOOT OF CORRECTION.
7. IT IS RECOMMENDED THAT A SUBSURFACE DRAINAGE SYSTEM BE INSTALLED AT THE BASE OF
BASEMENT FOUNDATION WALLS AND UNDER WALKS AND PATIOS. IT IS RECOMMENDED THAT SEPARATE
FOUNDATION DRAINAGE SYSTEMS BE INSTALLED ON BOTH THE INTERIOR AND EXTERIOR OF THE
FOUNDATION. THE DESIGN OF THESE SYSTEMS SHALL BE PROVIDED BY THE BUILDER.
8. THE CONTRACTOR SHALL PROTECT THE SUBGRADE FROM INCLEMENT WEATHER TO MAINTAIN
STABILITY. FOLLOWING REMOVAL OF TOPSOIL, PAVEMENT, AND ANY UNSUITABLE SOILS, THE RESULTING
SUBGRADE SHOULD BE SCARIFIED AND RE -COMPACTED TO A DEPTH OF 12 INCHES. A PROOFROLL TEST
SHOULD THEN BE PERFORMED TO DETERMINE SOFT OR UNSTABLE SUBGRADE AREAS. IF RUTTING OR
LOCALIZED UNSTABLE SUBGRADE AREAS ARE OBSERVED, THOSE AREAS SHOULD BE SUBCUT,
MOISTURE -CONDITIONED, AND RE -COMPACTED OR REMOVED TO A STABLE DEPTH. THE PROOF ROLL
SHOULD BE PERFORMED WITH A TANDEM AXLE DUMP TRUCK LOADED TO GROSS CAPACITY (AT
LEAST 20 TONS). ACCEPTANCE CRITERIA OF THE PROOF ROLL SHALL BE LIMITED TO RUT FORMATION NO
MORE THAN ONE INCH (1") DEPTH (FRONT OR REAR AXLES) AND NO PUMPING (ROLLING) OBSERVED
DURING THE VISUAL INSPECTION. PROOF ROLL TESTS SHOULD BE OBSERVED BY AN EXPERIENCED
TECHNICIAN OR ENGINEER PRIOR TO PLACEMENT OF THE AGGREGATE BASE COURSE TO VERIFY THE
SUBGRADE WILL PROVIDE ADEQUATE PAVEMENT SUPPORT.
9. PAVEMENT
BITUMINOUS PAVEMENT
2.0" BITUMINOUS WEAR (MNDOT 2360 - SPWEA240B)
TACK COAT (MNDOT 2357)
2.0" BIT NON -WEAR (MNDOT 2360 SPNWB230B)
6" AGGREGATE BASE (MNDOT 3138 CL5 OR CL7)
24" SELECT GRANULAR SUB -BASE
COMPACTED SUBGRADE
10. THE BROWNS CREEK WATERSHED DISTRICT ENGINEER AND INSPECTOR SHALL BE NOTIFIED AT LEAST 3
DAYS PRIOR TO COMMENCEMENT OF WORK.
LEGEND
BUILDING PAD
REAR ELEV
1—TYPE OF BUILDING
BASEMENT ELEV
— FRONT ELEV
CONCRETE PAVEMENT
ASPHALT PAVEMENT
MNDOT MIXTURE 25-141 GENERAL ROADSIDE
BROADCAST SEEDING
TEMPORARY - MIXTURE 21-111 OATS COVER CROP
SEEDING RATE PLS 59 LBS/AC.
FIBER BLANKET MnDOT CATEGORY 3N (ALL SEEDED
SLOPE >4:1, DITCH BOTTOM, AND INFILTRATION BASINS)
MNDOT MIXTURE 33-261 STORMWATER SOUTH
BROADCAST SEEDING
TEMPORARY - MIXTURE 21-111 OATS COVER CROP
SEEDING RATE PLS 35 LBS/AC.
SOD
SILT FENCE
DITCH CHECK
FILTER LOGS AFTER CONSTRUCTION AND STABILIZATION
CULVERT INLET PROTECTION
ELEELE
11. CONTOURS MAY NOT REFLECT BUILDING OR STREET HOLDDOWNS. REFER TO PROFILES, SECTIONS AND
DETAILS
12 SEDIMENT AND RUNOFF SHALL BE KEPT AWAY FROM THE INFILTRATION FACILITIES USING PRACTICES
SUCH AS DIVERSION BERMS AND VEGETATION AROUND THE PERIMETER. THE INFILTRATOIN FACILITY
SHALL NOT BE EXCAVATED TO FFINAL GRADE UNTIL THE CONTRIBUTING DRAINAGE AREA HAS BEEN
CONSTRUCTED AND FULLY STABILIZED. THE FINAL PHASE OF EXCAVATIONS SHALL REMOVE ALL
ACCUMULATED SEDIMENT, AND BE DONE BY LIGHT TRACKED EQUIPMENT TO AVOID COMPACTION OF
THE BASIN FLOOR. THE SOILS OF THE BASIN FLOOR SHALL BE LOOSENED TO A DEPTH NO LESS THAN 24"
AT A MAXIMUM COMPACTION OF 85% STANDARD PROCTOR DENSITY PRIOR TO PLANTING. AT SITES
WHERE BLOW COUNTS PER FOOT EXCEED 10, SOILS SHALL BE LOOSENED TO A DEPTH OF 5 FEET
BEFORE PLANTING.
13. THE UPPER 10" OF INFILTRATION BASIN SOIL SHALL BE TILLED PRIOR TO PLANTING.
BUILDING PAD NOTES
1. BUILDING SETBACK:
FRONT 30 FEET
SIDE GARAGE 5 FEET
SIDE HOUSE 10 FEET
2. FB = FULL BASEMENT - NO CHANGE IN REAR GRADE FROM FRONT TO BACK OF HOME)
3. FBLO = FULL BASEMENT LOOKOUT - GRADE AT REAR OF HOME ALLOWS FOR WINDOWS 42" ABOVE
BASEMENT FLOOR.
4. FBWO = FULL BASEMENT WALKOUT - GRADE AT THE REAR OF THE HOME FACILITATES INGRESS AND
EGRESS ACCESS. GENERALLY THIS DESIGN ALLOWS FOR A MAXIMUM CEILING HEIGHT OF 8' IN
BASEMENT.
_no
CO
I I
I I
I I
I 0 I
I I
I I
I I
c0 \ \ \ \ 'V/,1.�\�
0' \ \ \ \ \ \
\ \ \ \ \
\ \
GRO \
I
`-)eitc3I
0
W
0
co
EXISTING o co
\\\\
HOUSE o m \
RD'
1—cF
\ I I
\\\\\\\\\\\\\\\\\\\\\\\\
1 ��
ems •
h
t
cc).
rn
X
3' CURB TAPER FROM
SURMOUNTABLE TO
0" RIBBON CURB
0)
r
SILT FENCE (TYP)
II
ASPHALT
DRIVEWAY
SECTION I
GARAGE
••�
�q
�m .
�-�-•
rn
•
\
X
0)
2
00
0
0
0
X
1
CONSTRUCTION ENTRANCE
ADJUST LOCATION AS NEEDED
INSTALL TWO ROWS OF
SOD BEHIND CURB
/
/—
z
GILQX
1�06 \
1
I
\ I >
0
\ 0)
3\\
BLOCK �\
SILT FENCE (TYP)
BITUMINOUS
INTERLOCK AT
MATCHLINE
/
SILT FENCE (TYP)
0
— — o
0
0)
J
FILTER LOG INSTALLED
AFTER CONSTRUCTION
AND STABILIZATION
+ + + + + + + + -+ + -+ + + + + + + + + + + + + 1 + + + + + + + + + + + + + + + + + + + + + + Y
+ + ++++++ + ++++++++++++++++++++++
▪ +++++++++++++++++ ++++
▪ ++++++++++++;++++.+ +�tt O18 + T + + + +++++++++ +++++++++++�
+ + + + + ♦ I. ♦ + ♦ + + + + --
+ ++++++++++-,,--4
+++++++/
+ + + + + + +
0A2 SITE, GRADING, EROSION & SEDIMENT CONTROL PLAN
1"=20'
/4
BUILDING PAD
CONSTRUCTION
c
0
SURMOUNTABLE CURB
& GUTTER (TYP)
+ + + + + + + + + + + + + + + + + + + + + + + + + +_-+
+ + + + + + + + + + + + + + + + + + +
EROSION CONTROL
BLANKET (TYP)
/
ASPHALT
PAVEMENT
SECTION
MARYLANE AVE. N.
++++++++++++++
+++++++++++++
++++++++++++
* + + + + + + + + + + + �
+ + + + + + + + + +
++++++++++++
+ ++++++++++
+ + + + + + + + + + +
\++++++++++
+++++++
5
N
0
0
CATCH BASIN
INSTALLATION
RIP -RAP APRON
i
0
LC)
0
X
0'ID
+00
1 /
N I/
00
co
0
0
X
3' TRANSITION FROM SURMOUNTABLE TO
B618 CURB ON EACH SIDE OF CATCH BASIN.
MEET AND MATCH
EXISTING CURB
AND PAVEMENT
Know what's below.
Call before you dig.
20
co
60
SCALE IN FEET
MISSY HAUSE
JEFF HAUSE
JAM FREEDOM, LLC
613 155TH AVE
SOMERSET, WI 54025
651-442-6555
PROJECT
MARYLANE
GATEWAY
STILLWATER, MINNESOTA
SHEET INDEX
PRELIMINARY
PLAT APPLICATION
02/26/2021
REVISION DATE
Civil Engineering I Landscape Architecture I Construction Services
901 N 3rd STREET, SUITE 120
MINNEAPOLIS, MN 55401
p 612.260.7980
f 612.260.7990
CERTIFICATION
I hereby certify that this plan s e Xon or report
was prepared by me, v
Ns ct supervision,
Stephen M. Johnston
REGISTRATION NO. 18914
DATE
02/26/2021
SHEET
SITE, GRADING, EROSION &
SEDIMENT CONTROL PLAN
C-201
PROJECT NO.
U
m
\ I\\ram
I
in
LC)
LC)
/
—t--� 916
in
/
—c_
1
—
/in
15+00
MARYLANE AVE EAST CURB PLAN
1"=20'
925
920
915
910
905
L7
W
II
1,
/
/
/
L
J7f
�1 0�
\O �90g
X g•0
I
II I
1
3n ` 3n z_L366
3n
CURB STATIONING CORRESPONDS TO MARYLANE
AVENUE CENTERLINE STATIONING FROM THE
RUTHERFORD STATION DEVELOPMENT
J
N
--1-0— — — — — g050
--Z=606.
0
3+00
910
--__ — -
17.906X �! • — — (f
--- - _
06 x_ X
6.17
i
MARYLANE AVE. N.
-------vim
_ _c _-910----
6\\ --
ho— ----
\4)
0
0
rn
12+00
CD
0
0)
TT�
— IJ9o1 09
17111:12/• 016)<-6 X----())-67179+0 o �
---- ---- —5'606
1118
LC)
CO
PVI STA.= 15+34.• 4
PVI ELEV =
-
.—
H
eD
cG
p
p
N
M
co
W
�I
CD
.-
O
II
0
= 910.23
r
�-
'T+11,10
11 I,I
H
'
IIIgi
II
+
rn
>
LIJ
J
w
5 0
HILI
II
-.
_
,
PO
NT TO 11+95.20, PROVI I
ING A MINIMUM
■—
0.5
/0 GUTTER SLOPE. ADJU►T
� DES AS NECESSARY T
TRANSITION TO T
PAVEMENT
J
R
SM•OTH
1 • - •'
__
-
►
....
1.50%
1.1110
0
6)
M
Co
6)
CV
,—
00
O)
LC)
0)
co
6)
V
CA
CO
O)
V
LC)
U")
.1,—,
O
c
cc:,
Lc)
O)
V
M
-4
6)
CO
N
O)
C')
6)
N
6)
N
6)
N
O)
0)
I�
6)
N
N
O)
I,-
CO
O
6)
C)
CO
O
O)
LC)
N
O
6)
C)
N
O
O)
lf)
I-
6)
O
0)
C7
6)
6)
CD
0)
CO
6)
0)
CO
1"--
I
6)
CD
0)
CO
N
6)
0)
C)
CO
6)
O
0)
CO
6)
O
0)
CO
6)
O
0)
N
6)
CD
0')
Cv)
C")
O)
a)CD
0)
'
6)
0')
a:.LC)
N O
O) 6)
O O
O) 0)
CO
O
O)
O
O)
V
6)
co
O
0)
CO
-
O) 6)
O O
O) Cr)
CO
C)
6)
O
CS)
CV
6)
O
C)
CO
O)
O
O)
15+75
15+50
15+00
MARYLANE AVE EAST CURB PROFILE
HOR: 1" = 20'
VERT: 1" = 5'
14+50
14+00
13+50
13+00
12+50
12+00
11+50
925
920
915
910
905
11+00
20
60
MISSY HAUSE
JEFF HAUSE
JAM FREEDOM, LLC
613 155TH AVE
SOMERSET, WI 54025
651-442-6555
PROJECT
MARYLANE
GATEWAY
STI LLWATE R, M I N N ESOTA
SHEET INDEX
PRELIMINARY
PLAT APPLICATION
02/26/2021
REVISION DATE
Civil Engineering I Landscape Architecture I Construction Services
901 N 3rd STREET, SUITE 120
MINNEAPOLIS, MN 55401
p 612.260.7980
f 612.260.7990
www.elanlab.com
CERTIFICATION
I hereby certify that this plan se c' 4on or report
was prepared by me,
and that I d I
undePjYse s
i ct supervision,
Pr1_ sional Engineer
OTA.
No \ vc-o
Go
NS��
Stephen M. Johnston
REGISTRATION NO. 18914
DATE
02/26/2021
SHEET
MARYLANE AVENUE
EAST CURB
PLAN & PROFILE
0-202
Know what's below.
Call before you dig.
SCALE IN FEET
PROJECT NO.
CLS20020
Project Name / Location
Project Name
Mary Lane Gateway
Project Address
8483 Mary Lane North, Stillwater, MN 56031
Latitude / Longitude
43.6384, -93.4448
Site PID#
190303020320050
Project Type
Residential Redevelopment
Contacts
Owner
Contractor (Operator)
Preparer
TBD
Conner Deur
JAM Freedom LLC
Elan Design Lab, Inc.
613 155th Ave
901 N 3rd St.
Somerset, WI 54025
Suite 120
651-439-0189
Minneapolis, MN 55401
612-260-7982
cdeur@elanlab.com
SWPPP Design Certification
Expires 2021
General SWPPP Responsibilities
The Contractor (Operator) shall provide a knowledgeable and experienced person(s) to oversee the
implementation of the SWPPP and the installation. Inspection and maintenance of the erosion and
sediment control BMP's before and during construction. Training must be in conformance with the
NPDES Construction Permit requirements. Training documentation must kept on -site with the SWPPP
and the trained person must be available on -site within 72 hours.
Both the Owner and Contractor (Operator) shall be responsible for the proper termination and/or
transfer of the permit.
The Owner will be responsible for the long term operation and maintenance of the permanent storm
water management system(s).
Unless specifically stated the engineer (Preparer) shall have no responsibility for any SWPPP activities
during or after construction.
Project Description
The 2.57-acre project site consists of an existing residential community. The proposed project consists of
creating four lots on the existing property for the construction of single-family homes. This would
include the installation of utilities, pad grading and driveway construction for each lot, and the
construction of a stormwater management facility. As part of these improvements, Mary Lane will be
partially reconstructed with a surmountable curb and gutter. It is proposed to disturb ^'1.22 acres and
adding an estimated 0.45 acres of impervious surface and reconstructing 0.03 acres of impervious.
Soils
A geotechnical report was prepared on February 08, 2021 for this site. The soils encountered in the
borings consisted of both granular (sand) soils and cohesive (clay) soils. The granular soils consisted of
silty sand (SM) and poorly -graded sand with silt (SP-SM). The cohesive soils generally consisted of lean
clay corresponding of the ASTM Classification of (CL).
Receiving Waters
The site discharges to Brown's Creek (M-050-012-001-002). This stream has been identified as a trout
stream tributary (Minn. R. 6264.0050). Projects discharging to trout streams must incorporate the
additional best management practices (BMPs). In addition, the Contractor (Operator) must immediately
initiate stabilization and come to complete stabilization within seven (7) calendar days after the
construction activity in the portion of the site has temporarily or permanently ceased.
Project Plans
The following plan sheets are hereby incorporated into this SWPPP
Sheet Number
Description
Date
C-010
Demolition Plan
02/24/2021
C-201
Grading, Erosion & Sediment Control Plan
02/24/2021
C-202
Marylane Avenue East Curb Plan & Profile
02/24/2021
C-203
SWPPP Narrative
02/24/2021
C-301
Utility Plan
02/24/2021
C-501 - 503
Utility, Erosion & Sediment Control Details
02/24/2021
Stormwater Related Reviews and Permits
Agency
Type of Permit or Review
Status
City of Stillwater
Site Plan Review, Plat, Building Permit
Pending
Brown's Creek Watershed
District
Stormwater Management Review
Pending
MPCA
Construction Stormwater
To be acquired by
contractor.
Stormwater Management System Overview
See Stormwater Management Plan incorporated herein by reference for details on system design, flow
rates and volumes and system capacities. In general runoff is collected by a new storm sewer system
consisting of catchbasins and a pipe network which direct the runoff to an infiltration basin.
See Operations and Maintenance Manual for post construction system maintenance requirements.
Erosion Prevention Measures - General
The Contractor (Operator) is responsible for all erosion prevention measures for the project including
but are not limited to the following:
1. The Contractor (Operator) shall plan and implement appropriate construction practice and
construction phasing to minimize erosion and retain vegetation whenever possible
2. All areas not to be disturbed shall be delineated with flags, stakes, signs, or other means
necessary to protect these areas before construction begins on the site.
3. All drainage ditches and/or swales shall have temporary or permanent stabilization within 24
hours of connecting to a surface water or 24 hours after construction activity in the ditch/swale
has temporarily or permanently ceased.
4. All pipe outlets shall have temporary or permanent energy dissipation within 24 hours of
connecting to a surface water.
5. All exposed soils shall be stabilized as soon as possible to limit soil erosion. In no case shall un-
worked areas, including stock piles, have exposed soils for more than 7 days without providing
temporary or permanent stabilization.
Sediment Control Measures and Timing - General
The Operator (Contractor) is responsible for all sediment control measures for the project. Sediment
control measures include but are not limited to the following:
1. Sediment control measures shall be established on all down gradient perimeters before any up -
gradient land disturbing activities begin. These measures shall remain in place until final
stabilization has been established.
2. On slopes with 3:1 or steeper grades there shall be no unbroken slope length greater than 75
feet.
3. All storm drain inlets and culvert inlets shall be protected by an appropriate BMP during
construction until all sources with potential for discharging to the inlet has been stabilized. Inlet
and culvert protection shall conform to the MnDOT Specifications 2573 and 3891.
4. Stock piles shall be provided with an effective sediment perimeter control and shall not be
placed in any type of surface water or drainageway.
5. Vehicle tracking shall be minimized with effective BMP's. Where the BMP's fail to prevent
sediment from tracking onto streets the Contractor shall conduct street sweeping to remove all
tracked sediment.
6. The Operator is responsible for identifying the need for temporary sediment basins based on
actual field conditions to protect downstream resources. Temporary sediment basins shall be
constructed before up gradient vegetation is disturbed and maintained until the risk of damage
to downstream resources is mitigated by other means.
Dewatering and Basin Draining Activities - General
The Operator is responsible for adhering to all dewatering and surface drainage regulations, including
but not limited to the following:
1. Whenever possible water from dewatering activities shall discharge to a temporary and/or
permanent sediment basin.
2. If water cannot be discharged to a sedimentation basin, it shall be treated with other
appropriate BMP's, to effectively remove sediment.
3. All discharge points shall be protected from erosion and scour.
4. Discharge water shall be dispersed over an effective energy dissipation measure.
5. All water from dewatering shall be discharged in a manner that does not cause nuisance
conditions, erosion, or inundation of wetlands. Water shall not be discharged to adjacent
residential properties. It must be discharged to the public street.
Final Stabilization - General
The Operator is responsible for ensuring final stabilization of the site, including but is not limited to the
following:
1. All soil disturbing activities have been completed.
2. All exposed soils have been uniformly stabilized with of least 80% perennial vegetation.
3. All drainage ditches, ponds and all storm water conveyance systems have been cleared of
sediment and stabilized to preclude erosion.
Temporary Sediment Basin
During construction the contractor shall excavate and maintain temporary sediment basins as needed to
prevent sediment from reaching permanent filtration areas, natural depressions, adjacent residential
properties and other environmentally sensitive areas.
Construction Sequencing
Contractor shall comply with the following sequence. Contractor may make adjustments to the
sequence if needed to address their means and methods and unanticipated field conditions.
1. Install rock construction entrance, rumble racks or some other suitable device. Move as
necessary as construction progresses. Maintain access to townhomes.
2. Perform clearing and grubbing only to the extent necessary to install perimeter silt fence.
3. Install perimeter silt fence and other barriers at a minimum as indicated on the plan. The
contractor is responsible for any additional sediment control that is needed.
4. Complete clearing and grubbing.
5. Construct infiltration basin per plan. Seed and stabilize slopes. Minimize runoff to basin until
vegetation has been established.
6. Remove existing pavement within construction limits. Re -grade per plan.
7. Install site utilities.
8. Complete site grading. Remove any excess material from site.
9. Re -spread topsoil in disturbed areas outside of building and pavement areas.
10. Provide temporary erosion control seeding and mulch where active construction is not taking
place.
11. Complete landscaping.
12. Flush storm sewer system. Remove any sediment flumes.
13. Monitor vegetation and reinstall as needed until fully established.
14. Remove sediment barriers.
15. File NPDES Notice of Termination ("NOT") with MPCA within 30 days of final stabilization.
Inspection and maintenance
All inspections, maintenance, repairs, replacements and removal are to be considered incidental to the
BMP bid items.
The Contractor (Operator) is responsible for completing required inspections maintenance and
observation of weather conditions and rainfall amounts to ensure compliance with the permit
requirements. The Contractor (Operator) shall observe the construction site once every seven (7) days
during active construction and within 24 hours after a rainfall event greater than 0.5 inches in 24 hours.
The Contractor (Operator) shall keep a summary maintenance/construction observation report to be
recorded after each site visit/observation. The Contractor (Operator) shall submit a copy of the written
inspections monthly to the Owner. Records shall include the following:
1. Date and time of inspections
2. Name of person conducting inspection
3. Findings and recommendations for corrective actions if necessary
4. Corrective actions taken
5. Date and amount of rainfalls greater than 0.5 inches in 24 hours
6. Mention of any changes made to the SWPPP
7. A site map indicating active construction areas and land disturbing activities.
The Contractor (Operator) must keep the SWPPP, all inspection reports and amendments onsite. The
Contractor (Operator) shall designate a specific location to keep the records whenever construction
activity is in progress.
All erosion prevention and sedimentation control BMP's must be inspected to ensure integrity and
effectiveness. All nonfunctional BMP's must be repaired, replaced or supplemented with functional
BMP's. The Contractor (Operator) must investigate and comply with the following inspection and
maintenance requirements:
1. All sediment barriers including silt fence, bio-logs, and similar devices must be repaired replaced
or supplemented when they become nonfunctional or the sediment reaches 1/3 of the barrier
height. These repairs shall be made within 24 hours of discovery.
2. Temporary and permanent sediment basins must be drained and the sediment removed when
the depth of sediment collected in the basin reaches 1/2 the storage volume. Drainage and
removal must be completed within 72 hours of discovery.
3. Surface waters, including drainage ditches and conveyance systems, must be inspected for
evidence of erosion and sediment deposition. The Operator shall remove all deltas and
sediment deposited in surface waters, including drainage ways, catch basins, and other drainage
systems. The Operator shall re -stabilize the areas where sediment removal results in exposed
soil. Removal and stabilization must take place within 7 days of discovery, unless precluded by
legal, regulatory or physical constraints. The Contractor (Operator) is responsible for contacting
all local, regional, state and federal authorities and receiving any applicable permits, prior to
conducting any work.
4. Construction site vehicle exit locations shall be inspected daily for evidence of off -site sediment
tracking onto paved surfaces. Tracked sediment must be removed from all paved surfaces within
24 hours of discovery.
5. The Contractor (Operator) is responsible for the operation and maintenance of temporary and
permanent water quality BMP's. As well as erosion and sediment control BMP's for the duration
of the construction work at the site.
6. If sediment escapes the construction site, all off -site accumulations of sediment must be
removed in a manner and at a frequency sufficient to minimize off -site impacts.
7. All filtration areas must be inspected to ensure that no sediment from ongoing construction
activities is reaching the filtration areas and these areas are protected from compaction due to
construction equipment driving across the filtration area.
8. The Contractor is solely responsible for all costs associated with reconstructing the infiltration
basin when the functionality is compromised by the contractor's actions or inaction to protect
the basin.
Pollution Prevention Management Measures
The Contractor (Operator) shall be responsible for all pollution prevention management measures. The
Contractor (Operator) is responsible for informing all visitors and/or personnel on -site of the pollution
prevention management measures.
All pollution prevention management measures are to be considered incidental to the overall project
bid, unless otherwise noted. Pollution prevention management measures include but are not limited to
the following:
1. The Contractor (Operator) is responsible for the proper disposal, in compliance with MPCA
disposal requirements, of all solid or liquid waste and hazardous materials on -site.
2. Concrete trucks shall not be allowed to wash out or discharge surplus concrete or drum wash
water on -site, unless done in an engineered leak -proof containment system. The engineered
system provided by the Contractor (Operator) must include site drawings for the project file and
written assurance that the system will work as designed and leave no discharge of concrete or
concrete residue potential to waters of the state during a minimum of a 100-year storm event.
A sign must be installed adjacent to each washout system to inform concrete equipment
Operators to utilize the proper facilities. The concrete washout containment system and all
related items shall be considered incidental to the project bid.
3. All nonhazardous waste materials shall be collected and stored in a securely lidded metal
dumpster or other approved containment method at the end of each day. Any alternative to a
metal dumpster must be submitted in writing for approval by the project engineer. The
dumpster shall be emptied as necessary to function as intended for debris collection. No
construction garbage or waste material shall be buried on -site.
4. A licensed sanitary waste management Contractor shall collect all sanitary waste from the
portable units at a rate necessary to maintain designed function.
5. All fertilizers shall be stored in a covered shelter. Partially used bags shall be transferred to a
sealable bin to reduce the chance of spillage.
6. External washing of trucks and other construction vehicles and engine degreasing are prohibited
at the construction site. All vehicles on -site shall be monitored for leaks and receive regular
prevention maintenance to reduce the chance of leakage. Petroleum products shall be stored in
tightly sealed containers. Which are clearly labeled. Spill kits shall be included with all fueling
sources and maintenance activities. Secondary containment measures shall be installed and
maintained by the Operator.
7. Any asphalt substances used on -site shall be applied in accordance with manufacturer's
recommendations.
8. All paint containers and curing compounds shall be tightly sealed and stored when not required
for use. Excess paint and/or curing compounds shall not be discharged into the storm sewer
system and shall be properly disposed of according to manufacturer's instruction.
9. Materials and equipment necessary for spill clean-up shall be kept in an enclosed trailer or shed
on -site. Equipment shall include. But not limited to, brooms, mops, dust pans, rags, gloves,
goggles, absorbent (kitty litter) oil absorbent booms and diapers and buckets.
10. All spills shall be contained and cleaned up immediately upon discovery. Spills large enough to
reach the storm water conveyance system shall be reported to the Minnesota duty officer at 1-
800-422-0798.
Quantities
Practice
Detail / Spec.
Unit
Quantity
Silt Fence
A2/C-502
LF
1,280
Fiber Log Sediment Control
A3/ C-502
LF
414
Rumble Rack Construction Entrance
B2/ C-502
Each
1
Inlet Protection
A4/ C-502
Each
1
Erosion Control Blanket
A4/C-501
SY
366
Sod & Landscaping
MnDot 3878
SY
2,059
Post Construction Operation and Maintenance
Maintenance of the storm water management facilities will be the responsibility of the Owner and may
be subject to an agreement with the City of Stillwater. See Operation and Maintenance manual for
guidance.
Amendments to the SWPPP
The SWPPP will be amended as needed and/or as required by provisions of the permit. Amendments
will be approved by both the Owner and Contractor (Operator) and will be attached to the SWPPP as an
additional sheet. The SWPPP and amendments will be kept on site by the Contractor (Operator)
whenever construction activity is in progress.
MISSY HAUSE
JEFF HAUSE
JAM FREEDOM, LLC
613 155TH AVE
SOMERSET, WI 54025
651-442-6555
PROJECT
MARYLANE
GATEWAY
STI LLWATE R, M I N N ESOTA
SHEET INDEX
PRELIMINARY
PLAT APPLICATION
02/26/2021
REVISION DATE
Civil Engineering 1 Landscape Architecture 1 Construction Services
901 N 3rd STREET, SUITE 120
MINNEAPOLIS, MN 55401
p 612.260.7980
f 612.260.7990
www.elanlab.com
CERTIFICATION
I hereby certify that this plan, s ee on or report
was prepared by me; r( ct supervision,
and that I d csPr• sional Engineer
undse stetOf i� OTA. A`
Stephen M. Johnston
REGISTRATION NO. 18914
DATE
02/26/2021
SHEET
SWPPP
0-203
PROJECT NO.
CLS20020
UTILITY NOTES
VERIFY ALL CONNECTIONS TO EXISTING UTILITY SERVICES
PRIOR TO CONSTRUCTION. ANY DISCREPANCIES BETWEEN
LOCATED UTILITIES AND THE EXISTING CONDITIONS PLAN
SHOULD BE NOTED AND FORWARDED TO THE ENGINEER.
2. ALL CONNECTIONS TO PUBLIC UTILITIES TO BE IN
ACCORDANCE WITH THE CITY OF STILLWATER DESIGN
STANDARDS, LATEST EDITION.
3. CONTRACTOR TO PROVIDE ADEQUATE MEANS AND METHODS
TO ASSURE ADJACENT PROPERTY IS NOT DAMAGED DURING
UTILITY INSTALLATION.
4. PIPE LENGTHS SHOWN ARE MEASURED FROM CENTER OF
STRUCTURE TO CENTER OF STRUCTURE.
5. PIPE MATERIALS:
STORM SEWER
DRAIN TILE
WATER
SANITARY
RCP OR DUAL WALL HDPE
PVC (SDR 26)
COPPER (TYPE K)
PVC (SDR 26)
6. ALL UTILITY CONSTRUCTION TO CONFORM WITH STATE, CITY
ENGINEER'S ASSOCIATION OF MINNESOTA (CEAM),
MINNESOTA PLUMBING CODE AND CITY OF STILLWATER
STANDARD SPECIFICATIONS.
7. ADJUST ALL STRUCTURES, PUBLIC AND PRIVATE, TO
PROPOSED GRADES WHERE DISTURBED. COMPLY WITH ALL
REQUIREMENTS OF UTILITY OWNERS. STRUCTURES BEING
RESET TO PAVED AREAS TO MEET OWNERS REQUIREMENTS
FOR TRAFFIC LOADING.
8. WATER LINES SHALL HAVE A MINIMUM 7.5' TO A MAXIMUM 10'
OF COVER.
9. SEE DETAILS C3/C-503 AND C4/C-503 FOR PIPE BEDDING.
LEGEND
w w
««
UE UE
OE OE
UT UT
G G
SANITARY SEWER
DOMESTIC WATER SERVICE
STORM SEWER
UNDERGROUND ELECTRIC
OVERHEAD ELECTRIC
UNDERGROUND TELECOMM
GAS
r
X
X
Lit
0
Iw
0
w
0
w
w
0
w
0
w
0_
0
mo
CO
w
0
w
0
w
0
in
r 1
I I
I I
L_ J
t
in
WATER SERVICE
(TYP)
1
CURB STOP (TYP)
/ INV = 903.41
w
a _ 33' OF 4" PVC
3 v @2%
C1
C-503
v
- 3n
- In
311
0
311
2
LOCATE AND MARK ENDS OF ALL
EXISTING UTILITY SERVICES
BEFORE STARTING STREET
CONSTRUCTION
117
3n
0
3
BLOCK 1
in
3n
3n
L
L_
/
I
I
•/
4
CO
O
CO O
0
-
CONNECT 30" RCP TO EXIST STMH
ADJUSTED RIM = 910.0'
INV = 905.0' (S)
w
0
WATER SERVICE
w
C2
w
C-503
SEWER SERVICE (TYP)
w
w
w
w w
w
w
v
♦♦
•
1
•
♦
OCS 3
TOP= 905.0
INV = 901.50 (SE)
INV = 902.64 (W) /
•
I
•
5
30" PIPE INV = 901.92
TOP OF 30" PIPE 904.65
42" PIPE INV=905.12-
BOTTOM OF 12" PIPE 905.0
v
w
/
STM H
RIM=909.3
w
33' OF 4" PVC
@ 2.0%
STORM MANHOLE
(STMH)
25' - 24' RCP @ 0.20%
STMH 2
RIM = 905.00'
INV = 900.75
, �� �0
ti
"77
OUTLET CONTROL
STRUCTURE (OCS)
6
CONNECT 30" RCP TO EXIST STMH
ADJUSTED RIM = 909.0'
INV = 901.6' (N & E)
-77
? 30" HD
C3 & C4
0000-,-71111111111
PE @ p,5°10
STMH
A BURRIED
RIM=906
INV=901 .
W PLAN
Al
A
AlA
A
A
AI
A
A
A
A
A
A
A
A
A
A
A
CATCH BASIN MANHOLE (CBMH)
C-502J MOMENTUM PRESERVER BAFFLE
CB 4 >
> > > > > > > > > > > > > > r ' ^ U RIM = 908.96'
INV = 905.30
4' SUMP
SKIMMER BAFFLE
r^
MARYLANE AVE. N.
8"x4" PVC WYE
INV @ MAIN = 902.25
dA
0
8"x4" PVC WYE
INV @ MAIN = 901.0'
A
A
A
w
§0' (BOTH DIRECTIONS) - 4" PRF
PVC DRAIN TILE LOCATED AT
BOTTOM OF SELECT GRANULAR
SUB -BASE. BED TILE IN CHOKER
COARSE OF ASTM # 8 STONE
FLARED END
SECTION (FES)
FES 1
INV = 900.7
SET FES AS CLOSE AS
PRACTICAL TO EXISTING
FES. FORM RIP RAP INTO A
•SINGLE STILLING BASIN
1
EXPOSE COVER ON EXISTING STMH
RIM=906.0
INV=901.5
PLAN
N EXISTING
o,N HOUSE
STM H
BURRIED
RIM=906.6 PLAN
INV=901.6 N PLAN
COORDINATE ADJUSTMENT OF
_pEBESTALS AND -CABLES TO FINISHED
GRADE WITH THE APPROPRIATE
I UTILITY COMPANIES
w w
20
•
60
MISSY HAUSE
JEFF HAUSE
JAM FREEDOM, LLC
613 155TH AVE
SOMERSET, WI 54025
651-442-6555
PROJECT
MARYLANE
GATEWAY
STILLWATER, MINNESOTA
SHEET INDEX
PRELIMINARY
PLAT APPLICATION
02/26/2021
REVISION DATE
Civil Engineering I Landscape Architecture I Construction Services
901 N 3rd STREET, SUITE 120
MINNEAPOLIS, MN 55401
p 612.260.7980
f 612.260.7990
www.elanlab.com
CERTIFICATION
I hereby certify that this plan s e Xon or report
was prepared by me, X i ct supervision,
andthat I�ad� s d Pr�� sional Engineer
and e s tgof i h . OTA.
co
Stephen M. Johnston
REGISTRATION NO. 18914
DATE
02/26/2021
SHEET
UTILITY PLAN
0-301
RI
UTILITY PLAN
1"=20'
Know what's below.
Call before you dig.
SCALE IN FEET
PROJECT NO.
CLS20020
R=12"
R=28"
SLOPE 1/4" PER FT.
17.5" 10.5"
28"
R=68"
SURMOUNTABLE CURB & GUTTER
TACK COAT ALL EDGES
1/2 THICKNESS OF
EXISTING PAVEMENT
NO SCALE
6" MIN MILL AND OVERLAY
NEW PAVEMENT
SAW CUT ,
� . �' oI MA SEE NOTE 1
r LI�L ...440I LLL L III�� L I��IL IIILI ��1.41LILI I ILILI L.t_Im 4�I_I_II �L"kj��_'EXISTING AGGREGATE ' =L,..
BASE
COURSE
AGGREGATE
BASE COURSE
6"
NOTES:
1. SAW CUT AND REMOVE A MINIMUM 2" OF EXISTING PAVEMENT, PROVIDING A
MINIMUM 4" GAP BETWEEN CURB AND SAW CUT PAVEMENT EDGE.
2. SAW CUT ALL EDGES. REMOVE BITUMINOUS AND ENOUGH AGGREGATE BASE
MATERIAL TO ACCOMMODATE NEW PAVEMENT. EXTEND 6" AGGREGATE BASE TO
6" BEYOND THE BACK OF CURB
BITUMINOUS INTERLOCK AT MATCH LINE
SLOPE 3/4"
PER FT.
B618 CURB & GUTTER
NO SCALE
ZCONC. DRIVEWAY
PAVEMENT
(0
CURB
GUTTER LINE
C
4'
EXPANSION JOINT
PLAN
ENTRANCE WIDTH
4'
GUTTER
TOP B-618
CURB
i
ELEVATION
CURB DETAIL AT DRIVEWAYS
0
eller
THE ®IRTHPLACE OF MINNESOTA
DRIVEWAY
DETAIL
DRWYDTLI
DRWG
NO.
35
3.0" BITUMINOUS 41 WEAR
1 /2"R
6" AGGREGATE BASE
(MNDOT 3138 CL5)
COMPACTED SUBGRADE
BITUMINOUS PAVEMENT SECTION
NO SCALE
NOTES:
1. SILT FENCE SHALL BE PLACED AT THE DRIPLINE OF THE
TREE TO BE SAVED. FENCE SHALL COMPLETELY ENCIRCLE
THE TREE(S) OR RUN CONTINUOUSLY ON THE
CONSTRUCTION SIDE OF THE TREE(S) BEYOND THE
CONSTRUCTION LIMITS. MINIMIZE IMPACTS AND AVOID
DRIVING POSTS OR STAKES INTO MAJOR ROOTS.
2. FOR ROOTS OVER 1-IN DIA. THAT ARE DAMAGED DURING
CONSTRUCTION, MAKE A CLEAN, STRAIGHT CUT TO REMOVE
THE DAMAGED PORTION. ALL EXPOSED ROOTS SHALL BE
TEMPORARILY COVERED WITH DAMP BURLAP TO PREVENT
DRYING, AND SHALL BE COVERED WITH SOIL AS SOON AS
POSSIBLE.
3. WORK WITHIN PROTECTION FENCE SHALL BE DONE
MANUALLY. NO STOCKPILING OF MATERIALS, VEHICULAR
TRAFFIC, OR STORAGE OF EQUIPMENT OR MACHINERY
SHALL BE ALLOWED WITHIN THE LIMIT OF THE FENCING.
NO SCALE
1 �J►�l___7e: ;::?ff!
TREE PROTECTION FENCE
2.0%
BITUMINOUS PAVEMENT
1.5" WEAR COURSE (SPWEA240B)
2.5" BASE COURSE (SPNWB230B)
6.0" AGGREGATE BASE, CL5
24.0" SELECT GRANULAR
MARYLANE BITUMINOUS PAVEMENT SECTION
NO SCALE
NO SCALE
f9
GUTTER
4'-6" UNLESS
OTHERWISE NOTED
3'-0"
NEEHAH R-3067
OR EQUAL
3'-0"
GURB
REjvRN
co
6"
TAPER CONC. CURB & GUTTER
TO MATCH CASTING
PLAN
1/2" EXPANSION JOINT
— 2- #4 X 5'-0" LONG
J-V
\,1-%0 I IINV
"'\/ \
/
\ 11
TOP OF CURB
PLAN RIM ELEV
— 0.10'
SECTION
* INSTALL EXTERNAL SEALING SYSTEM
MANUFACTURED BY INFI-SHIELD.
DISTRIBUTED BY ESS BROS. & SONS INC.
CATCH BASIN INSTALLATION
FOR B-618 AND B-624 C. & G.
ger
THE OINTHPLACE OF MINNESOTA
CATCH BASIN
DETAIL
CBDTL4
DRWG
NO.
23
0.5'
40' 20'
FIRST FLOOR
BASEMENT
FLOOR
-C
GARAGE FLOOR
1.0' TOPSOIL MAX. J
o.\�% j
ANY AVAILABLE SOIL
MATERIAL UNLESS
REQUIRED BY ENGINEER
HOLD DOWN
HOLD DOWN
1.0' TOPSOIL MAX.
STRUCTURAL COMPACTED FILL IF REQUIRED (TYP)
/ %/W 7/%/WWWWW//////
SUITABLE BEARING SOIL (BOTTOM MUST BE APPROVED BY
GEOTECHNICAL ENGINEER.)
HOLD DOWNS
FB - 3 FT. FBLO - 2
FT. FBWO - 2 FT.
W/W//WWW//WWi
SUITABLE BEARING SOIL (BOTTOM MUST BE APPROVED BY
GEOTECHNICAL ENGINEER.)
THIS IS A GENERALIZED DETAIL ILLUSTRATING STRUCTURAL FILL REQUIREMENTS. FOLLOW CONTOURS SHOWN ON PLAN
BUILDING PAD CONSTRUCTION
1. APPLY LIME, FERTILIZER AND SEED BEFORE LAYING THE NET OR MAT.
2. START LAYING THE NET FROM THE TOP OF THE CHANNEL OR SLOPE AND UNROLL IT DOWN THE GRADE. ALLOW NETTING TO LAY LOOSELY ON
THE SOIL BUT WITHOUT WRINKLES - DO NOT STRETCH. MAT OR BLANKET - TYPE PRODUCT SHOULD PROVIDE AT LEAST 30% COVERAGE OF
THE SURFACE WHERE IT IS APPLIED.
3. TO SECURE THE NET, BURY THE UPSLOPE END IN A SLOT OR TRENCH NO LESS THAN 6 INCHES DEEP, COVER WITH SOIL, AND TAMP FIRMLY AS
SHOWN. STAPLE THE NET EVERY 12 INCHES ACROSS THE TOP END AND EVERY 3 FOOT AROUND THE EDGES AND BOTTOM. WHERE 2 STRIPS
OF NET ARE LAID SIDE BY SIDE, THE ADJACENT EDGES SHOULD BE OVERLAPPED 3 INCHES AND STAPLED TOGETHER. EACH STRIP OF NETTING
SHOULD ALSO BE STAPLED DOWN THE CENTER, EVERY 3 FOOT. DO NOT STRETCH THE NET WHEN APPLYING STAPLES.
4. TO JOIN TWO STRIPS, CUT A TRENCH AND ANCHOR THE END OF THE NEW NET. OVERLAP THE END OF THE PREVIOUS ROLL 18 INCHES, AS
SHOWN, AND STAPLE EVERY 12 INCHES JUST BELOW THE ANCHOR SLOT
TYPICAL STAPLES
#8 GAUGE WIRE
44,
44,
MAINTENANCE: INSPECT ALL MULCHES PERIODICALLY, AFTER RAINSTORMS TO CHECK FOR RILL EROSION,
DISLOCATION, OR FAILURE. WHEN EROSION IS OBSERVED, APPLY ADDITIONAL MULCH. IF
WASHOUT OCCURS, REPAIR THE SLOPE GRADE, RESEED, AND REINSTALL MULCH. CONTINUE
INSPECTIONS UNTIL VEGETATION IS FIRMLY ESTABLISHED.
10"
1/2"
O'';,,s....
////1111 H
.IIIL /////////(llIUI %-11111:2
O 0: II 01 %iiii15 i���i4::CC---------------- lllllllllllllllllll
\IIIJ \Il?/
AL
PRESS ENDS 6 INCHES
INTO THE SOIL AROUND
STRUCTURES AND
STAPLE SECURELY
WHEN USING NETTING IN CHANNELS, ROLL OUT
STRIPS OF NETTING PARALLEL TO THE DIRECTION
OF FLOW AND OVER THE PROTECTIVE MULCH.
AIILL
AIILL
viv
Alc
AIILL
— FLOW
vlv
FLOW
Apppp
110100//
11,2/4
AIL
Alc AIL
Alc
Allc
ILL
FLOW
vlv
>14
Aromoror
,LIII-i 11 111111—
it
FLOW
I* &
A. BURY THE TOP END OF THE MATTING
STRIPS IN A TRENCH 6 INCHES OR
MORE IN DEPTH.
B. TAMP THE TRENCH FULL OF SOIL.
SECURE WITH ROW OF STAPLES, 10
INCH SPACING, 4 INCHES DOWN FROM
THE TRENCH.
. OVERLAP - BURY UPPER END OF
LOWER STRIP AS IN "A" AND "B".
OVERLAP END OF TOP STRIP 18
INCHES AND STAPLE.
D. EROSION STOP - FOLD OF MATTING
BURIED IN SLIT TRENCH AND TAMPED
DOUBLE ROW OF STAPLES.
NO SCALE
MISSY HAUSE
JEFF HAUSE
JAM FREEDOM, LLC
613 155TH AVE
SOMERSET, WI 54025
651-442-6555
PROJECT
MARYLANE
GATEWAY
STILLWATER, MINNESOTA
SHEET INDEX
PRELIMINARY
PLAT APPLICATION
02/26/2021
REVISION DATE
Civil Engineering I Landscape Architecture I Construction Services
901 N 3rd STREET, SUITE 120
MINNEAPOLIS, MN 55401
p 612.260.7980
f 612.260.7990
www.elanlab.com
CERTIFICATION
I hereby certify that this plan s e ' 4on or report
was prepared by me, X,�,L i ct supervision,
andthat I�ad� s d Pr�� sional Engineer
and e s tgof i h . OTA.
No \ NS��
vc-o
Go
Stephen M. Johnston
REGISTRATION NO. 18914
DATE
02/26/2021
SHEET
DETAILS
0-501
DRIVEWAY DETAIL
NO SCALE
CATCH BASIN INSTALLATION
NO SCALE Ci;kL—D NO SCALE
EROSION CONTROL BLANKET
PROJECT NO.
CLS20020
PLAN VIEW
T
6"
6"
8"
8" 8" 8" 8"
8"
8"
8"
8"
8"
w
58"
58"
72"
72"
86"
86"
100"
100"
113"
113"
119"
119"
H
TO SUIT CASTING IMENSIONS
OPENING
ECC.ICON ECC.ICON. ECC.ICON ECC.ICON. ECC.ICON ECC.ICON.
REINF. FOR STREET LOADING
ALTERNATE COVER SLAB
FOR NEENAH R-3067 CASTING
PRE -CAST SECTION
(18" OR SMALLER
INLET OR OUTLET)
-- W=SLAB DIA
SECTION
NEENAH CASTING R-1733 W/
CENTER PICK HOLE OR EQUAL.
1 4 ADJUSTING RINGS
W/MORTAR JOINTS. PLASTER
OUTSIDE OF RINGS W/MORTAR.
r T
PRE -CAST SECTION
WITH GASKETS.
CONCRETE BLOCK MASONRY
TO BE BUILT TO OUTSIDE
DIAMETER OF THE PIPE
(21" OR OVER INLET OR OUTLET)
8" MIN.
STORM SEWER M.H. TYPE "B"(B-I) THRU "G"(G-I)
THE OIRTHPLACE OF MINNESOTA
STORM SEWER
MANHOLE
DETAIL
M H DTL3
DRWG
NO.
31
STORM SEWER MANHOLE (STMH)
NO SCALE
A SEE MNDOT STANDARD
PLATE 3133C FOR DEPTH AND
VOLUME OF RIPRAP REQ'D.
GEOTEXTILE FABRIC MATERIAL
SHALL BE USED FOR
FILTER BLANKET.
B
sal
1'
SEC. A -A
•I:t:
Aqi
RIPRAP - SEE SPECS.
wir ,
APo
IIPIPOAVIP
roirel.trirnetalmri.A1111"reelitk.
5 X DIAMETER
OR SPAN
PLAN
SEC. B-B
B
SLOPE VARIES
ale -
THE OIOTHPLACE OF MINNESOTA
APRON
DETAIL
APDTL2
DRWG
NO.
18
GALVANIZED "U" BOLT FASTENERS - 2 PER
JOINT LOCATED ON EACH SIDE OF THE
PIPE AT 60° FROM THE TOP C OF THE PIPE.
TIE THREE JOINTS UNLESS OTHERWISE NOTED
ON THE PLAN.
GALVANIZED TRASH GUARD
1/2" 0 ROD AT 6" O.C.
SEE DETAIL FOR
RIPRAP AT R.C.P.
APRONS.
"U" BOLT REQUIREMENTS
PIPE SIZE
BOLT DIA.
WIDTH
21" & LESS
1/2"
24"
24" TO 36"
5/8"
24"
42" TO 54"
3/4"
24"
60" & GREATER
1"
24"
CONCRETE APRON
0
aler
THE OIOTHPLACE OF MINNESOTA
APRON
DETAIL
APDTLI
DRWG
NO.
17
6'6"
FLARED END SECTION (FES)
4" #13 Beam 3" schedule 40 pipe
ALTERNATE - RUMBLE RACKS
2" x 2" WOOD POSTS 4' O.C.
RUNOFF FLOW
FILTER FABRIC (MIRAFI- ENVIRO
FENCE OR APPROVED EQUAL)
MIN. 30" - MAX. 36" ABOVE GRADE
BACKFILL 6" x 6" TRENCH
11 11
_I UNDISTURBED SOIL
IIII
111.
NOTES
1. DIG A 6"X6" TRENCH ALONG THE INTENDED FENCE LINE.
2. DRIVE ALL POSTS INTO THE GROUND AT THE DOWNHILL SIDE OF THE TRENCH.
3. LAY OUT SILT FENCE ON THE UPHILL SIDE ALONG THE FENCE LINE, AND BACK FILL.
4. SPACE WOOD POSTS UP TO 4' APART TO SUPPORT THE FABRIC.
5. REMOVE SILT FENCE AFTER TURF IS ESTABLISHED.
NO SCALE
BACK OF CURB LINE
MANHOLE
DIMENSION CHART
DIM
MANHOLE TYPE
B-1
C-1
D-1
E-1
F-1
G-1
P
48"
60"
72"
84"
96"
102"
K
14"
13"
13"
13"
13.5"
13.5"
T6"
8"
8"
8"
8"
8"
W
58"
72"
86"
100"
113"
119"
A
3"
11"
18"
25"
31"
34"
DEPTH VARIES
PRECAST
SECTION -
STEPS LOCATION
AM'f&b.
%VP
COVER SLAB
W = SLAB DIA.
18"
18"
w
w
�N
wuJ
GROUT
24"x 36"
OPENING
PIPE
REINFORCE SLAB
FOR STREET LOADING
NEENAH CASTING
R-3067 OR EQUAL
2-4 2"THICK ADJUST.
RINGS W/MORTAR
JOINTS - PLASTER
OUTSIDE, STRIKE
INSIDE CLEAN.
RUBBER GASKET
TYPICAL ALL JOINTS
R.C.P. BARREL
SECTION
CONC. BLOCK MASONRY
TO BE USED ONLY
WHERE NECESSARY.
PLASTER OUTSIDE, STRIKE
INSIDE CLEAN
I- 8., Fr
T 4
8" POURED
6" PRECAST
* INSTALL EXTERNAL SEALING SYSTEM
MANUFACTURED BY INFI-SHIELD.
DISTRIBUTED BY ESS BROS. & SONS INC.
MANHOLE/CATCH BASIN TYPE B-1 THRU G-1
THE SIOTHPLACE OF MINNESOTA
CATCH BASIN
MANHOLE
DETAIL
M H DTL2
DRWG
NO.
30
CATCH BASIN MANHOLE (CBMH)
SIDE BY SIDE INSTALLATION
For Side By Side Installations (i.e. (2) mats wide at the entrance, use short -straps to connect
mats as shown in diagram. Contact your distributor or FODS with any additional questions.
FODS MAT
CONSTRUCTION ENTRANCE
2"X2"X16" LONG WOODEN STAKES AT MAXIMUM 4' SPACING. INCREASE SPACING IN
HIGH FLOW AREAS. STAKES SHALL BE DRIVEN THROUGH THE BACK HALF OF THE
FILTER LOG AT AN ANGLE OF 45d WITH THE TOP OF THE STAKE POINTING
UPSTREAM.
RUNOFF FLOW
8" - 12" FILTER LOG SEDIMENT CONTROL
STAKE
8"-12" FILTER LOG SEDIMENT CONTROL
NO SCALE
USE KNITTED POLYPROPYLENE TUBES FOR TEMPORARY INSTALLATIONS OR JUTE
OR BURLAP WHEN DEGRADATION IN PLACE IS DESIRED.
NO SCALE
FOR NEW MANHOLE CONSTRUCTION,
CONTRACTOR TO MINIMIZE
PIPE PROTRUSION (L)
STRUCTURE
DIAMETER
MAXIMUM PIPE DIAMETER*
DISSIPATOR
ONLY
SKIMMER
ONLY
DISSIPATOR
& SKIMMER
48"
27"
24"
15"
60"
36"
30"
24"
72"
48"
42"
30"
84"
48"
36"
96"
48"
*RECOMMENDED TO PROVIDE ADEQUATE SPACING
BETWEEN COMPONENTS FOR ACCESS & MAINTENANCE.
REFER TO MANHOLE SIZING CHARTS FOR MORE DETAILED
STRUCTURE SIZING OR CONTACT MOMENTUM FOR
PROJECT SPECIFIC DETAILS. PRESERVER'. COMPONENTS
ACCOMMODATE PIPE SIZES UP TO 48" DIAMETER.
PART
NUMBER**
PIPE
DIAMETER
ALLOWABLE
PEAK FLOW
D15/S15
0"-15"
20CFS
D21 / S21
16"-21"
35 CFS
D27 / S27
22"-27"
60 CFS
D36 / S36
28"-36"
100 CFS
D48 / S48
37"-48"
175 CFS
"D" = DISSIPATOR, PLACED AT INLET(S)
"S" = SKIMMER, PLACED AT OUTLET
NOTE 2: MINIMIZE ELEVATION DIFFERENCE
BETWEEN INLET AND OUTLET INVERTS FOR THE
PRESERVERTN TO FUNCTION AS DESIGNED.
SUMP
MANHOLE
REFER TO MANHOLE SIZING
CHART TO ENSURE PROJECT
SPECIFIC DESIGN FEASIBILITY
NOTE 1: THE PRESERVER'. ENERGY DISSIPATOR WAS DESIGNED AND TESTED
TO FUNCTION WITH OR WITHOUT A SKIMMER. DISSIPATORS & SKIMMERS
CAN BE UTILIZED IN TANDEM OR INDEPENDENTLY.
CROSS SECTION AA
ZDDMIN .3
12" HDPE
902.30'
Do MIN.
NOTE 3: STOCK SKIMMERS HAVE A MINIMUM FREEBOARD DEPTH OF Do. FOR GREATER
FREEBOARD DEPTHS, DESIGNERS CAN UPSIZE THE SKIMMER, OR USE A CUSTOMIZED
SKIMMER. FOR CUSTOM DESIGNS, AND/OR PROJECT SPECIFIC DETAILS, CONTACT MOMENTUM.
Not to Scale
4 .omEnrum
877-773-0073 • www.MomentumEnv.com
STORM GRATE
REINFORCED
CORNER
MANAGEABLE
2 FOOT
CONTAINMENT AREA
THE PRESERVER.
STANDARD INSTALL DETAIL
ENERGY DISSIPATOR
AND/OR SKIMMER
P+R�O�UDLY OUMJAY MAMMALS]
Ismbewitte '1Cc" �4,altOPC
Js•SPhit-. 4,44l-=
CONCEPTUAL PLAN DISCLAIMER
THIS GENERIC DETAIL DOES NOT ENCOMPASS THE SIZING, FIT, AND
APPLICABILITY OF THE PRESERVER FOR THIS SPECIFIC PROJECT. IT
IS THE ULTIMATE RESPONSIBILITY OF THE DESIGN ENGINEER TO
ASSURE THAT THE STORMWATER SYSTEM DESIGN IS IN FULL
COMPLIANCE WITH ALL APPLICABLE LAWS AND REGULATIONS.
MOMENTUM ENVIRONMENTAL LLC DOES NOT APPROVE PLANS,
SIZING, OR SYSTEM DESIGNS. THE DESIGN ENGINEER IS
RESPONSIBLE FOR ALL DESIGN DECISIONS.
CATCH BASIN MANHOLE SKIMMER (CBMH)
CURB
OPENING
DUMPING
STRAPS
CURB FILTER
OPTIONAL
OUTFLOW PORTS
NO SCALE
MISSY HAUSE
JEFF HAUSE
JAM FREEDOM, LLC
613 155TH AVE
SOMERSET, WI 54025
651-442-6555
PROJECT
MARYLANE
GATEWAY
STILLWATER, MINNESOTA
SHEET INDEX
PRELIMINARY
PLAT APPLICATION
02/26/2021
REVISION DATE
Civil Engineering I Landscape Architecture I Construction Services
901 N 3rd STREET, SUITE 120
MINNEAPOLIS, MN 55401
p 612.260.7980
f 612.260.7990
www.elanlab.com
CERTIFICATION
I hereby certify that this plan, s elf lion or report
was prepared by me, l i ct supervision,
and that I a�ppt� d I d Pr. - sional Engineer
undert6lshe s OTA.
Xs
G°S
v °
Stephen M. Johnston
REGISTRATION NO. 18914
G-\
DATE
02/26/2021
SHEET
DETAILS
0-502
SILT FENCE DETAIL
NO SCALE
FILTER LOG SEDIMENT CONTROL
NO SCALE
INLET PROTECTION
NO SCALE
PROJECT NO.
CLS20020
MARK SERVICE LOCATION
AND END OF PIPE
WITH 4" X 4" LUMBER.
EXTEND CURB BOX TO
LOT GRADE
v
PROPERTY LINE
CURB BOX
URB STOP
10 ft. BEYOND
PROP. LINE
NOTES:
STREET
1. SEE SPECS FOR SIZE & TYPE OF MATERIALS.
2. MAINTAIN 18" VERTICAL & 24" HORIZONTAL
BETWEEN SEWER & WATER SERVICE LINES.
cr
w
0
0
SEE SPECS.
WATERMAIN (LOC. VARIES)
CORPORATION STOP
COPPER WATER SERVICE
WITH HORIZONTAL LOOPS
TO PROVIDE FOR SETTLEMENT
SEPARATION
WATER SERVICE CONNECTION
**** EXCEPT FOR LOT 7 - EXTEND AS SHOWN ON PLANS.
THE ®IRTH PLACE mF MINN EsoTA
WATERMAIN
DETAIL
WSVDTL1
DRWG
NO.
14
WATER SERVICE CONNECTION
PLANT NATIVE PLANTS
TOLERANT OF INUNDATION
AND DROUGHT
BOTTOM ELEVATION
TOLERANCE 0.05'±
EXTEND FILTRATION
MEDIA AND DRAINAGE
LAYER TO HWL
MPCA FILTRATION
MEDIA MIX B
i\
//////
NON -COMPACTED EXISTING SM SOIL
(SCARIFY TO DEPTH OF 12")
EXCAVATE AND BACKFILL WITH
WASHED SAND (ASTM C-33)
NO SCALE
/\/\/\/\/\/\/\/\//
INFILTRATION BASIN
/\ \\\
//\ TOP OF PLANTING MEDIUM 901.8'
LENGTH VARIES TO SUIT DEPTH
BENDS AS
NECESSARY
CONCRETE
ENCASEMENT
SEE SERVICE
DETAIL.
IMBED RISER IN TRENCH
WALL. SLOPE VARIES.
NOTE:
FOR SIZE AND TYPE OF
MATERIALS SEE SPECS.
SANITARY SEWER SERVICE RISER
41°llhivaer
THE 5I49TH PLACE mF MINN ESCTA
SEWER
DETAIL
SEWDTL3
DRWG
NO.
10
OVERFLOW ELEV 902.5'
BOTTOM OF PLANTING MEDIUM 900.0'
APPROXIMATE BOTTOM OF SM SOIL 890.4'
NO SCALE
SEWER SERVICE CONNECTION
NO SCALE
2' x 10" TREATED WOOD
REMOVABLE WEIR WALL
TOP 902.9
d
d
PLACE SANDBAGS IN
OPENINGS UNTIL
VEGETATION IN THE BASIN
IS ESTABLISHED AND
WEIR IS INSTALLED
4' WIDE WEIR
902.5
1.5' WIDE WEIR
902.0
15" HDPE INLET
INV 902.64
TOP 905.0
4
a4
4
d
CAST KEYWAY
HAALA PS4x8H GRATE
4.0' WIDE WEIR
903.0
4" NOTCH
IE 902.5
901.4
24" HDPE OUTLET
INV 901.4
d
d c
4
a 4
ad
REINFORCED BASE SLAB 1
CAST KEYWAY
2" x 8" TREATED WOOD PLANKS
WATER PROOF CAULK BETWEEN
BOARDS - INSTALL AFTER
VEGETATION IS FULLY ESTABLISHED
OUTLET CONTROL STRUCTURE
BASED ON 8' X 4' BOX CULVERT
NO SCALE
CONSTRUCTION SEQUENCE:
1. PLACE BEDDING MATERIAL. SHAPE TO MATCH PIPE, REMOVE
MATERIAL FOR BELLS
2. COMPACT OUTER BEDDING
3. INSTALL PIPE TO LINE AND GRADE
4. PLACE AND COMPACT THE HAUNCH AREA TO SPRINGLINE
5. COMPLETE BACKFILL TO SPECIFICATIONS.
II=II
%iVVV\iV \/�
Do/6
12"MIN
Do/3
GENERAL NOTES:
GENERAL NOTES:
BEDDING THICKNESS t=Do/24, BUT NOT LESS THAN
3" IN ROCK t=Do/12, BUT NOT LESS THAN 6"
IF UNSTABLE TRENCH BOTTOM SUBGRADE
CONDITIONS ARE ENCOUNTERED, ADDITIONAL
CRUSHED ROCK FOR BEDDING AND EXTENT
SHALL BE AS DIRECTED BY THE GEOTECHNICAL
ENGINEER.
TRENCH SHALL BE BRACED, SHEETED OR SLOPED
AS NECESSARY FOR THE SAFETY OF WORKMEN
AND PROTECTION OF OTHER UTILITIES IN
ACCORDANCE WITH APPLICABLE LOCAL, STATE
AND FEDERAL REGULATIONS.
TRENCH BACKFILL
ENGINEERED FILL: SEE
SPECIFICATIONS FOR MATERIAL AND
COMPACTION REQUIREMENTS
HAUNCHING AND INITIAL
BACKFILL: ENGINEERED FILL 1"
MAX. PARTICLE DIA.
BEDDING MATERIAL
MIDDLE BEDDING
PLACED LOOSELY
CONCRETE PIPE BEDDING
WHERE TRENCH BOTTOM IS UNSTABLE, THE CONTRACTOR SHALL EXCAVATE TO A DEPTH REQUIRED BY
THE ENGINEER AND REPLACE WITH A FOUNDATION OF CLASS I OR II MATERIAL AS DEFINED IN ASTM D2321,
LATEST EDITION
HAUNCHING AND INITIAL BACKFILL SHALL BE CLASS I, II OR III AND INSTALLED AS REQUIRED IN ASTM D2321,
LATEST EDITION.
MINIMUM COVER = 12" TO FINISH GRADE SURFACE
MOUND AND COMPACT TO 48" COVER DURING CONSTRUCTION
4" MIN. (D=4"-24")
6" MIN. (D>24")
LINE OF TRENCH
FINAL BACKFILL
D
W
4"
21"
6"
23"
8"
26"
10"
28"
12"
31"
15"
34"
18"
39"
24"
48"
SEE SPECIFICATIONS FOR
BACKFILL AND COMPACTION
REQUIREMENTS
INITIAL BACKFILL
HAUNCHING
BEDDING
HDPE PIPE BEDDING
NO SCALE
NO SCALE
MISSY HAUSE
JEFF HAUSE
JAM FREEDOM, LLC
613 155TH AVE
SOMERSET, WI 54025
651-442-6555
PROJECT
MARYLANE
GATEWAY
STILLWATER, MINNESOTA
SHEET INDEX
PRELIMINARY
PLAT APPLICATION
02/26/2021
REVISION DATE
Civil Engineering I Landscape Architecture I Construction Services
901 N 3rd STREET, SUITE 120
MINNEAPOLIS, MN 55401
p 612.260.7980
f 612.260.7990
www.elanlab.com
CERTIFICATION
I hereby certify that this plan se c' 4on or report
was prepared by me,
and that I d I
underjYse s
i ct supervision,
Pr._ sional Engineer
OTA.
No \ NS��
vc-o
Go
Stephen M. Johnston
REGISTRATION NO. 18914
DATE
02/26/2021
SHEET
DETAILS
0-503
PROJECT NO.
CLS20020
m
TREE PRESERVATION NOTES
1. TREE INVENTORY IDENTIFIED AND LOCATED BY REHDER FORESTRY CONSULTING, 612-760-3519.
2. NO VEGETATION CLEARING, PRUNING, AND TREE REMOVAL TO BE STARTED WITHOUT
COORDINATION WITH THE OWNER'S REPRESENTATIVE. TREES TO BE SAVED AND/OR REMOVED TO
BE MARKED IN THE FIELD AND APPROVED BY THE CITY PRIOR TO ANY REMOVAL. CONTRACTOR TO
PROTECT EXISTING TREES, SHRUBS, AND VEGETATION WHERE NOTED. UNAUTHORIZED REMOVAL
WILL REQUIRE REPLACEMENT AND POSSIBLE RESTITUTION. DURING THE CONSTRUCTION, IF TREES
NOTED TO BE SAVED ARE DAMAGED AND CONSIDERED LOST PER THE CITY'S STANDARDS,
CONTRACTOR IS RESPONSIBLE FOR REQUIRED REPLACEMENT AND FINANCIAL PENALTY.
3. INSTALL SILT FENCE AND TREE PROTECTION FENCE PRIOR TO COMMENCING GRADING ACTIVITIES.
INSTALL TREE PROTECTION FENCE AROUND TREES TO BE SAVED AT A DISTANCE IN FEET FROM
TREE EQUAL TO THE TREE DIAMETER (DBH). SILT FENCE AND TREE PROTECTION FENCE MUST BE
INSTPECTED BY CITY STAFF PRIOR TO ANY SITE WORK. MAINTAIN FENCES FOR DURATION OF
CONSTRUCTION ACTIVITIES. UPON ESTABLISHMENT OF TURF AND SEEDING, REMOVE FENCES AND
DISPOSE OFFSITE.
4. NO MATERIALS, VEHICLES, OR EQUIPMENT CAN BE STORED WITHIN THE TREE PROTECTION AREAS.
5. AVOID TRIMMING OR CLEARING OAK STANDS BETWEEN APRIL 15 AND JULY 1 TO PREVENT INSECT
TRANSMISSION. IF ANY PRUNING OR WOUNDING OAK OCCURS DURING THIS PERIOD, COVER THE
WOUND WITH A RECOMMENDED TREE WOUND DRESSING IMMEDIATELY. FRESH OAK STUMPS MUST
LEGBE05ATED, COVERED, AND GROUND OUT IMMEDIATELY FOLLOWING FELLING OF TREES.
TREE & VEGETATION CLEARING
IMPACTS ON SAVED TREE
■ ■ — TREE PROTECTION FENCE
TREE PRESERVATION SUMMARY
CANOPY COVER
1" DBH = 1' RADIUS CANOPY
REMOVE TREE
Tag
Remove
DBH
Species
Cond
Notes
1
Off Site
2
12
Spruce, white
Fair
3
10
Spruce, white
Fair
4
16
Spruce, white
Fair
5
13
Spruce, white
Fair
6
12
Spruce, white
Fair
7
51
Maple, silver
Fair
8
16
Aspen, quacking
Good
9
22
Boxelder
Fair
10
18
Ash, green
Fair
11
X
10
Elm, american
Fair
12
15
Elm, american
Good
13
7
Elm, american
Fair
14
8
Elm, american
Fair
15
X
11
Apple
Fair
16
12
Apple
Fair
2 Multistem
17
23
Cherry, black
Fair
2 Multistem
18
15
Ash, green
Fair
19
X
21
Cottonwood, eastern
Good
20
X
21
Walnut, black
Good
21
X
66
Maple, silver
Fair
3 Multistem - 22,22,22
22
X
33 lAsh,
green
Fair
3 Multistem - 20,7, 6
23
30
Maple, silver
Fair
24
51
Maple, silver
Fair
2 Multistem - 26, 25
25
28
Basswood, american
Fair
2 Multistem - 26, 25
26
22
Oak, red
Very Good
27
9
Spruce, white
Fair
28
18
Elm, american
Fair
29
30
Maple, silver
Fair
30
10
Spruce, white
Fair
31
Off Site
32
16
Elm, american
Fair
33
19
Elm, american
Fair
TOTAL EXISTING ON -SITE SIGNIFICANT TREES 31 TREES 645 INCHES
REMOVED 6 TREES 162 INCHES (25%)
IMPACTED (SAVED TREE, COUNTED AS LOST 2 TREES 81 INCHES (13%)
TOTAL REMOVED 38%
NO TREE REPLACEMENT IS REQUIRED (50% MAX ALLOWANCE)
z-
\ V ..--" ----
/
\ \ 7v•—�
I/ ) / /-
/ / /
/ / /
I r" / / , /
1 \ / / / / 7
1 \ / / / (
/ / I I — L
\ \
\ \ \ \N \\
\ \ \ \ \
\ N \
0
\ \ N
I \ \ \
\ \ \
\ \ \ \
---'7—
\ _ \
/
/
/
j�I J
/ L ` I I\
0 \ \co 0 \
N #7 \
/
/ /
/ // / /
/ /
/ —
/ // /
/ /
/
/ / / /
v i v /
-vi /
/
7
— t---E—�
EXISTING
HOUSE
1
\
\ \
\ \
\ \
\ \
\
\
I\ I I
\ I
0 \
0 [\\
\
\ \
I I
I I
I 1
I 1
li
II
/
/
ARAGE
\O
0
/
/
/
/
/
3�1
THEE PROTECTION
FENCE (TYP)
REMOVE TREES
\
I \
Err
\
/
7
TREES N
IMPACTED♦
♦
12% IMPACTS
ON CANOPY COVER
24% IMPACTS
ON CANOPY COVER
/ i �7
'3n �--1 an
w \ w
1
w
\♦
#20
4--
in
3n - _ Imo 3n
w
/
#10
REMOVE -TREE
/
-��
w
w
w
/
—994
w
REMOVE TREE
REMOVE TREE
PROTECT TREES & VEGETATION
/
TREE PROTECTION
FENCE (TYP)
MARYLANE AVE. N.
w
—
90A-
REMOVE TREE
TREE PROTECTION
— FENCE (TYP)
IV
/
vv
20 60
MISSY HAUSE
JEFF HAUSE
JAM FREEDOM, LLC
613 155TH AVE
SOMERSET, WI 54025
651-442-6555
PROJECT
MARYLANE
GATEWAY
STILLWATER, MINNESOTA
SHEET INDEX
PRELIMINARY
PLAT APPLICATION
02/26/2021
REVISION DATE
Civil Engineering I Landscape Architecture I Construction Services
901 N 3rd STREET, SUITE 120
MINNEAPOLIS, MN 55401
p 612.260.7980
f 612.260.7990
CERTIFICATION
I hereby certify that this plan w
under my direct su e
Licensed L
stat
Xred by me, or
Ct Itthe laws of the
I am a duly
Pilarsinee Saraithong DATE
REGISTRATION NO. 45059 XX/XX/2020
SHEET
TREE PRESERVATION
PLAN
L-010
TREE PRESERVATION PLAN
Know what's below.
Call before you dig.
SCALE IN FEET
PROJECT NO.
LANDSCAPE NOTES
2
3
4
5
1. LANDSCAPE CONTRACTOR IS RESPONSIBLE FOR FINISHED GRADING AND POSITIVE SURFACE DRAINAGE IN ALL
LANDSCAPE AREAS. LANDSCAPE CONTRACTOR MUST ENSURE THAT THE FINAL GRADES ARE MET AS SHOWN ON
GRADING PLAN. IF ANY DISCREPANCIES ARE FOUND, IMMEDIATELY NOTIFY LANDSCAPE ARCHITECT FOR RESOLUTION.
2. ALL PLANT MATERIALS ARE TO CONFORM WITH STATE & LOCAL CONSTRUCTION STANDARDS AND THE CURRENT
ADDITION OF THE AMERICAN ASSOCIATION OF NURSERYMEN STANDARDS. ALL PLANT MATERIALS ARE TO BE
HEALTHY, HARDY STOCK, AND FREE FROM ANY DISEASES, DAMAGE, AND DISFIGURATION.
3.
4.
5.
QUANTITIES OF PLANTS LISTED ON THE PLAN ARE TO GOVERN ANY DISCREPANCY BETWEEN THE QUANTITIES SHOWN
ON THE PLANT SCHEDULE AND PLAN. PLACE PLANTS IN PROPER SPACING FOLLOWING LAYOUT FIGURES.
TOPSOIL TO BE MNDOT 3877.2E LOAM TOPSOIL BORROW FOR LANDSCAPED AREAS AND PLANTING BEDS. PROVIDE
ROOTING TOPSOIL BORROW MNDOT 3877.2E FOR PLANT RESTORATION, WATER QUALITY, AND FILTRATION PLANTING.
PLANTING SOIL TO HAVE A PH BETWEEN 6.5-7.5, BE FREE OF CHEMICAL CONTAMINANTS, DEBRIS, LARGE ROCKS
GREATER THAN 1/ 2" DIAMETER, AND FRAGMENTS OF WOOD. SUBSOIL SHALL BE SCARIFIED TO A DEPTH OF 4" BEFORE
PLANTING SOIL IS SPREAD.
6. MULCH TO BE SHREDDED HARDWOOD BARK MULCH (MNDOT 3882 TYPE 6), CONSISTED OF RAW WOOD MATERIAL FROM
TIMBER AND BE A PRODUCT OF A MECHANICAL CHIPPER, HAMMER MILL, OR TUB GRINDER. THE MATERIAL SHALL BE
SUBSTANTIALLY FREE OF MOLD, DIRT, SAWDUST, AND FOREIGN MATERIAL AND SHALL NOT BE IN AN ADVANCED STATE
OF DECOMPOSITION. THE MATERIAL SHALL NOT CONTAIN CHIPPED UP MANUFACTURED BOARDS OR CHEMICALLY
TREATED WOOD, INCLUDING, BUT NOT LIMITED TO, WATER BOARD, PARTICLE BOARD, AND CHROMATED COPPER
ARSENATE (CCA) OR PENTA TREATED WOOD. THE MATERIAL SHALL BE TWICE -GROUND/ SHREDDED, SUCH THAT; NO
INDIVIDUAL PIECE SHALL EXCEED 2 INCHES IN ANY DIMENSION.
x
7. APPLY FOUR (4) INCH DEPTH OF SHREDDED HARDWOOD BARK MULCH IN FOUR (4) FOOT DIAMETER RING AROUND ALL
TREES.
8. SOD SHOWN ON LANDSCAPE PLAN TO BE INSTALLED BY LANDSCAPE CONTRACTOR. SOD SHALL CONFORM WITH
MNDOT 3878.2A, BE DENSE, AND OF UNIFORM TEXTURE, FREE OF WEEDS AND DISEASE. APPLY MINIMUM SIX (6) INCHES
OF TOPSOIL (MNDOT 3877) AND THOROUGHLY APPLY SLOW RELEASE FERTILIZER TO TOP TWO (2) INCHES BEFORE
LAYING SOD.
9. FOLLOW LANDSCAPE DETAILS FOR ALL INSTALLATION, UNLESS OTHERWISE NOTED.
10. LANDSCAPE CONTRACTOR SHALL MAINTAIN PLANTS IN HEALTHY CONDITION THROUGHOUT WARRANTY PERIOD. THE
WARRANTY PERIOD IS TWO FULL YEARS FROM DATE OF PROVISIONAL ACCEPTANCE UNTIL FINAL ACCEPTANCE.
WARRANTY PERIOD FOR PLANT MATERIAL INSTALLED AFTER JUNE 1ST SHALL COMMENCE THE FOLLOWING YEAR.
PLANT SCHEDULE
KEY
QUANT.
DECIDUOUS TREES
I,dllull IIIIAIIIJII I�uii d iull idlllAllull loll
ONE FLAG PER WIRE
COMPACT PLANTING SOIL —
SCARIFY SIDES OF PIT
PRIOR TO PLANTING
COMMON NAME
SCIENTIFIC NAME
SIZE
5 ESPRESSO KENTUCKY GYMNOCLADUS DIOICUS 2.5" CAL.
COFFEETREE 'ESPRESSO-JFS'
3" MIN.- 8" DIAMETER
2-PLY CORRUGATED HDPE GUARDS
UV INHIBITOR -TREATED WHITE EXTERIOR
WITH BLACK INNER SURFACE
SET BOTTOM FIRMLY IN SOIL
MULCH DISH
I I I AINJ l I III II,d1IIJ I I
(IIAIIIJII MIA
NOTES
ROOT
COND.
MATURE
SIZE
B&B 50'H X 35'W
TREE GUARDS
MAINTAIN TREE IN PLUMB POSITION
THROUGHOUT THE WARRANTY PERIOD
(SEE SPECIFICATIONS).
TREE STAKING AND ITS METHOD ARE
OPTIONAL TO CONTRACTORS. TWO
ALTERNATIVES ARE SHOWN.
mulll I\uuAlNdll�m
III III II
MOUND SUBGRADE
SCARIFY BOTTOM PRIOR
TO PLANTING
PLANTING PIT 2-3 X DIA. OF SOIL BALL
DUG & TILLED PIT 3-5 X DIA. OF SOIL BALL
DECIDUOUS TREE PLANTING
DOUBLE STRAND 14 GA. WIRE
& 3 STEEL STAKES AT 120 DEGREE
INTERVALS
16" POLYPROPYLENE OR
POLYETHYLENE,
40 MIL, 1-1/2" WIDE STRAP
8' STEEL STAKE INSTALL ON THE SIDE I
fOF PREVAILING WIND
uil,ym1Ik1.0,
TREE WRAP TO FIRST BRANCH
ROOT FLARE AT FINISHED GRADE OR
FIRST MAJOR BRANCHING ROOT
AT 1 INCH BELOW SOIL LINE
CUT AND REMOVE TOP
1/3 BURLAP (MIN.),
WIRE BASKET, AND ALL
NYLON CORD
MULCH, EDGING, & DISH RING
(SEE LANDSCAPE NOTES)
PLANTING SOIL
WATER & TAMP TO
REMOVE AIR POCKETS
NO SCALE
LEGEND
r
EXISTING SIGNIFICANT TREE
& CANOPY COVER
LANDSCAPE PLAN
+++
+ + + + i
+ + + +
SOD
GENERAL ROADSIDE SEEDING
SEE SHEET C-201 FOR SEEDING NOTES
STORMWATER SEEDING
SEE SHEET C-201 FOR SEEDING NOTES
7
B
ADJUST LOCATIONS OF
TREES TO AVOID CONFLICTS
WITH UNDERGROUND
TELEPHONE AND ELECTRIC
i
EXISTING TREES & VEGETATION
INFILTRATION BASIN
n n n
EXISTING TREES & VEGETATION
PRESERVATION OR REMOVAL OF
EXISTING VEGETATION COVERS
OUTSIDE CONSTRUCTION LIMITS BY
HOMEOWNER (TYP)
MARYLANE AVE. N.
•
♦
FOUNDATION PLANTING
AROUND HOUSE BY OTHERS
(TYP)
1"=20'
1-
INSTALL STREET TREE 10'
FROM RIGHT-OF-WAY
(TYP)
DECIDUOUS TREE
PLANTING (TYP)
O
Know what's below.
Call before you dig.
20
1
60
SCALE IN FEET
MISSY HAUSE
JEFF HAUSE
JAM FREEDOM, LLC
613 155TH AVE
SOMERSET, WI 54025
651-442-6555
PROJECT
MARYLANE
GATEWAY
STILLWATER, MINNESOTA
SHEET INDEX
PRELIMINARY
PLAT APPLICATION
02/26/2021
REVISION DATE
Civil Engineering Landscape Architecture I Construction Services
901 N 3rd STREET, SUITE 120
MINNEAPOLIS, MN 55401
p 612.260.7980
f 612.260.7990
www.elanlab.com
CERTIFICATION
I hereby certify that this plan wXred by me, or
under my direct su .e I am a duly
Licensed L. . c. ii ct u r the laws of the
statgof �'+ A O
O� F -�ON
�Oc
ONS�
G
Pilarsinee Saraithong
REGISTRATION NO. 45059
DATE
02/26/2020
SHEET
LANDSCAPE PLAN
L-1O1
PROJECT NO.
CLS20020