HomeMy WebLinkAbout1998-05-07 DTPC Packetiliwater
THE BIRTHPLACE OF MINNESOTA
Downtown Parking Commission Agenda
Meeting Date Thursday, May 7, 1998
City Hall Riverview Conference Room (2nd floor)
8:15 a.m.
Agenda Items.
1. Parking Tickets (Karl)
2. UBC Lot Update
3. Update parking lot improvements (South Main - River Lots)
4. Other business
CITY HALL: 216 NORTH FOURTH STILLWATER, MINNESOTA 55082 PHONE: 612-439-6121
IMPERIAL PARKING
TEL:612-341-4442 May 05'98 13:18 No.019 P.01
Memo
To: Steve Russell, City of Stillwater
PromPAUL SCHNETTLER
Date: May 5, 1998
Re: Paving for River Lot
Imperial Parking, Inc
FAX: 430-8810
Enclosed are the two estimates I received for the re -paving on the River Lot, I did not receive a bid
from Frattaione as of yet and have requested again that they submit a did to me.
Also enclosed Is the revised Schedule "B" indicating the paving project for the South Main Lot, We
need to discuss the projected shortfall in terms of finencing fees or If the City is going to out a check
from last year's proceeds.
I have Thursday at 8:15 as the next meeting. Is ttls correct?? On your phone message earlier today
you mentioned that you would see me tomorrow (Wednesday). Please confirm the reefing time.
Thanks Steve!!
IMPERIAL -PARKING,
TEL
May 05'98 13:20 No.019 P.03
Civil & Construction
Engineering, Inc.
Proi'ou l Roe,
Stillwater Out 082 (North Lot)
City of Stillwater — Imperial Parking, lac.
Palle l of 2
Base Bid: Reconstruct Existing Parking Lot (Approx. 32RO sy)
1, Redesign lot to maximize parkin spews and improve drainage
1. Reclaim existing aeph* t
1. Tolerance reclaimed Asphalt Millings for proper slope and grade
2. Add 3" Mn DOT Class 3 100% brimstone or recycled Aggresste & Compact
1 I ''/x" MnDOT Spec. 7311, Type 32-B Base Course
4. 1 112y' MnDAT Spec_ 2331, Type 41-B Wear Course
5, Sod Restoration
b, Now. Stripktg tay owner
Proposal Amount. 334241,90
Option #Z: Reconstruct Existing Lot awl Extend Lot East to 60' width (Approx. 3530 sy)
1. Redesign lot to maximize parking spaces end improve drainage
1, Reclaim existing asphalt
2. Submit, And export soil tt expanded arm
3. Gaadc end Compect Subgrade
4. Furnish and Placed" Mn DOT Class 5 100%/0 lirneetoas or recycled nggrog tc & C tupawt in
extended area
3, Furnish and Place 3" Mr DOT Close 5 100% limestone of recycled aggregate & Compact in
reclaimed area
6. 1 '4" MnDOr Spec. 2331, Type 32-13 Base Course
'7. 1 ys" MnDOT Spec. 2331, Type 41-B Wear Course
8. Sod Restoration
9, Note Striping by owner
Proposal Anv"mt' ... .9,aQN,--
2416 Went 24'b Street, Minnospvti, MN 5i403 Tel/Fax (6I Z) 377.4817
Sitcwork Mandl & Devolopnunt • Construction Management • Site Feasibility / (:nxt Analysis
IMFERpL PARKING TEL
May 05'98 13:19 No.019 P.02
Civil & Construction
Engineering, Inc.
Proposal fur (Co*dseed):
Stillwater Lot 082 (North Lot)
City of Stillwater— Imperial Parking, Inc.
Page 2 of 3
Option s 3: Patch and Overlay
1. Remove fatigued asphalt and replace with 3" patch (Approx. 70sy)
2. Level uneven areas 1 Vs"— 2" (Approx. -55 3 s j
3. Overlay 1 Vs" MnDOT Spec. 2331, Type 41-B: Approx. 3280 sy
4 Sod Restoration
5. Note: Striping by Owner
Proposal Amount: S 1 5.0fl0.00
Option 04: Patch and Overlay and Extend Lot Emit to 60' width (Approx. 3530 sy)
2. Redesign lot to maximize parking spaces and improve drainage
10. Patch and overlay existing lot per Option #3
11. Subeut and export soil in expanded areas
12. Grade and Compact Subgrade
13. Fumish and Place 6" Mn DOT Class 5 100% limestone or recycled aggregate & Compact in
extended area
14. 1 'h" MnDOT Spec. 2331, Type 32-3 Base CCM= in expanded area
15. 1 V" MnDOT Spec. 2331, Type 41-B Wan' Course in expanded area
16. Sod Reatoralion
17. Note: Striping by owner ,—
���t„ .t3a-44",I
Proposal Amount:
Alternate 01 Furnish and ,install Approx. 10501f B6-12 Concrete Curb and Gutter
Proposal Amount: S15.000.00
Exclusions:
• Silt Fence
• Any necessary performance, material, and maintenance bonds
• Soil borings, testa, and inspections by a soils engineer during construction
• Hidden and buried debris. if any
• Correction of any soils encountered dean ed unsuitable for proposed construction
2416 West 24' Street, Minneapolis, MN 55405 Tel/Fax (612) 377-4817
Sitework Planning & Development • Construction Management • Site Feasibility f Cost Analysis
iMPERIRL PRR''CING
.TEL_:612-341-4442 _ May 05"98 13:20 No.019 P.04
& Con
Engineering, Inc.
LOr 4# 14Z
2416 Weal 24* Street, ems, MN 55405 TeWvc (612) 377-4817
% work Phtmsss & Dovelomoat s Cunstrundon Management • Site Fessibs'Iity / Cost Analysis
IMPERI;L PRR'<ING
TEL:612-341-4442 May 05'98 13:21 No.019 P.05
AT:
'TOWER ASPHALT, INC.
P. 0. Bo* 15001
LAKEI.AND, MN 53043
QFP10E: (11114114444
FAX: (411) 441141511
w 1�w.�.. rasMpWw
FAX TRAN.MTSSION
TO:11 *'7e#/ _
-4,
FROM: sa.,k A 00411c., -
Tiiis 3AHSMISSION IS A PAGES INMVPING COVER
DATE: V.-/X4
EQUAL OPPOPT1J NT1' EMPLOYER
.l*.4u
IMPERIAL PARKING
TEL:612-341-4442 May 05'98 13:21 No.019 P.06
r c15,"
ern,ptYial
rage Ivo. VI
�7s. � —��� .s�. '-gym•
yen hA RUR flyr� Trt
�tnperlel Parking Inc.
TOWER ASPHALT. INC.
P. 0. BOX 15001
LAKELAND* MN 55043
PHONE (612) 436.8444
FAX (612) 43b.6510
555 Nieollet Mall, Suite 391
AnISMITFCT
We hreby>tubr*it *PLO icat one and patimatsa 4er
...
1 naTr Ai P: PIN
.trnu r
{612) 341-8000
f ATC
4-La-96
Jos romc
Stillwater Parking Lots
me I,CxATIQM
8. Mein Street Lot and Chestnut Lot
cewmoT ncrcoe
Paul C. Schnettler
South Wain Street Parking Lot and Chestnut Street Perking Lot
South Main Street Lot- Approx. 3370 eq. yds.
- Pe is m existing lot.
- Remove existing bituminous curb & concrete bumpers.
- Install'appros. 565 lineal foot of 8612 curb & gutter.
-Pine grade and tolerance reclaimed C1-5 for proper drainage
- install a 1 1/2" compacted lift of MNDOT 2331 Tryst 313 base on parking
area, 2 1/2" compacted lift on entry.
- Apply, tack Coat.
-install a 1 1/2" compacted lift of MNDOT 2331 Type 418 wearing course over
entire lot.
-Ctripioe by wtherb.
Project Cost 329,905.00
Chestnut ?Arkin; Lot- Approx. 1UV sq. yde.
- Cut, or mill edges.
- Remove es needed.
- Install 3" compacted lift of MNDOT 2331 Type 418 wear.
Project cost $1,150.00
at Trimost hereby to 'urnlsh material and tabor — t.uurjeti In ut.yurcion;.e with above speciflcell0ht1, t01 the sum IV:
SEE REVQR9O MMOS FOR TIMM, of AOMEEMENT
EQvol Opportunity Employer
.P4 t xunrr vi rOpnuL —me skive prim, epocifkations
and cendRiw,s are satisfactory and are Newby errantwrt Viso ere autlrrlseet
to de the work es edacified. Peynlent wilt be mode AI outlined above.
Date et neeepiewea 541 IIVre _.
Sltptatu
Sigeetu►s -
TOTAL P.e2
TITT1ST1ILWATER
LOGGING AND RAILROAD
1, pf)
MUSEUM
April 29, 1998
The Honorable Mayor Jay Kimble
Stillwater City Council Members and Staff
216 North Fourth Street
Stillwater, MN 55082
Dear Sirs:
The Minnesota Zephyr is in the process of putting on the market two (2)
railroad trolleys at a price of $45,000.00 each. These trolleys have been totally
refurbished and used for the past 3 1/2 years transporting passengers from the
Stillwater Depot to the South end of the city near the Andiamo.
These trolleys are standard gauge carrying 24 passengers. The trolleys
are FRA approved with a 65 horsepower gasoline air-cooled engine. Each
trolley has a sound system for -narration and music_.A railroad, lease and..
insurance must be maintained by the purchaser. Other arrangements however
are possible.
if the City is irlteres.ted. in purchasing th +ve.trollleys, please,:s bmit a letter
of interest as soon as possible, no later than June 1, 19U8 to the address below.
A complete list of specifications is available upon request.
i
Very truly yours,
David L. Paradeau
President
601 NORTH MAIN, P.O. BOX 573, STILLWATER, MINNESOTA 55082 / 612-430-3000 / FAX 612-430-3662