Loading...
HomeMy WebLinkAbout2019-051 (Development Agreement for Marylane Meadows, Case No. 2019-08) RESOLUTION 2019-051 CITY OF STILLWATER WASHINGTON COUNTY, MINNESOTA A RESOLUTION APPROVING THE DEVELOPMENT AGREEMENT FOR MARYLANE MEADOWS CASE NO. 2019-08 WHEREAS, Mark J. Guenther, President, Fenway Land Company, Inc., made application for approval of the final plat known as MARYLANE MEADOWS; and WHEREAS, on January 23, 2019 the Stillwater Planning Commission held a public hearing and recommended approval of the preliminary plat; and WHEREAS, on February 5, 2019 the City Council held a public hearing on the preliminary plat and preliminary plans and found them to be compatible with the neighborhood and consistent with the City's Zoning Ordinances, Subdivision Ordinances, Comprehensive Plan, and infrastructure; and WHEREAS, on April 2, 2019 the Stillwater City Council reviewed the final plat, final plans and Development Agreement for MARYLANE MEADOWS and found them to be consistent with the preliminary plat and plans. NOW, THEREFORE, BE IT RESOLVED, that the City Council of the City of Stillwater hereby approves the Development Agreement for MARYLANE MEADOWS with the following conditions: 1. The site shall be developed in substantial conformance with the following plans on file with the Community Development Department, except as may be modified by the conditions herein: • Preliminary plat Sheet 3 of 7 Dated 12/20/18 • Removals plan Sheet 3 of 8 Dated 2/15/19 • Site&utility plan Sheet 4 of 8 Dated 2/15/19 • Grading&Erosion control plan Sheet 6 of 8 Dated 2/15/19 • Temporary Sediment Basin exhibit Sheet 6.1 of 8 Dated 2/15/19 • Tree preservation plan Sheet T1 of 1 Dated 2/15/19 • Landscape plan Sheet L1 of 1 Dated 2/15/19 2. All civil engineering plans shall be found satisfactory to the City Engineer, or revised to his satisfaction, prior to release of the final plat from City Offices for filing with Washington County. 3. The Brown's Creek Watershed District grading permit must be issued prior to release of the plat from city offices for recording with Washington County. If the grading permit requires any changes to the grading plan referenced in Condition 1 above, they must be reviewed and found satisfactory to the City Engineer prior to commencing any grading. In addition, if any changes are required by the watershed district that result in substantive changes to the final plan set,then the City Council will need to review the final plans again before the final plat is released from city offices. 4. The developer must construct a bituminous trail over Outlot A connecting Marylane Avenue to the Settler's Glen tail system. The developer's cost of building the trail will be credited against the park and trail fee for the project. The balance of the bid cost of construction (if found satisfactory to the City Engineer) will be credited against the total park and trail fee and the balance must be submitted to the City prior to release of the final plat from City offices for recording with Washington County. 5. All electrical and communications utility lines shall be buried. 6. The Developer will be responsible for paying the Trout Stream Mitigation Fee of $27,645.20 and trunk sewer and water fees of$49,605.60. If these fees are not paid in 2019, rates will increase and the higher rates will apply. These fees will be due prior to release of the final plat for recording with the county. 7. Materials may not be stored in the critical root zone of trees to be saved, nor may equipment or materials be leaned or stacked against trunks of trees identified to be saved. Enacted by the City Council of the City of Stillwater, Minnesota this 16th day of April, 2019. CITY OF STI LWATER Ted Kozlowski, Mayor ATTEST: Beth Wolf, City Clef'