Loading...
HomeMy WebLinkAbout2019-02-21 DTPC Packet DOWNTOWN PARKING COMMISSION AGENDA Thursday, February 21, 2019 8:30 AM Conference Room 213, City Hall 1. CALL TO ORDER 2. APPROVAL OF AGENDA 3. APPROVAL OF JANUARY 17, 2019 MINUTES 4. ELECTION OF VICE CHAIR 5. NEW BUSINESS 5.01. Crosby Hotel request for valet signage 5.02. Cruisin’ the Croix event parking 5.03. Opera on the River event parking 5.04. 2018 parking enterprise fund report 6. UNFINISHED BUSINESS 6.01. Parking capacity study scope 7. UPDATES 7.01. Council decision on Historic Armory 7.02. Memorial Day event 7.03. Farmer’s Market 8. ADJOURNMENT DOWNTOWN PARKING COMMISSION MEETING MINUTES January 17, 2019 CALL TO ORDER Chair Anderson called the meeting to order at 8:33 a.m. Present: Chair Anderson, Commissioners Glynn, Hopfe and McAllister; Council Liaison Junker Absent: Commissioners Johnson, Lettner and Pelletier Staff present: Community Development Director Turnblad Police Chief Gannaway Parking Enforcement Officer Pasket ELECTION OF OFFICERS Motion by Commissioner McAllister, seconded by Commissioner Hopfe, to elect Commissioner Anderson as Chair. All in favor, 4-0. The Commission considered electing Commissioner Pelletier as Vice Chair, but tabled election of Vice Chair until next month. APPROVAL OF MINUTES Possible approval of minutes of December 20, 2018 meeting Motion by Commissioner McAllister, seconded by Commissioner Glynn, to approve the minutes of the December 20, 2018 meeting. All in favor, 4-0. NEW BUSINESS Historic Armory parking analysis Community Development Director Turnblad stated that the new owners of the historic armory property on Chestnut and Third Streets are proposing to remodel and convert the property to eight high-end apartments, possibly a distillery or brewery, and office space. Limited changes will be made to the exterior. There are two options for building use: with or without a brewery/distillery. The non-residential parking required after remodeling will be 28 or 39 depending on which of the two use options are chosen. The 15 residential parking spaces required will be provided onsite. The current parking load is 39 spaces. The goal of Downtown Parking Commission January 17, 2019 Page 2 of 3 meeting all required parking on-site has been met, so parking mitigation will not be necessary for the project. Staff finds Options A and B both meet the standards and intent of the City’s parking codes, and therefore recommends approval as submitted. Mr. Turnblad added that he discovered a footnote in the parking ordinance stating that unless the increase in parking need is greater than four, a mitigation plan is not required for a change of use. Matt Wolf, applicant, stated there will be one designated interior parking space per resident and the remaining exterior spots will be for guest parking. They have tried to squeeze as much parking on site as possible. A structural analysis of the basement indicated they can’t put parking there. They have approached adjoining landowners about shared parking and may devise parking agreements with them in the future, but for tonight’s meeting they just wanted to ensure they were adhering to what the code requires. Commissioner McAllister asked if the potential brewery/distillery owner who already met with the Commission about a parking mitigation plan is the same entity Mr. Wolf is referring to. Mr. Wolf replied they are one of many potential brewery/distillery tenants. Architects have carved out a piece of the front of the existing garage for a brewery/distillery retail space. Tonight’s parking approval would supplant the previously approved parking mitigation plan. Motion by Commissioner Glynn, seconded by Chairman Anderson, to approve the parking plan as recommended by staff. All in favor, 4-0. Parking Capacity Study scoping discussion Mr. Turnblad reminded the Commission that a parking capacity study is planned for 2019. The goal of the study is to discover and implement ways to increase capacity in the downtown public parking system without the expenditure of significant capital dollars. The first phase is to create a scope for the study. Transportation planner Lance Bernard from HKGi led discussion aimed at defining the scope of the parking capacity study. He reviewed existing conditions and challenges, and summarized steps to maximize existing parking supply through low cost/high benefit solutions before making a large capital investment. He discussed the following district-wide parking models: a Downtown Development Authority, Enterprise Funds, a Parking Benefit District, Improvement Districts, Public-Private Partnerships, and a Transportation Management Association. Mr. Bernard went on to describe the steps involved in implementing each approach. He also presented comparisons with other municipalities, and reviewed costs of a parking structure and financial strategies for construction. Commissioners recognized the following issues: valet parking and using shuttles for major events have been attempted in the past; Uber and Lyft seem underutilized in Stillwater; there is inconsistency between pay lots and non-pay lots; there are three to four months of seasonal down time when demand is lower; parking perception has changed since the opening of the new bridge made it easier to get downtown; there is a problem with employee parking; and the future opening of more trails will impact parking needs. Downtown Parking Commission January 17, 2019 Page 3 of 3 The Commission discussed possible study outcomes and directed staff and the consultant to draft a scope for the study and an RFP for consulting services. For the next meeting, Mr. Turnblad will bring 2018 parking revenue figures, talking points and study costs. “No cash” policy for parking ramp Mr. Turnblad reported that staff recommends approval of establishing a parking ramp policy of credit or debit card only, no cash. Parking Enforcement Officer Pasket suggested erecting a sign at the ramp entrance notifying drivers. Motion by Commissioner McAllister, seconded by Chairman Anderson, to approve the “No cash” policy for the parking ramp. All in favor, 4-0. UNFINISHED BUSINESS ADA data for Downtown parking lots Mr. Turnblad stated staff has looked at the number of handicapped spaces available and required in each lot. Public works will add signage and then the City will be in compliance. The handicapped spots have already been established. UPDATES Commissioner McAllister questioned valet parking signage at the Crosby Hotel. Mr. Pasket said he has talked to the property manager and will follow up. ADJOURNMENT Chairman Anderson adjourned the meeting at 10:30 a.m. Respectfully Submitted, Julie Kink, Recording Secretary TO: Downtown Parking Commission FROM: Bill Turnblad, Community Development Director DATE: February 13, 2019 RE: Crosby Hotel valet parking INTRO Late last year the Crosby Hotel requested three valet parking spots on Main Street. The Parking Commission approved two 15 minute spaces, but did not authorize the use of the two spaces exclusively for valet purposes. Subsequently, the City’s Public Works Department has installed those two signs. The hotel feels that valet parking on Main Street is crucial to their operations and has requested that the Parking Commission reconsider. SPECIFIC REQUEST The Crosby is asking for permission to place two A-frame valet parking signs at the curb of the two 15 minute parking spaces. The signs would read “valet parking”, not “valet parking only”. And they are requesting permission to place them curbside daily from 8 am – 11 am and then again from 3 pm to 8 pm. COMMENTS Related to the valet parking is snow removal. The bank of plowed snow that accumulates along the curbline is removed by the City’s Public Works Department as time permits. But, that is not frequent enough for convenient use by guests that are unloading luggage. So, as the Lora does, the Crosby will need to remove the bank of snow after each snowfall. ACTION The Parking Commission is asked to reconsider the valet sign request. cc: Anne Loff bt TO: Downtown Parking Commission FROM: Bill Turnblad, Community Development Director DATE: February 12, 2019 RE: Cruisin’ on the Croix - Special Event Parking INTRO Frank Fabio has made application for the 2019 Crusin’ on the Croix event permit. He has requested the use of all the spaces in Municipal Parking Lots 4 (12 of 29 spaces approved last year), 5 (approved last year), 8b (not approved last year), 9 (approved last year), 10 (not approved last year) and 11 (approved last year). This is a total of 234 parking spaces. Last year 94 spaces were approved. As last year, the event organizer proposing the use of two on-street parking spots again, one at Water & Myrtle and one at Water & Mulberry, for event registration tents. These were denied last year. Eight event dates are requested, which would occur every other Wednesday beginning June 12th and ending September 18th. These dates are June 12 & 26, July 10 & 24, August 7 & 21, and September 4 & 18. This is the same schedule as last year and the same number of dates. PARKING LOT RESERVATIONS Lot 4 All of Lot 4 is requested. Because of the bridge conversion project, only 12 of the 29 spaces were approved for use last year. This is because the rest are committed to the project by agreement with the City. It was hoped that the bridge project would be completed by June of 2019, but due to delay in the manufacture of the Lift Bridge replacement gears, the project may not be completed now until into August. Until then, only 12 spots will be available in Lot 4. (See graphic on next page.) Lot 5 Due to construction on Water Street Inn, there is limited access to Myrtle Street east of Water Street. Consequently, access to Lot 5 may be difficult. Staff is not comfortable guaranteeing that Lot 5 will be available to the public. Cruisin’ on the Croix February 12, 2019 Page 2 Lot 8b River Market Co-op has a lease for the exclusive use of Lot 8a. And since Lot 8b is inextricably coupled with Lot 8a, the use of Lot 8b can be disruptive to the Co-op’s customer parking. Therefore, the City has adopted a policy NOT to allow Lot 8b to be used for any events except Lumberjack Days. Staff recommends following the policy. Parking for Lift Bridge Project Lot 9 Since Lot 9 lies east of the Downtown Walkway, staff supports its use for events. Lots 10 & 11 By policy, the City does not want Lot 11 to be used for events, since it lies west of the Downtown Walkway. However, since Lot 11 was approved for use last year in order to keep Lot 10 open for through traffic. Staff recommends the same arrangement this year. To summarize, staff recommends the use of 12 spaces in Lot 4, all spaces in Lot 9 and the 45 spaces in Lot 11. But, we do not recommend the use of Lot 5, Lot 8b or Lot 10. Cruisin’ on the Croix February 12, 2019 Page 3 Reservation fees The number of parking spaces available in the lots recommended by staff is 87. Last year there were 94 spaces approved, but that included the 7 spaces in Lot 5, which will likely be inaccessible to the public this year. The reservation fee is $1.50 per space per day. Over the course of eight event dates, the total fee for the 243 requested spaces would be $2,916 ($364.50/event date). If only the recommended 87 spaces are approved, the fee would be $1,044. Historical Data& Requested 2019 2013 2014 2015 2016 2017 2018 2019 Parking spaces 109 111 159 159 141 94 243 # of event dates 13 13 9 8 8 8 8 Cost per date $154.50 $166.50 $238.50 $238.50 $211.50 $141.00 $364.50 Total cost $2,008.50 $2,164.50 $2,146.50 $1,908.00 $1,692.00 $1,128.00 $2,916 RECOMMENDATION City staff recommends approving the reservation of 12 spaces in Lot 4, as well as all of the spaces in Lots 9 and 11 at a fee of $130.50 per event date, with the added condition that no street parking will be used. cc: Frank Fabio attachments: application form Commission minutes parking system map Bt 1 Bill Turnblad From:Beth Wolf Sent:Monday, February 04, 2019 9:15 AM To:Bill Turnblad; Diane Ward; John Gannaway; Jon Muller; Nate Meredith; Nick Chaves; Shawn Sanders; Stuart Glaser; Tim Moore; Tom Ballis; Tom McCarty Cc:Abigail.Miller@co.washington.mn.us Subject:2019 Cruisin on the Croix Car Show Attachments:Cruisin' on the Croix 2019 Application.pdf Attached is the 2019 Cruisin’ on the Croix Car Show event application. They are requesting the car show be held every other Wednesday starting June 12th – September 18th (8 dates). The event is proposed the following.  Requesting parking Lots 4, 5, 8b, 9, 10 and 11.  1 food vendor in Lot 9 needing electricity and inspection.  They use their own barricades.  They remove their own trash and use the ped plaza restrooms, no extra portapotties have been required.  Live music on Maple Island’s patio from 5-8 pm and a DJ sets up at the corner of Lot 4 and Myrtle using electricity on the pole.  They put up event signage on Water St Inn’s fence.  They are requesting two 10x10 check-in tents on Water St at Myrtle and Mulberry again – these were denied to be located on the street. If allowed then parking rates need to be applied. The application should go before Downtown Parking then onto Council, dates to be determined. Please review the attached application and provide comment. Thank you. Beth Wolf, City Clerk City of Stillwater 216 4th Street North, Stillwater, MN 55082 651-430-8802 | Fax 651-275-4100 DOWNTOWN PARKING COMMISSION MEETING MINUTES December 21, 2017 REGULAR MEETING 8:30 A.M. Chairwoman Pelletier called the meeting to order at 8:34 a.m. Present: Chairwoman Pelletier, Commissioners Hopfe, Glynn, Johnson, Lettner, Council Liaison Junker Absent: Commissioner Anderson Staff: Community Development Director Turnblad, Parking Enforcement Officer Pasket, Zoning Administrator/Assistant Planner Olson-Williams APPROVAL OF MINUTES Approval of November 16, 2017 meeting minutes Minutes were accepted as presented. SPECIAL EVENTS Cruisin’ on the Croix Community Development Director Turnblad reviewed the request. Frank Fabio has made application for the 2018 Cruisin’ on the Croix event permit. He requested the use of Municipal Parking Lots 4, 5, 8b, and 9 (141 parking spaces) for eight event dates: June 13 & 27, July 11 & 25, August 8 & 22, and September 5 & 19. Mr. Fabio also is proposing the use of two on-street parking spots, one at Water & Myrtle and one at Water & Mulberry, for event registration tents. In November the Commission tabled this request pending confirmation from Mead Stone, manager of the River Market Co-op, that he supports the use of Lot 8b for the event. In discussion with the co-op manager this week, staff heard that he does not support the use of Lot 8b this year. Therefore, staff recommends following the City policy and not allowing the event in this lot. Only a portion of Lot 4 will be available this year because the City Council approved the use of 8 spaces for construction office trailers needed for the lift bridge conversion project and an additional 9 spaces for construction crew parking. City staff recommends approving the reservation of 12 spaces in Lot 4, as well as all of the spaces in each of Lots 5, 9 and 11 at a fee of $141 per event date, with the added condition that no street parking will be used. Frank Fabio, organizer of Cruisin’ on the Croix, stated that if the use of Lot 8b is not approved, he would like to use the Mulberry Point roundabout. He would reserve the parking Downtown Parking Commission December 21, 2017 Page 2 of 3 spaces with cones during the day but not close off the street until the event begins in the afternoon. His goal is to keep the car show as contiguous an event as possible. Community Development Director Turnblad pointed out that the Mulberry Point turnaround is needed for access to the boat gas dock. Chairwoman Pelletier stated the car show has grown too big and has a negative impact on her business because it greatly limits parking. Her Wednesday sales are down by about one-third in the summer. Mr. Fabio pointed out that on off Wednesdays, downtown business is sparse. He listed business owners who report better revenues on Wednesdays with the car shows. He is all for promoting downtown businesses. He suggested the City is going to have to draw more people during the week in future years. Mead Stone, River Market Co-op Manager, said that on Wednesdays when there is a car show, his revenues are down 5%. Wednesdays without the car shows do not show this dip in revenue. Council Liaison Junker mentioned that there is no single event that will have a positive effect on every downtown business. No matter the event, some businesses will see revenue gain and others will see a loss. He also stated he does not support using Mulberry Point, which is a public street, for the car show. He feels this event, like all others, should be limited to parking lots, not streets. Commissioner Hopfe pointed out that construction crews are displacing a lot of public parking spaces this year, so the City should be extra protective of the public parking spaces. The Commission really has to consider how all the events benefit and impact the City. Commissioner Lettner said there needs to be a balance. The downtown parking system needs to be able to support the businesses, not just the events. Yet having events downtown can be good for at least some businesses. Councilmember Junker commented that the public parking system supports not only businesses and events, but also downtown residents and office workers. Mr. Fabio said Cruisin’ on the Croix is a popular event for Stillwater that benefits business downtown. The reduction from every Wednesday to every other Wednesday gives him a needed break. He does not make any money from the car show. He reminded the Commission of its mission statement which is to deal with the parking and the lots. Motion by Commissioner Lettner, seconded by Commissioner Johnson, to approve the reservation of 12 spaces in Lot 4, as well as all of the spaces in each of Lots 5, 9 and 11 at a fee of $141 for each of the eight event dates for Cruisin’ on the Croix 2018, with the condition that no on-street parking may be reserved. Motion passed 4-1, with Chairwoman Pelletier voting nay. ^ ^ ^ ^ ^ # # # # # # # ^ # Lot 1 Lot 2 Lot 3 Lot 4 Lot 5Lot 6 Lot 7 Lot 9 Lot 8b Lot 11 Lot 10 Lot 12 Lot 13 Lot 14 Lot 15 Lot 16 Lot 17 Lot 18 Lot 8a M u l b e r r y S t C o m m e r c i a l A v e M y r t l e S t C h e s t n u t S t O l i v e S t N e l s o n S tMain StWater StSecond StThird StN e l s o n A l l e yUnion AlleyP i n e S t Crosby Hotel ramp 3 4 43 3 4 4 24 24 24 4 4 4 24 Lowel l ParkLowellParkL iftB r id g e T e d d y B e a r P a r k P i o n e e r P a r k Map produced by Community Development Dept for Downtown Parking Commission Jan 1, 2019 Lot 1 (pay lot) -- 98 spaces Lot 2 (pay lot) -- 84 spaces Lot 3 (free lot - 3 hr) -- 33 spaces Lot 4 (free lot - 4 hr) -- 29 spaces Lot 5 (free lot - 4 hr) -- 7 spaces Lot 6 (free lot - 3 hr) -- 16 spaces Lot 7 (free lot - 3 hr) -- 16 spaces Lot 8a ("private" *) -- 51 spaces Lot 8b (free lot - 4 hr) - 75 spaces Lot 9 (free lot - 4 hr) -- 30 spaces Lot 10 (free all day; overnight by permit) - 48 spaces Lot 11 (free all day; overnight by permit) - 45 spaces Lot 12 (part free all day; no overnight here) - 78 spaces (part permit only; overnight allowed here) - 23 spaces Lot 13 (free lot - 4 hr) - 13 spaces Lot 14 (free lot - 4 hr) - 47 spaces Lot 15 (free lot - 4 hr) - 97 spaces Lot 16 (free after hrs) - 60 spaces Lot 17 (free after hrs) - 75 spaces Lot 18 (free lot - 24 hr) - 22 spaces Public Ramp (pay) -- 248 spaces Public level, Crosby (pay) 52 spaces * Free public lot after 6 PM 1,247 off-street parking spaces: 1,206 general public 41 handicapped spaces 468 marked on-street spaces: 416 general public 18 handicapped spaces 14 15 minute spaces 7 30 minute spaces 19 Loading spaces 239 unmarked on-street spaces (Includes 91 on 2nd St no. of Mulberry) 1,954 total public spaces 1,451 free public spaces (74.3%) Public Parking Downtown Stillwater 2019 3 Legend Downtown Parking District City Parking Lot City Parking Ramp Public - upper level (Crosby Hotel) Trailhead Parking (Lot 12) Private parking only (Lot 8a) Permit parking only (Lot 12) Trailers & large vehicles (Lot 12) On-street handicapped 15 minute parking limit 30 minute parking limit Loading/unloading Bus loading/unloading Bus parking ^Business Permit Valid #DT Resident Permit Valid Free parking lot Pay parking lot Available to public after 6 PMLotparkingStreetparkingPermitsvalid FreeorPayMonthly Permits (allows overnight parking) Numbers in circles = hour limits on free parking3 On-street parking is free, but limited to 3 hrs unless posted for less TO: Downtown Parking Commission FROM: Bill Turnblad, Community Development Director DATE: February 19, 2019 (Revised report) RE: Opera on the River – Special Event Parking INTRO Rouse Legacy and Operatunity Theater of Forest Lake are requesting permission from the City to hold a concert on August 3rd in front of the Lowell Park Pavilion. Event setup, concert and take down would all occur on Saturday, August 3rd. Lots 5 and 9 are requested to be reserved for this event. Lot 5 is proposed to be used for service of alcoholic beverages and Lot 9 for vendors and portable restrooms. The lots would be reserved only on August 3rd. PARKING LOT RESERVATIONS Lot 9 has 30 spaces and Lot 5 has 7 spaces. The fee would be $3 per space for the day, or a total of $111. COMMENTS The request is consistent with the City policy to allow only the public parking lots east of the Downtown Trail to be reserved for events. ACTION REQUIRED The Parking Commission should review the request and make a recommendation to the City Council whether to reserve the public parking spaces for the event, and the amount of the fee. cc: Obed Floan attachments: application form Bt 612-803-3688 OperaOnTheRiver@OperatunityTheatre.org MAIN STAGE Artists Tent Roped-Off VIP Seating Liquor Enclosure Soundboard Tent FREE SEATING On All Remaining Open Areas Throughout Rest of Park Lawn chairs, Picnic Blankets & Other Picnic Items Welcome. Food / Truck Vendor Area - Artisan/Service/Merch./Non-Food Vendors (All 10x10 Spaces) - Port-A-Potty Areas (2 handicaps & 18 singles) - Trash/Recycling Areas (12 Areas Listed) PARK EVENT LAYOUT PLAN • MAIN STAGE – 40x40 • ARTISTS’ TENT – 20x20 • LIQUOR ENCLOSURE – 30x10 o (Adjacent to Roped-Off VIP Seating overlapping Lot 5) • ROPED-OFF VIP SEATING – 40x40 XXX XXX XXX XXX XXX - Street Barricades (5 Total) -North Entrance to Lot 10 -Mulberry St E & Sam Bloomer -Lot 8B connection to Lot 9 -Entrance to Lot 5 -Myrtle Street just past Entrance to Lot 4 XXX • SOUNDBOARD TENT – 10x10 o (Enclosed with Roped-Off VIP Seating, but adjacent to maximize seating capacity) PLANNING REPORT DATE: February 20, 2019 TO: Downtown Parking Commission RE: 2018 Revenues FROM: Bill Turnblad, Community Development Director Parking Lots The parking lot budget is developed and maintained by the Police Department. Generally speaking the surface lots generate about $100,000 to $140,000 more in revenue than required for operating costs1. The surplus is transferred to the Parking Enterprise Fund (aka “capital account”.) The table below shows revenue and expenses for the surface lots from 2015 to 2018. The 2018 figures are not final and have not yet been audited. 1 Depreciation is not included in these totals. Parking System Budget Page 2 Comments: 1. Even though we had a lot of construction and disruption in the system in 2019, the parking lot revenue stayed healthy with a $137,116 transfer to the parking enterprise fund. 2. Parking permit revenue increased dramatically in 2018. This may be due in part to successful collection of quarterly parking mitigation fees and increased sales for commercial parking permits. But, that would not explain the entire increase. The reasons for the increase may need more investigation. 3. The revenues generated by Lot 1 are falling steadily over the years since 2015. But, the as the main users of the lot, the number of passengers for the St Croix Boat & Packet has not decreased correspondingly. So, we should explore why this loss of revenue is occurring. Perhaps there was a significant period of time that the revenue equipment was not functioning. 4. The revenue from parking tickets was substantially higher than in 2017. Parking Ramp The parking ramp budget is developed and maintained by the Planning Department. Generally speaking, revenue covers operation costs but not capital costs. Therefore, the Parking Enterprise Fund has to cover capital needs for both the ramp and the surface lots. The table below shows revenue and expenses for the parking ramp from 2014 to 2018. The 2018 figures are not final and have not yet been audited. Comments: 1. Next capital expenditures are scheduled for 2020 and include replacement of revenue equipment, computers and software. 2. The revenue from monthly parking passes is stagnant. 3. Revenue from transient sales (“cash and credit cards”) has increased steadily each year since the ramp opened. In the last year, the increase is likely attributable to the opening of the JX Event Center. Parking System Budget Page 3 Capital Costs In 2013 the Parking Commission approved a Capital Improvement Program (CIP) to address the maintenance needs of all of the parking lots. The CIP documents are attached. Construction that was going to occur on Lots 13, 14 and 17 in 2018 was rescheduled for 2019. Since Lots 13 and 14 were sold to the Crosby Hotel, we delayed work on Lot 17 until there were several lots to be done. So, this year Lots 8 and 17 will be resurfaced at an estimated cost of $143,000. And Lot 4 will be reconfigured to accommodate the closing of Chestnut Street to traffic. The cost estimate for Lot 4 has not been completed yet. But, it will include replacement of some curbing and re-striping. After this summer, all parking lots in the system will have been reconstructed or resurfaced. So, the next scheduled lot improvements will not be necessary until 2028. Attachments: Ramp and Lot budget reports for 2018 CIP bt Capital Projects for Downtown's Public Parking Lots Lot Number Year constructed Asphalt (in)Gravel (in)Area (sf)Rehab Year Estimated Cost Comments 1 1980 2 6 36,000 M+O 2013 $68,000 2 unknown 26,800 M+O 2033 $50,652 Total reconstruction in 2013 - 4" asphalt, 6" gravel 3 1993 5 4 9,500 M+O 2014 $18,000 4 unknown 11,000 M+O 2033 $21,000 Total reconstruction in 2013 - 4" asphalt, 6" gravel 5 2013 M+O 2033 Total reconstruction in 2013 - 4" asphalt, 6" gravel 6 & 7 1993 5 4 10,000 M+O 2032 $19,000 Mill & Overlay in 2012 8a 1998 40,500 M+O 2018 $68,000 8b unknown M+O 2033 Total reconstruction in 2013 - 4" asphalt, 6" gravel 9 2013 4 6 20,600 M+O 2033 39,000 Square footage and cost includes 8b as well 10 2013 32,600 M+O 2033 $62,000 New in 2013 11 2000 3 6 13,000 M+O 2020 $25,000 12 1993 5 4 37,500 M+O 2015 $71,000 13 unknown 6,000 M+O 2017 $11,400 14 gravel 4,300 TR 2017 $30,000 15 2010 2030 16 1993 5 4 18,500 M+O 2014 $35,000 17 1997 39,500 M+O 2017 $75,000 18-20 1994 45,000 M+O 2028 $85,000 Notes: mill & overlay every 20 years Total Reconstruction every 60 or as needed Mill & Overlay cost estimated at $1.90/SF in 2014 dollars Lot numbering system changed this year. Lots 13 and 14 were sold. So previous Lot 15 is now Lot 13, etc TO: Downtown Parking Commission FROM: Bill Turnblad, Community Development Director DATE: February 13, 2019 RE: Scope of Parking Study INTRO The Downtown Parking Commission is preparing to undertake a study of the downtown parking system. The purpose of the study is to identify strategies for improving the capacity of the parking system without major capital investments. To that end we have engaged Lance Bernard of HKGi to draft a scope for the study. The draft scope is attached. COMMENTS The attached scope identifies two phases of work. The first is the study, the second is implementation of the study. Tasks in the first phase, the study itself, include: 1) Project coordination, by the parking consultant 2) Three meetings with the Parking Commission a) Findings of analysis (as outlined in Task 3 below) b) Discussion of study results c) Review of final report draft and of scope of Phase 2 activities 3) Analysis of the existing system a) Mapping of utilization data b) Examination of the system’s regulatory and financing framework i) Zoning Ordinance ii) Revenues and expenditures c) Review of 5 similar cities’ parking systems d) Employee survey e) Parking generation model development i) This tool will help Parking Commission to analyze impact of each downtown proposal for its potential impact upon the public parking system Parking Study Scope February 12, 2019 Page 2 4) Strategies and recommendations a) Event parking b) Employee parking c) Revenue d) Regulatory and/or revenue changes 5) Final deliverables a) Draft report b) Present to Parking Commission and City Council More details can be found in the attached scoping document. ACTION The Parking Commission is asked to consider the scoping document and make changes as desired. Once there is consensus on the scope, it will be brought to the City Council for approval. Following that we will distribute it to parking consultants for cost estimates and project proposals. cc: Lance Bernard attachment: Draft scope bt January 21, 2019 | Downtown Stillwater Parking Study | DRAFT SCOPE Phase One Tasks Task 1 Project Coordination Task 1.1: Project Coordination  Task 1.1 provides time for HKGi to coordinate study tasks with City Staff. Deliverables  Bi-weekly check -ins with City Staff via phone or email. Task 2: Engagement Task 2.1 Parking Commission Meetings  HKGi will attend and facilitate up to three (3) meetings with the Parking Commission. City staff will be responsible for coordinating and scheduling the meetings. The purpose and intent for each meeting is described below: o Meeting #1: HKGi will meet with the Parking Commission to discuss key findings from the utilization counts and peer review research (see Task 3). o Meeting #2: HKGi will present draft recommendations to the Parking Commission for their consideration. The purpose of this meeting is to reach a consensus on the study results. o Meeting #3: HKGi will meet with the Parking Commission to review the final deliverables and scope Phase II activities. Deliverables  Preparation and attendance for up to three (3) Parking Commission meetings. Task 3: Exploration Phase Task 3.1: Data Collection and Mapping  Data collected under this task will determine parking utilization rates by parking facility and provide a baseline for confirming parking concerns. HKGi will utilize existing utilization counts (provide by the City) to build base maps depicting the study area’s parking attributes and utilization rates. Findings will help identify potential parking reservoirs that are underutilized. The parking reservoirs may present opportunities for employee parking or mitigate the parking needs/requirements for new uses or redevelopment initiatives. Task 3.2: Review existing regulatory structure and funding strategies  Zoning ordinance  Funding/financing policy o Capital expenditures o Ongoing operations and maintenance Task 3.3: Peer Review  HKGi will research up to five (5) comparison downtowns for comparing their parking requirements, district-wide parking models, pricing structure and financing mechanisms. Findings from this task will help inform potential modifications to the City’s parking requirements and district-wide parking approach. Task 3.4: Employee Survey  HKGi will work with City Staff to prepare an online survey to better understand the number of employees working in Downtown Stillwater during specific days and times. The survey results will help inform Task 3.2 and 4.2. The City will be responsible for distributing the survey. Task 3.5: Parking Generation Model  Data collected under Task 3.1 will be integrated into a customized “parking generation model.” The purpose of the model is to help determine the parking needs for new uses or future redevelopment efforts. Model assumptions will utilize the city’s parking requirements and policies to determine the study area’s current and future parking demand. The model will be used to run future parking scenarios based on future land use and redevelopment assumptions and parking reduction factors (e.g., parking demand rates that reflect current utilization, best practices, or multimodal goals).  The “parking generation model” will help determine when a new use or redevelopment initiative is unable to meet parking demands without building new off street park ing supply. Deliverables  Base maps depicting the study area’s parking utilization and attributes.  Memorandum documenting existing conditions and findings from the peer review.  Development of an on-line survey for the City’s use.  Parking generation model developed in Microsoft Excel. Task 4: Strategies and Recommendations Task 4.1: Event Parking  HKGi will develop recommendations for managing parking needs during large events (e.g., Lumber Jack Days and Harvest Fest). Various parking strategies may include shared parking opportunities, shuttle services, and travel demand management strategies. Task 4.2: Employee Parking  HKGi will develop recommendations for managing parking needs for downtown employees. Various parking strategies may include shared parking opportunities, shuttle services, and travel demand management strategies. Task 4.4: Enterprise Fund Evaluation  HKGi will develop a funding tool that compares Downtown Stillwater’s Enterprise Fund (fee-in-lieu payments for parking requirements) against other models. The model’s assumptions will be based on findings from Task 3.3. Task 4.5: Parking Framework  Our main objective throughout the planning process is to focus on an action/phasing plan that outlines recommendations and strategies that maximizes downtown’s parking supply. The recommendations and strategies will focus on the following: o Employee parking o Event parking o Parking solutions for new uses or redevelopment initiatives o Modifications to the parking ordinance (i.e., requirements and Enterprise Fund model) Deliverables  Memorandum documenting the proposed parking strategies and recommendations.  Development of an on-line survey for the City’s use.  Financial model developed in Microsoft Excel. Task 5: Final Deliverables Task 5.1: Draft Report  HKGi will provide a technical memorandum documenting the study’s process and findings. Supporting materials used throughout the process (e.g., GIS files, spreadsheets, maps, and power points) will be provided as part of the final deliverables. Task 5.2: City Council  HKGi will prepare and attend one (1) City Council meeting. We will present the study’s findings and recommendations. Deliverables  Consolidation of the Task 3 and 4 memorandums into a final report.  Preparation and attendance at one (1) City Council meeting. Phase Two Tasks Once Phase I activities are complete, HKGi will prepare a detailed scope of work and budget for Phase Two which will focus on implementation measures, while formalizing a preferred district- wide parking approach. This will be done in close collaboration with City Staff and the Parking Commission. Potential activities may include:  Stakeholder engagement to reach a consensus on the study’s recommendations  Zoning amendments  Design guidelines for parking structures  Wayfinding and signage plan  Design criteria for siting a new parking facility  Cost estimates for the recommendations  Shared parking agreements