COUNCIL CW\MBER
Stillwater, Minnesota
9:00 A. M.
MaY 3. 1971
SPECIAL MEETING
The meeting was called to order by president powell.
present:
councilmen Balfanz, Lammers, wohlers and president powell
Absent:
councilman peterson
Also present:
city coordinator, Marshall
city Attorney, Kimmel
FLOOD nVERTlME PAY
On motion of councilman Lammers, seconded by council~n Wohlers the council
approved the payment of flood pay at the overtime rate for the employees
detailed on the 1971 Flood payroll sheet. (See sheet in the Flood Fl1e-1971).
The meeting adjourned at 9:10 A. M.
a)//h~~/f~
Mayor
Attest,?~~~Jt/' J:.~~
~ Actin ity clerk
59
.
.
.
60
COUNCIL CHAMBER
Stillwater. Minnesota
May 4, 1971
4.00 P. M.
SPECIAL MEETING
The meeting was called to order by President powell
Present:
councilmen Balfanz, Lammers, Peterson, Wohlers and
president powell (Councilman 1~mmers arrived at 4:50 P. M.)
Absent:
None
Also Present:
City Coordinator. Marshall: Acting City Clerk, Schnell:
city Attorney. Kinnel: SUpP.rintencient of Public works,
Shelton: Consulting Bngineer, Elliott
~ NO. 49 CONTRACT FOR 1971
The contract was reaa in its entirety and the following changes were
recOl1IlI8nded:
ARTICLE I - section 4
Add ahead of present wording - "Within each job
Classification".
_ Section 5. Add at the end -if he posses qualifications for the
position" .
ARTICLE II=. Section 4. In the fifth line change "reimburseo" to "paid".
Add at the end "no deduction being made for the portion
of sick leave reimbursed by workmen's compensation-.
ARTICLE VIII-section 1. Waeres - Delete "or the cost of Living Increase,
whichever is greater."
section 2. Leave out entirely and then renumber all the other
sections to a total of 6.
Mr. Marshall was instructed to contact Mr. McPherE.on regarding these proposed
changes and the retyping of this contract.
UNFINISHED BUSINESS
This was the day and time set to open bids on Local Improvement No. 101 Dike
Removal, Embankment Construction, Bridge Demolition and Miscellaneous
construction Items.
The Clerk read the advertisement for bids alOud, Mayor Powell inquired if
the advertisement for bids was published, and the Clerk informed the council
that the advertisement for bids was published in the Stillwater Evening
Gazette, official newspaper of the city, on April 23, 1971 and in the Con-
struction Bulletin on April 22, 1971.
The following bids were then opened and read aloud:
Bid No. 1
w. J. Bbertz Grading & Excavating, Inc.
St. Paul, Minnesota
Bid Bond
Total Bid
$39.686.04
r
.
~
.
.
r"'
(May 4, 1971 - continued)
r-
Bid NOa 2,
carl Bolander & Sons Company
Minneapolis, Minnesota
Bid Bond
Total Bid
$22,916.00
Bid No.3
Shafer Contracting Co., Inc.
Shafer, Minnesota
Bid Bond
Total Bid
$29.615.00
Bid No.4
Schutz contracting Co., Inc.
savage, Minnesota
r
sid Bond
Total Sid
$27,630.00
Bid No.5
Moelter construction Co.
Stillwater, Minnesota
,-
sid Bond
Total Bid
$35.807.50
Bid No.6
Miller Eacavating
Stillwater, Minnesota
Certified Check
Total sid
$22.299.00
Bid No.7
Carl H. Peterson Company
Minneapolis, Minnesota
Bid Bond
Tot&l Bid
$34.217.00
Bid No. S
Marvin Rehbein Contracting, Inc.
Porest Lake, Minnesota
,-
Bid Bond
'-
Total sid
$24,205.00
on motion of Councilman Peterson, seconded by councilman Balfanz
these bids were referred to the City Attorney and the Consulting
Engineer for a report later in the meeting.
~
M.ISCELLANEOUS ITEMS
Mr. Elliott reported that due to the fact that the stipulation for sewer
separation has not been approved and sent in to the PCA they will not approve
the plans and specifications for Project No.1, L. I. #99 for sanitary sewer.
The first stipulation relates to the sewer separation and the second one relates
to the Nutrient Removal which is to be taken care of by the Metro Sewer Board.
On motion of councilman Peterson, seconded by Councilman Balfanz
Mr. Elliott was directed to write a letter to the Pollution Control
Agency regarding this stipulation.
....
v
61
.
.
.
.
.
.
I
f
~
f:i2
.
(May 4. 1971 - continued)
At this time the OATH OF OFFICE was administered to RAYMOND MARSHALL, City
Coordinator, City Clerk, City Treasurer by the Acting city Clerk, Dorothy
schnell.
on motion of Councilman Peterson, seconued by councilman Wohlers the City
Coordinator and consulting Engineer were instructed to contact the Pollution
Control Agency in person and discuss the problem with the refusal of the
PCA to approval of extension of sewers in the City of stillwater and that
this be done as soon as possible and report back at the next Council meeting.
UNFINISHED BUSINESS
On motion of Councilman Wohlers, seconded by Councilman Peterson a resolution
was introduced awarding the contract for the removal of the Dike, Local
Improvement No. 101 to Miller Excavating for a bid price of $22,299.00 and
that we hold the second low bid until the contract is entered into with Mr.
Miller. (see resolutions).
RESOLt7l'IONS
The following resolutions were read and on roll call were unanimously adopted:
1. Execute applicati~~ for Sewer Separation Federal Granc_ (repass)
2. City Attorney Provide Legal Data for Hud Funds. (repatos)
3. Awarding the Contract for Dike Removal (Miller Excavating).
ADJOllRNMENT
On motion of Councilman Balfanz, seconded by councilman Lammers the meeting
adjourned at 6:00 P. M.