HomeMy WebLinkAbout1981-09-24 JPC CorrespondanceSeptember 24, 1981
SHORT-ELLIOTT-HENDRICKSON, INC.
CONSULTING ENGINEERS
ST. PAUL, MINNESOTA • CHIPPEWA FALLS, WISCONSIN
Immuno Nuclear Corporation
1951 Northwestern Avenue
Stillwater, Minnesota 55082
Gentlemen:
RE: JOINT POWERS COMMITTEE
WASHING^1ON COUNTY
OUR FILE NO. 80054
On September 18, 1981, the undersigned met with your architect,
Mr. Steve Urbin of Be Architects, Inc., and Mr. Dennis Anderson of
Immuno Nuclear Corporation, regarding the onsite curb construction
and driveway entrances.
Since Immuno Nuclear Corporation still has guarantee money
escrowed for job performance, they are interested in reducing the
amount escrowed if at all possible. The undersigned told Mr.
Urbin that he had reviewed the onsite curb requirements and
driveways with Mr. Dennis O'Donnell of Washington County Planning
Department. Because of proposed building expansion and final
drainage configuration, the originally proposed curbing at the
edge of the bituminous driveway on the east side of the site, is
not necessary. We reviewed the driveway entrances and
particularly the connection and reconstruction of the curb and
gutter portion on Northwestern Avenue. The existing concrete curb
and gutter on each side of each driveway entrance should be sawed
to povide a clean contraction joint. The southerly driveway
entrance curb and gutter portion, is higher than the existing on
the north edge thereby creating a slight drainage problem in the
gutter. It was requested that approximately half of the new curb
and gutter be removed and replaced such that the grade would allow
drainage through the entrance on Northwestern Avenue.
We estimate the amount of work required for the driveway
corrections to be approximately $200 and would reconuuaend that you
contact the Washington County Planning Department for estimated
costs of additional landscaping items. We also recommend you
request a reduction in the performance money such that the amount
retained would cover the proposed driveway corrections and any
other items which the Washington County Joint Powers Committee may
require included. We are also enclosing a copy of Mn/DOT's
standard plate 7035 J which shows the driveway entrance
requirements in the Joint Powers area.
200 GOPHER BUILDING • 222 EAST LITTLE CANADA ROAD • ST. PAUL, MINNESOTA 55117 • PHONE (612) 484-0272
Immuno Nuclear Corporation
September 24, 1981
Page 2
Mr. Steve Urbin assured the undersigned that the driveway
correction items will be made quickly. We feel these will satisfy
the requirements of both the City of Stillwater and the Joint
Powers Committeefor drainage and surfacing. If there are any
further questions please do not hesitate to contact the
undersigned.
Sincerely,
Richard E. Moore
jcj
cc: Mr. Dennis O'Donnell, Washington County Planning Department
Ar. Nile Kriesel, City of Stillwater
Mr. Steve Urbin, Be Architects