HomeMy WebLinkAbout1980-008 JP-CUPWASHINGTON COUNTY, MINNESOTA NO `'''-�'`'`' �` `'"�;U
TOM of STILLWATER Permit Fee � 7n,,, "A
JOINT POWERS DISTRICT
❑ Certificate of Compliance
(tJ Conditional Use
Date Fee Paid
ZONING USE PERMIT
❑ Rezoning ❑ Sign
❑ Mining ❑
❑ Planned Unit Development ❑ Grading
Applicant: Irmiuri, Nuclear Corporation
Address:.. 6303 Osgood Avenue North
City/State/Zip Cade: Stillwater, Mrs 55082
Property Description: N 270' of S 915' of W 450' of SES, SE14, Section 32, T30, R20
Permitted Uses: Lilrlted Manufacturing Plant
Subject to the following special conditions or restrictions:
s ) AtLaci ea i Unul LiUns
2) Exhibit A
3) Exhibit B
4) Exhibit C
5) Exhibit U
6) Exhibit E
7) Exhibit F
We accept the conditions of this permit. We understand that any changes from these plans must be resubmitted
for approval.
ld
OWNER OR REPRESENTATIVE' DATE ZONING ADMINISTRATOR DATE
WHITE COPY -APPLICANT CANARY COPY -FILE PINK COPY -LOCAL GOVT. UNIT
CONDITIONS
JP -CUP -80-008
IMMUNO NUCLEAR CORPORATION
NOVEMBER 18, 1980
1) All applicable provisions of the Joint Powers Zoning Ordinance as
well as any more restrictive provisions of the City of Stillwater
concerning industrial development shall be complied with.
2) Upon agreement between the Zoning Administrator, City of Stillwater
and the Joint Powers Committee, no building permit will be issued
prior to the issuance of this conditional use permit.
3) Sanitary sewer and water improvements shall be constructed and util-
ized in compliance with the standards and approval from the City of
Stillwater engineer and water department.
4) On-site drainage shall comply with the grading and site plan attached
as Exhibit A.
5) Design and location of all drives and parking areas shall comply with
the plan attached as Exhibit A.
6) All turfed areas on the parcel that have been disturbed or destroyed
during the construction phase of this project shall be graded with
topsoil, rough seeded, mulched and fertilized or sodded prior to
May 25, 1981 in accordance with the recommendations of the Washington
County Soil Conservation Service.
7) Design, locations and specifications of signs shall conform with the
Joint Powers Zoning Ordinance and are subject to approval from the
Zoning Administrator. All signs shall require a sign permit to be
issued by the Zoning Administrator.
8) All waste materials and refuse shall be stored inside a fenced or
screened area or within a structure.
9) Any alterations to the attached Exhibits shall be reviewed and ap-
proved by the Zoning Administrator and shall require an amended
conditional use permit.
10) Any plant materials indicated on Exhibit A that do not survive must
be replaced as needed.
11) The parking lot shall be lighted according to the standards of the
Joint Powers Zoning Ordinance.
12) Concrete curb and gutter shall be constructed to meet the require-
ments of design 8618 set forth in the State of Minnesota Department
of Transportation Standard Plates Manual: Standard Plate No. 7100E
and shall be located as indicated on Exhibit A.
13) Driveway entrances shall be constructed in accordance with the speci-
fications of Standard Plate No. 70351 attached as Exhibit B. Exist-
ing curb and gutter shall be removed at the driveway entrances onto
the public street.
14) Development of the site shall be subject to the letters dated Novem-
ber 17, 1980 written by Richard E. Moore of Short -Elliott -Hendrickson,
Incorporated submitted to the Joint Powers Committee and attached as
Exhibit C and D.
15) Northwestern Avenue shall be repaired according to the specifications
of Exhibit F in any and all locations the street is disturbed.
16) The conditions of this permit shall apply to the land described and
shall not in any way, except herein noted, be affected by any subse-
quent sale, lease or other change from the current ownership.
17) Non-compliance with the conditions and attachments of this permit
shall be considered a violation of said permit and may result in
revocation of said permit.
18) Construction shall begin within one (1) year after the issue date of
this permit or the permit becomes void.
19) A $48,000.00 financial guarantee attached as Exhibit E shall be re-
tained by the Zoning Administrator to insure compliance with the
conditions of this permit.
OWNER EPRESENTATIVV� DATE
7 A V En/A
71�]iT/O
-2-
_ CUp ZS LI
CV
iP-sua -da - 008
Case Number JP- CUP- 60 - Cog
Fee Paid p �,
Date Filed
APPLICATION FOR CONSIDERATION OF PLANNING REQUEST
(This form should be filled out in duplicate by typing or printing in ink)
Vacant land fronting on the East side of North -
Street Location of Property: western Avenue
Legal Description of Property: The South 270 feet of the West 450 feet of the
tract of land more particularly aescribed in Ex i it A annexe Here:EF)
and made a part hereof.
Spirit of St. Croix, a limited partnership
Owner: Name under the laws of the State of Minnesota Phone
c/o First -Market Properties, Inc.
Address Suite 202. Eden 100 Building. 5100 Eden Avenue
City Minneapolis
Applicant (If other than owner):
Name Immuno Nuclear Corporation
State Minnesota Zip 55436
Address 6303 Osgood Avenue North
City Stillwater
Phone 439-9710
State Minnesota Zip 55082
Conditional
Type of Request: Rezoning Variance x xSvl Use Permit
X Subdivision Approval Other:
Description of Request: Applicant seeks approval of a minor subdivision to permit
Applicant to purchase the above-described tract consisting of approximately
2.8 acres from a larger tract of land containing approximately 15 acres.
Applicant intends to construct a light industrial building on said 2.8
acre tract of land. The proposed building would contain approximately
20,000 square feet which would be used for Applicant's business - (over)
Present Zoning Classification:
Existing Use of the Property:
Has a request for a Rezoning, Variance or special use permit on the subject site or any part
thereof been previously sought? No. When?
IUNO NUCL AR CORPO TION �3� , zU
j i
Signature of Applicant:/7A7 //) _ . Date j 0„I/V /� v
By _1
Approved Denied by the Planning Commission on
(d ate)
Approved Den ied by the Council on
(date)
Form No.7.6300-2
";.
8" Pav't. 77
:L'••' Paved Alley
4" Wal3 4" Walk
Curb and Gutter
6" Pav't.
Private i
Driveway '
Contraction Joints
..+
Variables
1/2" Expansion Joint
4"Walk
2)
1 •ut�OV`; ar 20a 77
—
,,Q��
SPECIFICATION
STANDARD
". a
•.
' Private Walk Prov ide intermed late jo int at -
1/4"
R 1/4 per ft. slope toward roadway squared end in sidewalk, vvhen
sidewalk Is adjacent to curb
---r-- --.-. and gutter.
Variable Width: PLAN
SECTION THRU WALK
MM
ME
CONCRETE WALK�
Variables
1/2" Expansion Joint
4"Walk
1 •ut�OV`; ar 20a 77
—
,,Q��
SPECIFICATION
STANDARD
". a
•.
`1
1/2" Preformed Joint Filler Material -
�,
'
AASHTO M213 (Not regtr ired when curb
Driveway need not be poured rnonol ith ically
No deduction to be inade in
and gutter or walk are adjacent to
,,s,1
With curb and gutter.
bituminous paving.)
1/2" Expansion Joints at 60' (approx.)
q Entrance
maximum intervals.
6 �
Q3
Same thickness as driveway.
- 0
600 to 400
Without sidewalk pave only to end of curb return
ENGINEER REFERENCE
when entrance is unsurfaced or construction is
+7
not needed beyond this point.
8 4
With sidewalk pave to back edge of sidewalk.
szOPe
.,.,.,,.:,gym•:,
Paid for as concrete driveway pavement.
. --
R
--
Driveway Pavement
1/4110
®
Variables
1/2" Expansion Joint
X Length Varies
r--
1 •ut�OV`; ar 20a 77
—
,,Q��
SPECIFICATION
STANDARD
". a
•.
0
Contraction Joint (Formed or Sawed)
Note:
'
(D
Driveway need not be poured rnonol ith ically
No deduction to be inade in
8 $-1076 desiatik,
,,s,1
With curb and gutter.
Curb and Gutter for'Entrarice.
1576 roux. diff.
V
See Std . Plate 7036 and Glans for placement
SECT ION A -A
of pedestrian curb ramp
ENGINEER REFERENCE
HALF PLAN PERSPECTIVE
See Road Design Manual for geometric design
of entrances.
Where the maximum allowable entance gradlant
would be exceeded, due to the position of the
CONTRACTOR REFERENCE
See plans for placement of walk and existing walk, the walk shall be removed arid
dimcnsiorts for construction of driveways. replaced, at the pavement warped to Wovkie
�"D0 DrT11,JtJ the re aired tra I
q en n�.e s ope .
1 •ut�OV`; ar 20a 77
—
STATE OF MINNESOI A
SPECIFICATION
STANDARD
. —
JEPARTiMENT OF TRAN:.'POPTAf101\1
REFERENCE
PLATE
I r
,,s,1
70351
November 17, 1980
�JC1#I$IT G
RECEIVED
SHORT-ELLIOTT-HENDRICKSON, INC. NOV 181980
CONSULTING ENGINEERS
ST. PAUL, MINNESOTA 0 CHIPPEWA FALLS, WISCONSIN
Joint Powers Committee
Washington County Courthouse
14900 61st Street North
Stillwater, Minnesota 55082
RE: JOINT POWERS COMMITTEE
IMMUNO NUCLEAR CORPORATION SITE
JP -CUP -80-008
OUR FILE NO. 80054
Attention: Mr. Dan Koehler, Planner
In accordance with Mr. Koehler's request we are submitting herewith
a site plan indicating finished grades, minimal storm sewer require-
ments for the first stage development, utility location and parking
lot structural section for the subject development. The proposed
site plan as submitted by Be Architects, Lake Elmo, MN, was used as
a basis for the site plan. The architects indicated finished contours
on their site plan. We found some discrepancy in existing roadway
widths and scaled dimensions on the original site plan. We, therefore,
refined the site plan correcting any discrepancies and indicating
finished elevations for gutter areas, bituminous surface areas, and
storm sewer facilities. The architect also indicated a future parking
area on the easterly side of the site which we did investigate with
preliminary grades such that if they desire to do any filling or
preliminary grading at this time it could be accomplsihed.
At present, there is a natural detention basin easterly of the pro-
posed site which accepts drainage from a portion of this site and the
Cub Food Store parking lot. This basin naturally overflows to the
north and eventually outlets onto Industrial Boulevard near the exist-
ing storm sewer. Before any further development is considered within
the entire parcel, which is designated Parcel No. 98-2050, we recommend
that an overall drainage study be accomplished. A 30 inch stub was
provided westerly from the LP catch basins located in a low point of
Industrial Boulevard on the Feeley Addition. This 30 inch pipe will
provide a storm sewer outlet for the parcel in question and any
drainage that may be required to flow in a northerly direction. We
feel that a storm sewer system or other means of drainage should be
investigated for the entire parcel before further development is
anticipated. It is our feeling that perhaps the commitee would like
to request the property owner to proceed with a drainage study.
Also, in accordance with Mr. Koehler's instructions, we have designed
a typical bituminous structural section for the parking areas and
driveways within the Immuno Corporation site. With anticipated
200 GOPHER BUILDING • 222 EAST LITTLE CANADA ROAD • ST. PAUL, MINNESOTA 55117 • PHONE (612) 484-0272
Joint Powers Committee
November 17, 1980
Page 2
traffic and growth we feel that a 2 inch bituminous wearing course
surface and a 4-1/2 inch aggregate base would serve the facility
adequately. We have also suggested B-618 curb and gutter in
accordance with our suggested standards to the committee in August
of 1980.
When utilities were installed on Northwestern Avenue, a six inch
cast iron soil pipe sanitary sewer service was provided to this
parcel. Also, because of unknown development, 2 one inch copper
water services were provided to this parcel within the proposed
site. One copper water service near the 6 inch sewer service is
indicated on the drawing. It is our understanding from the architects
that the building will be provided with fire protection in the form
of a sprinkler system. If fire protection sprinklers are required
within the building the 1 inch copper water service would not be
large enough to serve this facility. We have also indicated on the
site plan a proposed 8 inch water service which would have to be cut
into the existing main within the street surface at Northwestern Avenue
and extended to the property in question. It is the requirement of
the water department that these services be tapped under pressure and
an 8 inch gate valve and box be installed on the service at the pressure
tap. The developer should check with the Stillwater Water Department
to obtain their requirements for tapping into the existing 12 inch
main. We are enclosing copies of our as -built plans indicating the
watermain and the sanitary sewer on Northwestern Avenue. We are also
enclosing the typical section for the street construction on North-
western Avenue; this section would have to be replaced in kind after
excavating at the watermain location within the roadway surface.
The architects original drawing did indicate an existing retaining
wall on the easterly portion of the site above the future parking area.
It is our belief that this wall is in poor condition at this time.
However, in the future when the new parking area is constructed, a
retaining wall would be required to provide slope protection. Since
the dimensions on the original site plan were somewhat in error,
our finished grades are approximately one foot higher in the area of
the existing retaining wall than was originally proposed.
The developer will also be required to remove concrete curb and
gutter in the area of the new driveways; this concrete curb and
gutter will require replacement with a driveway section as previously
submitted to the Joints Powers Committee.
Joint Powers Committee
November 17, 1980
Page 3
We trust this review and revised drawing of the site together with
the bituminous structural section, drainage facilities, and utilities
will satisfy the requirements of our review and your request for
a site plan and specs on the proposed development.
Sine ely,
R
is and E. Moore
jcj
Enclosures
cc: Be Architects, Inc.
Ex�18�r �
- SHORT-ELLIOTT-HENDRICKSON, INC.
�..� CONSULTING ENGINEERS
ST. PAUL, MINNESOTA 0 CHIPPEWA FALLS, WISCONSIN
November 17, 1980
Joint Powers Committee
Washington County Courthouse
14900 61st Street North
Stillwater, Minnesota 55082
RE:. JOINT POWERS COMMITTEE
IMMUNO NUCLEAR CORPORATION SITE
JP -CUP -80-008
OUR FILE NO. 80054
Attention: Mr. Dan Koehler, Planner
On this date, the undersigned met with Steve from Be Architects
of Lake Elmo (architects for Immuno Corporation), concerning the
proposed site plan, grading and drainage. The undersigned reviewed
the requirements as indicated on the drawing which accompanies
our report. The existing sections, as-builts, and material specs
for the water service and parking lot structural section were also
reviewed.
Be Architects will revise their site plan to incorporate the suggested
changes in accordance with the drawing and specs from SEH.
In light of our meeting this morning, we feel that the architects
will meet the requirements and submit a revised site plan. If there
are any further questions please do not hesitate to contact the
undersigned.
Sincerely,
Richard E. Moore
jcj
cc: Be Architects
200 GOPHER BUILDING • 222 EAST LITTLE CANADA ROAD • ST. PAUL, MINNESOTA 55117 • PHONE (612) 484-0272
NORTHWESTERN BANK
2000 Northwestern Ave.
Stillwater. Minnesota 55082
612/439-2425
November 18, 1980
Washington County Planning Department
Stillwater, MN 55082
Attention: Dan Koehler
RE: Irrevocable Letter of Credit
Immuno Nuclear Corporation
Gentlemen:
We hereby open our Irrevocable Letter of Credit, dated
November 18, 1980 in your favor for the account of
Immuno Nuclear Corporation for a sum of $48,000.00.
Available by your Draft at sight presented on our bank
at the address given. The Draft must be accompanied
by invoices resulting from the installation of landscaping,
paving and curbing, as specified in the use and building
permits issued by joint powers planning group.
ENSIR�t��r
Bco
The Draft drawn under this credit must be marked "drawn
under Irrevocable Letter of Credit, dated November 18,
1980, of the Northwestern State Bank of Stillwater."
This credit is subject to the "Uniform Customs and Practices
for Documentary Credits (1974 Revision) International
Chamber of Commerce Puhlication#290."
We engage with you and any endorsers and holder of the Draft
drawn and negotiated in compliance with the terms of this
Letter of Credit that the same will be duly honored on
presentation on or before November 1, 1983.
Very truly yours,
J. C. Graham
President
JCG:bam
Northwestern State Bank of Stillwater
Downtown Office: 102 N Main St.
RECEIVFC
NOV 1 8 1980
E