THE STILLWATER PLANNING COMMISSION WILL MEET ON MONDAY, MAY 11, 1987
AT 7:00 P.M. IN THE COUNCIL CHAMBERS OF CITY HALL, 216 NORTH FOURTH
STREET.
AGENDA
Approval of Minutes - April 20, 1987.
PUBLIC HEARINGS:
1. Case No. CUP/87-22 - Conditional Use Permit request for filling
and grading a 2.5 acre site and rip -raping the river bank with
rocks and construction material. The site is located North of the
Stillwater Yacht Club between the Burlington Northern Railroad
tracks and the St. Croix River in the Flood Plain District. Frank
Aiple, Applicant.
2. Case No. SUB/87-24 - Preliminary Plat Approval for Interlachen
Hills Third Addition (Phase II).
CITY HALL: 216 NORTH FOURTH STILLWATER, MINNESOTA 55082 PHONE: 612-439-6121
STILLWATER PLANNING COMMISSION
DATE: May 11, 1987
TIME: 7:00 P.M.
MEMBERS PRESENT: Gerald Fontaine, Chairman
Judy Curtis Don Valsvik
Mark Ehlenz Dean Miller
Steve Russell, City Planner
MEMBERS ABSENT: Jay Kimble Rob Hamlin
Nancy Putz Jean Jacobson
APPROVAL OF MINUTES
Minutes of April 20, 1987 were approved as submitted.
PUBLIC HEARINGS:
Case No. SUP/87-22
Conditional Use Permit request for filling and grading a 2.5 acre site and
rip -raping the river bank with rocks and construction material. The site is
located North of the Stillwater Yacht Club between the Burlington Northern
Railroad tracks and the St. Croix River in the Flood Plain District. Frank
Aiple, Applicant.
Mr. Aiple presented the application for the Conditional Use Permit. He
stated the problems of erosion on his land and expressed concern about the
river bank. He would like to rip -rap the river front and level his land.
The Commission asked questions about rip -raping and how the DNR reviewed
the plans.
Motion by Dean Miller for approval of request if the following conditions
are met:
1. The drainage from the site is detained on site.
2. The site is planted to restore the vegetative cover.
3. A plan showing how and where the rip -rap will be placed and describing
the rip -rap material shall be submitted and approved by the City, DNR
and Corps of Engineers.
4. The site shall be secured at all times so that dumping without City
and Property Owner approval does not occur.
Second by Don Valsvik with a 5th Condition -
5. Particular use at the site be defined by the request of the DNR May 8,
1987.
Passed 5-0.
Case No. SUB/87-24
Public Hearing on the Preliminary Plat Approval for Interlachen Hills
Third Addition (Phase II) in the RA Single Family District. Interlachen
Company, Applicant.
Mr. Dale Beckman, representing the Developer, presented the project on the
Interlachen Subdivision.
Citizens expressed concerns about the following issues:
- Dumpsite
- The drainage and flooding in the area of the pond (932 elevation)
- Grade of the roads (8% by City standards)
- New plots adjacent to Property Owners.
- The slope of some plots (3 to 1)
- Drainage easements on each plot.
Issues for June meeting on Interlachen Subdivision:
1. Grades of the streets.
2. Lots 8 and 9 acquisition (access to park).
3. Setback standards set by the City.
4. Mr. Tyler's land (acquisition of land adjacent to his).
5. Turn -around area dimensions on a cul de sac.
The meeting adjourned at 8:25 P.M.
Respectfully submitted,
Ann Pung
Secretary