Loading...
HomeMy WebLinkAbout2017-128 (support for Roadway and Trail Improvements (State Aid Project No. S.A.P. 082-624-009) RESOLUTION 2017-128 A RESOLUTION OF SUPPORT FOR ROADWAY AND TRAIL IMPROVEMENTS (STATE AID PROJECT NO. S.A.P. 082-624-009) WHEREAS, Washington County has, through its Capital Improvement Plan (CIP) recommended a project on County State Aid Highway (CSAH) No. 24, also known as Osgood Avenue, to improve pavement condition,traffic operations, pedestrian accessibility and safety, and drainage; and WHEREAS,Washington County, in consultation with the City of Stillwater, engaged in a preliminary design process beginning in 2016 to identify potential and prioritized improvements for the CSAH 24 corridor within the City of Stillwater; and WHEREAS,the City of Stillwater, in consultation with Washington County, developed and approved the city's Trails Master Plan, which recommended a trail along CSAH 24 within the project area and was adopted by the City Council of the City of Stillwater on September 15, 2015; and WHEREAS, the City and County have engaged in community engagement process as part of the preliminary design effort intended to gather and consider public feedback for the proposed trail; and WHEREAS, concept project layout showing proposed pedestrian and traffic improvements on and along CSAH 24,within the limits of the City of Stillwater, has been prepared and provided to the City; and NOW, THEREFORE BE IT RESOLVED that the City Council of the City of Stillwater supports the proposed construction in year 2018 of a new 8-foot wide bituminous trail to be located on the west side of Osgood Avenue (CSAH 24) from between 62n1 Street and 65th Street and a replacement of the existing concrete sidewalk with a 5-foot wide concrete sidewalk to be located along the east side of Osgood Avenue (CSAH 24) from between 62nd Street and 400 feet north of 63rd Street. BE IT FURTHER RESOLVED that the City Council of the City of Stillwater supports the County continuing with the development of final plans and right-of-way acquisition necessary for the construction of the project. ADOPTED THIS TWENTIETH DAY OF JUNE,2017 ZesC7 Ted Kozlowski, Mayor Attest: • IO Diane F. Ward, City Clerk