Loading...
HomeMy WebLinkAbout2016-119 (Bank Stabilization Feasibility Study & Quote) RESOLUTION 2016-119 AUTHORIZING FEASIBILITY STUDY FOR BANK STABILIZATION AND ACCEPTING QUOTE WHEREAS,staff was given approval from Council to request quotes from consultants for a bank stabilization study along the St. Croix River on the south end of town from approximately the Dock Cafe to the City limits by Sunnyside Marina; and WHEREAS,portions of this segment have steep and/or eroded slopes and are in close proximity to the Loop trail and to our trunk sanitary sewer main; and WHEREAS,three quotes were received and WSB provided the lowest cost of$49,500, and included data collection, conceptual development of stabilizing the river bank, grant analysis, permitting requirements, soil borings and cost estimates,with approximately three to four months to complete the study; and WHEREAS, the study would be paid for from funds refunded from the Corps of Engineers Levy Project. NOW THEREFORE, BE IT RESOLVED that the Stillwater City Council hereby authorizes the Feasibility Study for the St. Croix River Riverbank Restoration Project and accepting quote by WSB in the amount of$49,500 to perform such services. Adopted by the Stillwater City Council this 7th day of June, 2016. -1Zet2 k --,. Ted Kozlowski, Mayor ATTEST: 'l4iii;' /ll% . Thomas McCarty, ting City Clerk