HomeMy WebLinkAbout2016-119 (Bank Stabilization Feasibility Study & Quote) RESOLUTION 2016-119
AUTHORIZING FEASIBILITY STUDY FOR BANK STABILIZATION AND ACCEPTING
QUOTE
WHEREAS,staff was given approval from Council to request quotes from consultants
for a bank stabilization study along the St. Croix River on the south end of town from
approximately the Dock Cafe to the City limits by Sunnyside Marina; and
WHEREAS,portions of this segment have steep and/or eroded slopes and are in close
proximity to the Loop trail and to our trunk sanitary sewer main; and
WHEREAS,three quotes were received and WSB provided the lowest cost of$49,500,
and included data collection, conceptual development of stabilizing the river bank, grant
analysis, permitting requirements, soil borings and cost estimates,with approximately three
to four months to complete the study; and
WHEREAS, the study would be paid for from funds refunded from the Corps of
Engineers Levy Project.
NOW THEREFORE, BE IT RESOLVED that the Stillwater City Council hereby
authorizes the Feasibility Study for the St. Croix River Riverbank Restoration Project and
accepting quote by WSB in the amount of$49,500 to perform such services.
Adopted by the Stillwater City Council this 7th day of June, 2016.
-1Zet2 k --,.
Ted Kozlowski, Mayor
ATTEST:
'l4iii;' /ll%
. Thomas McCarty, ting City Clerk