Loading...
HomeMy WebLinkAbout2016-051 (Water Street Dumpster Enclosure & Sidewalk) RESOLUTION 2016-051 ACCEPTING QUOTE FOR CONSTRUCTION OF WATER STREET DUMPSTER ENCLOSURE AND SIDEWALK WHEREAS, staff has been working with the business owners of Marx, Lolos,HAF Architects and 45 Degrees, as primary users of the dumpsters, have agreed on the location; and WHEREAS,the dumpster enclosure would be located on two parking stalls on Water Street and centered on the Marx and Lolo property line and match the existing dumpster enclosure further north on Water Street; and WHEREAS, included with the dumpster enclosure, it is proposed to install better access from the existing sidewalk south of the dumpster location. Currently,the existing elevated walk exits,via a ramp onto Water Street, with no easy access to the existing sidewalk to the north. WHEREAS,two quotes were received for construction of the enclosure and the sidewalk connection,with Curbmasters providing the lowest cost of$32,000; and WHEREAS,the work would be paid for by payments received from the lease of the Municipal Barge Property. NOW THEREFORE, BE IT RESOLVED that the Stillwater City Council hereby approves the construction of dumpster location and sidewalk by Curbmasters at a cost of$32,000. Adopted by the Stillwater City Council this 8th day of March, 2016. Michael Polehna, Vice Mayor AT: Diane F. Ward, City Clerk