HomeMy WebLinkAbout2016-051 (Water Street Dumpster Enclosure & Sidewalk) RESOLUTION 2016-051
ACCEPTING QUOTE FOR CONSTRUCTION OF WATER STREET DUMPSTER
ENCLOSURE AND SIDEWALK
WHEREAS, staff has been working with the business owners of Marx, Lolos,HAF Architects and
45 Degrees, as primary users of the dumpsters, have agreed on the location; and
WHEREAS,the dumpster enclosure would be located on two parking stalls on Water Street and
centered on the Marx and Lolo property line and match the existing dumpster enclosure further north
on Water Street; and
WHEREAS, included with the dumpster enclosure, it is proposed to install better access from the
existing sidewalk south of the dumpster location. Currently,the existing elevated walk exits,via a
ramp onto Water Street, with no easy access to the existing sidewalk to the north.
WHEREAS,two quotes were received for construction of the enclosure and the sidewalk
connection,with Curbmasters providing the lowest cost of$32,000; and
WHEREAS,the work would be paid for by payments received from the lease of the Municipal
Barge Property.
NOW THEREFORE, BE IT RESOLVED that the Stillwater City Council hereby approves the
construction of dumpster location and sidewalk by Curbmasters at a cost of$32,000.
Adopted by the Stillwater City Council this 8th day of March, 2016.
Michael Polehna, Vice Mayor
AT:
Diane F. Ward, City Clerk