Loading...
HomeMy WebLinkAbout2015-145 CITY OF STILLWATER WASHINGTON COUNTY, MINNESOTA RESOLUTION NO. 2015-145 A RESOLUTION APPROVING THE PRELIMINARY PLAT AND CONDITIONAL USE PERMIT FOR BROWN'S CREEK COVE, A SINGLE-FAMILY DEVLOPMENT LOCATED ON NEAL AVENUE NORTH CASE NO. 2015-20 WHEREAS, Todd Baumgartner of WB Development, LLC has made application for approval of a Preliminary Plat for a 15 lot single-family development, and a Conditional Use Permit for "cluster residential development" on property legally described as follows: See Exhibit A;and WHEREAS,on July 8,2015 the Planning Commission held a public hearing on the case and on a unanimous vote recommended approval of both the Preliminary Plat and Conditional Use Permit;and WHEREAS,on August 18,2015 the City Council held a public hearing to consider the development proposal;and WHEREAS, the Preliminary Plat and Conditional Use Permit are consistent with the City's Zoning and Subdivision Ordinances,and the City's infrastructure can support the proposed development. NOW, THEREFORE, BE IT RESOLVED, that the City Council of the City of Stillwater hereby approves the requested Preliminary Plat and Conditional Use Permit for BROWN'S CREEK COVE with the following conditions: Res No.2015-145 Page 2 of 4 1. The site shall be developed in substantial conformance with the following plans on file with the Community Development Department,except as may be modified by the conditions herein: • Existing Conditions Sheet C2 dated 6/19/15 • Site Layout Plan Sheet C3 dated 6/19/15 • Erosion Control Plan Sheet C4 dated 6/19/15 • Grading Plan Sheet C5 dated 6/19/15 • Street Plan&Profile Sheet C6 dated 6/19/15 • Sanitary sewer&Water Plan Sheet C7 dated 6/19/15 • Storm sewer plan&profile Sheet C8 dated 6/19/15 • Details Sheet C9,C10,C11,C12 dated 6/19/15 • Landscape Plan Sheet L1 dated 6/19/15 2. The Final Plat application materials must document a maximum of 25% impervious cover on Lot 8. Excess impervious surface must be removed prior to release of development sureties. 3. The landscape plan submitted with Final Plat application materials must specify proposed ground cover in all disturbed areas. To the extent that this lies within the creek and wetland buffer,reestablished vegetation will need to be native grasses and vegetation rather than turf. 4. The Final Plat application materials must detail the dimensions and setbacks of the building pads on all of the lots. 5. The development impact fees and trunk utility fees(a total of$172,389.28) must be paid to the City prior to release of the final plat for recording with Washington County. 6. All electrical and communications utility lines shall be buried. This shall be specified in the plans submitted for final plat approval. 7. The Washington County Highway Department requires that the Final Plat include a notation that access will be restricted along McKusick Road. 8. Review comments from the Brown's Creek Watershed District must be addressed in the Final Plat application materials. This includes review and approval of the location of the averaged wetland buffer limits. 9. A trail easement found satisfactory in form and content to the City Attorney shall encumber the trail alignment over Outlot A in favor of the public,and shall be filed at Washington County together with the Final Plat. 10. A trail easement found satisfactory in form and content to the City Attorney shall encumber the trail alignment over Lot 2 in favor of the public,and shall be filed at Washington County together with the Final Plat. 11. On the Final Plat application materials,Outlot A must be shown as private rather than a public park. 12. All civil engineering plans must be found satisfactory to the City Engineer, or revised to his satisfaction prior to release of the Final Plat for filing with Washington County. 13. Prior to release of the final plat for recording with Washington County,a $26,000 park dedication fee shall be submitted to the City(minus any credit for pre-approved excess trail costs). In the alternative,the developer may Res No.2015-145 Page 3 of 4 pay the$26,000 park dedication fee prior to release of the plat,and upon completion of the trail any credit determined to be applicable by the City Engineer would then be reimbursed to the developer. 14. One model home may be constructed on either Lot 11 or Lot 12. The building permit for the one model will only be issued after filing the plat with Washington and after development fees are paid to the City. 15. Prior to release of final plat,a Development Agreement found satisfactory to the City Attorney and City Engineer must be executed by the developer. Enacted by the City Council of the City of Stillwater, Minnesota this 18TH day of August, 2015. CITY OF STILLWATER '67.49 Ted ozlowski, yor ATTEST: Diane Ward,City Clerk EXHIBIT A All that part of the East 1/2 of the Southeast 1/4 of the Northeast 1/4 of Section 19, Township 30 North, Range 20 West, Washington County, Minnesota, described as follows: BEGINNING at the southeast corner of said Northeast 1/4, thence northerly along the east line of said Northeast 1/4 for 653.24 feet; thence westerly parallel with said north line of Southeast 1/4 of the Northeast 1/4 to the west line of said East 1/2 of Southeast 1/4 of Northeast 1/4; thence southerly along said west line 388.04 feet; thence easterly at right angle to last described line a distance of 82.50 feet; thence southerly at right angles to last described line to the south line of said Northeast 1/4; thence easterly along said south line of Northeast 1/4 to the point of BEGINNING. EXCEPT Parcel No. 5 of Washington County Highway Right of Way No. 84. (Doc. No. 717713)