HomeMy WebLinkAboutHistoric Property Reuse Study of Bergstein Shoddy Mill 2015-05-27A Historic Property Meuse Study
of the Bergstein Shoddy Mill
Stillwater, MN
na ved
Cummurfty Development CePe""fd'
A Historic Property Reuse Study
of the Bergstei n Shoddy Mill
Stillwater, MN
CONTENTS
Background
The Project Team
Approach
Issues Analysis
Disposition Alternatives
Use Alternatives
Recommendations
Next Steps
Bibliography
History and Interpretation
MnDOT Move Photos
Existing Conditions Photos
Existing Conditions, Code Analysis, and Rehabilitation Recommendations
Existing Conditions Drawings
Schematic Design Drawings
Structural Analysis
Cost Estimates
Financial Analysis
List of Interviewees
Examples of Similar Projects
Urban Ag Center
Amended National Register Nomination
Prepared for the City of Stillwater by
John Lauber and Company LLC
Claybaugh Preservation Architecture Inc
2015
Recelved
MAY 2 7 2015
Community Development Department
ACKNOWLEDGEMENTS
This program is financed in part with federal funds from the National Park Service, U.S.
Department of the Interior. However, the contents and opinions do not necessarily reflect
the views or policies of the Department of the Interior, nor does the mention of trade
names or commercial products constitute endorsement or recommendation by the
Department of the Interior.
This program receives federal financial assistance for identification and protection of
historic properties. Under Title VI of the Civil Rights Act of 1964, Section 504 of the
Rehabilitation Act of 1973, and the Age Discrimination Act of 1975, as amended, the
U.S. Department of the Interior prohibits discrimination on the basis of race, color,
national origin, disability, or age in its federally assisted programs. If you believe you
have been discriminated against in any program, activity, or facility as described above,
or if you desire further information, please write to:
Office for Equal Opportunity
National Park Service
849 C Street, NW
Washington, DC 20240.
PROJECT BACKGROUND
The Moritz Bergstein Shoddy Mill and Warehouse are the remaining structures from
what was originally a complex of six buildings located above the St. Croix River in Oak
Park, Minnesota. The structures were listed on the National Register of Historic Places in
2008 under Criterion A as an intact example of a property providing insight into the daily
living patterns of Germanic -Jewish immigrants to
community of Stillwater.
Minnesota, and their efforts to sustain themselves in a new
land. The mill and warehouse building were moved to their
current location on the St. Croix River in 2012 in keeping
with a Section 106 mitigation agreement completed as part
of planning for the new St. Croix River Bridge. The
buildings are now owned by the City of Stillwater, and the
new site will be a focal point within Bridgeview Park, a new
city park which will eventually be connected to the planned
Loop bicycle and pedestrian trail, and may also eventually
be provided with transient docking facilities for boaters on
the St. Croix. The park will serve as a gateway that will
help introduce visitors to the resource -rich historic
Recognizing that the Bergstein property could play an important role in the community's
efforts to foster historic preservation and heritage tourism in the area, the City of
Stillwater and the Stillwater Heritage Preservation Commission issued a request for
proposals in 2014, seeking a team of preservation professionals to conduct a historic
property reuse study for the Mill and Warehouse.
In response to that solicitation, preservation consultants and experienced reuse study
leaders John Lauber and Bob Claybaugh made a scoping visit to the property on 5
November 2014, meeting with city planner Abbi Jo Wittman, touring and photographing
the buildings, and discussing aspirations and expectations for the reuse study project.
Prior to that visit, both consultants had reviewed a number of documents tracing the
history, significance and preservation of the Mill and Warehouse. Bob Claybaugh had
first become familiar with the Bergstein complex as part of a Relocation Feasibility Study
he had completed for the Minnesota Department of Transportation in 2005.
The co -principal investigators for the Bergstein Shoddy Mill project exceed the Secretary
of the Interior's Professional Qualification Standards for history, architectural history,
and historical architecture. All work on the project was completed in accordance with
guidelines established in A Primer for Historic Properties Reuse Teams in Minnesota.
The results of our investigation are presented in the pages that follow.
THE PROJECT TEAM
John Lauber
Architectural Historian/Preservation Planner
John Lauber served as co -principal Investigator for the Bergstein Shoddy
Mill reuse study and his firm, John Lauber and Company LLC, served as
prime contractor. John exceeds the Secretary of the Interior's Professional
Qualification Standards for both History and Architectural History.
Robert Claybaugh, AIA
Historical Architect
Robert Claybaugh served as co -principal Investigator for the Bergstein
Shoddy Mill reuse study. Bob exceeds the Secretary of the Interior's
Professional Qualification Standards for Historic Architecture. Bob is a licensed
architect in the states of Minnesota, Wisconsin, and Missouri.
Daniel Hoisington
Historian and Interpretive Specialist
Dan Hoisington served as the interpretive specialist for the Bergstein
Shoddy Mill Reuse Study. Dan is principal of Hoisington Preservation
Consultants --a cultural resource management firm headquartered in Roseville,
Minnesota. He exceeds the Secretary of the Interior's Professional Qualification
Standards for History and Architectural History.
Jon Commers
111 Planner/Development Specialist
Jon Commers served as financial analyst for the Bergstein Shoddy Mill
is Reuse Study. Jon is principal of Donjek, a public finance, project
management, and public policy consulting firm based in St. Paul.
Gene Dwyer
Structural Engineer
Gene Dwyer, PE, of LS Engineers in Le Sueur served as structural
consultant for the Shoddy Mill study. Gene has previously collaborated
with the co -principal investigators on historic structure reports and reuse
studies for a variety of historic properties throughout Minnesota.
PPMProfessional Project Management
,.�._ Cost Estimators
Cost estimates for proposed work on the Shoddy Mill property were prepared by
Professional Project Management, a Twin Cities -based construction management firm.
Bergstein Shoddy Mill 2
Reuse Study
APPROACH
In its proposal, the project team outlined the following goals for the Bergstein Shoddy
Mill Reuse Study:
-Engaging and leading citizens of Stillwater through a systematic and inclusive study
process, gathering and providing the facts they will need to make an informed decision
about the future of this historically significant property.
-Evaluating the historical integrity, defining characteristics, current condition, and
adaptability of the buildings and site.
-Examining the realities of the local political, social, recreational, business and economic
environment and outlining a range of practical and achievable alternatives for
rehabilitating and utilizing the buildings and site.
-Understanding that preservation and reuse of any historic buildings is inherently an
exercise in sustainability, evaluate additional opportunities for integrating sustainable
practices into any reuse scenario for the buildings and site.
-Identifying potential tenants, concessionaires, developers, and other partners who may
contribute to a viable reuse of the building and site.
-Identifying life safety, building code and accessibility requirements that must be
addressed as part of a reuse plan.
-Describing alterations that may be required to accommodate new uses of the property.
-Identifying opportunities for interpreting the history and significance of the buildings.
-Outlining an orderly plan for completing rehabilitation work. Quantifying costs and
phasing of proposed work.
-Providing information about grants and other sources of revenue for reuse scenarios.
Specific steps in the study process included:
Pre Contract Site Visit
On 5 November 2014, John Lauber and Bob Claybaugh traveled to Stillwater to meet
with planner Abbi Wittman and tour and photograph he Shoddy Mill site and buildings.
Information gathered during this visit was used to assemble the project team and develop
a proposal specifically tailored to the requirements of the Bergstein project.
Background Research
The Bergstein Shoddy Mill has been the subject of an extensive series of studies
completed over the past 20 years. These include historic properties surveys,
determinations of National Register Eligibility, environmental impact statements,
relocation studies, and park/trail plans. The reuse study team began its work on the reuse
study project by reviewing these documents.
Site Visits
Much of the information for the reuse study was gathered through field inspections of the
buildings and site. The fieldwork phase of the project began on 29 December 2014,
when John Lauber and Bob Claybaugh participated in a project startup meeting with
Abbi Wittman to discuss the reuse study process, schedule, and expectations. Following
the meeting, the team leaders completed a preliminary inspection of the buildings,
completing baseline documentation. Team leaders returned to the site on 9 January 2015
Bergstein Shoddy Mill
Reuse Study
for an intensive evaluation of the physical integrity, salient features and existing
conditions of both structures, taking measurements, photographs and field notes. On 27
January 2015, the leaders returned to the site with structural engineer Gene Dwyer, to
complete supplemental documentation and participate in a structural analysis of both
buildings. On 2 February 2015, the team leaders and project historian Dan Hoisington
attended a meeting of the Stillwater Heritage Preservation Commission to discuss the
reuse study process and present preliminary findings from the field assessments.
Interviews and Public Meeting
Team members John Lauber, Bob Claybaugh, and Dan Hoisington were in Stillwater
from 24-26 March for intensive interviews with more than forty public officials, agency
representatives, local business and tourism leaders, members of the arts and non-profit
community, and other stakeholders.
Team members John Lauber, Bob Claybaugh, Dan Hoisington, and Jon Commers
returned to Stillwater on 30 March for additional interviews and a public meeting
attended by approximately two -dozen local citizens. In meeting, the team presented a
visual tour of the site and buildings, discussed the physical condition and adaptability of
the structures, summarized findings from the interviews, and solicited opinions from
attendees regarding opportunities, obstacles, and objections for potential reuse.
A shoddy "devil, " used to shred fabric scraps for reuse.
ergstein Shoddy Men 4
Reuse Study
ISSUES ANALYSIS
Drawing on information gathered during three days of focused interviews and a public
meeting, the reuse team compiled a listing of issues that should be considered as the
community ponders the future of the Shoddy Mill property.
Historic Preservation Issues
The citizens of Stillwater have demonstrated their appreciation for history and historic
preservation for many years. The city brands itself as "The Birthplace of Minnesota."
The iconic Stillwater Lift Bridge, Commercial Historic District, Territorial Prison Site
and a host of other landmarks have helped make the city a destination for tourists, and
tourism plays an important role in the local economy. The community has an active
Heritage Preservation Commission, and is home to the Washington County Historical
Society.
Despite their long history, the Shoddy Mill and Warehouse are new to Stillwater. The
buildings were originally part of a larger complex located in nearby Oak Park Heights,
and were moved to their present location in 2012 as part of mitigation for the new St.
Croix River Bridge. The buildings were listed on the National Register of Historic Places
in their original location and, as part of a Memorandum of Agreement between the
Minnesota Department of Transportation, the Minnesota State Historic Preservation
Office and others, will retain their National Register status despite the move. An
amendment to the original nomination has been prepared and is ready for submittal to the
MnSHPO. The property's National Register status and subsequent mitigation efforts
have provided a great deal of historical information about the activities that took place in
the buildings. MnDOT, the city of Stillwater, the MnSHPO and others have invested
significant time and money to document and move the buildings, and have a stake in
ensuring their preservation.
The site selected for relocation of the Bergstein buildings is adjacent to the
archaeological ruins of the Hersey and Bean Lumber and Planing Mills, which closely
reflect the industrial history of Stillwater. By contrast, the Shoddy Mill and Warehouse
are most significant as an example of an industry practiced the St. Croix River Valley's
small population of Jewish immigrants.
Because the buildings were not originally part of Stillwater's built environment, and
because they reflect a little known aspect of the area's history, the mill and warehouse are
unfamiliar to most residents of the community. The buildings are physically nondescript,
and timeworn, and are therefore not visually obvious landmarks.
The buildings are extraordinarily simple in construction, which will make restoration
work relatively inexpensive. Interior spaces retain very little historic fabric, making them
virtually blank slate for adaptive reuse. Restoration will make buildings more visually
appealing.
Bergstein Shoddy MITI
Reuse Study
Design Issues
The Shoddy Mill and Warehouse are extremely simple buildings. The Warehouse is a
simple wood -frame building combining traditional timber framed structural elements
with conventional balloon framing. The Mill building is crudely constructed of local
stone, with a roof supported on salvaged iron rafters, reflecting the history of the site as
an early recycling center.
Despite a number of alterations to the exterior of the warehouse, including installation of
an overhead garage door, wide Masonite lap siding and alterations to a number of the
original window openings, a substantial amount of original exterior fabric remains in
place. Original materials include wood drop siding, the large sliding doors on the east
and west ends, some original window trim, cornice moldings and beadboard soffits.
Exposed timber framing and the windlass and hopper on the upper level are virtually the
only original features remaining on the interior of the Warehouse. The Mill building is
essentially a stone shell, with no original interior features. Both buildings were placed on
new foundations as part of the move in 2012. Utility connections were run to the site at
that time, and the lack of floor slabs and simple construction, especially of the warehouse
building, would make connections relatively easy.
Because of the buildings' simplicity and relative lack of character -defining original
interior features, no extraordinary measures or artisanal skills will be required to return
them to functional condition. The Warehouse is in need of some structural repair,
including replacement of a missing column near the west end and reinforcement of
temporary repairs to the lower portions of studs. Substantial reinforcement of the upper
level floor system in the Warehouse would be required to return that portion of the
building to active use.
At this point it seems unlikely that the either structure will used in the winter. However,
it would be easy to insulate the Warehouse building and install a radiant heating system
in a new concrete floor slab to prepare the structure for eventual year around use. The
large original sliding doors at each end could be opened in the summer to provide fresh
air and a visual connection to the riverfront.
Bergstein Shoddy Mill 6
Reuse Study
Site/Shoreline Issues
The Bergstein buildings were relocated to a city -owned property on the banks of the St.
Croix River, south of the downtown commercial district and the new St. Croix River
Bridge. The narrow parcel is adjacent to busy Highway 95 and the buildings are partially
concealed from the roadway by trees and other vegetation. Abandoned train tracks and a
gravel road flank the property on the west. There is very limited parking on the gravel
road, and additional parking along the shoulders of Highway 95.
The property lies within the boundaries of the St. Croix National Scenic Riverway, a unit
of the National Park Service. Visitors to the parcel look out over the River toward a
relatively undeveloped natural shoreline on the Wisconsin side. One interviewee
observed that the Shoddy Mill site offers "the best view of the Stillwater lift bridge in
town."
The site's riverfront location, scenic vistas, and the courtyard -like space between the mill
and warehouse buildings would seem to make this an ideal location for outdoor activities.
The advent of bike/pedestrian trails and potential transient docking facilities for boaters
will provide ways for visitors to reach the site without using automobiles.
Because of its location within the Scenic Riverway and within a floodplain along a major
navigable river, the property is subject to a variety of regulatory authorities, including the
Park Service, the US Army Corps of Engineers, and the Minnesota DNR. Relocation of
the buildings required raising the elevation of the site to one foot above the 100 -year
flood level, obtaining variances for setbacks from both the shoreline and bluffs on the
west side of the land, and installation of riprap to stabilize the river bank. Regulatory
agencies have strongly emphasized a need to minimize high-intensity uses for the site, to
protect the riverbank and to maintain the natural character of the area through careful
landscape design. Some concerns were expressed about plans to develop transient
docking facilities at the site.
Safety and Security Issues
The relocated Mill and Warehouse buildings occupy a relatively isolated sot between the
St. Croix Boat and Packet Company and the Sunnyside Marina. Although a chain link
fence has been installed around the property and the buildings have been secured with
plywood panels and padlocks, neighboring businesses report that they regularly see
intruders inside the fence and around the buildings. Despite efforts to secure the
buildings, they are susceptible to intrusion and vandalism. The Warehouse is a wood -
frame structure that is that could easily be damaged by fire. Although the staircase to the
upper level has been removed, it would still be possible for intruders to reach the upper
room by climbing on exposed bracing in the east wall. This presents a potential falling
hazard and exposes the city to liability.
Bergstein Shoddy Mill 7
Reuse Study
Recreation and Tourism Issues
There has been a flurry of bike/pedestrian trail development in and around Stillwater in
recent years, much of which has resulted from planning for the new St. Croix River
Bridge. The recently completed Brown's Creek Trail provides a new connection between
Stillwater and Minneapolis/St. Paul via the Gateway Trail. The iconic lift bridge will
soon be converted from a vehicle bridge into a bike/pedestrian crossing. A new six -mile
long Loop Trail will take cyclists and pedestrians through downtown Stillwater, along the
Riverfront directly past the Shoddy Mill site, and across the river into Wisconsin via the
lift bridge and the St. Croix River Crossing. Current redevelopment at the St. Croix
Boomsite, planned acquisition of the Aiple property north of town for incorporation into
the park system, and an anticipated increase in visits to city -owned Kolliner Park on the
Wisconsin side of the river following conversion of the historic lift bridge to a
bike/pedestrian trail all add to the critical mass of recreational opportunities in and
around Stillwater.
In anticipation of these new routes, the city has recently constructed public restrooms
along the downtown riverfront. A trailhead with parking and composting toilets will be
developed near the Sunnyside Marina to the south of the Shoddy Mill site. The
conceptual master plan for Bridgeview Park includes schematic design for developing
transient docking for watercraft at the Bergstein site.
Stillwater and the Shoddy Mill property lie within the boundaries of the St. Croix
National Scenic Riverway, administered by the National Park Service. For several years
NPS maintained an office in Stillwater, but it moved its operations to the Arcola Mill
historic site north of town a few years ago. From the point of view of the Park Service,
that arrangement has been unsatisfactory. Noting that Stillwater is essentially the
southern boundary of the Riverway, that the Park is relatively unknown, and that there is
not even a sign identifying the area as a National Park, NPS officials have expressed an
interest in establishing a dedicated contact station in or near Stillwater as a means of
introducing visitors to the resource. Officials have also stated that a visitor contact
station should be explicitly dedicated to park -related activities, and should not be
expected to double as a general-purpose travel information center for the city.
A number of interviewees pointed out that motorboat traffic is relatively heavy on the in
this part of the river, and that there is no convenient access for human -powered watercraft
such as kayaks, canoes, or paddleboats. There was a general consensus that recreational
activity at the Bergstein property should focus on bicycle traffic.
The St Croix Boat and Packet Company is located near the Shoddy Mill property on the
north, and operates a popular and successful program of excursions and charter tours.
This activity draws a significant crowd to the area, and will help to create awareness of
the Bergstein property as a destination. Noting that the new bike/pedestrian trail passes
through the Packet Company property, some individuals have expressed concern about
potential congestion as cyclists and pedestrians mix with excursion boat passengers.
Bergstein Shoddy Mill
Reuse Study
Traffic and Parking Issues
Parking at the Shoddy Mill site is extremely limited and in high demand. Motorists can
presently park along Highway 95, and a few spaces are available on the gravel frontage
road between the Bergstein buildings and the Packet Company. Many noted the lack of
parking for patrons of the Packet Company located just north of the Shoddy Mill site.
A majority of reuse study interviewees identified parking as a major local issue, and one
that must be considered in developing plans for the Shoddy Mill site. Although the city
has a large municipal ramp downtown, and is developing additional parking along the
riverfront in the commercial core, there seems to be a general consensus that many
visitors are unaware of these opportunities for parking.
Although many trail users will reach the Shoddy Mill site by bike or on foot, there is
likely to be a large contingent who will load their bicycles on bike racks and drive to the
site to begin the rides. The new parking lots downtown will serve some of these
individuals, and a trailhead/vehicle parking area for the Loop Trail is being developed as
part of the Bridgeview Park project. There is nearly uniform agreement that no
additional vehicle parking should be included in any development of the Shoddy Mill
site. The lack of parking could limit some potential uses, such as proposals that the
buildings be used as a visitor information center for out-of-town visitors, or as a contact
station for the National Park Service.
Plans for Bridgeview Park include the possibility that transient docking facilities for
boaters may eventually be developed at the Shoddy Mill site. This would bring an
additional group of visitors to Stillwater.
It is anticipated that completion of the new St. Croix River crossing will significantly
change traffic patterns through downtown Stillwater, eliminating a bottleneck from
vehicles waiting to cross the historic lift bridge, and diverting commuter traffic away
from downtown.
Bergstein Shoddy Mill 9
Reuse Study
Downtown Issues
Foi decades, many of the business in Stillwater's historic downtown commercial district
have relied heavily on tourism. Bars/restaurants, hotels, bookstores, galleries, and
boutiques, and other specialized retail outlets abound. There is presently some
uncertainty and concern about how the diversion of traffic away from the historic
commercial core resulting from completion of the St. Croix River Bridge may affect
downtown businesses. In an effort main the vitality of the business district in the face of
change, a coalition of local business owners recently formed the Downtown
Revitalization Committee.
In addition to the DRC, business -oriented organizations include the Stillwater
Convention and Visitors Bureau and the Greater Stillwater Chamber of Commerce. These
organizations are funded by membership fees, and in the case of the CVB, by a local tax
on lodging. These entities help with coop advertising, marketing, and some event
planning. They have attempted to maximize promotion dollars by minimizing
expenditures for physical facilities and staff and maximizing the use of social media.
One member of the DRC described the Shoddy Mill site as "an important piece of real-
estate." Representatives from the Chamber of Commerce, DRC, Convention and Visitors
Bureau, and other business and civic leaders all suggested that the buildings could
function in part as a gateway for visitors to Stillwater, providing information about local
hospitality and other businesses, parking, and events. There was a general consensus that
restrooms and a picnic area should be included as part of any redevelopment and that
vehicle parking should be limited. There was considerable enthusiasm for proposed
development of transient docking facilities at the Bergstein property.
Several interviews expressed the view that any commercial enterprise housed in the
Bergstein buildings (coffee kiosk, bike rental, or repair facility) should not compete with
existing local businesses.
Bergstein Shoddy Mill 10
Reuse Study
Compatibility Issues
The Shoddy Mill and Marehouse are, and are likely to remain, city -owned buildings,
which limits certain types of uses, including intensive commercial endeavors. There is a
general consensus that the properties should serve some sort of public good, enhance
tourism, create new recreational activities and programming opportunities, and provide
basic services to trail users.
The city of Stillwater already offers or is developing facilities and programs that could
directly or indirectly duplicate activities being discussed for the Bergstein property.
Teddy Bear Park serves as an inexpensive and well-appointed venue for birthdays,
wedding receptions, family reunions, and other gatherings. New restrooms and parking
areas being developed in the Lowell Park will provide amenities for trail users passing
through downtown. There has been some conversation about the city acquiring the
vacant Armory building for use as an events center.
A number of local organizations already offer activities and programs that could take
place elsewhere in town and that could be affected by duplication of effort at the Shoddy
Mill site. One example is the existing Farmers' Market that takes place near the
Washington County Courthouse.
Bergstein Shoddy Mill 11
Reuse Study
Programming Issues
A number of interviewees, including the National Park Service, the Minnesota
Department of Natural Resources, local arts and non-profit organizations and others
identified a wealth of programming opportunities for the site, and expressed an interest in
using the Shoddy Mill and Warehouse for activities. Specific programming ideas
included:
-Historical exhibits
-Arts and music events
-Environmental programs
-Pontoon boat tours
-Interpretive bike tours
-Urban agriculture center
-Children's museum
The Jewish Historical Society of the Upper Midwest has recently developed an exhibit on
the scrap industry that could help to interpret the site's history as a shoddy mill.
An active schedule of programming appealing to a broad cross section of interests would
help to define the Bergstein property as a destination for trail users and local residents.
Programming activities are more likely to be funded than pure bricks -and -mortar projects
and could help ensure the long-term viability of the property.
Partnership Issues
Although the city of Stillwater is likely to bear the initial expense of rehabilitating the
Bergstein buildings, it may be able to reduce the costs of long-term operations and
maintenance, provide programming and staff, and leverage other sources of grant funding
by forging strategic partnerships with outside organizations and agencies. A number of
agencies and non-profit organizations expressed an interest in establishing partnership
arrangements with the city to use the Shoddy Mill property. These include, but are not
limited to:
-The National Park Service (visitor contact center, staffing, programming)
-The Minnesota Department of Natural Resources (programming, exhibits)
-The Jewish Historical Society of the Upper Midwest (exhibits, programming)
-ArtReach St. Croix (programming)
-The Washington County Historical Society (exhibit development)
-Transition Stillwater (youth environmentalist organization)
Partnerships with private concessionaires to provide visitor amenities such as snacks or
equipment rentals could also help offset operating and maintenance costs, help with
staffing, scheduling and securing the site, and provide a modest revenue stream. The city
already employs a public-private partnership model to operate the municipal parking
ramp and the community recreation center.
Bergstein Shoddy Mill 12
Reuse study
Financial Issues
As part of the planning for the new St. Croix River Bridge, the Minnesota Department of
Transportation was required to consider the project's potential to have adverse effects on
National Register -eligible properties in the construction zone, including the Bergstein
Shoddy Mill and Warehouse. To comply with this requirement, MnDOT forged a
Memorandum of Agreement with a host of state and local agencies, outlining steps that
would mitigate the new bridge's impact on the mill and warehouse.
Mitigation efforts included extensive documentation, planning studies, engineering work,
construction of new foundations above the flood plain, and moving the buildings from
their original location in Oak Park Heights to their present location. These efforts
required a significant investment of time and money.
The city of Stillwater provided a site for the new buildings, agreed to take ownership
from MnDOT once the move was accomplished, and accepted responsibility for their
preservation and reuse. The site has been integrated into the community's park system,
making it unlikely that the buildings will be transferred into private ownership. As public
buildings, the mill and warehouse have limited potential to generate sufficient revenue to
offset the costs of rehabilitation and ongoing operation. If the buildings are to be
rehabilitated, the city will probably have to fund the work.
Officials and residents generally seemed willing to support some public investment in the
property, but there was also agreement that the rehabilitation should be accomplished as
cost effectively as possible, and that an effort should be made to generate some sort of
revenue stream or barter arrangement that would reduce ongoing operating and
maintenance expenses.
13ergstein Shoddy Mill 13
Reuse Study
DISPOSITION ALTERNATIVES
The Bergstein Shoddy Mill and Warehouse buildings were moved from their original
location in Oak Park Heights to a new site provided by the City of Stillwater in 2012 in
order to facilitate construction of a new highway bridge across the St. Croix River. The
move was completed in accordance with a Memorandum of Agreement between the
Federal Highway Administration, the U.S. Army Corps of Engineers, the Advisory
Council on Historic Preservation, and both the Minnesota and Wisconsin State Historic
Preservation Offices.
In preparation for the move, an existing barge terminal building was demolished, the site
elevation was raised to a level one foot above the 100 -year floodplain, the shoreline was
stabilized, new foundations were constructed for both structures, utility lines were
stubbed in to the perimeter of the warehouse building, temporary structural repairs were
made to the walls of the Warehouse, and a temporary roof was installed on the Mill
building. The buildings have been secured with plywood sheeting and a security fence
encloses the site. Both buildings have stood vacant since the move. Disposition
alternatives for the Mill and Warehouse may include:
Demolition
Under this scenario the Mill and Warehouse buildings and their new foundations would
be completely demolished and the site would be restored as a green space. The city would
incur the costs of demolition and site restoration. The dollars that were already invested
to move the buildings and construct the new foundations would essentially be wasted.
Demolition would clearly violate the intent and terms of the Memorandum of Agreement
that led to the move in 2012, and could require further negotiation/mitigation with SHPO
as well as potential involvement of the Advisory Council on Historic Preservation.
As one interviewee observed, the city has "a moral obligation, but not necessarily a legal
obligation" to use the buildings, Nonetheless, when the city took ownership of the Mill
and Warehouse, provided the site, negotiated variances for shoreline and bluff setbacks,
and integrated the site and structures into planning for Bridgeview Park, it made a
substantial commitment to restore and maintain the buildings. Demolition would
constitute a default on that commitment. Failure to creatively integrate the structures into
the park and trail system could be a lost opportunity.
The site is located on banks of the St. Croix River and is within the boundaries of the St.
Croix National Scenic Riverway, and some individuals might consider demolition as a
means of restoring the natural character of the shoreline.
Do Nothing
Under this scenario, the buildings and site would remain secured but unoccupied, with no
maintenance. Both the Mill and the Warehouse would continue to deteriorate due to
weather, pests, and ordinary wear and tear on building materials. With no tenants to
monitor the site, the buildings would be subject to intrusion and vandalism, which would
further diminish the physical integrity of the structures, present safety hazards, and
Bergstein Shoddy Mill 14
Reuse Study
expose the city to liability for injuries. Prolonged neglect or deferred maintenance would
result in the eventual loss of historic resources and forfeiture of considerable effort and
funding that has already been invested to foster preservation of the property.
This option would require virtually no funding beyond the costs of site maintenance
(mowing, snow removal), insurance, etc. The city could utilize the structures for
equipment storage or other low-end uses. Utilities would remain disconnected, and there
would be no costs for stabilization or new construction. The buildings would remain
available for eventual restoration or adaptive reuse, but the costs of completing the work
would increase due to continuing deterioration. The Mill and Warehouse would be
visually unappealing and are likely to be considered eyesores rather than historic
resources.
Stabilization/Mothballing
Under this scenario, the city would take temporary, simple, and inexpensive steps
designed to protect the buildings from the elements, pests and vandals. Stabilization
would help prevent or slow down the pace of deterioration, and would buy additional
time for planners to explore ways to reuse and integrate the structures into the park and
trail system.
The city could use the structures for equipment storage or other low-end uses. Utilities
would remain disconnected. With no tenants to monitor the site, the buildings would be
subject to intrusion and vandalism, which would present safety hazards and potentially
expose the city to liability for injuries. The buildings would remain available for
eventual restoration or adaptive reuse. The Mill and Warehouse would remain visually
unappealing and are likely to be considered eyesores rather than historic resources.
Exterior -Only Rehabilitation
Under this scenario, the exterior envelopes of both buildings would be restored to their
historic appearance. This would protect the buildings from further deterioration, and
would make them more visually appealing. However, it would be considerably more
expensive than stabilization and would not return the structures to active use.
Partial Rehabilitation
Under this scenario, the city would complete a partial restoration of both buildings, based
on projected uses. The Warehouse building seems to offer the most opportunities for
reuse, with ample space for restrooms, simple kitchen facilities and flexible programming
space on the main level. The upper level has structural and accessibility issues that
would make restoration unlikely. The building's lack of historic interior features, simple
wood frame construction, unfinished floor system, and proximity to utility connections
would make installation of electrical, plumbing, and mechanical systems relatively
simple and inexpensive.
The stone Mill building is extremely simple, and is resistant to rot and other damage that
typically afflicts wood frame buildings. It has been greatly altered, and despite clues to
the original configuration of door and window openings, there is no known
Bergstein Shoddy Mill 15
Reuse Study
documentation to serve as a guide for full restoration. The building's small scale and
existing garage door opening could make it a good location for bike rental/repair, a
coffee/snack bar, or other uses that would require minimal buildout.
Under this scenario, the Warehouse would be restored to its historic appearance on the
exterior and would be adapted on the interior to accommodate multiple uses. Roof
framing and sheathing would be repaired as needed and a wood shingle roof would be
installed to replicate the historic roof. Original siding would be repaired and repainted,
Original openings would be restored and replica doors and windows would be installed.
Interior work would be limited to the lower level. The missing support column near the
west end would be restored, electrical, mechanical and plumbing systems would be
installed, and a new floor slab with piping for a radiant heating system would be poured.
Walls and ceilings would be insulated. Accessible restrooms and a kitchen counter
would be built along the north wall. The lower level would be made accessible. An
opening would be left in the ceiling to expose the original windlass, and the opening
would be enclosed on the upper level to minimize heat loss.
Work on the Mill building would essentially confined to restoration of the exterior
envelope. A permanent roof would be installed, and stonework would be repointed using
mortar that matches the original composition. Electric service would be provided to the
building, and a new concrete floor slab would be poured.
There are two possible approaches to rehabilitation of the principal (north) fagade.
-The existing garage door and service door openings could be left as they are, with a roll
up door installed in the garage opening and a period -appropriate replica door installed in
the service door opening. This would make it easy to use the building as a bike rental
facility or repair shop, would reduce overall cost of the rehabilitation, and would make it
possible to restore the exterior to its historic appearance at a future date.
-The north fagade could be fully restored to its historic appearance based on architectural
evidence (brick arch lintels) and additional documentary research. A period -appropriate
door and replica windows would be installed in the recreated openings. This approach
would restore the historic integrity of the exterior, but would cost more than the first
option, and would make the building less useful for recreation -related activities, such as
bike rental, that require storage.
Full Rehabilitation
Under this scenario both the Mill and Warehouse would be fully rehabilitated on both the
interior and exterior.
The exterior of the Warehouse would be restored to its original appearance. Both the
upper and lower levels would be rehabilitated for multiple year -around uses. This would
require structural reinforcement of the upper level floor structure to support intensive use,
installation of a stairway to provide access, and accessibility improvements that could
Bergstein Shoddy Mill 16
Reuse Study
include an elevator. The building would be fully insulated and new mechanical systems,
including plumbing, electrical, and HVAC equipment would be installed to allow year
around use. The lower level would contain accessible restrooms and a catering kitchen.
The exterior of the Mill building would also be restored to its original configuration, with
original door and window openings reconstructed.
This approach would significantly increase the cost of the rehabilitation work with a
modest gain in utility and an uncertain return on the additional investment.
Bergstein Shoddy Mill 17
Reuse Study
USE ALTERNATIVES
The reuse team solicited information and ideas about potential uses of the Bergstein
Shoddy Mill and Warehouse through more than forty individual interviews and a public
meeting. Residents offered ideas ranging from storage for public works/park equipment
to full rehabilitation as a youth hostel.
There was nearly unanimous agreement that any reuse should take advantage of the
riverfront location and proximity to the proposed bike/pedestrian trail system; that any
use should focus on recreational/non-motorized activities, and that any commercial
activities should provide only basic amenities for trail users and not compete with
existing businesses.
The most common limitation that was identified during the interview process was the
lack of parking at the site, and there was a clearly expressed sentiment that parking
should remain limited under any reuse scenario.
Specific ideas for the property included:
-Storage for park or public works equipment.
-Restrooms, picnic facilities, and other amenities for users of the pending Loop Trail, the
St. Croix River, and Bridgeview Park.
-Gateway/Tourist Information Center for visitors to Stillwater.
-National Park Service Contact Station for the St. Croix National Scenic Riverway.
-Space for interpretation of the Bergstein family and the shoddy industry; the local
lumber milling industry embodied in the adjacent Hersey and Bean archaeological site;
and the natural and environmental resources of the St. Croix River.
-Rental space for weddings, family reunions, and other celebratory events.
-An urban agriculture/sustainability center.
-A venue for arts and music events.
-A youth center
-A hostel for trail users.
-A concessionaire operated coffee ship, bike rental, and repair facility for trail users
Bergstein Shoddy Mill 18
Reuse Study
CONCLUSIONS AND RECOMMENDATIONS
Summary of findings
-The Mill and Warehouse occupy a highly desirable site along a burgeoning trail system
and on the banks of the St. Croix River.
-The buildings are extraordinarily simple in construction and detailing, which suggests
that the costs of rehabilitation are likely to be relatively low.
-The city of Stillwater is likely to bear full responsibility for rehabilitation of the Shoddy
Mill and Warehouse Buildings. There is a strong interest in minimizing the costs of
rehabilitation and offsetting the costs of ongoing operations and maintenance.
-The site's National Register status and city ownership make the property eligible for a
variety of financial incentives that could significantly reduce the out-of-pocket costs of
rehabilitation.
-A number of public entities have demonstrated their interest in preservation of the
properties and have already invested substantial financial resources to document and
move the buildings. This track record of interest increases the likelihood that the city can
be successful in its quest for additional grant funding in the future.
-The properties are unlikely to generate sufficient revenue to fully offset the full costs of
rehabilitation and operations.
-There is near -universal agreement that the buildings should be used for a public purpose,
focused on non -motorized recreational activities.
-There is a plethora of agencies and non-profit organizations willing and eager to provide
programming at the site. Fundraising efforts tied to programming are more likely to be
successful than efforts to obtain funding for bricks -and mortar projects.
-There appears to be strong potential for a public/private partnership that could provide
basic services to trail users and other visitors. Services could include a beverage/snack
bar and bike or other recreational equipment rental/repair facilities. These activities
could enable a concessionaire to generate modest revenue in exchange for staffing and
day-to-day maintenance. The city has already employed this partnership model for
operation of the municipal parking ramp and the community recreation center.
Recommendations
The City of Stillwater should undertake a partial rehabilitation of the Bergstein Shoddy
Mill property, rehabilitating the exterior of the Mill building and the lower level of the
Warehouse for use as a multi -use interpretive/event/trail amenity center.
The main level of the Warehouse would provide basic services to trail users (restrooms,
possibly bike rentals, snacks or other services). The space would be designed for
maximum programming flexibility, and would make maximum use of the riverfront
location. A coalition of non -profits (Jewish Historical Society, Washington County
Historical Society, DNR, NPS would develop a variety of exhibits interpreting the history
of the Bergstein operation, the archaeological history of the site, and environmental
features of the site and Riverway.
The exterior of the Mill building would be rehabilitated to serve as a rental facility for
bikes or other recreational equipment. Current openings on the north side would remain
Bergstein Shoddy Mill 19
Reuse Study
intact with a new roll -up overhead door and a period appropriate service door installed to
provide access and accommodate rental equipment.
The site would be operated as a partnership between the city of Stillwater, other
government and non-profit entities, and a private concessionaire. The city would incur
the cost of the initial rehabilitation and ongoing major maintenance and repair.
The National Park Service would utilize a portion of the Warehouse as a visitor contact
station for the St. Croix National Scenic Riverway in exchange for seasonal programming
and oversight of the property. Additional programming would be provided by the
Minnesota Department of National Resources, local non -profits (environmental,
historical, arts, performance, sustainability).
Amenities and day-to-day maintenance would be provided through a low-cost or no -cost
lease agreement between the city and a private concessionaire. The concessionaire would
take care of day-to-day maintenance and security and would take the lead in scheduling
events.
Next steps
Using the Historic Property Reuse Study as a guide, the city should establish a steering
committee of potential partners to develop a detailed redevelopment/business plan for the
Shoddy Mill and Warehouse. The committee should include city staff and officials,
representatives of agencies and non-profit groups identified in this report and potential
concessionaires.
Each member of the steering committee should be prepared to describe specific types of
programming it is willing/able to offer, list facilities it would need in order to provide
programming, and both quantify and commit to its role in staffing, operating, and funding
ongoing redevelopment and use of the property.
Once the redevelopmentibusiness plan is in place, the steering committee should meet
with architects to develop a detailed rehabilitation program for the buildings and site.
The rehabilitation plan should include well-developed design drawings, outline finishes
and equipment, and provide detailed cost projections.
Using the redevelopmentibusiness plan and detailed rehabilitation plan as a basis,
partners should embark on an active fundraising effort, assembling the funding that will
be necessary to rehabilitate and reuse the Shoddy Mill and Warehouse.
Once the funding is in place, rehabilitation and reuse of the Bergstein Shoddy Mill and
Warehouses can begin.
Bergstein Shoddy Mill 20
Reuse Study
Bibliography
"Bergstein Property Relocation Mitigation Project: Proposed Site Assessment." The 106
Group Ltd., and SRF Consulting Group, prepared for the city of Stillwater, 2005.
"Bridgeview Park: Master Plan Update." SRF Consulting Group, prepared for the City
of Stillwater, 2015.
"Construction Plan for Relocation of Shoddy Mill & Warehouse Buildings." State
Minnesota Department of Transportation Project 8214-114Q. Architectural
drawings of Shoddy Mill and Warehouse Buildings, new riverfront site, and
foundations (28 sheets). 2010.
"Hersey & Bean Planing Mill: Wall Stabilization Report." Collaborative Design Group,
prepared for the City of Stillwater, 2011.
Long, Barbara Beving. "Phase III Historical Documentation Study: The Moritz &
Bertha Bergstein House, Shoddy Mill & Waste Materials Yard. Prepared for the
Minnesota Department of Transportation, 1997.
Mathis, Gregory. "Moritz Bergstein Shoddy Mill and Warehouse (documentation of
move)." Amended National Register of Historic Places Registration Form, 2014.
"Moritz Bergstein Shoddy Mill and Warehouse: Minnesota Historic Property Record,
Property Inventory No. WA -OHC -001." Collaborative Design Group, prepared
for the Minnesota Department of Transportation, 2010.
"Relocation Feasibility Report: Bersgstein Shoddy Mill and Warehouse, 6041
Stagecoach Trail North. Oak Park Heights, Minnesota." Claybaugh Preservation
Architecture Inc, prepared for the Minnesota Department of Transportation. 2005.
Terrell, Michelle M. "Stillwater South Main Street Archaeological District." National
Register of Historic Places Registration Form, 2007.
Zellie, Carole S. "Moritz Bergstein Shoddy Mill and Warehouse." Draft National
Register of Historic Places Registration Form, 2008.
Bergstein Shoddy Mill 21
Reuse Study
HISTORY and INTERPRETATION
Stillwater, Minnesota, is a city filled with history. In 1837 the United States entered into a
treaty with several bands of Ojibwe and Dakota Indians. Under the terms, the Indians
ceded the northern third of present-day Wisconsin and more than three million acres of
land between the St. Croix and Mississippi rivers. Soon after, Joseph R. Brown, a
colorful Indian trader and promoter, opened a small warehouse at the head of Lake St.
Croix to supply his upriver fur trading operations.
A new mill opened just south of Brown's warehouse, and it soon became the preferred
location for new arrivals looking for work. John Allen and his family were the first to
settle in the new village of Stillwater. By 1846 the town had around ten families and
twenty single men.
After Wisconsin became a state in 1848, with its western boundary set at the St. Croix
River, it left residents of the triangular delta between the Mississippi and St. Croix rivers
uncertain about their government. A convention met in Stillwater in August 1848 and
elected Henry Hastings Sibley to take a petition to Congress to create a new territory, an
action that earned Stillwater its title as the birthplace of Minnesota. Sibley was successful,
and Minnesota became a territory on March 3, 1849. In 1851 Stillwater was awarded a
political plum when it was chosen as the site of the territorial prison.
The town was platted in 1848 with 600 residents "of whom nearly all of the men were
lumbermen," as one historian wrote. It was lumber that drove Stillwater's economy in the
nineteenth century taking advantage of the river that carried timber from the pine forests
to the north down to a log -holding boom just upriver from Stillwater. Steam mills sprang
up on the St. Croix in the 1850s, and wood -finishing industries followed. Products
included shingles, windows, doors, fizrniture and flooring.
Excellent transportation helped the city prosper. The river carried goods between
Stillwater and river ports to the south, and early stage roads connected the city to St. Paul
and Point Douglas. Railroads arrived in the early 1870s, expanding markets for timber
and manufactured goods.
By the late nineteenth century, Stillwater had entered a golden age that produced one of
the largest opera houses west of Chicago, the elegant mansions of the lumber barons, and
many brick commercial buildings on Main Street. The first electric street railway in
Minnesota began operation in Stillwater in June 1889.
By 1900 the lumber was giving out and the mills closed. The last lumber raft leaving
Lake St. Croix took place in 1914, the same year that the state prison moved to South
Stillwater. As the jobs left, Stillwater's population declined from a high of more than
13,000 in the 1880s to a low of around 7,000 in 1940.
As the lumber industry came to a close, the city adjusted to a new economy. A
community-based group built the Lowell Inn, a hotel that evoked colonial era architecture.
It was promoted as the attraction that would bolster Stillwater's stagnant economy. When
it opened in 1927, the Stillwater Daily Gazette optimistically predicted, "The scar left by
the closing of the sawmills and the extinction of logging has gradually healed, and
Stillwater has entered upon a new era, an era that promises to produce lasting resources
Bergstein Shoddy Mill 22
Reuse Study
which shall place Stillwater in the front ranks of Northwest cities."
Preservation in Stillwater
Those "lasting resources" were already in place — Stillwater's superb historic homes and
commercial buildings set within the scenic beauty of the St. Croix Valley. Local history
found a strong advocate in 1934, with the organization of the Washington County
Historical Society, a private, non-profit educational institution. In 1941, the Society
purchased the Warden's House Museum in Stillwater from the state. It is one of
Minnesota's oldest buildings as well as its second oldest continuously operating house
museum.
After World War II, when good roads and automobiles put residents in commuting range
of the Twin Cities, Stillwater began to reinvent itself as a tourist destination, highlighting
its outstanding historic buildings and natural landscape. In 1945 Tom Curtis, a local
businessman, purchased the old Joseph Wolf Brewery, to house a car dealership. Curtis,
though, had an idea that the caves could be turned into a tourist attraction. To liven it up,
he added indoor and outdoor trout ponds and then opened it to the public for a small fee.
Thousands of visitors went through the caves from the late 1950s until Curtis sold them
in 1971.
Amidst a growing national interest in historic preservation in the 1960s and 1970s,
Stillwater residents grew increasingly concerned about threatened local treasures. Three
challenges energized local preservation.
The first battle was over the future of the Washington County Courthouse. The The
oldest courthouse in Minnesota, it was designed in the Italianate style by Augustus
Knight of St. Paul. When it opened in 1870, the county was doing a booming business in
the lumber industry, and the imposing columned edifice reflected the county's wealth as it
overlooked the city from atop Zion's Hill. By 1962, though, the county had outgrown the
building, and serious consideration was given to razing the structure to make way for a
parking lot. A 1962 bond issue to construct a new courthouse failed at the polls, allowing
time for preservationists to make their case. In 1971, the building was placed in the
National Register of Historic Places.
In 1975 the county moved to a new government center one mile south of the original
courthouse and made plans for an adaptive re -use of the old building. It reopened in 1982
as a community facility providing office space for nonprofit groups, offering
interpretative historical exhibits and tours, and serving as a venue for private and public
gatherings. In 1997, the county designated the facility as a Washington County park.
Today, the courthouse is preserved as a historic landmark with tours and exhibits. It
provides a rental venue for private and public gatherings.
A second battle took place in the mid-1970s. Nelson School, located at 1018 South First
St., opened in September 1897. Called "a model structure of its kind" by the Stillwater
Gazette, the building was designed by the architectural firm of Orff and Joralemon of
Minneapolis. It was named after Socrates Nelson, the real estate speculator whose name
is included in the district. The public school system stopped using this as a school
building in the 1950s, although it continued to hold District 834 administrative offices
through 1977.
Bergstein Shoddy Mill 23
Reuse Study
When the district sought to sell the property, with demolition likely, a new preservation
organization, Rivertown Restoration stepped forward and filed a taxpayer suit against the
city. In December, 1978, District Court Judge Esther Tomljanovich, later a Minnesota
State Supreme Court Justice, ruled that the school was a "historical resource" and issued
a temporary injunction stopping the transfer of the property. It was later purchased by a
group of investors known as the Nelson School Partners in 1980. They renovated the
school into apartments, now converted to condominiums.
Finally, there was a decade-long debate about the future of the Lift Bridge. On July 1,
1931, 15,000 people lined the shores when Governor Floyd Olson dedicated the bridge.
At the time, most movable bridges were of the swing -span variety, pivoting on an axis to
allow water traffic to move back and forth. Instead, Stillwater would have a
counterweighted, cable -and -tower design — in other words, a lift bridge. Only six
vertical -lift highway bridges were built in Minnesota and Wisconsin prior to World War
II, and Stillwater's is one of only three that still survives. At the time of the bridge's
completion, the St. Croix River was only lightly used as a navigable waterway, as the
Minnesota Department of Highways noted in a 1938 letter stating: "For several years not
a single request for its opening was received." But after World War II, recreational river
use grew, as did highway traffic between Wisconsin and Minnesota.
With a new bridge under construction to the south of Stillwater, the old lift bridge, will be
saved as a pedestrian and bike trail. As a direct result of the government's evaluation of
the impact of the new bridge, local, county, and federal agencies studied the historical
resources within the area of impact. This led to the creation of the South Stillwater
Archaeological District, encompassing the site of the Hersey -Bean Sawmill. Seeking to
place the bridge within a larger context, more than 250 properties have been determined
to be contributing to the significance of the Stillwater Cultural Landscape District,
including dwellings, commercial and industrial buildings, public stairways, and an
archaeological site. Finally, the Bergstein Shoddy Mill and Warehouse, located in the
path of the new bridge, were deemed historically significant. Based on a Memorandum of
Agreement, the two buildings were moved to the present site.
Inspired by this public debate generated by these controversies, and armed with new tools
such as Certified Local Government laws, the city embraced preservation as a means to
improve the community's quality of life and as a way to attract tourism to the city. The
Heritage Preservation Commission (HPC) began a multiyear study of the city's resources.
In 1993 the HPC directed Robert Vogel, historian, to prepare a study that initiated a
comprehensive historic preservation planning process. Over the next decade, the
commission prepared surveys of local neighborhoods, documenting their resources and
making recommendations for further action. The HPC's outreach programs, including an
heirloom home program, with its own website, and video walking tours, gained national
recognition. Stillwater became the first commission in Minnesota to win a Commission
Excellence Award from National Alliance of Preservation Commissions (NAPC). It won
in the category of "Best Practices: Public Outreach."
In 1992 the Stillwater Commercial Historic District (containing 82 resources) was listed
in the National Register of Historic Places. Other local landmarks in the National
Register include:
Bergstein Shoddy Mill 24
Reuse Study
• Stillwater Lift Bridge over the St. Croix River
• Chicago, Milwaukee & St. Paul Depot and Freight House, 305 S. Water Street
• Roscoe Hersey House, 416 S. Fourth Street
• Austin Jenks House, 504 S. Fourth Street
• Ivory McKusick House, 504 N. Second Street
• St. Croix Lumber Mills/ Stillwater Manufacturing Company, 318 N. Main Street
• William Sauntry House, 626 N. Fourth Street
• William Sauntry Recreation Hall, 625 N. Fourth Street
• Territorial State Prison Warden's House, 602 N. Main Street
• Washington County Courthouse, 101 W. Pine Street
• Mortimer Webster House, 435 S. Broadway
The Stillwater Heritage Preservation Commission also locally designated some of these
properties. In addition, the city created a residential conservation district, empowering the
HPC to review changes within its boundaries.
Now, prominent landmarks such as the Washington County Courthouse, the Warden's
House, and Staples Mill provide historic tourism destinations. Old mansions received
new life as bed and breakfasts. Restaurants opened in the caves and the freight house,
shops in old utility buildings, and a hotel in the Lumberman's Exchange. In its third
century, Stillwater is a bustling community boasting a variety of industry and business.
Bergsteln Shoddy Mill 25
Reuse Study
MnDOT Move Photos
01 / 0/2012
X�j .
off
05/10/2012
Bergstein Shoddy Mill
Moving Photos
Alp
? ;fir; ? �1
""T5r r .
rw
I
Bergstein Shoddy Mill 3
Moving Photos
Bergstein Shoddy Mill
Moving Photos
Bergstein Shoddy Mill
Moving Photos
0 -do,
ti
#Olil(
evil
it409/11/2012
A I *--
21/09/2012
=OEM
y.
Now bcL.,-%
19/09/2012
I
T
t
11 A!"I
J
Bergstein Shoddy Mill 10
Moving Photos
Existing Conditions Photos
Historic view 1. The south side of the warehouse building as it appeared in the 1950s.
The original drop siding remains in place and appears to be unpainted.
Historic view 2. Close-up view of the southeast corner, showing 2/2 double hung sash,
which may be original.
Bergstein Shoddy Mill 1
Photos
Historic view 3. The west end of the building, with rail spur visible in the foreground -
1950s. The original wood -shingled roof has been replaced with metal, but the lack of al
ridge cap suggests that the current metal roof is newer.
Historic view 4. The east end of the warehouse.
Bergstein Shoddy Mill 2
Photos
• i
LAMM"�-
V,
1
ti
P�. ! l ~
w !
Historic view 8. The interior of the warehouse, 2009, looking east. A concrete slab has
replaced the original wood floor, and an office/restroom enclosure has been built in the
southeast corner. An original timber column in foreground has been cut off and replaced
with a makeshift truss in order create clear span for auto repair business. Walls and
ceiling are sheathed with gypsum wallboard.
Historic view 9. Looking southwest on the lower level of the warehouse, 2009. The
office is visible at left, and the overhead door is visible at center.
Bergstein Shoddy Mill 4
Photos
Historic view 10. The upper level of the warehouse, looking east, 2009. The framework
for the rope -powered wood elevator is visible at the center of the photo.
Historic view 11. Upper level, looking west. The north wall is sheathed with drywall.
Bergstein Shoddy Mill
Photos
a
ps
Historic view 12. North side of the mill building in its original location, 2009. The
overhead and service doors are not original to the building.
Historic view 13. West side of the mill building in 2009.
Bergstein Shoddy Mill
Photos
C
Historic view 14. The south side of the mill building in 2009.
Historic view 15. The west side of the mill building, 2009. Note the window infill
(circled). The upper portion of the wall appears to have been reconstructed.
Bergstein Shoddy Mill 7
Photos
Historic view 16. Interior of the mill building, looking east. Planks have been sistered
to the original center beam to support the roof.
Historic view 17. Interior of the mill building, looking west.
Bergstein Shoddy Mill 8
Photos
Aerial view 1. The mill and warehouse were moved to a new site along on the banks of
the St. Croix River, south of downtown Stillwater, in 2012.
Aerial view 2. The mill and warehouse in their new location.
Bergstein Shoddy Mill 9
Photos
AdML
OP`ND
Photo 1. South elevation of the warehouse building in its new location. The overhead
door and Masonite siding were added in 1983.
Photo 2. South and west elevations of the warehouse. The metal batten -seam roof with
snow catchers and a ridge cap appears to be newer than the roof shown in Historic view
3. The building was placed atop a new foundation as part of the 2012 move.
Bergstein Shoddy Mill 10
Photos
707
Photo 3. West elevation.
Photo 4. North and west elevations. Exposed framing on the interior of the upper level
indicate that there were originally windows on the north elevation.
Bergstein Shoddy Mill 11
Photos
Photo 5. North elevation.
Photo 6. North and east elevations. The original drop siding remains exposed on the
east side.
Bergstein Shoddy Mill 12
Photos
f`sr i
-----------------------------------
Photo 6. North and east elevations. The original drop siding remains exposed on the
east side.
Bergstein Shoddy Mill 12
Photos
Photos 7-8. Pests have chewed holes through siding on east end (left). Detail of the
eaves above the east end (right). Original skip sheathing, cornice molding and corner
boards are visible.
s
I
Id
jrhotos 9-iu. i)etails of the onginal prop suing on the east siae. ine tongue-ana-groove
siding was applied over flush board sheathing.
Bergstein Shoddy Mill 13
Photos
Photo 11. Lower level of the warehouse, looking southeast. The building originally had
a wood floor. The new foundation walls were filled with sand as part of the move.
Photo 12. Lower level, looking northeast.
Bergstein Shoddy Mill 14
Photos
Photo 13. Lower level looking southwest.
Photo 14. An original timber post has been removed from the west end of the building,
and replaced with a makeshift truss to allow a clear span. Rotted studs were cut off and
reinforced with new material, and a treated lumber sill was installed to prepare the
building for the move
Bergstein Shoddy Mill 15
Photos
Photo 15. The original sliding doors remain in place on both the east and west ends of
the building.
Photos 16-17. The original sliding door hardware and tracks remain intact (left). A
faded label on the hardware identifies the maker as "Lawrence." Detail of the door
construction (right)
Bergstein Shoddy Mill 16
Photos
Photos 18-19. The upper level of the warehouse building, looking west (left). Pests have
chewed through the wall at the southwest corner (detail of circled area is at right).
Photo 20. North wall of the upper level. Framing for the original windows remains in
place, although sash have been removed and openings filled in.
Bergstein Shoddy Mill 17
Photos
Photo 21. Upper level, looking east. Framework for elevator windlass is visible at the
center of the photo.
Photos 22-23. Window opening near the southeast corner of the upper level (left).
Original double -hung sash have been removed, but original trim remains in place (right).
Bergstein Shoddy Mill 18
Photos
J
i
.,,`"'fit - - _ _ •� , _ � `
1 _ �
Photo 27. Detail of roof framing showing rafters, collar ties and lightweight struts.
Although the struts may add strength to the roof structure, they do not function as actual
trusses.
Photo 28. Slats and chicken wire between struts were used as a holding area for
shredded cloth.
Bergstein Shoddy Mill 20
Photos
Photo 29. Detail of ridge board and skip sheathing. The original wood shingles are
visible between sheathing boards.
Photo 30. North side of the mill building in its new location. Brick arches above the
wide opening indicate location and size of original openings. Color variations in the
mortar indicate that the walls have required repair many times in the past.
Bergstein Shoddy Mill 21
Photos
Photo 31. North and west sides of the mill building.
Photo 32. West and south sides of the mill building. A temporary membrane roof was
installed following the move.
Bergstein Shoddy Mill 22
Photos
Photo 33. South elevation of the mill building.
Photo 34. South and east sides of the mill building. The warehouse is visible in the
background.
Bergstein Shoddy Mill 23
Photos
Photo 35. East side of the mill building. This wall is badly cracked, and the upper
section appears to have been rebuilt. An original window opening with a brick arch has
been filled in. Mortar adjacent to the infill bears is inscribed with the date 1896 (circled
area is detailed below).
Photo 36. Detail of inscribed date on east wall of the mill.
Bergstein Shoddy Mill 24
Photos
Photo 37. Interior of the mill building, looking east. The center beam and roof sheathing
were replaced following the move. The iron angles may be original to the building. An
inscription in the window infill (circled) reads "CB 1880 Sept. 30." See detail below.
Photo 38. Close-up view of inscription in window infill on the east wall of the interior.
Bergstein Shoddy Mill 25
Photos
Photo 39. A charred lintel above the small window in the east end of the building
provides evidence of a fire.
Photo 40. Looking west inside the mill building. Remnants of timber joists set into the
walls (circled here and in Photo 42) suggest that there may have been a loft in the
building, or that the roofline was altered at some point.
Bergstein Shoddy Mill 26
Photos
Photo 41. Roof rafters are assembled from short sections of iron channel, riveted
together.
• z -
Y x
` ;.•' : 4 f
AAy'+i� — _ —_ '� a .. I � ��� �� .. /. -�.� ii �l • f r 1 .
Photo 42. South wall of the interior. Pockets for timber joists are circled.
Bergstein Shoddy Mill 27
Photos
Existing Conditions
Code Analysis
Rehabilitation Recommendations
CLAYBAUGH PRESERVATION ARCHITECTURE
361 W. Government St. Taylors Falls, Minnesota 55084
Site Visit Report January 27, 2015
Bergstein Shoddy Mill Reuse Study
South Main Street, Stillwater, MN
Participants: Robert Claybaugh, CPAi
John Lauber, JLCo LLC
Gene Dwyer, LSE
Shoddy Mill
• General:
o The building has been moved to a new site and set on new concrete foundation.
o The wood roof beam has been replaced.
o New plywood sheathing has been installed over the steel angle joist and a temporary
membrane roof installed.
o Some pointing of masonry was done to help stabilize the structure.
o There is no floor slab in the building.
Masonry:
o The exterior 18" rubble stone bearing walls are in tough shape. There are a lot of cracks
and open joints in the walls that will require extensive grouting and tuckpointing.
o The original mortar appears to be fairly bad with coarse aggregate of various types of
stone. There is a variety of later pointing and repairs in the mortar.
o Mortar samples should be taken and tested to determine an appropriate mortar mix.
o The recent mortar repairs were done with a tinted fine aggregate mortar that does not
match the original.
o There is evidence that the upper walls of the building and roof configuration have been
modified over the life of the building.
Openings:
o The east opening appears to be original with a segmented arch. The opening was infilled
in 1886 according to a date scratched in the mortar. There is evidence of an earlier fire on the
interior wood lintel.
o The west opening appears to be original with a segmented arch.
o The north openings are later modifications to provide a garage size door and an entry
door. There are remnants of segmented arches that would indicate possibly three original
openings of similar size as on the east and west walls. The auto repair owner told me in 2005
that they were two smaller openings before they cut in the garage door.
Roof:
o The steel angle joists appear to be repurposed truss members judging from the riveted
splices. These are probably not original to the building but to an earlier modification possibly
after the fire.
o The roof deck has been replaced with plywood and is covered by a loose laid roof
membrane without insulation. The deck overhangs the masonry by about 16 inches.
Warehouse:
General:
o The building has been moved to a new site and set on new concrete foundations.
o Due to rot a new 6x6 wood sill beam was installed, rotted sections of original studs were
cut off, new temporary studs were sistered to the originals and extended to the sill in a
haphazard manner. The intent was to stabilize the structure.
o There is no floor slab in the building.
o There are no utilities connected to the building. The site relocation drawings indicate that
sewer and water service was extended to five of the warehouse.
Exterior Walls:
o The original wood drop siding has been covered with Masonite siding except on the east
wall. The drop siding appears to be in rough condition.
o The last use of the building was for auto repair and many of the modifications were for
that use.
■ The large overhead door on the south wall.
■ Removal of an interior wood support column.
■ Addition of 2 layers of gypsum board on the north wall for fireproofing.
■ Addition of gypsum board on the walls and ceiling of the ground floor.
■ Addition of batt insulation in the ground floor walls.
o The second floor is entirely unfinished.
Openings:
o The large sliding wood doors on the east and west walls appear to be original. The sills
of these doors are about 8" above the sill beam. This would indicate the original wood floor
level of the building. The auto repair business installed a concrete floor on grade.
o The two double hung windows on the west wall are probably from the auto repair
remodeling. We saw evidence of larger window openings at these locations.
o The other window openings are the same size as on the second floor and have double
hung wood sash probably from the auto repair remodeling. The sash are either in poor
condition or missing.
o The south wall probably had a small window opening where the overhead door is now.
The entry door location may be original but the steel door is new.
o The second floor window openings appear to be original.
Roof -
0 The existing roof is covered with metal panels over the original wood shingles. The
shingles are visible from the second floor though the spaced wood sheathing.
o The overhang soffits are in poor condition.
o There are no gutters or downspouts in the building.
Interior:
o There are no interior partitions on the first floor.
o The stair to the second floor is partially in place. It would not meet current code
o The second floor is open with no interior finishes.
o There is a 73" square opening in the floor with a 7'10" diameter wood sheave mounted at
ceiling level. The sheave has a 2" manila rope that would have been used to raise and lower
items from the second floor. This is the most notable feature of the building.
Submitted by,
CLAYBAUGH PRESERVATION ARCHITECTURE INC
2
CLAYBAUGH PRESERVATION ARCHITECTURE
361 W. Government St. Taylors Falls, Minnesota 55084
May 6, 2015
Existing Conditions
Bergstein Shoddy Mill Reuse Study
South Main Street, Stillwater, MN
Site
The two buildings are sited in the same relationship as on the original site.
The site is fairly level and was created with fill to be above the 100 year flood plain.
There are no other improvements on the site.
Shoddy Mill
• General:
o The building has been moved to a new site and set on new concrete foundation.
o The wood roof beam has been replaced.
o New plywood sheathing has been installed over the steel angle joist and a temporary
membrane roof installed.
o Some pointing of masonry was done to help stabilize the structure.
o There is no floor slab in the building. Only a sand base.
Masonry:
o The exterior 18" rubble stone bearing walls are in tough shape. There are a lot of cracks
and open joints in the walls that will require extensive grouting and tuckpointing.
o The original mortar appears to be fairly bad with coarse aggregate of various types of
stone. There is a variety of later pointing and repairs in the mortar.
o Mortar samples should be taken and tested to determine an appropriate mortar mix.
o The recent mortar repairs were done with a tinted fine aggregate mortar that does not
match the original.
o There is evidence that the upper walls of the building and roof configuration may have
been modified over the life of the building.
Openings:
o The east opening appears to be original with a segmented arch. The opening was infilled
in 1886 according to a date scratched in the mortar. There is evidence of an earlier fire on the
interior wood lintel.
o The west opening appears to be original with a segmented arch.
o The north openings are later modifications to provide a garage size door and an entry
door. There are remnants of segmented arches that would indicate possibly three original
openings of similar size as on the east and west walls. The auto repair owner told me in 2005
that they were two smaller openings before they cut in the garage door.
Roof -
0 The steel angle joists appear to be repurposed truss members judging from the riveted
splices. These are probably not original to the building but to an earlier modification possibly
after the fire.
0 The roof deck has been replaced with plywood and is covered by a loose laid roof
membrane without insulation. The deck overhangs the masonry by about 16 inches.
Warehouse
General:
o The building has been moved to a new site and set on new concrete foundations.
o Due to rot a new 6x6 wood sill beam was installed, rotted sections of original studs were
cut off; new temporary studs were sistered to the originals and extended to the sill in a
haphazard manner. The intent was to stabilize the structure.
o There is no floor slab in the building.
o There are no utilities connected to the building. The site relocation drawings indicate that
sewer and water service was extended to within five feet of the warehouse.
Exterior Walls:
o The original wood drop siding has been covered with Masonite siding except on the east
wall. The drop siding appears to be in rough condition.
o The last use of the building was for auto repair and many of the modifications were for
that use.
■ The large overhead door on the south wall.
■ Removal of an interior wood support column.
■ Addition of 2 layers of gypsum board on the north wall for fireproofing.
■ Addition of gypsum board on the walls and ceiling of the ground floor.
■ Addition of batt insulation in the ground floor walls.
o The second floor is entirely unfinished.
Roof and 2°d Floor Structure:
o Refer to LS Engineers, Inc. report dated May 5, 2015 for structural assessment of the
building.
Openings:
o The large sliding wood doors on the east and west walls appear to be original. The sills
of these doors are about 8" above the sill beam. This would indicate the original wood floor
level of the building. The auto repair business installed a concrete floor on grade.
o The two double hung windows on the west wall are probably from the auto repair
remodeling. We saw evidence of larger window openings at these locations.
o The other window openings are the same size as on the second floor and have double
hung wood sash probably from the auto repair remodeling. The sash are either in poor
condition or missing.
o The south wall probably had a small window opening where the overhead door is now.
The entry door location may be original but the steel door is new.
o The second floor window openings appear to be original.
Roof -
0 The existing roof is covered with metal panels over the original wood shingles. The
shingles are visible from the second floor though the spaced wood sheathing.
o The overhang soffits are in poor condition.
o There are no gutters or downspouts in the building.
Interior:
o There are no interior partitions on the first floor.
o The stair to the second floor is partially in place. It would not meet current code
2
o The second floor is open with no interior finishes.
o There is a 73" square opening in the floor with a 7' 10" diameter wood sheave mounted at
ceiling level. The sheave has a 2" manila rope that would have been used to raise and lower
items from the second floor. This is the most notable feature of the building.
Submitted by,
CLAYBAUGH PRESERVATION ARCHITECTURE INC
Robert J. Claybaugh AIA, President
File:. SHM-Existing-050615
3
CLAYBAUGH PRESERVATION ARCHITECTURE
361 W. Government St. Taylors Falls, Minnesota 55084
May 25, 2015
Shoddy Mill Reuse Study
Highway 95 North
Stillwater, Minnesota
Code Review
Historic Status: The buildings are currently listed on the National Register but are not listed on
the City of Stillwater local register.
Minnesota State Building Code: The 2007 Minnesota State Building Code amendments and
the 2006 International Building Code, and the 2015 Minnesota Accessibility Code were used for
the code review of this building.
Mill Building:
• Building gross floor area:
0 1St Floor: 578sf
o Total occupied: 578 sf
• Stories: 1 story
• Occupancy: Group M Mercantile
• Construction Type (Table 601):
o Type III B Masonry bearing wall & unprotected roof structure.
• Allowable Height and Building Area (Table 503) Type III B Construction:
o Height: 4 stories
o Area: 12,500/floor
• Floor Occupancy (Table 1004.1.1):
0 1St Floor: 30gsf/person= 20 persons
o Exits: one (table 1015.1)
Warehouse Building
• Building gross floor area:
0 1St Floor: 1,617sf
0 2nd Floor: 1,617sf
o Total occupied: 3,234sf
• Stories: 2 stories
• Occupancy:
o Group A2 Restaurant
o Group R2 Donn/motel
o Group M Mercantile
• Construction Type (Table 601):
o Type VB -unprotected wood frame
• Allowable Height and Building Area (Table 503) Type V B Construction:
o Group A2:
Shoddy Mill 1
■ Unprotected
■ Protected:
o Group R2:
■ Unprotected
■ Protected:
o Group M:
■ Unprotected
■ Protected:
1 story, 6.000sf/floor
2 stories, 11,500/floor (sprinklered)
2 stories, 7,000sf/floor
3 stories, 12,000sf/floor
1 story, 9,000sf
3 stories, 14,000sf/floor
• Floor Occupancy (Table 1004.1.1):
o A2: Tables and Chairs: 15 sf/person
o R2: 200 sf/person
o M: 30 sf/person
o E: Classroom: 20sf/person
• Floor Live Loads (Table 1607.1)
o Assembly/movable seating:
100psf
o Dining rooms
100psf
o Office:
50psf
o Office/class corridor above 1" floor:
80psf
o Residential:
40psf
o Hotel rooms & corridors to rooms:
40psf
o Classrooms:
40psf
• Building with one exit (Table 1019.2):
o A and E: 1 story, 49 occupants
o Band M: 2 stories, 30 occupants
o R2: 2 stories, 4 units, 50 foot travel
Automatic Sprinkler Systems (Section 903 and MN1306):
• Stillwater has adopted MN Chapter 1306 Special Fire Protection Systems:
• A2 Occupancy: Required through out
• R2 occupancy: Required throughout
• B and M Occupancy: 2,000 sf or more per floor and three or more stories.
• E Occupancy: 2,000 sf or more per floor and two or more stories.
Upper Floor Accessibility/Elevator (MN Chapter 1341):
• Generally not required if less than 30 occupants. An elevator would probably be desired for
any use of the 2° floor.
• Other requirements do apply to some occupancy classifications.
Claybaugh Preservation Architecture Inc
Robert J. Claybaugh AIA
File: SHM-Code-052515
Shoddy Mill 2
r` CLAYBAUGH PRESERVATION ARCHITECTURE
■►.J 361 W. Government St. Taylors Falls, Minnesota 55084
May 25, 2015
Renovation/Adaptive Reuse Recommendations
Bergstein Shoddy Mill Reuse Study
South Main Street, Stillwater, MN
Site
• Accessibility: Create accessible path from parking to entry of each building.
• Outdoor Space: Develop space between the buildings and toward the river for outdoor events
such as farmer market, performances, etc.
Shoddy Mill
• General:
O This structure is probably best suited for seasonal use that would not require heating or
air-conditioning. There could be some electric radiant base board heat if necessary.
o Underground electric power should be connected to the structure with a panel with
circuits to handle lighting, convenience outlets and ceiling fans.
O Provide security and fire alarm system.
O A sprinkler system would not be required.
• Masonry:
o Mortar samples should be taken and tested to determine an appropriate mortar mix.
o We would recommend that the stone walls be left exposed on the interior of the structure.
o All of the exterior and interior mortar joints should be repointed with the mortar mix
determined by testing.
• Openings:
o Large East Window: Leave the masonry infill in place along with the date inscriptions
in the mortar.
o Small East Window: This is an odd and ill placed opening but appears to have been
there a long time. Consider leaving the opening and install an operable window for
ventilation.
o West Window: Install a new wood double hung sash in this opening.
o North Openings:
■ Alternative 1:
• The existing door openings are later modification and are to be removed.
• Using the remnants of the brick segmented arches as a guide,
reconstruction three opening on the north fagade. They could all be door
openings or only the center opening could be a door with the flanking
openings as windows.
• This alternative would limit the functionality of the building for rentals
and visitor services.
■ Alternative 2:
0 Restore the small door opening.
• Retain the large opening and install a roll -up door to provide good access
for rental and visitor services.
Floor:
a Install a new 4" concrete slab over 2" rigid insulation on the existing sand base.
o Finish floor covering would be optional.
Roof:
o Remove the existing temporary roof covering.
o Install EPDM adhered roof membrane over cover board and 4" rigid insulation over
existing plywood deck.
o Install new painted wood fascia at roof edge.
Warehouse
Utilities:
o Provide underground electrical service to the building.
o Connect building to existing water and sanitary sewer services that are stubbed on site.
o Provide gas service to the building.
Exterior Walls:
o Remove existing Masonite siding and gypsum board layers from the exterior to expose
the original wood drop siding.
o Infill the overhead door opening.
o Replace deteriorated drop siding to match the existing, prime and paint. The condition of
the siding underneath will not be apparent until the newer siding has been removed.
Replacement of 50% of the siding would be a good estimate at this time.
Roof and 2nd Floor Structure:
o Refer to LS Engineers, Inc. report dated May 5, 2015 for structural recommendations
including upgrading the 2nd floor structure to 40psf. This would only be done if the 2nd floor
is to be occupied.
o Replacement of the missing wood post would be part of the scope of work along with
replacing the other wood posts with full height posts.
Openings:
o Replace the existing 1St floor west fagade windows with openings to match the 2nd floor
windows.
o Add a window opening on the 1St floor south facade in line with the 2nd floor window
above.
o Install new 2/2 thermal glazed wood double hung sash in all of the existing and new
window openings.
o Install a new wood door and frame in the south fagade door opening.
o Restore the original wood sliding doors. These would not be the primary weather closure
for the openings.
o Install new wood and glass doors with sidelights in these openings.
0 Floor:
o Install a new 4" concrete slab over 2" rigid insulation on the existing sand base.
o Provide in slab hydronic heating system.
2
Roof:
o Remove existing wood and metal roof coverings.
o Replace deteriorated wood sheathing as required.
o Install new cedar shingle roof over cedar breather, plywood sheathing and 3" rigid
insulation on the existing wood sheathing.
o Install galvanized metal half round gutters and corrugated round downspouts on the north
and south roof eaves.
Interior:
0 1" Floor:
■ Remove all existing wall and ceiling finishes and insulation.
■ Insulate the exterior walls with full thick batt insulation.
■ Insulate the 2nd floor joist space with 6" batt insulation.
■ Install painted gypsum board with veneer plaster finish on all wall and ceiling
surfaces. Leave the existing wood bracing visible.
■ Build out space as shown on proposed floor plans.
■ Provide service access ladder to 2"d floor.
0 2"d Floor:
■ The 2"d floor would remain unfinished except for closure walls around the wood
sheave and opening so it is visible from the 1St floor.
■ Insulate the exterior walls with full thick batt insulation.
■ If the 2"d floor were to be made usable, the following items would need to be part
of the scope of work:
• Reinforce 2"d floor structure.
• Construct one or two exit stairs depending on use.
• Construct an elevator to provide accessibility to the 2nd floor.
o HVAC:
■ Provide in floor hydronic heating system in 1St floor slab.
■ Provide forced air cooling and ventilating on the 1St floor with exposed round
spiral ductwork.
■ No HVAC on the 2"d floor.
o Electrical:
■ Provide general lighting and track lighting on the 1St floor ceiling.
■ Provide general lighting in the restrooms and kitchen space.
■ Provide exit and emergency lighting.
■ Provide security and fire alarm system for the building.
o Fire Protection:
■ Stillwater has adopted Minnesota Chapter 1306 Special Fire Protection Systems.
■ An A2 -Assembly occupancy would require a sprinkler system throughout.
■ A B -Business or M -Mercantile occupancy would not require a sprinkler system.
Submitted by,
CLAYBAUGH PRESERVATION ARCHITECTURE INC
Robert J. Claybaugh AIA, President
File: SHM-Recommend-052515
Existing Conditions Drawings
s
illwater
NOW
The Birthplace of Minnesota
Bergstein Warehouse
and Shoddy Mill
Parcel Boundaries
r«� Municipal Boundary
Water Pipes
O Water Valves
O Hydrants
0 80 160 320
Feet
I General Site Location I
9
0-
28'-8"
2nd Floor Warehouse Plan
9
NORTH
28'-8"
--Original sliding door
T
1
Original siding door
1st Floor Warehouse Plan
1/8" = 1'- 0"
Lei
1st Floor Area: 1,617 sf
2nd Floor Area: 1,617 sf
CLAYBAUGH
PRESERVATION
ARCHITECTURE
INC
361 West Government Street
Taylors Falls, MN 55084
Tel: 651.206.0980
E-: claybaugh7@gmail.com
March 2015
I I I 1 1 1 1 1 1 1 1 1
u I I I I I i i
I I I I I I I I I I I I
--------
I
I
I
L 1 1 1 1 1 1 1 1 1 1 1
I
I�
I I
I
I
I
I
L -
I
I
I
I
J
74" x 74" hatch above
Wd. post--
Wd. beam above--
Wd. post—
r-- - - - - --- - - - -
I
I
I
I
I
I
I
I
I
I
I
I
I
--------------
1
Original siding door
1st Floor Warehouse Plan
1/8" = 1'- 0"
Lei
1st Floor Area: 1,617 sf
2nd Floor Area: 1,617 sf
CLAYBAUGH
PRESERVATION
ARCHITECTURE
INC
361 West Government Street
Taylors Falls, MN 55084
Tel: 651.206.0980
E-: claybaugh7@gmail.com
March 2015
28'-8"
- Metal roof over vjd. sheathing
------Future floor level
-Existing sand level
WAREHOUSE SECTION
1/8" = 1'- 0"
2" X 6" Wd. studs @ 24" O.C.
--2" X 8" Wd. joists @ 24" O.C.
with 1x10 wd. subfloor & 7/8"
x 5" t&g wd. floor
2" X 8" Wd. studs @ 24" O.C.
with 1x6 wd. sheathing & 3/4"
x 5 1/2" wd. drop siding
-6x6 wd. sill
CLAYBAUGH
PRESERVATION
ARCHITECTURE
INC
361 West Government Street
Taylors Falls, MN 55084
Tel: 651.206.0980
E-: claybaugh7@gmail.com
March 2015
Schematic Design Dra
drop off lane
One way drive
Highway 95
Future Bike/PedestrianTrail
Site Plan
S1 Scale: 1" = 40 ft
F
CLAYBAUGH
PRESERVATION
ARCHITECTURE
INC
361 West Government Street
Taylors Falls, MN 55084
Tel: 651.206.0980
E-: claybaugh7@gmail.com
May 25, 2015
E
28'-8"
2 Second Floor Plan
Al Scale: 1/8" = 1'-0"
1
�— 28'-8" — --
l First Floor Plan
NORTH
Al Scale: 1/8" = 1'-0"
1st Floor Area: 1,617 sf
2nd Floor Area: 1,617 sf
CLAYBAUGH
PRESERVATION
ARCHITECTURE
INC
361 West Government Street
Taylors Falls, MN 55084
Tel: 651.206.0980
E-: claybaugh7@gmail.com
May 25, 2015 Al
28'-8"
_Warehouse Section
A2 Scale: 1/8" = 1'-0"
- 2" X 6" Wd. studs @ 24" O.C.
-2" X 8" Wd. joists @ 24" O.C.
with 1x10 wd. subfloor & 7/8"
x 5" t&g wd. floor
-2" X 8" Wd. studs @ 24" O.C.
with 1x6 wd. sheathing & 3/4"
x 5 1/2" wd. drop siding
4" concrete slab over 2"
rigid insulation
CLAYBAUGH
PRESERVATION
ARCHITECTURE
INC
361 West Government Street
Taylors Falls, MN 55084
Tel: 651.206.0980
E-: claybaugh7@gmail.com
May 25, 2015 A2
- Restore window openings
3 Alternative 1 North_ Elevation
A3 Scale: 1/8" = 1'-0"
Roll -up door in existing opening
4 Alternative 2 North Elevation
A3� Scale: 1/8" = 1'-0"
EPDM membrane over coverboard & 4"
rigid insulation
j Existing steel angle joists
C
o _
m
C:
c
0
o
r_ �)
c _
C
rn
-Infilled window
u
opening to rem
4" concrete slab over 2"
rigid insulation.
2 Building Section
A3 Scale: 1/8" = 1'-0"
- Infilli=d nnPninn to remain
21'-0"
04
N
-New window in !Iexisting opening
1 Floor Plan
A3 Scale: 1/8" = 1'-0"
y
NORTH
Building footprint: 578 sf
Insider floor area: 441 sf
CLAYBAUGH
PRESERVATION
ARCHITECTURE
INC
361 West Government Street
Taylors Falls, MN 55084
Tel: 651.206.0980
E-: claybaugh7@gmail.com
May 25, 2015 A3
Structural Analysis
Shoddy Mill and Warehouse Re -use Study
Stillwater, MN
Purpose
On January 27, 2015 I visited the Shoddy Mill and Warehouse in Stillwater, MN. The
purpose of my investigation was to assess the existing condition, identify apparent
distress or structural concerns, and gather sufficient information to comment on the upper
floor capacity of the Warehouse.
Background
• The Shoddy Mill and Warehouse were recently relocated from a previous location to
the current site.
• The Warehouse is a wood -framed structure roughly 28 feet (north -south) by 60 feet
(east -west).
• The Warehouse has an upper floor and a gabled roof with a center ridge running the
long direction.
• The Mill is a 27'-6" (east -west) by 21'-0" (noifih-south) stone -walled structure with a
mono -sloped roof (high end north).
• A new foundation was installed at the current site for both structures.
Observations and Recommendations
Warehouse
• There are two interior columns in the lower level, one in the center, and one at the
easterly quarterly point. There once was a column at the westerly quarter point, but it
was cut off at some point in time, and replaced with a steel rod suspension system. It
appears that an original rod failed, and was replaced with the current strapping
system. There is a significant sag in the beam suspended by steel rods. The column
at the westerly quarter point should be reinstalled on a new foundation, and the rod
system should be removed
• When moved, rotten portions of wood studs were cut off the bottom and new partial
length studs were lapped with and nailed to the original solid stud material that
remained. The 2x6 lumber lapped with and fastened to the existing studs appears
somewhat random and not designed. I recommend that the studs be reinforced with
full height studs.
LSEngineers, Inc. — 234 North Main Street — Le Sueur, MN 56058 — (507) 665-6255
Shoddy Mill and Warehouse
Stillwater, MN
May 5, 2015
Page 2
• The window openings in the upper level are not original, and the framing around
openings was not properly addressed when installed (see Photo 1). I recommend that
jamb studs and lintels be installed where required around the windows.
Photo
There is rot on the roof framing and upper floor framing. In some locations roof rot
extends into wall top plate and wall studs and siding (see Photos 2 and 3). All rotten
materials should be replaced in kind
LSEngineers, Inc. — 234 North Main Street — Le Sueur, MN 56058 — (507) 665-6255
Shoddy Mill and Warehouse
Stillwater, MN
'Y
`r.
s
Photo 2 — Roof and Wall Rot
May 5, 2015
Page 3
Photo 3 — Rotten Roof Framing
LSEngineers, Inc. — 234 North Main Street — Le Sueur, MN 56058 — (507) 665-6255
Shoddy Mill and Warehouse
Stillwater, MN
May 5, 2015
Page 4
Shoddy Mill
• The stone Mill was stabilized when relocated.
• Mortar generally appears to be sound and performing.
• The center roof beam was replaced, and it also appears to be sound and performing.
Floor Capacity of Warehouse
Once the columns and rotten framing are replaced as recommended, the floor will have a
live load capacity of about 20 pounds per square foot (psf). This capacity is satisfactory
for unoccupied attic space, but it is not suitable for occupancy. A 40 psf live load
capacity could be achieved by installing additional beams below the existing beams, and
by adding joists between existing joists at 4'-0" on center (every other joist space).
Limitations
The opinions stated in this report are based on limited visual observations of the structure
only and there is no claim, either stated or implied, that all conditions were observed. No
physical testing was performed and no calculations have been made to determine the
adequacy of the structural system or its compliance with accepted building code
requirements. This report does not warrant the original design of the building.
Certification
I hereby certify that this plan, specification, or report was prepared by me or under my
direct supervision and that I am a duly Licensed Prgfessional Engineer under the laws of
the state of Minnesota. /
Signature
Eugene M. Dwyer, P.E.
Date: May 5, 2015 License Number: 19951
LSEngineers, Inc. — 234 North Main Street — Le Sueur, MN 56058 — (507) 665-6255
itimates
Cost estimates are pending and will be included in the final report.
Financial Analysis
Jon Commers, Principal
D O N E K 2288 University Avenue West
Saint Paul, IVIN 55114
Public Finance, Project Management, Policy ph) 651.645.4644
www.donjek.com
BERGSTEIN SHODDY MILL REUSE STUDY
Capital and Operating Funding Resources: Draft Text
May 27, 2015
Reuse of the Bergstein Shoddy Millwill be made sustainable by a deliberate, long-term funding
strategy. Capital funding is required for rehabilitation of one or both of the structures, and for
modest repair and replacement of the buildings over time. Operating support, likely through a
combination of earned revenues, City funds and contributions from partnering organizations, will
allow for the mill to contribute to the economic and civic vitality of Stillwater.
Funding Rehabilitation
Assembling the resources required to elevate the mill buildings from their current state, into fully
functional structures for seasonal or year-round use, is likely to draw on multiple funding sources.
As the owner and lead partner of the mill buildings, the City of Stillwater is well positioned to
coordinate the raising of capital for rehabilitation. Prospective sources include the following.
• City Bonds: The City manages a bond portfolio to fund general government investments,
street improvements, redevelopment through tax increment financing, and other priorities.
The outstanding principal of bonds owed by the City has been declining over the last ten
years. The City is authorized to fund all or part of historic rehabilitation projects such as the
mill buildings, as a portion of their issuance and repayment of municipal bonds. An
advantage to this source is that the investment can be amortized over time.
• Park/Trail Dedication Fund: The City operates a fund that supports capital outlay for City
parks, using park/trail dedication fees paid by developers of parcels in Stillwater. At the end
of 2013, this account had grown to exceed $300,000, and may provide a source for historic
rehabilitation in the City's Bridge Park area.
• Philanthropy: Philanthropic partners including the St. Croix Valley Foundation and its
affiliate Stillwater Foundation, may assist the campaign to raise capital for rehabilitation,
through grant making and/or sponsorship of a capital raising initiative for the mill
structures. Foundation leaders expect growth in local philanthropy in the coming years.
• Minnesota Historical and Cultural Heritage Grants: Given the mill structures are listed on
the National Register of Historic Places, these grants funded through the Legacy program
could finance work on exterior building preservation, building accessibility, and interior
systems. While not eligible for remodeling or modernization of the structures, these grant
funds could comprise a portion of the project's capital structure.
• State Capital Project Grants -In -Aid: Local governments are eligible applicants for grants, on
a 1:1 matching basis, to finance historic preservation construction projects at publicly owned
sites.
• Private Lending: Rehabilitation may also be funded by construction debt, subsequently
consolidated into a long-term mortgage on the property.
• In -Kind Contributions: Materials, labor and expertise can be contributed by individuals,
organizations or businesses to the project, adding to the capital resource available for
rehabilitation. Building materials such as windows are examples of material often contributed
at cost or on a donated basis.
• Minnesota State Bonds: In addition to the grants-in-aid described above, the State funds
public assets deemed to have statewide significance, typically through capital investment
legislation approved every other year. The nature of the historic significance of the mill
buildings, and eligibility for designation on the National Register of Historic Places, may
strengthen a City proposal for state support.
Funding Operations and Maintenance
Ongoing operations and upkeep of the mill buildings, once reuse has commenced, is also a critical
consideration for their viability. A combination of earned revenue and partner support will need to
cover operating expenses and regular deposits to a replacement and reserve account.' Prospective
sources for these uses include:
Earned Revenue: Revenues from concessions, bicycle storage and parking facilities, food
service or dock access can support the financial viability of the site and its offerings. Interest
by local businesses in operating these concessions can provide a valuable partnership
opportunity.
Lodging Tax: The City established a lodging tax within the last ten years, to provide a
funding stream to support the attraction of tourism and convention business. In 2013, the
tax raised $170,000 for these purposes, a figure that has steadily increased since its initial
collection in 2008.
Park Maintenance Fund: In addition to the park/trail dedication revenues noted above, the
City collects fees from investors in property to reflect the need for park assets nearby. In
2013 no deposits or expenditures are noted for this fund, but is balance of $144,000 could
provide for targeted investment in the mill site as a park asset of citywide interest.
Um
I An industry standard guideline of a deposit to a replacement and reserve account of 3.00% of total value, would
amount to $9,000-$15,000 per year. These funds are escrowed for repair needs to the exterior, interior, and roof
structures.
List of Interviewees
PEOPLE INTERVIEWED
Intensive personal interviews with local officials, business leaders, civic leaders,
recreational and environmental advocates, members of the arts and non-profit
community, agency representatives, and ordinary citizens were a primary source of
information for the Bergstein Shoddy Mill Reuse Study. Team members conducted on-
site interviews with more than forty people during the course of the study.
Bobby, Amy, Brian Anderson
St Croix Boat & Packet
Craig Beemer
Oasis Cafe
Todd Clarkowski
MnDOT-St. Croix River Crossing Coordinator
Paul Creager
Teacher/Film and Music Festivals
Mark Desch
Downtown Revitalization Committee
Kate Dietrick
University Of Minnesota -Upper Midwest Jewish Archives
Chuck Dougherty
Discover Stillwater/Water Street Inn
Jenna Fletcher
Planning Commission
Diane Hedeen
DNR -William O'Brien State Park
Sherri Hopfe
Independent Business Association
Renee Hutter-Barnes
MnDOT Cultural Resources
Ted Kozlowski
Mayor
Brandon Lamb
Downtown Revitalization Committee
B&i,gsts5n Shoddy Y1,11119
ese lu y
Brian Larson
Heritage Preservation Commission
Tom Lynum
Discover Stillwater/B&B owner
Andy Mahn
Downtown Revitalization Committee
Tom McCarty
City Administrator
Doug Menikheim
City Council
Jonathan Moore
National Park Service
Tim Moore
Public Works/Parks
Randy Moses
Chilkoot Velo
Aimee Peltier
Independent Business Association
Brent Peterson
Washington County Historical Society
Ann Pung-Terwedo
DRC/Washington County Planning
Linda Radimecky
DNR -Brown's Creek, Gateway, and Luce Line Trails
Christie Rosckes
Discover Stillwater
Heather Rutledge
Art Reach
Cindy Shilts
Building Official
2
Beygstaon Shadily P.t1111
Rause Zbudy
Molly Shodeen
DNR Hydrology
Jackie Sluss
MnDOT Cultural Resources
Jennifer Sorenson
DNR Hydrology
Chris Stein
National Park Service
Jane Stevenson
St. Croix Valley Foundation
Todd Streeter
Greater Stillwater Chamber of Commerce
Roger Tomten
Downtown Revitalization Committee
Bill Turnblad
Economic Development Director
Louise Watson
Transition Stillwater
Elizabeth Welty
Heritage Preservation Commission
Abbi Wittman
Planner
3
ear 7�8ln zhc4zly p ll]l
Res Q udy
Examples of Similar Projects
EXAMPLES of SIMILAR PROJECTS
The Depot Coffee House
Hopkins, MN
Located at the junction of several regional bike trails in Hopkins, the Depot Coffee House
is operated by a non-profit organization. The facility provides parking for automobiles,
and serves both bicyclists and pedestrians.
From the website:
The Depot is a renovated train depot in Hopkins, Minnesota that now serves as a coffee
house, youth community project, and trailhead for area bike trails. It was planned and
opened by area students and their allies in 1998 to create a chemically -free environment
for teens.
The Depot also serves as an important asset to the community by providing students all
over the west Metro an opportunity to create their own place to learn, relax, and have fun
while directing both a coffee shop and an entertainment venue.
http://www.thedepotcoffeehouse.com
Sergsteln Shoddy Mill
Freewheel Midtown Bike Center
Minneapolis, MN
Located along the Midtown Greenway in South Minneapolis, the Freewheel Midtown
Bike Center is a popular public-private partnership accessible only by bicycle.
From the website:
The Freewheel Midtown Bike Center has two large bicycle parking bays as well as bike
sales, parts, repairs and rentals. The bathrooms, chilled drinking water, and showers
serve casual and commuting bicyclists. Freewheel Bike does the nuts -and -bolts
operations and the Midtown Greenway Coalition focuses on community engagement.
With its office down the hall and overlooking the trails, the Coalition can better connect
with Greenway users and better engage the Phillips community with the Greenway.
http://midtown reg enway.org/about-the- reg enway/bike-center/
Bergstein Shoddy Mill 2
Reuse Study
Urban Ag Center
Bergstein Warehouse and Shoddy Mill Reuse as
Urban Agricultural Center
Limitations:
Limited Parking for public and for loading/delivery trucks during event
Visibility, wayfinding
Opportunities:
Connections and visibility to green minded, buy local community using trails
(bike, ped...). Opportunity for locally supported, local producers to gain
synergy from a centralized downtown identity. Community access to choice
real estate for urban agriculture events.
Access to river through new public short term small craft dock,
controlled by parking meter type fee
Vision:
Event center for urban agricultural community
to promote/celebrate/share/educate community about what they do.
A visible city commitment to community driven initiatives surrounding
locally produced, environmentally more sustainable, agriculture.
Promotion of these choices to a wider audience.
A gathering place where ideas are shared about community agriculture much like
what historically happened at the town feed store/elevator or general store.
How'd it work:
PT coordinator/director, public calendar, sign up like you rent a park bldg.
Rent includes secure short term storage, publicity coordination to other
community calendars -Buy Local, Transition Stillwater, Chamber, Stillwater
Current, Local Harvest etc
Types of Events/ User Groups:
CSA (Communtiy Supported Agriculture) box distribution - different weekday
for each farm for the 20+/- summer weeks and some winter share weeks
Big River
Foods, Turnip
Rock, Pahl's
Market Eener's
Farm
Threshing Table Farm
Community Homestead
Fresh Earth Farms
Mhonpaj's Garden
Fay Freedom Farm
La Finca Farm
Farm Where Life is Good
Treasured Haven Farm
CSA farm sign-up event typically late winter,
CSA harvest party Aug/ Sept weekend for each farm separately or together
Community Garden Plotsign-up weekend day in March -
Community Garden member only pot -lucks, growing season weeknight
North Hill Community Garden,
South Hill Community Garden,
Meadowlark Organic Community Garden
New Shoddy Mill Community Garden
Gardening Classes
Stillwater Farm Store -seed potatoes, onion starts, cover crop seeds The
Backyard Grocer
River Market co-op
Small local growers satellite farmers market?
Blueberries of Stillwater
The Flower Farm
Renee's Flower Farm- Live Flowers
Local eggs, raised on site eggs
Local honey, harvested on site honey
Local wine/beer producers release party events, Lift
Bridge Brewery
Hop Growers Association
Maple Island Brewery
Northern Vineyards Winery
St. Croix Vineyards
Agricultural community winter coffees, seed/ideas exchange; like what maybe
historically happened at the elevator/feed store w/ local baked goods for sale
Chilicoot Cafe
L'etoile Du Nord
Cafe BreadArt
Bakery Great Harvest
Bakery
Local bedding plant sales by garden clubs- May; meeting place for clubs
Perennial Garden Club of Stillwater -Trillium, Daylily, Columbine
Wild Ones Native Plants
Lilies of the Valley Garden Club
Ivy Garden Club
Pollinator Friendly Alliance,
Honey Bee Club of Stillwater
Highs school Greenhouse- Andy
Weaver 4H
Junior Master Gardeners (Stonebridge elementary)
Plant pest/disease diagnostic clinic
Washington County Master Gardeners
U of' horticultural/entomology departments
Ag issues -water quality, buffers: wildlife, pollinators, run-off
classes/demos Washington County Conservation District
MN Dept. of Ag
Pollinator Friendly Alliance
U of MN Center for Urban Ecology and Sustainability
4H meeting place (currently no 4H club in Stillwater; Mahtomedi and Baytown
Township have clubs) week night year round
Minnesota Extension
Valley cheese maker/dairy events, weekend Cass
Lake Creamery
Wedge and Wheel
Poultry events, informational meeting, sales of chicks and eggs
Backyard Chickens
Houle's Farm Store -- DNR ducks, grouse, pheasant fledglings
Local Wool/Alpaca producer Events?
Darn Knit Anyway
Bee events --Extracting demonstration, extracting and bottling space rental
(would need permanent equip. storage), Honey Sales, beekeeping classes?
Honey Bee Club of Stillwater (300 members in St. Croix River Valley)
Nature's Nectar
Bees Knees
Pollinate Minnesota
Maple Syrup tapping demo/cooking event
Warner Nature Center
Carpenter Nature Center
William O'brien state park
VHW/Lions etc. pancake breakfast tie-in fee event
Local Beef/ Pork/Chicken Producer grill out/roast fee event
Buffalo - Belwin Nature Center
Pasture Raised Beef- guy in Grant
Tie-in with local beer sales
Foraging, Nut gathering, Mushroom hunting class/demo fee event
MN Mycological society
45 degrees
River Market Co-op
MN Master Naturalists
Preserving, Cheese making, Pickling, Bread Making class /demo
Our Community Kitchen
Cooks of Crocus Hill fee event
Valley Outreach
Living Healthy in Washington County
stcroixriverfishing.com letsgofishingstillwater.com
Buy local catered farm style dinner location, fee event
Foodies on Foot
Fishing? Fish cleaning house? Fish fry fee event? City/state parks
Distribution spot
Fare for All
Bountiful Baskets
Ag type permit applications for city -bee, chicken, city community garden plots,
Summer Tuesday Market vendors?, Farmers Market vendors?
Info packets; fielding requests, questions
Application processing
Program needs:
Loading dock for kegs, honey supers, CSA boxes...
Commercial catering kitchen or better, coffee maker, dishwasher, walk-in fridge
Secured storage w/18 hr access for renting organization
Bathroom
Office for coordinator/director
Solar/Photovoltaic array?
Liquor license
Wifi, projection system, sound system inside for classes
Rolling indoor/outdoor service counters/bar
Indoor/outdoor rectangular tables, seating -- used for demos/dining/display,
Hard surface/porous pavers between bldgs for tables and barn
dance/powwow, Drive -up pick-up lane
Outdoor sound system or at least power
Grill
Potting bench/outdoor work station
Rain Barrel water collection if gutters on buildings
Community garden plots for Stillwater condo/apt
residents - shared tool storage for on site ag
Demonstration rain garden, raised bed, sq. ft. garden, cold frame etc.
Monarch/Pollinator way station
Bee hive(s) maintained by director or contracted out in solar electric
fenced apiary or hive on very accessible bear proof roof
Chicken tractor? Maintained by director or contracted out Mature Mapletree(s)
for tapping (sugar or silver preferred)
Bikeracks
Contract Satellite(s) facilities for large events
Duplication to avoid:
Farmers Market at 3rd and Pine St
Small ag/gardening classes at River Market Loft (tiny space not accessible)
Cooking classes appropriate to other locations -Cooks of Crocus Hill
Here's Minnesota Grown's list of producers w/in 10 miles of 55082. Ifyou search w/in 25
miles you get 130 members. http://www.minnesotagrown.com/member-directory/Many smal ler
local producers are not listed.
Axdahl's Garden Farm & Greenhouse
Stillwater
Blueberry Fields of Stillwater
Stillwater
Northern Vineyards Winery
Stillwater
Saint Croix Vineyards
Stillwater
Stillwater Farmers Market
Stillwater
Aamodt's Apple Farm, Inc.
Stillwater
Stillwater
Bergmann's Greenhouses & Farm Market
White Bear Lake
Costa Farm & Greenhouse
Lake Elmo Stillwater
Ziertman's Pumpkin Farm
Lake Elmo
Stillwater Christmas Tree Farm
Stillwater Bayport
Krueger's Christmas Trees of Lake Elmo
Mahtomedi White
Honey -Pine Apiary
Bear Lake
Bayport Farmers Market
Marine on St. Croix
Schultz Farm Organics
White Bear Lake
Pine Tree App le Orchard
Hugo
Big River Farms
Lake Elmo
Century College - Horticulture
Marine on St. Croix
KDE Farms
White Bear Lake
Afton
Lake Elmo Sod Farms, LLC
Oakdale
Live Flowers, LLC
Afton
City of White Bear Lake Farmers Market
Hugo
Afton Garlic Farm
Maplewood
Oakdale Farmers Market
10th Street Farm & Market LLC
Lutz Cuts
Bachman' s Floral, Home & Garden
Amended National Register Nomination
NPS Form 10-900 OMB No 1024-0018
United States Department of the Interior
National Park Service
National Register of Historic Places Registration Form
This form is for use in nominating or requesting determinations for individual properties and districts. See instructions in National Register Bulletin, How to Complete
the National Register of Historic Places Registration Form. If any item does not apply to the property being documented, enter "N/A" for "not applicable." For
functions, architectural classification, materials, and areas of significance, enter only categories and subcategories from the instructions.
1. Name of
Historic name: Bergstein, Moritz, Shoddy Mill and Warehouse (documentation of move)
Other names/site number: NRIS 408000133
Name of related multiple listing:
N/A
(Enter "N/A" if property is not part of a multiple property listing)
2. Location
Street & number: 805 South Main Street
City or town: Stillwater
Not for publication: F1
State: MN
3. State/Federal Agency Certification
Vicinity: 1-1
County: Washington (code 163)
As the designated authority under the National Historic Preservation Act, as amended,
I hereby certify that this —nomination _ request for determination of eligibility meets the documentation
standards for registering properties in the National Register of Historic Places and meets the procedural and
professional requirements set forth in 36 CFR Part 60.
In my opinion, the property —meets _ does not meet the National Register Criteria. I recommend that this
property be considered significant at the following level(s) of significance:
national statewide local
Applicable National Register Criteria:
A B C D
Signature of certifying official/Title
State or Federal agency/bureau or Tribal Government
Date
In my opinion, the property _ meets does not meet the National Register criteria.
Signature of commenting official
Title:
Sections 1-6 page 1
Date
State or Federal agency/bureau or Tribal
Government
A full copy of the amended nomination will be included in the final report.