HomeMy WebLinkAbout2012-09-24 PRC MIN
CITY OF STILLWATER
PARKS AND RECREATION COMMISSION
SEPTEMBER 24, 2012
Present: Chair Linda Amrein, Commissioners David Brandt, Scott Christensen, Rob McGarry,
Sandy Snellman, Don Stiff, Solveg Peterson, and Councilmember Mike Polehna
Absent: None
Staff present: Public Works Superintendent Tim Moore
Chair Amrein called the meeting to order at 7:03 p.m.
Approval of Minutes:
Motion by Commissioner Snellman, seconded by Commissioner Brandt,
to approve the August 27, 2012 minutes. All in favor.
OPEN FORUM
There were no public comments.
ACTION ITEMS
Municipal Swimming Pool
Councilmember Polehna introduced Jim Maland who designs ice arenas, pools and rec centers
across the country. Mr. Maland explained that the three types of water facilities are: traditional
pools (rectangular bodies of water), family aquatic centers, and water parks (for-profit
businesses). Traditional pools have a limited appeal and usually recoup less than 40% of their
operating costs. Aquatic centers have activities for youth, adults and families, and can recover
anywhere from 70% of their costs to making 20% profit.
Mr. Maland stated that the components of an aquatic center are: shallow water with a zero edge
0-3 feet deep; medium depth 3-5 feet; deep water 5-12 feet; peripheral amenities such as “lazy
rivers”; building features, and support elements. He presented photos showing various features
of aquatic centers throughout the Midwest.
Mr. Maland informed the Commission that the first step is to do a feasibility study, which
evaluates a site, size, design and cost. He also recommended doing a community survey to
help determine the scope and direction of the project. The next step would be to secure funding
through fundraising and perhaps a referendum. After that comes design development,
schematic design, development of construction plans, bidding and then construction. The
feasibility study can take anywhere from two months to a year. Design takes five to eight
months, bidding takes about one month, and construction usually begins early in the spring for
opening the following year. He told the Commission to keep in mind that staff will need time to
be trained to operate the facility.
In terms of who is involved in the process, Mr. Maland said that usually a task force is involved
in the first few steps which involve gathering input. Design and construction are more technical
and therefore involve city staff. The task force determines community needs in response to the
budget; staff looks at maintenance, control of operating costs, and development of an operating
plan.
He stated that a goal for the first steps is to determine if it’s realistic to recover capital and
operating costs. Most communities don’t fully recover capital costs, but try to recover operating
Park and Recreation Board Minutes
September 24, 2012
Page 2 of 3
costs. Some communities subsidize operating costs to make it more affordable for the general
public to use the facility.
Mr. Maland presented a variety of scenarios of expense versus revenue for aquatic facilities;
also a chart by the National Park and Recreation Association comparing population percentages
and what capacity (“bather load”) of pools would be supported. Bath house configuration would
be determined by state code. Site acreage, amenities, topography, land configuration, green
space requirements and parking all determine the size of the facility. There are many different
themes to aquatic facilities. The most popular features are zero-depth, slides, drop slides, and a
lazy river. Staffing an aquatic center is different than a rectangular pool. You need staff at the
top and bottom of some of the elements, guards for lap pools, and staff for shallow water.
He reviewed potential capital costs. Bather load, size of facility, amenities, and the quality of the
facility all determine cost. He suggested aiming at 1,000-1,100 bather load capacity for
Stillwater. A ballpark cost estimate for such a facility would be $7-12 million including design,
construction, and amenities. He added that an outdoor facility makes more sense than an indoor
facility for Minnesota, due to the cost of operating an indoor facility - there are air quality issues
and other factors. He estimated that six to nine acres would be needed.
Mr. Maland answered commissioners’ questions about various facilities around the metro area.
$7-15 is the usual charge for users. Often a pass system is set up. He recommended doing a
community survey to gauge support for the project. Mr. Moore pointed out that the city doesn’t
have a five to six acre parcel available for a facility at this time. Commissioner Amrein said
perhaps the group pursing this can look outside city limits for a site. She feels a site should be
determined before doing a community survey. Councilmember Polehna said the facility should
be a revenue generator. It also may be difficult to find staff. Mr. Moore concurred that it is a
struggle to find lifeguards, and added that staffing needs would depend on the hours of
operation. Councilmember Polehna commented that neighboring communities will need to buy
into the project in order to make it feasible. Commissioner Christensen mentioned several open
parcels in the city, but they are all too small. Public Works Superintendent Moore expressed
concern about operating costs in light of future city infrastructure needs. Commissioner Stiff said
he feels the facility should break even.
Mr. Moore suggested bringing a recommendation to the Council stating that after Mr. Maland
presentation, seeing what size of property is needed and capital outlay to build it, the
Commission doesn’t feel it’s worth pursuing at this point.
Motion by McGarry, seconded by Amrein, to advise the Council that because a six to nine acre
site and $7-12 million capital outlay would be needed per the presentation by Jim Maland, the
recommendation to the Council is not to pursue the project at this time. All in favor.
Outdoor Winter Rinks
Mr. Moore reviewed data on maintenance costs of the outdoor ice rinks. About 1,000 hours
every winter is spent maintaining rinks, equating to about $45,000 in labor. Another $5-6,000 for
miscellaneous materials is spent, not including water. If the City paid for water, it would cost
another $5-6,000. In summary, the City spends about $55,000 a year on the rinks. The rinks
being proposed for closing are the ones that appear to get the least amount of use. He has
received preliminary approval from the school district to double the size of the rink at the old
athletic field and is looking at bringing in a temporary shelter there. He feels that the City could
have better ice if there were fewer rinks to maintain.
Park and Recreation Board Minutes
September 24, 2012
Page 3 of 3
Motion by Commissioner McGarry, seconded by Commissioner Snellman, to approve Public
Works Superintendent Moore’s schedule for the outdoor rinks and to schedule a neighborhood
meeting on the issue to gather input. All in favor.
Chairman Amrein asked, if individual residents wanted to, would they be allowed to maintain the
rinks themselves? Commissioner McGarry responded that, due to liability, he would discourage
it. Mr. Moore added that because the rinks are flooded from hydrants, a resident doing it
themselves would be difficult.
Fall Colors Fine Art & Jazz Festival
There was discussion on when event applications are due and how to enforce deadlines.
Motion by McGarry, seconded by Stiff to approve the festival permit. All in favor.
INFORMATIONAL ITEMS
Mr. Moore stated he has not had a chance to work on the Pickle Ball request, but thinks next
year it could be developed at Staples Field.
COMMISSION ITEMS/TOPICS
Chair Amrein said the hip hop and graffiti art activity at Pioneer Park was very successful and
interesting.
The meeting was adjourned at 8:50 p.m. on a motion by Amrein, second by Stiff.
Respectfully submitted,
Julie Kink
Recording Secretary