Loading...
HomeMy WebLinkAbout2012-02-22 Joint Board PacketMeeting Notice Stillwater City and Town Joint Board City Council Chambers 216 North Fourth Street Stillwater MN 55082 7 p.m. Wednesday, February 22, 2012 AGENDA 1. CALL TO ORDER 2. APPROVAL OF APRIL 2011 MINUTES 3. ELECTION OF OFFICERS 4. PUBLIC HEARINGS 4.01 Case No. 2012 -01. A final plat and final PUD approval for Millbrook 6th Addition. US Home Corp, applicant. 5. NEW BUSINESS 5.01 Building Permit Activity Report 5.02 Fairy Falls Road Area Annexation — Policy Discussion Stillwater City and Town Joint Planning Board Meeting Minutes April 20, 2011 Present: Dave Johnson and Linda Countryman, Stillwater Township; Ken Harycki and Jim Roush, City of Stillwater. Staff present: Stillwater Community Development Director Bill Turnblad. Chair Johnson cal led the meeting to order at 7:05 PM. Approval of Agenda Mrs. Countryman moved to approve the agenda. Mr. Roush seconded the motion, which passed unanimously. Public Hearings Case No. 2011 -08 A request by Joe Jablonski of Lennar for approval of Millbrook 5th Addition. The plat would include 37 single family homes. Mr. Turnblad summarized the planning report of April 13, 2011 written by City Planner Mike Pogge. Mr. Johnson opened the public hearing. There being no public comments, he closed the public hearing. Mrs. Countryman moved to approve the plat of Millbrook 5th Addition. The motion was seconded by Mr. Harycki and passed on a 4 -0 vote. Case No. 2011 -04 A request by the City of Stillwater to create a new zoning district and to rezone 403 properties in order to be consistent with the 2030 Comprehensive Plan future land use map. Mr. Turnblad summarized his report of April 12, 2011. Mr. Johnson opened the public hearing. There being no public comments, he closed the public hearing. Mr. Harycki moved to approve the ordinance to create a new PROS (Park, Recreation or Open Space) Zoning District, and to rezone 403 properties to be consistent with the 2030 Comp Plan's future land use map. Mr. Roush seconded the motion, which passed unanimously. New Business Building Permit Activity Report Mr. Turnblad presented the 2010 permit report. 39 permits were issued in 2010 for residential units in the Orderly Annexation Area. The total number of residential permits issued from 1996 to 2010 totals 1,201. During that time, at a rate of 120 permits allowed annual, 1,920 permits could have been issued to date. Therefore, a positive balance of 719 permits exists. Election of Officers Mr. Roush moved to elect the same officers for 2011 that served in 2010. M r. Harycki seconded the motion, which passed unanimously. Therefore, the Chairman for 2011 is Mr. Johnson and the Vice Chair is Mr. Roush. Adjournment Mr. Harycki moved for adjournment. Mr. Roush seconded the motion, which passed unanimously. Meeting adjourned at 8:05 PM. Respectfully submitted, Bill Turnblad Acting Recording Secretary Stillwater Township /City of Stillwater Joint Board DATE: February 14, 2012 REQUEST: Millbrook 6th Addition Final Plat and Final PUD Site Plan APPLICANT: Joe Jablonski, U.S. Home Corporation LOCATION: State Highway 96 west of South Twin Lake MEETING DATE: February 22, 2012 REVIEWED BY: Community Development Director PREPARED BY: Michel Pogge, City Planner.` ec CASE NO.: 12 -01 BACKGROUND The Preliminary Plat and Concept Planned Unit Development for Millbrook was approved by the City in the Summer of 2006 and subsequently amended in July of 2010. The 170 acre preliminary plat includes 172 single family homes and 98 townhomes. Development of the property is planned to occur in three overall phases. The application at hand is the third and final plat of Phase II. This plat is known as Millbrook 6th Addition and includes a total of 10 single family homes that are zoned Cottage Residential and 22 townhouse units that are zoned townhouse. The roads White Pine Way and Maureen Lane will be installed completing the loop around the townhouses. Public utilities will be installed by the developer to support this plat as part of the site improvements. Millbrook 6th Addition — Final Plat and Final PUD Site Plan February 14, 2012 Page 2 REQUEST AND ANALYSIS The specific request before the City is to approve the Final Plat for MILLBROOK 6th ADDITION and the Final PUD Site Plan. The City Council adopted a resolution approving the preliminary plat and concept PUD permit for MILLBROOK on August 15, 2006. On July 28, 2009, the Council adopted a resolution approving an amendment to the preliminary plat and concept PUD permit as they apply to the single - family homes in MILLBROOK. Since the plans are substantially similar to the preliminary plat and concept PUD permit approved, the final plat and final PUD permit for Millbrook 5th Addition are subject to the pertinent conditions of both resolutions of approval. They are detailed below. I. August 15, 2006 Resolution Conditions. 1. The Final Plat and Final Planned Unit Development application shall be substantially similar to the following plans prepared by Sathre - Bergquist, Inc., and on file in the Community Development Department, except as modified herein: Site Plan dated 7/21/06 Phasing Plan dated 7/24/06 Buffer Averaging Plan (including trails) - 8 sheets dated 6/26/06 Preliminary Site Map* (Sheets SM2 - SM6) dated 1/17/06 Preliminary Plat (Sheets PP1 -7) dated 3/30/06 Final Grading Plan (Sheets GP2, 3, 4, 4A, 5, 6) dated 4/12/06 Final Utility Plan (Sheets 2 -5) dated 4/12/06 Preliminary Landscape Plan (Sheets 1 -4) dated 2/1/06 *Except trails to be as shown in Site Plan dated 7/21/06 The final plan submittals for MILLBROOK 6TH ADDITION are substantially similar to the approved preliminary plans. 2. The developer shall complete a Lakeshore PUD worksheet and submit it to the Minnesota Department of Natural Resource's (DNR) Area Hydrologist prior to submitting an application for a final plat for Phase One. If the DNR review results in substantial changes to the Preliminary Plat or Concept PUD plans, then the developer shall resubmit the Concept PUD and Preliminary Plat for review by the City and Joint Planning Board. This condition has been satisfied. 3. The trail and sidewalk system shall be constructed substantially the same as represented in the following plan sets on file with the Community Development Department: a. Carnelian Marine Trails - Revised (Sheets CM -1, 2, 3) dated 6 -21 -06 b. Brown's Creek Trail - Revision 3 (Sheet BC 2b -1) dated 6 -26 -06 c. Brown's Creek Trail - Revision 2 (Sheet BC 2 -2 + 2 -3) dated 6 -22 -06 d. Revised Sidewalk Plan (Sheets SP -1, 2,3) dated 6 -21 -06 Park and trail plans for MILLBROOK 6TH ADDITION are consistent with the approved preliminary plans. 4. All trails shall be paved. This condition has been satisfied. Millbrook 6th Addition — Final Plat and Final PUD Site Plan February 14, 2012 Page 3 5. Prior to release of the final plat for Phase One, a blanket easement shall be provided over the open space outlot on the south side of South Twin Lake for trail purposes. Should the Carnelian- Marine Watershed District rules ever change and allow a trail closer to the lake, the easement will give the City the right to construct that trail. This condition has been satisfied. 6. Prior to release of the final plat for Phase One, the developer shall provide a 20 foot wide general easement allowing for future use for trails and utilities on the property along the south side of State Highway 96 right of way. The easement shall be reviewed by the City Engineer and City Attorney and found satisfactory to them in both form and content. This condition has been satisfied. 7. The trail connection to State Highway 96 along Outlot F shall be allowed as shown only if the wetland in the ditch is determined by a State licensed delineator to be an incidental wetland. If it is not an incidental wetland, then the trail shall be realigned westward along the rear of Lots 17 through 19. Documentation from the delineator shall be submitted together with final plat application materials for the Phase One final plat. This trail connection was originally important when the regional trail connecting Stillwater to St. Paul was identified to run along the south side of State Highway 96. Now with the prospect that the Browns Creek State trail, no regional trail will be constructed along State High 96. Thus this trail connection is likely no longer needed. Additionally, staff would recommend against installing this trail connection now since there is currently no safe pedestrian path along State Highway 96. A trail easement was secured to allow a future connection if it would be needed in the future. 8. Lots 129 and 149 adjacent to the trail access off of the roundabout will be restricted by covenant to have open rail fencing and non - continuous shrubbery not exceeding four feet in height along their side and rear lot lines abutting the trail corridor. This is to provide for a more inviting entrance to the trail system. This condition applies to a different phase of the project. 9. The Developer shall provide water service stubs at each park with three stubs to be included at the large active park. A sanitary sewer stub will be provided at the large active park at a place yet to be determined by the City of Stillwater. This condition has been satisfied. Millbrook 6th Addition — Final Plat and Final PUD Site Plan February 14, 2012 Page 4 10. The two active parks will be graded by the developer as part of the first phase of development and the developer shall establish turf to the satisfaction of the city prior to the City's assuming maintenance of same. This shall at a minimum include mowing, fertilizing, rock picking, leveling, trimming, weed management and over seeding as necessary. Target date for the first transfer of park land will be fall of 2007. The park sites were transferred to the City in the Fall of 2010 and the requirements for the final turf establishment is covered in the Millbrook Plat 4 development agreement. 11. The Brown's Creek trail link on the Millbrook property that connects to the Carlson property to the south shall be installed by the developer at the same time that the Carlson property trail is constructed, if prior to construction of the final phase in Millbrook. OK. 12. An as built easement map showing 30 foot easements where possible (minimum of 15 foot) for trails shall be completed and recorded as each section of trail is completed. OK. 13. Final civil engineering plans shall be found satisfactory to the Stillwater Public Works Director or they shall either be: a) revised to his satisfaction; or b) reviewed by the City Council and approved. The civil engineering plans have been reviewed by the Public Works Director and were found substantially satisfactory. There are no items outstanding. 14. Prior to commencement of any grading on the subject property, the developer shall enter into a Development Agreement that is approved by the City Council. An addendum to the master development agreement for MILLBROOK was signed already for the first phase. A development agreement for this plat will be presented to the City Council with the final plat. Millbrook 6th Addition — Final Plat and Final PUD Site Plan February 14, 2012 Page 5 II. April 17, 2007 Resolution Conditions 1. The Final Plat and Final Planned Unit Development Permit applications for the townhomes shall be substantially similar to the following plans on file in the Community Development Department, except as modified herein: Preliminary Plat Amendment (Sheet PP) dated 1/8/07 Preliminary Grading Plan (Sheet GPI) dated 1/12/07 Preliminary Utility Plan (Sheet UP1) dated 1/12/07 Preliminary Landscape Plan (Sheet LP1) dated 1/12/07 Colonial Foundation Planting Plan (Sheet L1) dated 6/8/061 Architectural elevations submitted with materials for 4/17/07 Council Meeting This condition is satisfied. 2. Any conditions applicable to the townhome development that are found in Resolution No. 2006 -179 (Resolution Approving Preliminary Plat and Concept PUD Permit) shall continue to be applicable. This condition is satisfied. 3. Evergreen trees shall be added to screen the driveways from the public streets and shall be added along the north side of White Pine Way between the street and the townhome pond. The landscape plan has been revised to include these plantings. 4. Three to four architectural elevations shall be developed for the ends of the units that face the public street and the pond. This condition is satisfied. 5. In order to reduce the mass of the units a variety of materials and colors shall be introduced into each building with variations amongst the buildings. This condition is satisfied. 6. Depending on the orientation of the building, sidewalks shall be extended from the ends of the units to either the sidewalk along the public street or to the sidewalk surrounding the pond. This has been included in the revised plans. 7. Material samples shall be submitted with the Final Plat and Final PUD Permit applications to be reviewed by the Heritage Preservation Commission. This condition is satisfied. 8. All minor modifications to the Design Review Permit shall be approved in advance by the Community Development Director. All major modifications shall be approved in advance by the HPC. Determination of the distinction between "major" and "minor" shall rest with the City Administrator. ' Augmented by foundation planting plan submitted together with materials for 4/17/07 City Council meeting Millbrook 6th Addition — Final Plat and Final PUD Site Nan February 14, 2012 Page 6 III. July 28, 2009 Resolution Conditions 1. The Final Plat and Final Planned Unit Development application shall be substantially similar to the plans prepared by Sathre - Bergquist, Inc., and on file in the Community Development Department as listed in Stillwater City Council Resolution Number 2006 -179 except as amended by the revised concept sketch dated May 8, 2009. This condition is satisfied. 2. The developer shall complete a Lakeshore PUD worksheet and submit it to the Minnesota Department of Natural Resource's (DNR) Area Hydrologist prior to submitting an application for a final plat approval for the lots being revised with this amendment. If the DNR review results in substantial changes to the PUD Amendment, then the developer shall resubmit the PUD amendment or review by the City and Joint Planning Board. This condition is satisfied. 3. The proposed traffic calming median in White Pine Way shall align with the proposed trail between Lots 7 and 8 on the north side of White Pine Way as shown on Area B. Additionally, the trail north of lots 7 and 8 on the north side of White Pine Way as shown on Area B shall be adjusted to remove the multiple 90- degree turns. This condition applies to an area not included in this plat. 4. Conditions 3 through 14 in Stillwater City Council Resolution Number 2006 -179 shall remain in effect with this PUD Amendment. This condition is satisfied as noted above. 5. Changes to the lots sizes are approved for Area A and C. The lot sizes for Area B shall remain unchanged. This condition is satisfied. 6. The new house plans shall only be used on the CR lots. This condition is satisfied. CITY OF STILLWATER PLANNING COMMISSION RECOMMENDATION The Planning Commission reviewed the Final Plat and Final PUD request at their February 13, 2012 meeting. They recommended Stillwater City Council approve Millbrook 6th Addition Final Plat and Final PUD Site Plan subject to the following conditions: 1. An as -built easement map showing 30 -foot easements where possible (minimum of 15 foot) for trails shall be completed and recorded as each section of trail is completed. 2. Per the original development approvals and landscaping plans, evergreen trees shall be added to screen the driveways from the public streets and shall be added along the north side of White Pine Way between the street and the townhome pond CITY OF STILLWATER STAFF RECOMMENDATION Staff recommends that the Joint Planning Board review the proposed plat and provide comments to the Stillwater City Council to consider. cc: Joe Jablonski Millbrook 6th Addition 7 Ut) • c Et' ti CO U MAUREE PRIV, DR. 10 c' c PR IV DR. 11 rn 0 cc d co 0 > co Ft 0 0 a PRiV- PRIV. DR. 4 PRIV. DR. 3 0 • C.4-4 Legend Zoning A -P, Agricultural Preservation RA- Single Family Residential RB - Two Family TR, Traditional Residential LR, Lakeshore Residential CR, Cottage Residential CTR, Cove Traditional Residential CCR, Cove Cottage Residential CTHR, Cove Townhouse Residential TH, Townhouse RCM - Medium Density Residential RCH - High Density Residential VC, Village Commercial CA- General Commercial _ CBD - Central Business District BP -C, Business Park - Commercial _ BP -O, Business Park- Office BP -I, Business Park - Industrial IB - Heavy Industrial CRD - Campus Research Development PA - Public Administration PROS - Park Rec or Open Space Public Works Facility ROAD WATER MILLBROOK 6TH ADDITION KNOW ALL BY THESE PRESENTS: That U.S. Home Corporation, aDelaware corporation, fee owner of the following described property situated in the County of Washington, State of Minnesota to wit: Outlots A and C, MILLBROOK 4TH ADDITION, according to the recorded plat thereof, Washington County. Minnesota. Has caused the same to be surveyed and platted as MILLBROOK 6TH ADDmON and does hereby dedicate the lanes, ways, and drainage and utility easements as shown on this plat. In witness whereof said U.S. Home Corporation, a Delaware corporation has caused these presents to be signed by its proper officer this day of , 2012. Signed: U.S. Home Corporation Jon Aisne, Division Vice President STATE OP MINNESOTA COUNTY OF The foregoing instrument was acknowledged before me this — day of 2012 by Jon Aisne, Division Via President of U.S. Home Corporation, a Delaware corporation as behalf of the eaporuion. Notary Public, County, Minnesota Printed Name My Commission Expires I hereby certify that I have surveyed and platted or directly supervised the survey and plat preparation of the property described on this plat as MILLBROOK 6TH ADDITION; that this plat is a correct representation of the boundary survey; that all mathematical data and labels are correctly designated on the plat; that all monuments depicted on the plat have been or will be correctly set within one yew as indicated on the plat; that ell water boundaries and wet lands as defined in Minnesota Statutes, Section 505.01, Subdivision 3 existing as of the date of this certification are shown and labeled on the plat; and that all public ways are shown and labeled on the plat. Daniel L, Schmidt Licensed Land Surveyor Minnesota License No. 26147 STATE OF MINNESOTA COUNTY OF The foregoing Surveyor's Certificate was acknowledged before me this day of , 2012, by Daniel L. Schmidt, Licensed Land Surveyor, Minnesota License No. 26147. Notary Public, County, Minnesota Printed Name My Commission Expires f IN SATHRE- BERGQUIST, INC. II i'tb. t STILLWATER. MINNESOTA This plat of MILLBROOK 6TH ADDITION was approved by the City Council of the City of Stillwater. Minnesota this day of 2012, and hereby certifies compliance with all requirements as set forth in Minnesota Statutes, Section 505.03. Subd. 2. Signed: CITY OF STILLWATER By: Mayor By. Clerk Approved by the Planning Commission of the City of Stillwater, Minnesota, this day of By: Planning Commission Chairman .2012. BY: Planning commission Secretary COUNTY SURVEYOR Washington County. Minnesota Pursuant to Chapter 820, Laws of Minnesota, 1971, this plat has been approved this day of By: Washington County Surveyor 2012. By: Asaistant county Surveyor COUNTY AUDITOR/TREASURER Washington County. Minnesota There are no delinquent taxes. the current taxes due and payable for the year 20 have been paid, and transfer has been enured this ,2012. By: Washington County Auditor/Treasurer COUNTY RECORDER Washington County, Minnesota Document Number By: Deputy I hereby certify that this instrument was recorded in this Office of the County Recorder for record on this o'clock — M. and was duly recorded in Washington County Records. Washington County Recorder By: , Deputy day of day of 2012, at PRELIMINARY COPY November 28, 2011 SHEET 1 OF 2 SHEETS MILLBROOK 6TH ADDITION ts PRELIMINARY COPY November 28, 2011 4 S SATHRE - BERGQUIST, INC. 73.0► 149.9 k Ali 1 ,i[7P1P�li IVIIL.L.L.I1 v v EDGE OF 'MET LAND S75 °15 400E MOD 45852 MAUREEN LANE 00 97.47 S75 °15'40 E 51.26 101 r • •JN • N teba 4� / Dtos .1 .I as�9 8 �' 'CB 23.77 V° 15.00 t..90.47.21 .toei 71 975°15 40'E 311.15 ' R � 7 i- �167.t9 Ram" \e'.a a 00'E 77 J i� 2 9�9 03'._ Jss� . \ � c '1 25.65 \�'' O13e9 -0'S % 9 —IC ' �5.1P13 ;1\ 1 (� `1 %t \T:,,. s ��. ��v lii !I: � 5 �aN � o- D,K i\ rvS+.(\p ° L / a• 1P, Vs s \ � ''i./'• �?A; 9 ti /.p'� of- `,/4,44 o tb • C ,5, ,/4, 4w • ��\ , $ 1�1 V1 SO fa e• v 6`' 8 6e 4+feb * ef 0. 101 / \ ks <y ■ a lip 00 `534e49.48,E• e. 218.00.003 .--53 3631 434:_.:48, 44 V S °3•4l• 4461 tin"/ .9, 2 A/ t7a>82/ SA8e34,4, 8420D •00 ti 6 0' � � • - J 1 \,N." 1 oT n1;�1i \1 1 ■•• ■-• s 1 INF 14'A1 11 1 1 b 1 S58°34.411, '�\\I :` ... t 0, u i --� ANO '. J J t J \ 1 N68 °18'06'66 98.29 i 582°55 24'E 680.92 2 lyow•' Tbebaa fain the beating system h the uoe hoed Ou of C, MILLBROOK, Wuligem° Coat*, Minnesota, winds is assumed to bean 575.1 V40•E. w o co 120 I INCH EQUALS 60 FEET SCALE IN FEET O Dooms a 12 inch by 14 inch iron pipe with a play& cap inaoibed by License No. 26147, which hat boon sat in to pound of win be sot ineu poundm uomda=with MS 500.031, Subd. 10. • Dodo a hood 12 inth by 14 loch iron mated by License No. 24766. tThe nuncios lot comae oleo met -family lW aru located within proposal building structures, titanium no mammas will be oat at these lot comas. DRAINAGE AND UTILITY EASEMENTS ARE SHOWN THUS. NOT TO SCALE Haas 5 hat • width and mooing lot 16h, lot= otherwise indicated. and 10 fret in width and adjoining sight of way linos, Mows Auntie indicated, as shown ea pLi. VICINITY MAP SECTIONS 18 & 19, TONNSMP 30 NORTH OF RANCE 20 WEST OF THE 4TH PRINCIPAL MERIDIAN, WASHINGTON COUNTY, MINNESOTA SHEET 2 OF 2 SHEETS TO: City Council FROM: Bill Turnblad, Community Development Director DATE: February 14, 2012 MEETING DATE: February 22, 2012 REGARDING: Annexation Area Building Permit Update through 2011 For 2012, there were 54 permits issued for residential units within the City of Stillwater, 44 of them were within the Orderly Annexation Area. The Orderly Annexation Agreement allows up to 120 housing unit permits to be issued each year starting in 1996. Over that period, a total of 1,920 permits could have been permitted. The total number of permits issued through December 31, 2011 has been 1,245. For 2012, the number of permits that could be issued for new housing starts in the annexation area is 792, which is the unit surplus that has accumulated over the 16 year period plus 120 housing units for 2012. Year Res. Unit Permits Issued Res. Unit Permits Allowed 1996 0 120 1997 0 120 1998 13 120 1999 104 120 2000 201 120 2001 228 120 2002 172 120 2003 142 120 2004 106 120 2005 53 120 2006 47 120 2007 22 120 2008 41 120 2009 33 120 2010 39 120 2011 44 120 Total 1,245 1,920 BT /mjp cSli jiwater THE BIRTHPLACE O F MINNESOTA DATE: February 14, 2012 TO: Joint Planning Board Members SUBJECT: Annexation Policy for Fairy Falls Road Area MEETING DATE: February 22, 2012 PREPARED BY: Bill Turnblad, Community Development Director BACKGROUND David and Lynne Murphy live at 9098 Fairy Falls Road. Their property has a size of 3.88 acres. It is their desire to subdivide one lot from their homestead. However, the minimum lot size in Stillwater Township is 2.5 acres. Therefore, they do not own enough land to create the new lot. If the land were located in the City of Stillwater, the minimum lot size for this property would only be 1.5 acres. So, the landowners have submitted an annexation petition to the City to allow for the lot split. The Stillwater Town Board discussed the detachment on January 12, 2012 and concluded that they would offer no objection. The City of Stillwater Planning Commission held a public hearing for the annexation request on February 13, 2012. The landowner and residents at 2216 Orwell Court N and the owner of 9033 Fairy Falls Road testified against the petition. A number of issues were offered in opposition, but the one that resonated most with the Planning Commission was the fear of "opening the floodgates ". In the absence of a policy or annexation plan for the area, approving one annexation request could lead to others with a haphazard result. Never the less, the petition to annex this specific property found general support amongst the Commissioners. On a 5 -2 vote they recommend approval of the annexation, but requested staff to discuss a potential annexation policy for the Fairy Falls Hill area with the Town Board and City Council. Fairy Falls Hill Detachment/Annexation Policy Page 2 of 3 POLICY DISCUSSION If the Township and City are interested in setting a mutual policy as recommended by the City Planning Commission, here are a few thoughts offered by City staff. • As a general policy the City of Stillwater discourages new construction if municipal sanitary sewer is not available. The Fairy Falls Hill neighborhood has neither municipal sewer nor municipal water. Furthermore, it would not be cost effective to provide utilities to this isolated neighborhood. Perhaps a property or two being detached may make sense, but not as a general policy. • Obvious physical demarcations serve as good municipal boundaries. In this neighborhood the City boundary follows a public survey section line, which is not an obvious physical boundary. Roads, rivers, etc. serve as better physical boundaries. • Perhaps limiting the potential annexation area to those few properties bounded by Fairy Falls Road to the north /northeast and Orwell Avenue to the west would serve the purposes of limiting the potential number of properties while using clear physical features as boundaries. The potential area is shown in the attached map. REQUEST If the Joint Planning Board members believe there is a need or value in discussing a detachment /annexation policy for this neighborhood, City staff will provide information for future Board and Council meetings. bt attachment: map Planning Report for Murphy Annexation Petition Fairy Falls Hill Detachment/Annexation Policy Page 3 of 3 Stillwater Township 9154 Potential Detachment/ Annexation PolicyArea 4491 Zoning Map w January 2012 Zoning Districts �xovr-s zees e•c "as "MS -C ro+. a 04Aesrc-tsa xeas.a: :- ❑ R.- leg e :IT 3 arse,: asst;; a Resae- e . -R -aes-a-e R fee - -a O A -crag. Res cr:e . CTA Gaud Taata-a 'vsce-:a . C-C4 CocaCYace RsCC-:e . C,!43 Ca Tteraoae %nee-- a DACte- Ne0af1 ors Case,. !POT -Nr1 feat easae- ^.a DC Wage Comear =a .G- Ora. Graeae. . CSO s.er. es Jsc . !-C. &.s -.es Aare - Scares. . moo DEP Blanes as%• a . b -mil Mane !ICAO- Ca^gOResar T Jere Were . AA- A.0-e.bnrlaae se MAWS • Ark saaaemea Caw Sae. ® RO':Cxanle saca4 DRCA: :PATER THE BIRTHPLACE O F M I N N E S O T A DATE: February 9, 2012 TO: Planning Commission REQUEST: Annexation APPLICANT: David and Lynne Murphy LAND OWNER: David and Lynne Murphy LOCATION: 9098 Fairy Falls Hill (Stillwater Township) MEETING DATE: February 13, 2012 AUTHOR: Bill Turnblad, Community Development Director CASE NO.: 2012 -05 BACKGROUND Mr. and Mrs. Murphy have submitted a petition for annexation of their 3.88 acre homestead property at 9098 Fairy Falls Hill. Their goal is to split the property creating one more building site. The property is currently located in Stillwater Township where the minimum lot size does not allow the property to be split. If the property were located in the City, a lot split would be possible. Therefore, the landowners have submitted an annexation petition. If this annexation is approved by the City, Township and Municipal Board, then the Murhpys will make application for a subdivision, rezoning and a minor Comprehensive Plan amendment. EVALUATION OF REQUEST The property is not located within the Orderly Annexation Agreement area, so review of the annexation request is simplified. Essentially the decision will be based upon whether the City can offer something that the Township cannot, and whether Murphy Annexation February 9, 2012 Page 2 of 3 the Township supports the detachment. If both of these can be answered in the affirmative, the City could decide to approve the request. The City can offer improved, but not dramatically improved local government services. The City Police Department is larger and more diverse than its counterpart in the Township, so the quality of police service has the potential to be improved for the property. The City Fire Department currently provides fire protection to the property through a contract with the Township, so fire service would remain the same. No City utilities are available in the Murphys' neighborhood. In summary, a slight service improvement argument can be made, but it would not be dramatic. However, one distinct advantage the City offers is that the required minimum lot size for unsewered property is less in the City than in the Township. The Township requires 2.5 acres for a lot in the subject neighborhood, whereas the City would only require 1.5 acres on the property1 (as long as on -site sewage treatment is possible). The two planned lots on the Murphy property would be about 1.6 acres and 2.2 acres in size. Therefore, the property could possibly be split if it were in the City, but cannot be in the Township. The Town Board said at their January 12, 2012 meeting that they would offer no objection to a request by the Murphys to detach from the Township and be annexed to the City of Stillwater. ALTERNATIVES The Planning Commission has the following options: 1. Recommend approval of the requested annexation with the following conditions: a. Approval of the annexation does not compel the City to approve the future split of the property into two lots. b. When application is made by the landowners for a lot split, a septic system designer must provide proof that an on -site septic system will function satisfactorily on the new lot and that the loss of 1.65 acres will not make future on -site septic service for the existing lot difficult. ' The property would ultimately be rezoned to RA, Single Family Residential if annexed. Minimum lot size in the RA district is 10,000 square feet. But, the property is also located in the St. Croix River Overlay district, which requires 1 acre for unsewered lots. Finally, the property is encumbered by a scenic easement since it is located within the National Wild and Scenic River Corridor of the St. Croix River. The easement requires a minimum lot size of 1.5 acres. Since the easement is the most restrictive of the lot size standards, its 1.5 acre minimum requirement takes precedence. Murphy Annexation February 9, 2012 Page 3 c. When the landowners make application for the lot split, they will also need to make application for a rezoning and for a minor Comprehensive Plan . amendment to include the property within the City's future land use map. 2. Recommend denial of the requested annexation. 3. Continue the public hearing until the next meeting for more information. RECOMMENDATION Staff recommends alternative one. attachments: Location and Zoning Map Survey Applicant Letter Stillwater Township 14440 HIGHWAY 9154 Murphy Property Rogp NpRrH 2103 EAST ALDER ST 2012 z HAZEL STREET 921 911 ` i 0 STREET 101 1917 HAZEL STREET 321 1915 315 312 1912 311 1904 404 402 318 306 1819 1905 1924 1914 1912 1908 224 K EAST WILLOW 1 1824 1818 2 1816 1901 1813 POPLAR. STREET 104 WEST POPLAR STREET 1801 1723/ 721 1 308 305 181 1812 1806 1802 1722 410 `> HAZEL BT 1921 j 124 tillwater rcu Birteor nresol:) Zoning Map January 2012 Zoning Districts X012 city limit browns creek and tribs ❑missing row 6 EA -P, Agncuttural Preservation E RA- Single Family Residential E RB - Two Family ▪ TR, Traditional Residential LR, Lakeshore Residential ❑ CR, Cottage Residential ▪ CTR, Cove Traditional Residential ■ CCR, Cove Cottage Residential ▪ CTHR, Cove Townhouse Residential TH, Townhouse ❑ RCM - Medium Density Residential RCH - High Density Residential ❑ VC, Village Commercial ■ CA - General Commercial ■ CBD - Central Business District ❑ BP -C, Business Park - Commercial ■ BP-0, Business Park - Office EBP -I, Business Park - Industrial IB - Heavy Industrial ▪ CRD - Campus Research Development al PA - Public Administration ■ PROS - Park, Recreation or Open Space Public Works Facility ❑ ROAD WATER Notes: e Bearing system Assumed. CERTIFICATE • Ind. iron found in place. o Ind. #13774 iron pipe set. "Deed" Ind. Deed call. The right -of -way of Fairy Falls : >.oad North is not currently defined by desc. in furnished documents as to right -of -way width and the use of this publically maintained road easement is \`'uF assumed to be an easement that is prescriptive in nature. v4Q^ BARRETT J. STACK, tel. (651) Notes: 4:)1: S U R Y `, E Y "M." Ind. Meas. value LAND SURVEYOR "R." Ind. Record value. 439 -5630 Approx. contour data per Wash. County mapping. Drainfield Loc. shown is approximate. "EBT" Ind. approx. loc. of Bit. Pavt. The overall parcel is subject to a Scenic Easement as Desc. in Doc. No. 367575. Overall Parcel Description supplied is Rec. in Doc. No. 316881, Wash. Co. records. Survey Made For: Lynne and David Murphy 9092 Fairy Falls Road North Stillwater, r'innesota 55082 '3 - \ .2 X20 \ *74 sue, 57-��s °c c52" DEEV la e, is vC 7Z'lV EC 33 '75 t /l/- ''_9' 7:44 v. \ 41/ar3e OESe.) 0 \ l ,y ti \\ \ N\ �1 `'� \ \N\ 1 / - �4. i \ , 1 1 1 / �EC L ;�' 1 tiw / S �1 oo A st N l �1 / I 1 l \\ \ \\ LO T 1 Z- ,---7c \ \ \ \ \\ \\ illill----c _.›,Th\ \ \\\ \ I / 'IN if �, I\ i / Ill) I Ill I l ) l l i �� I it // I I 1 \ /1// / ri kki L't/ k: 11 ( \ \ \ ---) \ \ I (" t4f- -, \ 1 , \ \ \ \ ( — -4 \ \ 721/,. 923z o 5° T\ \7<.'9 \ \ \ \ 0 \ / i /1 ) \ \� \,\ 1 �� / \\\ \\ \j 1 ir \\\\\ \ / r1 , l `._J 1 \ \ \ \ N\al) \— 1 ) \( ) \ \\ \\\\ 1 2�78 - — - y _ -223'. 78 S -H. B3AA'S —z s‘• -mss La r 9 N /76 /L 2" ✓ 1 /� 1 ! 1 /hereby certify that this survey, plan, or report was 1 prepared by me or under my direct supervision and that ( I + , 1 I am a duly Registered Land Surveyor under the laws of \ ZOT1 \ the State of Minnesota. 5;7.44/4.- .544 sE/ Date 1. -28 -2011 Reg.No 1.3.774 p . To City of Stillwater: Regarding our application of annexation to the City of Stillwater of the property at 9098 Fairy Falls Rd N, property owners David and Lynne Murphy, PID 16.030.20.44.0006: We want to subdivide our 3.88 acre property into two lots with the intention of selling the undeveloped piece (approx. 1.5 ac.) at the south end of the property. Attached is a recent survey of the 3.88 acres which is contiguous to the city on the south property line. We have had discussion with the Stillwater Township Board of Supervisors who stated at their meeting on January 12, 2012, that they will offer no objection to the detachment of the property. We have had discussion with Chris Stein, of the St Croix National Scenic Riverway Park Service, which has a scenic easement on the property. That easement requires a minimum of 1.5 acres with frontage of 250 feet parallel to the river. Our survey indicates that this would allow one buildable lot that would front on Orwell Court Rd as indicated on the survey enclosed. The proposed lot would meet all the requirements of the City of Stillwater. A soil test has not been completed, but the maps indicate that the soils are more than adequate to support a septic system. A perc test will be done as weather permits. David and Lynne Murphy 9098 Fairy Falls Rd Stillwater, MN 651- 439 -9485 January 13, 2012