HomeMy WebLinkAbout2012-02-13 CPC PacketCITY OF STILLWATER
PLANNING COMMISSION
NOTICE OF MEETING
MONDAY, February 13, 2012
7 p.m.
The City of Stillwater Planning Commission will meet on Monday, February 13, 2012 at 7 p.m. in the
Council Chambers at Stillwater City Hall, 216 North Fourth Street. City of Stillwater Planning Commission
regular meetings are held at 7 p.m on the second Monday of each month. All City Planning Commission
meetings are open to the public.
AGENDA
1. CALL TO ORDER
2. APPROVAL OF December 12, 2011 MINUTES
3. Annual Election of Officers
4. OPEN FORUM The Open Forum is a portion of the Commission meeting to address subjects which are
not a part of the meeting agenda. The Commission may reply at the time of the statement or may give
direction to staff regarding investigation of the concerns expressed. Out of respect for others in
attendance, please limit your comments to 5 minutes or less
5. PUBLIC HEARINGS. The Chairperson opens the hearing and will ask city staff to provide background on
the proposed item. The Chairperson will ask for comments from the applicant, after which the Chairperson
will then ask if there is anyone else who wishes to comment. Members of the public who wish to speak will
be given 5 minutes and will be requested to step forward to the podium and must state their name and
address. At the conclusion of all public testimony the Commission will close the public hearing and will
deliberate and take action on the proposed item.
5.01 Case No. 2012 -01. Final plat approval for Millbrook 6' Addition, Outlots A and C of Millbrook 4th
Addition. US Home Corp, applicant.
5.02 Case No. 2012 -05. An annexation request for a 3.88 acre property located 9098 Fairy Falls Rd N.
David and Lynne Murphy, applicant.
5.03 Case No. 2012 -06. Amendment to the City of Stillwater 2030 Comprehensive Plan specifically to
the City's Transportation Plan (addressing changes to Metropolitan Highways and Transit Routes &
Facilities) and the City's Park Plan (by adding the Middle St. Croix Valley Regional Trail Search
Corridor) as required by the release of a Metropolitan Council System Statement. City of Stillwater,
applicant.
6. NEW BUSINESS
6.01 Discussion of ornamental fence height.
7. OTHER BUSINESS
7.01 Update of Comprehensive Plan amendment consistency rezoning for marina properties.
8. ADJOURNMENT
City of Stillwater
Planning Commission
December 12, 2011
Present: Aron Buchanan, Mike Dahlquist, Eric Hansen, Mike Kocon, John Malsam,
Anne Siess, and Scott Spisak
Absent: Cameron Kelly
Staff present: Planner Mike Pogge and Council liaison Doug Menikheim
Mr. Dahlquist called the meeting to order at 7 p.m.
Approval of minutes: Mr. Malsam noted corrections to those in attendance at the Nov. 14, 2011,
meeting; those not in attendance included Mr. Malsam, Ms. Siess, and Mr. Hansen. Mr. Kocon,
seconded by Mr. Buchanan, moved approval as corrected. Motion passed unanimously.
OPEN FORUM
No comments were received.
PUBLIC HEARINGS
Case No. 2011 -29 A variance request to the side yard setback (3 feet requested, 5 feet
required) for construction of a deck at 1101 2nd Street N. in the RB, Two Family Residential
District. Lucia Pearson, applicant.
Mr. Pogge reviewed the request. He noted that the home sits at a 0 -foot setback. He said
initially the applicant was asking to match that 0 -foot setback, but has agreed to pull the deck
back to a 3 -foot setback, which still encroaches into the required side yard setback. He said the
proposal meets all of the RB zoning standards except for the setback. He reviewed the three
criteria for the issuance of a variance and said staff believes the request meets the criteria.
The applicant was present. Mr. Buchanan asked about the height of the deck; Ms. Pearson said
she wasn't exactly sure but estimated it would be about 5' high.
Mr. Dahlquist opened the public hearing.
Gary Stewart, neighbor, showed photos indicating the closeness of the properties and described
an experience with the applicant removing a cement slab. He said he was against the plan due
to the proximity of the homes. Mr. Dahlquist noted that the applicant is now planning to move
the deck back away from the edge of the house, 3` in from the property line. Mr. Stewart noted
that 5' in pretty much the national standard for the setback in question and suggested there is a
reason for that.
No other comments were received, and the hearing was closed. Mr. Kocon pointed out if this
were a new home, the request would have to meet the required 5' setback; however, this is not
a new home and there is a hardship involved that was not created by the homeowner. Mr.
Kocon said he did not think a deck sitting back 3' from the property line when the rest of the
home is on the property line is an added imposition. Mr. Spisak asked about the extent of the
cement slab that was removed; the applicant indicated the position of the slab and steps. There
was discussion of a previous case of a variance for deck and stairs on Churchill. Mr. Dahlquist
noted that if the applicant were to pull the deck farther back to meet the full 5' required, it would
1
City of Stillwater
Planning Commission
December 12, 2011
result in a railing in the middle of a window; he said he thought 3' seems to be a reasonable
number. Mr. Buchanan pointed out that meeting the required 5' setback would result in about a
5' wide deck; the applicant said the 3' setback would allow a bit more room for a table and
chairs. Mr. Buchanan said he thought the 3' setback seems to be a reasonable compromise
considering the closeness of the houses and will provide for reasonable use of a deck.
Mr. Menikheim suggested perhaps tabling the matter until neighbors meet and discuss the
issue. It was noted any decision of the Commission can be appealed to the City Council and
any action by the Commission wouldn't prevent the neighbors from getting together in an effort
to reach an alternative design. Mr. Hansen and Mr. Malsam both said they thought the 3' was a
reasonable compromise based on the age and proximity of the houses.
Mr. Kocon moved to approve the variance with the conditions listed in the staff report. Mr.
Hansen seconded the motion; motion passed unanimously. Mr. Pogge noted the action could
be appealed to the City Council within 10 days; after 10 days, the action becomes final.
OTHER BUSINESS
Mr. Dahlquist asked for Commissioner's thoughts and opinions on the size of the Commission.
He noted the Commission has effectively been operating with eight members for the past year,
pointing out that the Commission is supposed to have nine members. He noted that
Councilmember Menikheim had brought this issue to the City Council's attention; Mr. Menikheim
said the Council's reaction was immediate -- that a nine member body is better than a seven -
member body because more members makes for a higher quality decision. Mr. Dahlquist
pointed out that according to City Attorney Magnuson, City ordinance allows up to nine
members, but does not require a nine - member body. Mr. Pogge said the issue has been
brought before the Council on two occasions; he said initially there was concern that there be
equal Ward representation on the Commission.
There was discussion as to the importance of Ward representation, with Mr. Kocon suggesting
that the Commission makes City -wide planning decision. Mr. Pogge pointed out that equal Ward
representation is a guideline and factor for appointments to other Commissions. Mr. Kocon said
Ward residence is an arbitrary demarcation; he said he thought representation by Ward would
be sufficient if there is one person from each Ward, with the remaining members at -large
representatives selected by the basis of merit. Mr. Kocon also said with the size of the
Commission at nine, educational opportunities are limited due to City budgetary constraints; he
said he would be comfortable remaining at eight members until someone resigns and then
going to a seven - member body.
Mr. Buchanan asked about the impetus for going to seven members. There was discussion of
past appointment practices prior to the interview process now used; Mr. Dahlquist noted that at
times, there are very few applicants and appointments have been made based on whoever
applied. Mr. Malsam said he initially thought nine was a bit large and pointed out than can be
quorum issues; he said he thought 1 person from each Ward, excluding the chairman and
several at -large appointees for a body of seven or eight would provide for a good functioning
commission. Mr. Hansen also spoke of issues related to having a quorum with a body of nine
members.
2
City of Stillwater
Planning Commission
December 12, 2011
Mr. Spisak said, as part of his job, he appears before councils and planning commissions
throughout the area and has never seen a Planning Commission of nine people; he said five is
the typical number. He said he was surprised that a city the size of Stillwater would have a
Planning Commission of nine; he said he thought there have been times in the past where the
size perhaps dragged out discussions that could have been a little more concise. Mr. Spisak
said he believes the Commission could operate effectively with seven members; he noted there
are other City commissions that have fewer than nine members and said he would be in favor of
seven. Mr. Dahlquist said this issue was brought to the forefront with him when the change was
made making the Council representative a non - voting member. Mr. Kocon said his personal
preference would be for seven members, but said if the decision is to remain at nine members,
and the ninth member is an active participant, he would be OK with that, too.
Mr. Spisak said he thought the focus should always be on selecting the best applicant, whether
trying to fill a vacancy based on Ward residence or an at -large position. Mr. Menikheim raised
the question of what makes for the best candidate. Ms. Siess suggested that everyone has a
reason for making application to serve on the Commission and said anyone can be a good
salesperson when in the interview process; she said she thought equal representation between
Wards is somewhat important. Mr. Kocon said folks who want to serve on the Commission
because they have aspirations for political office or who want to protect their neighborhood will
make decisions that are biased and inappropriate; he said he thought the interview process
would bring out the reasons an applicant has for wanting to serve.
Mr. Kocon, seconded by Mr. Spisak, moved to adjourn at 8 p.m.
Respectfully submitted,
Sharon Baker
Recording Secretary
3
Planning Commission
DATE: February 9, 2012
REQUEST: Millbrook 6th Addition Final Plat and Final PUD Site Plan
APPLICANT: Joe Jabonski, U.S. Home Corporation
LOCATION: State Highway 96 west of South Twin Lake
MEETING DATE: February 13, 2012
REVIEWED BY: Community Development Director
PREPARED BY: Michel Pogge, City Planner
CASE NO.: 12 -01
BACKGROUND
The Preliminary Plat and Concept Planned Unit Development for Millbrook was
approved by the City in the Summer of 2006 and subsequently amended in July of
2010. The 170 acre preliminary plat includes 172 single family homes and 98
townhomes. Development of the property is planned to occur in three overall phases.
The application at hand is the third and final plat of Phase II.
This plat is known as Millbrook 6th Addition and includes a total of 10 single family
homes that are zoned Cottage Residential and 22 townhouse units that are zoned
townhouse. The roads White Pine Way and Maureen Lane will be installed
completing the loop around the townhouses. Public utilities will be installed by the
developer to support this plat as part of the site improvements.
Millbrook 6th Addition — Final Plat and Final PUD Site Plan
February 9, 2012
Page 2
REQUEST AND ANALYSIS
The specific request before the City is to approve the Final Plat for MILLBROOK 6th
ADDITION and the Final PUD Site Plan.
The City Council adopted a resolution approving the preliminary plat and concept PUD
permit for MILLBROOK on August 15, 2006. On July 28, 2009, the Council adopted a resolution
approving an amendment to the preliminary plat and concept PUD permit as they apply to
the single - family homes in MILLBROOK.
Since the plans are substantially similar to the preliminary plat and concept PUD permit
approved, the final plat and final PUD permit for Millbrook 5th Addition are subject to the
pertinent conditions of both resolutions of approval. They are detailed below.
I. August 15, 2006 Resolution Conditions.
The Final Plat and Final Planned Unit Development application shall be substantially
similar to the following plans prepared by Sathre - Bergquist, Inc., and on file in the
Community Development Department, except as modified herein:
Site Plan dated 7 /21/06
Phasing Plan dated 7/24/06
Buffer Averaging Plan (including trails) - 8 sheets dated 6/26/06
Preliminary Site Map* (Sheets SM2 - SM6) dated 1/17/06
Preliminary Plat (Sheets PP1 -7) dated 3/30/06
Final Grading Plan (Sheets GP2, 3, 4, 4A, 5, 6) dated 4 /12/06
Final Utility Plan (Sheets 2 -5) dated 4/12/06
Preliminary Landscape Plan (Sheets 1 -4) dated 2/1/06
*Except trails to be as shown in Site Plan dated 7/21/06
The final plan submittals for MILLBROOK 6TH ADDITION are substantially similar
to the approved preliminary plans.
2. The developer shall complete a Lakeshore PUD worksheet and submit it to the
Minnesota Department of Natural Resource's (DNR) Area Hydrologist prior to
submitting an application for a final plat for Phase One. If the DNR review results in
substantial changes to the Preliminary Plat or Concept PUD plans, then the developer
shall resubmit the Concept PUD and Preliminary Plat for review by the City and Joint
Planning Board.
This condition has been satisfied.
3. The trail and sidewalk system shall be constructed substantially the same as
represented in the following plan sets on file with the Community Development
Department:
a. Carnelian Marine Trails - Revised (Sheets CM -1, 2, 3) dated 6 -21 -06
b. Brown's Creek Trail - Revision 3 (Sheet BC 2b -1) dated 6 -26 -06
c. Brown's Creek Trail - Revision 2 (Sheet BC 2 -2 + 2 -3) dated 6 -22 -06
d. Revised Sidewalk Plan (Sheets SP -1, 2,3) dated 6 -21 -06
Park and trail plans for MILLBROOK 6TH ADDITION are consistent with the
approved preliminary plans.
4. All trails shall be paved.
This condition has been satisfied.
Millbrook 6th Addition — Final Plat and Final PUD Site Plan
February 9, 2012
Page 3
5. Prior to release of the final plat for Phase One, a blanket easement shall be provided
over the open space outlot on the south side of South Twin Lake for trail purposes.
Should the Carnelian- Marine Watershed District rules ever change and allow a trail
closer to the lake, the easement will give the City the right to construct that trail.
This condition has been satisfied.
6. Prior to release of the final plat for Phase One, the developer shall provide a 20 foot
wide general easement allowing for future use for trails and utilities on the property
along the south side of State Highway 96 right of way. The easement shall be
reviewed by the City Engineer and City Attorney and found satisfactory to them in
both form and content.
This condition has been satisfied.
7. The trail connection to State Highway 96 along Outlot F shall be allowed as shown
only if the wetland in the ditch is determined by a State licensed delineator to be an
incidental wetland. If it is not an incidental wetland, then the trail shall be realigned
westward along the rear of Lots 17 through 19. Documentation from the delineator
shall be submitted together with final plat application materials for the Phase One
final plat.
This trail connection was originally important when the regional trail
connecting Stillwater to St. Paul was identified to run along the south side of
State Highway 96. Now with the prospect that the Browns Creek State trail,
no regional trail will be constructed along State High 96. Thus this trail
connection is likely no longer needed. Additionally, staff would recommend
against installing this trail connection now since there is currently no safe
pedestrian path along State Highway 96. A trail easement was secured to
allow a future connection if it would be needed in the future.
8. Lots 129 and 149 adjacent to the trail access off of the roundabout will be restricted by
covenant to have open rail fencing and non - continuous shrubbery not exceeding four
feet in height along their side and rear lot lines abutting the trail corridor. This is to
provide for a more inviting entrance to the trail system.
This condition applies to a different phase of the project.
9. The Developer shall provide water service stubs at each park with three stubs to be
included at the large active park. A sanitary sewer stub will be provided at the large
active park at a place yet to be determined by the City of Stillwater.
This condition has been satisfied.
Millbrook 6th Addition — Final Plat and Final PUD Site Plan
February 9, 2012
Page 4
10. The two active parks will be graded by the developer as part of the first phase of
development and the developer shall establish turf to the satisfaction of the city prior
to the City's assuming maintenance of same. This shall at a minimum include mowing,
fertilizing, rock picking, leveling, trimming, weed management and over seeding as
necessary. Target date for the first transfer of park land will be fall of 2007.
The park sites were transferred to the City in the Fall of 2010 and the
requirements for the final turf establishment is covered in the Millbrook Plat 4
development agreement.
11. The Brown's Creek trail link on the Millbrook property that connects to the Carlson
property to the south shall be installed by the developer at the same time that the
Carlson property trail is constructed, if prior to construction of the final phase in
Millbrook.
OK.
12. An as built easement map showing 30 foot easements where possible (minimum of 15
foot) for trails shall be completed and recorded as each section of trail is completed.
OK.
13. Final civil engineering plans shall be found satisfactory to the Stillwater Public Works
Director or they shall either be: a) revised to his satisfaction; or b) reviewed by the City
Council and approved.
The civil engineering plans have been reviewed by the Public Works Director
and were found substantially satisfactory. There are no items outstanding.
14. Prior to commencement of any grading on the subject property, the developer shall
enter into a Development Agreement that is approved by the City Council.
An addendum to the master development agreement for MILLBROOK was
signed already for the first phase. A development agreement for this plat will
be presented to the City Council with the final plat.
Millbrook 6th Addition — Final Plat and Final PUD Site Plan
February 9, 2012
Page 5
II. April 17, 2007 Resolution Conditions
1. The Final Plat and Final Planned Unit Development Permit applications for the
townhomes shall be substantially similar to the following plans on file in the
Community Development Department, except as modified herein:
Preliminary Plat Amendment (Sheet PP) dated 1/8/07
Preliminary Grading Plan (Sheet GP1) dated 1/12/07
Preliminary Utility Plan (Sheet UP1) dated 1/12/07
Preliminary Landscape Plan (Sheet LP1) dated 1/12/07
Colonial Foundation Planting Plan (Sheet L1) dated 6/8/061
Architectural elevations submitted with materials for 4/17/07 Council Meeting
This condition is satisfied.
2. Any conditions applicable to the townhome development that are found in Resolution
No. 2006 -179 (Resolution Approving Preliminary Plat and Concept PUD Permit) shall
continue to be applicable.
This condition is satisfied.
3. Evergreen trees shall be added to screen the driveways from the public streets and
shall be added along the north side of White Pine Way between the street and the
townhome pond.
The landscape plan has been revised to include these plantings.
4. Three to four architectural elevations shall be developed for the ends of the units that
face the public street and the pond.
This condition is satisfied.
5. In order to reduce the mass of the units a variety of materials and colors shall be
introduced into each building with variations amongst the buildings.
This condition is satisfied.
6. Depending on the orientation of the building, sidewalks shall be extended from the
ends of the units to either the sidewalk along the public street or to the sidewalk
surrounding the pond.
This has been included in the revised plans.
7. Material samples shall be submitted with the Final Plat and Final PUD Permit
applications to be reviewed by the Heritage Preservation Commission.
This condition is satisfied.
8. All minor modifications to the Design Review Permit shall be approved in advance by
the Community Development Director. All major modifications shall be approved in
advance by the HPC. Determination of the distinction between "major" and "minor"
shall rest with the City Administrator.
Augmented by foundation planting plan submitted together with materials for 4/17/07 City Council meeting
Millbrook 6th Addition — Final Plat and Final PUD Site Plan
February 9, 2012
Page 6
III. July 28, 2009 Resolution Conditions
1. The Final Plat and Final Planned Unit Development application shall be
substantially similar to the plans prepared by Sathre - Bergquist, Inc., and on file
in the Community Development Department as listed in Stillwater City Council
Resolution Number 2006 -179 except as amended by the revised concept sketch
dated May 8, 2009.
This condition is satisfied.
2. The developer shall complete a Lakeshore PUD worksheet and submit it to the
Minnesota Department of Natural Resource's (DNR) Area Hydrologist prior to
submitting an application for a final plat approval for the lots being revised
with this amendment. If the DNR review results in substantial changes to the
PUD Amendment, then the developer shall resubmit the PUD amendment or
review by the City and Joint Planning Board.
This condition is satisfied.
3. The proposed traffic calming median in White Pine Way shall align with the
proposed trail between Lots 7 and 8 on the north side of White Pine Way as
shown on Area B. Additionally, the trail north of lots 7 and 8 on the north side
of White Pine Way as shown on Area B shall be adjusted to remove the multiple
90- degree turns.
This condition applies to an area not included in this plat.
4. Conditions 3 through 14 in Stillwater City Council Resolution Number 2006 -179
shall remain in effect with this PUD Amendment.
This condition is satisfied as noted above.
5. Changes to the lots sizes are approved for Area A and C. The lot sizes for Area
B shall remain unchanged.
This condition is satisfied.
6. The new house plans shall only be used on the CR lots.
This condition is satisfied.
RECOMMENDATION
Recommend City Council approve Millbrook 6th Addition Final Plat and Final PUD Site Plan
subject to the following conditions:
1. An as -built easement map showing 30 -foot easements where possible (minimum of 15
foot) for trails shall be completed and recorded as each section of trail is completed.
2. Per the original development approvals and landscaping plans, evergreen trees shall
be added to screen the driveways from the public streets and shall be added along the
north side of White Pine Way between the street and the townhome pond
cc: Joe Jablonski
•
W
yb
6th Addition
_________________
-------------------------
MAUREE
PR /V
DR 1p\
PR /V c•
DR. ./1
0)
0
CC
a. 0 d o
PRIV.
> j In DR.4
a_ 0 a 0 PRIV.
DR.3
c PRIV.
DR. 2
0
Im
ct
Legend
Zoning
A -P, Agricultural Preservation
RA - Single Family Residential
RB - Two Family
TR, Traditional Residential
LR, Lakeshore Residential
CR, Cottage Residential
CTR, Cove Traditional Residential
- CCR, Cove Cottage Residential
!PM CTHR, Cove Townhouse Residential
TH, Townhouse
RCM - Medium Density Residential
RCH - High Density Residential
VC, Village Commercial
- CA - General Commercial
- CBD - Central Business District
BP -C, Business Park - Commercial
BP -O, Business Park - Office
BP -I, Business Park- Industrial
IB - Heavy Industrial
CRD - Campus Research Development
PA - Public Administration
PROS - Park, Rec or Open Space
Public Works Facility
ROAD
WATER
Millbrook 6th Addition
i�
MILLBROOK 6TH ADDITION
KNOW ALL BY THESE PRESENTS: That U.S. Home Corporation, a Delaware corporation, fee owner of the
following described property situated in the County of Washington, State of Minnesota to wit:
Outlots A and C, MILLBROOK 4TH ADDITION, according to the recorded plat thereof, Washington County,
Minnesota.
Has caused the same to be surveyed and platted as MILLBROOK 6TH ADDITION and does hereby dedicate the lanes,
ways, and drainage and utility easements as shown on this plat.
In witness whereof said U.S. Home Corporation, a Delaware corporation has caused these presents to be signed by its
proper officer this day of , 2012.
Signed: U.S. Home Corporation
Jon Aune, Division Vice President
STATE OF MINNESOTA
COUNTY OF
The foregoing instrument was acknowledged before me this day of , 2012 by Jon Aune, Division
Vice President of U.S. Home Corporation, a Delaware corporation on behalf of the corporation.
Notary Public, County, Minnesota Printed Name
My Commission Expires
I hereby certify that I have surveyed and platted or directly supervised the survey and plat preparation of the property
described on this plat as MILLBROOK 6TH ADDITION; that this plat is a correct representation of the boundary
survey; that all mathematical data and labels are correctly designated on the plat; that all monuments depicted on the
plat have been or will be correctly set within one year as indicated on the plat; that all water boundaries and wet lands as
defined in Minnesota Statutes, Section 505.01, Subdivision 3 existing as of the date of this certification are shown and
labeled on the plat; and that all public ways are shown and labeled on the plat.
Daniel L. Schmidt
Licensed Land Surveyor
Minnesota License No. 26147
STATE OF MINNESOTA
COUNTY OF
The foregoing Surveyor's Certificate was acknowledged before me this day of , 2012, by
Daniel L. Schmidt, Licensed Land Surveyor, Minnesota License No. 26147.
Notary Public,
County, Minnesota Printed Name
My Commission Expires
w►�� SATHRE- BERGQUIST, INC.
STILLWATER, MINNESOTA
This plat of MILLBROOK 6TH ADDITION was approved by the City Council of the City of Stillwater, Minnesota this
2012, and hereby certifies compliance with all requirements as set forth in Minnesota Statutes, Section 505.03, Subd. 2.
Signed: CITY OF STILLWATER
By:
Mayor
Approved by the Planning Commission of the City of Stillwater, Minnesota, this
By:
Planning Commission Chairman
day of
By
Clerk
COUNTY SURVEYOR
Washington County, Minnesota
Pursuant to Chapter 820, Laws of Minnesota, 1971, this plat has been approved this
By: By:
Washington County Surveyor Assistant County Surveyor
COUNTY AUDITOR/TREASURER
Washington County, Minnesota
By
day of
,2012.
Planning Commission Secretary
day of ,2012.
There are no delinquent taxes, the current taxes due and payable for the year 20 have been paid, and transfer has been entered this day of
, 2012.
By:
Washington County Auditor /Treasurer
COUNTY RECORDER
Washington County, Minnesota
Document Number
By:
Deputy
I hereby certify that this instrument was recorded in this Office of the County Recorder for record on this
o'clock . M. and was duly recorded in Washington County Records.
Washington County Recorder
By: , Deputy
day of
,2012,at
PRELIMINARY
COPY
November 28, 2011
SHEET 1 OF 2 SHEETS
MILLBROOK 6TH ADDITION
t
0
PRELIMINARY
COPY
November 28, 2011
3 1 SATHRE - BERGQUIST, INC.
75.09
1
♦i •
rI
o
LA
o.
a^
S75 °1540.1
255.9
458.52
A All 1 x[7/1/1 It
IVIIL- L_L.1 \VVI\
EDGE OF WET LAND
MAUREEN LANE
S75 °15'40'1
149.97
311.16
30.00
8. It
ml
97.47
575 °15'40 -E
n 1 51.26
0
_ 161.19 23.36 � R -15.00 \ 8 p =69°72'39$1 \�� 576°03'00"1 =55.77 t, ▪ 7
\� `2,yog0'S2��ft`\ 1 ,9 ."p 1 tom- � r579 5352E gam, 6 -1
`S' ` •i • `\
+Z i13\ �o�\
C�9 15642.5
5 '4).
,6i
1 Zg° \ 01. °/ /v
4
`pi \ 01l '''-'3 �4t9 �
ts$
\ obi. \ % XS. ¶,"•
e / 3 •4"%.: ,
\ , C' // .Dn�%,i
tt
'V 1
, ! r°r` �• °� ty
c. \.r
'St�3,
,.
N o
SO
t v� V L-
/ An‘J\ /
3. sor
r DCs69oA5
'1 1
go. , 1C8
m/
i
R2:31.57.700 8 �O„•� .13.
p =90 °47.21• K4
S75°38'08-E 17.52
0
▪ Cs
43.00 32.00
N75° . 06'W 118.06 / \�
,1i
r i,fny ° 6Z i , 4,/4.2,
1.1 Ito • 516.58 9 _ �7
4r �a, ` •
e1e t
4, 4004
6cs,
Q�
21
`4e
4'�r
044 a�
SJ
4104 00
ye-
o 8
N58 °34.41 -I
vS34 °43'4$ "E
., 88.00009 ■3
' • ,•_,/ y6 3\
s5-1°43.m.,
89
\
■ tv �L
��
44•
„'
44.00
r28
"'1 M•
844,
48
44
444 00 r
4410"';
ry6
'P.M 1/p. 4} 8
-t^ CJ
9�C�S �, N6Jo43'
44.004.
�. ?7.e s 10•N oo
A�� y8s�� E�
/ �t9o`'� S38°J4'4t E
4316[
44 90
m -
/v 'II
//41 `
)78 S38°34'41.E [45.18
Lori t 0 M•t•
id
-Y
04
't.
'411
r71 1'_ 4
1 \�
` 5•'
L•
1
It yL-
bb
Syr
0` -"'"-
1s4
1\ \
S58°34'41
271.6
Gtr 1v
rs
t.
\`
J
0
N68 °18.06 -W
98.29
Ins
r
S62 °55'24.1
680.92
-4
V
,
The basis for the bearing system is the north
line of Outlet C, MILLBROOK, Washington
County, Minnesota, which is assumed to
bear S75°I5310'E.
60 30 30 60
120
I INCH EQUALS 60 FEET
SCALE IN FEET
O Denotes a U2 inch by 14 inch von pipe
with a plastic cap inscribed by License
No. 26147, which has been set in the
ground or will be set in the ground m
accordance with MS 505.021, Subd. 10.
• Denotes a Found l/2 inch by 14 WO'
iron marked by License No. 24764.
tThe interior lot corners of the multi- family lots are
located within proposed building structures, therefore
no monuments will In set at these lot comas.
DRAINAGE AND UTILITY EASEMENTS ARE SHOWN THUS:
NOT TO SCALE
Being 5 fee in width and adjoining lot lines, unless otherwise
indicated, and 10 feet in width and adjoining right of way tines,
unless otherwise indicated, as shown 00 the plat-
VICINITY MAP
SECTIONS 18 & 19, TOWNSHIP 30 NORTH OF
RANGE 20 WEST OF THE 4TH PRINCIPAL MERIDIAN,
WASHINGTON COUNTY, MINNESOTA
SHEET 2 OF 2 SHEETS
Jllwt!r
THE BIRTHPLACE OF MINNESOTA
DATE: February 9, 2012
TO: Planning Commission
REQUEST: Annexation
APPLICANT: David and Lynne Murphy
LAND OWNER: David and Lynne Murphy
LOCATION: 9098 Fairy Falls Hill (Stillwater Township)
MEETING DATE: February 13, 2012
AUTHOR: Bill Turnblad, Community Development Director
CASE NO.: 2012 -05
BACKGROUND
Mr. and Mrs. Murphy have submitted a petition for annexation of their 3.88 acre
homestead property at 9098 Fairy Falls Hill. Their goal is to split the property
creating one more building site.
The property is currently located in Stillwater Township where the minimum lot
size does not allow the property to be split. If the property were located in the City,
a lot split would be possible. Therefore, the landowners have submitted an
annexation petition.
If this annexation is approved by the City, Township and Municipal Board, then the
Murhpys will make application for a subdivision, rezoning and a minor
Comprehensive Plan amendment.
EVALUATION OF REQUEST
The property is not located within the Orderly Annexation Agreement area, so
review of the annexation request is simplified. Essentially the decision will be based
upon whether the City can offer something that the Township cannot, and whether
Murphy Annexation
February 9, 2012
Page 2 of 3
the Township supports the detachment. If both of these can be answered in the
affirmative, the City could decide to approve the request.
The City can offer improved, but not dramatically improved local government
services. The City Police Department is larger and more diverse than its counterpart
in the Township, so the quality of police service has the potential to be improved for
the property. The City Fire Department currently provides fire protection to the
property through a contract with the Township, so fire service would remain the
same. No City utilities are available in the Murphys' neighborhood. In summary, a
slight service improvement argument can be made, but it would not be dramatic.
However, one distinct advantage the City offers is that the required minimum lot
size for unsewered property is less in the City than in the Township. The Township
requires 2.5 acres for a lot in the subject neighborhood, whereas the City would only
require 1.5 acres on the propertyl (as long as on -site sewage treatment is possible).
The two planned lots on the Murphy property would be about 1.6 acres and 2.2
acres in size. Therefore, the property could possibly be split if it were in the City,
but cannot be in the Township.
The Town Board said at their January 12, 2012 meeting that they would offer no
objection to a request by the Murphys to detach from the Township and be annexed
to the City of Stillwater.
ALTERNATIVES
The Planning Commission has the following options:
1. Recommend approval of the requested annexation with the following conditions:
a. Approval of the annexation does not compel the City to approve the future
split of the property into two lots.
b. When application is made by the landowners for a lot split, a septic system
designer must provide proof that an on -site septic system will function
satisfactorily on the new lot and that the loss of 1.65 acres will not make
future on -site septic service for the existing lot difficult.
1 The property would ultimately be rezoned to RA, Single Family Residential if annexed. Minimum lot size in
the RA district is 10,000 square feet. But, the property is also located in the St. Croix River Overlay district,
which requires 1 acre for unsewered lots. Finally, the property is encumbered by a scenic easement since it is
located within the National Wild and Scenic River Corridor of the St. Croix River. The easement requires a
minimum lot size of 1.5 acres. Since the easement is the most restrictive of the lot size standards, its 1.5 acre
minimum requirement takes precedence.
4.
Murphy Annexation
February 9, 2012
Page 3
c. When the landowners make application for the lot split, they will also need
to make application for a rezoning and for a minor Comprehensive Plan
amendment to include the property within the City's future land use map.
2. Recommend denial of the requested annexation.
3. Continue the public hearing until the next meeting for more information.
RECOMMENDATION
Staff recommends alternative one.
attachments: Location and Zoning Map
Survey
Applicant Letter
Stillwater Township
9154
Murphy Property
9098
E KVH AF S
HIGHWAY
2012
405
2005
303
HAZEL STREET
203
2012
E ALD R ST
305
4 324
HAZEL STREET
0
0
0)
1917
1915
1905
1901
EAST
F
O
1017 i
1813
1924
1914
1912
Q
�QSl
HAZEL
921 w
02 i>.'
101
O
104 0 103 w
w o
1908
224
o)
ce
LL
WILLOW
1818
1824
1816
300
STREET
181
1801
308
POPLAR STREET
1721\
305
1812
1806
1802
1722
Y
105
z
REEF
jffiwater
The Birthplace oI Minnesota;
Zoning Map
January 2012
Zoning Districts
ME012 city limit
browns creek and Cribs
Elmissing row 6
A-P, Agricultural Preservation
❑ RA- Single Family Residential
RB - Two Family
7TR, Traditional Residential
!MLR, Lakeshore Residential
[JCR, Cottage Residential
CTR. Cove Traditional Residential
. CCR, Cove Cottage Residential
®CTHR, Cove Townhouse Residential
7TH. Townhouse
❑ RCM - Medium Density Residential
RCH - High Density Residential
❑VC, Village Commercial
® CA- General Commercial
. CBD - Central Business District
BP-C, Business Park - Commercial
BP-0, Business Park - Office
❑BP -I, Business Park - Industrial
▪ IB - Heavy Industrial
. CRD - Campus Research Development
. PA - Public Administration
. PROS - Park, Recreation or Open Space
Public Works Facility
ROAD
WATER
Motes:
Notes:
"M." Ind. Meas. value
Bearing system Assumed. CERTIFICATE OF SURVEY
• Ind. iron found in place. BARRETT M. STACK,
o Ind. #13774 iron pipe set. tel. (651) 4
"Deed" Ind. Deed call.
The right -of -way of Fairy Falls Road North
is not currently defined by desc. in furnished
documents as to right -of -way width and the use
of this publically maintained road easement is
■`'a assumed to be an easement that is
Ua�kl prescriptive in nature.
Survey Made For:
0,
ft /1 /P NMt'
te
/N0
\ --
I
\ DIY
se
ly
"'-
4
LAND SURVEYOR "R." Ind. Record value.
39 -5630 Approx. contour data per Wash.
County mapping.
Urain£ield Loc. shown is approximate.
"EBT" Ind. approx. loc. of Bit. Pavt.
The overall parcel is subject to a Scenic
Easement as Desc. in Doc. No. 367575.
Overall Parcel Description supplied is Rec.
in Doc. No. 316881, Wash. Co. records.
Lynne and David Murphy
9098 Fairy Falls Road North
Stillwater, t'innesota 55082
-Q,
3J %s L .4,- \.
\ \ \ F e'`� �'ci°T a z
\ \ \ PAW. t— ■ ,F J,A,\
\ \ \ —1
\ \ \
\\ \ /
''� \
oJzo is
.1'r,vB
e <Txr ✓. J6i. iv,
}�O
n1 \ /
.� \ \s
/
/ /
1
Q�/ 'l / \\ \
` y. / \ i\ \\
\ I(' k r 1 1 1 / / / JZ -- 88,Q'f. J(I�
li `'/�_�...' / I 1 / / 1 ( SvAT Tl �✓. \ v.
W " "Nlio \\ \\ ` c / 1 \\ \
L r\� h; \ \\\\''.. \�\ C L/ / ?�� , \ V —
3 �I r \ 1r VX .\\ \\ \\ / / / 1- — �� \ \ \ \ \` �e
v
1:'.11 v l
l µ..,) \\ / 1 , 1 iv
`� // \!\\ \ \ \\ \ \J • 1 /' /. I I �1II'
�l14 Kok I -- . \�\ \ • \ ,( ;jilt,,i .��
1 M\
1 \lir 1 k li (
\ T
1 I `
Q I I \ \ \ \ v `
o 1� v ' l G ' 4, I i 'then/
`I \ F� % 4737 \ o \" f / i l 1,f
/ i ' r..Gi.•r
,� \ \ \
— \ ,„,„,'ff.i -- R..w,71 Ti'N.,t Kt s — ( f 1, hereby certify that this survey, plan, or report was
T_ — ` Dow ..-E ` i / 1' \ prepared by me or under my direct supervision and that
C I I am a duly Registered [sad Surveyor under the laws of
- -u —sR S1� \ t for`\ the State of Minnesota,
\ ‘',. \\ /a
D494' 4 t'.
B. f't
Air a<
T /Ai
LOT
LOT 7 N
C /17 %f' /.;
Date 11 -28 -2011 R
No
4
To City of Stillwater:
Regarding our application of annexation to the City of Stillwater of the property at 9098 Fairy Falls Rd N,
property owners David and Lynne Murphy, PID 16.030.20.44.0006:
We want to subdivide our 3.88 acre property into two lots with the intention of selling the undeveloped
piece (approx. 1.5 ac.) at the south end of the property.
Attached is a recent survey of the 3.88 acres which is contiguous to the city on the south property line.
We have had discussion with the Stillwater Township Board of Supervisors who stated at their meeting
on January 12, 2012, that they will offer no objection to the detachment of the property.
We have had discussion with Chris Stein, of the St Croix National Scenic Riverway Park Service, which
has a scenic easement on the property. That easement requires a minimum of 1.5 acres with frontage
of 250 feet parallel to the river. Our survey indicates that this would allow one buildable lot that would
front on Orwell Court Rd as indicated on the survey enclosed.
The proposed lot would meet all the requirements of the City of Stillwater.
A soil test has not been completed, but the maps indicate that the soils are more than adequate to
support a septic system. A perc test will be done as weather permits.
David and Lynne Murphy
9098 Fairy Falls Rd
Stillwater, MN
651 - 439 -9485
January 13, 2012
Planning Commission
DATE: February 9, 2012
REQUEST: Amendment to the City of Stillwater 2030 Comprehensive Plan
APPLICANT: City of Stillwater
MEETING DATE: February 13, 2012
REVIEWED BY: Community Development Director
CASE NO.: 12 -06
PREPARED BY: Michel Pogge, City Planne
DISCUSSION
In 2011, the Metropolitan Council released minor update to their "system statements"
for the seven county region related to Transportation and Parks & Trails. The City is
required to update its comprehensive plan to reflect these changes.
Transportation Plan
There are two main changes that impact the City related to Transportation. First, the
Metropolitan Council is now listing the St. Croix River Bridge and associated
improvements along the TH 36 corridor in their 2030 Transportation Policy Plan. The
City's current comprehensive plan discussed this project in both the transportation
chapter and the downtown chapter of the Comprehensive Plan. No update to our plan
is necessary at this point related to this project.
The second change is related to the "Transit Market Areas" the City is in. Originally the
entire City was in Transit Market Area 3. Under the new plan areas of Stillwater south
of Myrtle St and in the Downtown area are within Transit Market Area 3 with all other
areas in Transit Market Area 4. Service options for Market Area 3 include express,
urban radial, suburban local, circulators, and general public dial -a -ride while service
options for Market Area 4 include peak period express and general public dial -a -ride.
From a practical standpoint, this will have little impact to the level of transit service the
City currently receives. In fact, with the new general public dial -a -ride option that is
now available to the Community we have seen an increase in transit options since the
completion of the comprehensive plan in 2009.
Amendment to the City of Stillwater 2030 Comprehensive Plan
February 9, 2012
Page 2
Since the transit section of the plan needs to be updated, staff has also updated the
information of the new general public dial -a -ride that is now available throughout the
City.
Parks and Trail Plan
In the Parks and Trails Plan the only change that impacts the City is the addition of the
Middle St. Croix Valley Regional Trail Search Corridor to the Metropolitan Council
regional parks and trails plan. This is a proposed regional trail search corridor that will
stretch from the planned Browns Creek State Trail in Stillwater to Interstate 94 and will
connect to local trails in Lakeland. We have updated the trails map to show this change
and acknowledge the regional trail search corridor in the text of our plan.
Since the Trail section of the plan is being updated staff has updated the progress that
has occurred on the Browns Creek State Trail, reflect the change of ownership on the
Jackson Wildlife Management Area, and updated the Parks and Trails map to show
new trails that have been completed since the plan was completed in 2009.
STAFF RECOMMENDATION
Review and recommend City Council approval of the proposed changes to the 2030
City of Stillwater Comprehensive Plan.
PARKS AND RECREATION COMMISSION ACTION
The Parks and Recreation Commission reviewed the parks and recreation plan at their
December 19, 2011 meeting. They recommended that the Stillwater City Council
approve the changes to the parks and trails chapter of the 2030 City of Stillwater
Comprehensive Plan as presented.
Attachments:
Draft pages 8 -8, 8 -15, 8 -16, 8 -17, 8 -18, and 9 -25
Figure 8.2 : City Parks & Trails Map
1s
I'
IP
rote_
Brown's Creek State Trail
rown's Creel
7 Brown's Creek State Trail
Browns Creek
Oak Glen
Golf Course
Stillwater
Country Club
I III[
I LJ-j
iSc
II lenbe g Pak1�
Oak Glen
Golf Course
0
McKusick Lake
Trail & Dike
•
Stonebridge
\ Elem. School
Lake
McKee'
1
Staples Field
McKuS ick' Park
•
•
•
•
•
•
•
•
•
•
•
•
•
•
Jaycee's Fields
1
Rutherford
Elem. School
L�s iI 1—i,_..,,,,_ School
ff Il l
II�
Ir 1 o
Ra e ye ` _1
ryr�li� r
Grov "e
Park
Kolliner
Park
Future Loop Trail
NI0\5 �; Middle St. Croix Valley
Regional Trail Search Corridor
Teddy Bear Park
Triangle Park
N fv� ��.
A
N..
f
Heritage -Park
3 2j
U 2.
gI
C_>
t ;l
g
•
15
•
Legends
Park
Bergman
( Park
�Lakesside
Open Space
Nightingale
Park
Sunrise
Park
;/
Lily Lake;
Park 0/ IL
I1
1
(_Gazebo
Benson
Park
Stillwater
Junior High
Anez Ridge Park
Olil Atliletic_Field
1 ■• • 1111111i m• -Oak Park 11u1E•
1 Elem. Schools ■11111
_ L T1111t1111 J MUM
:91111111
/ rl I ( I II
rriin
1111111►
iliwater�
I F A . R T 1 P I A C E O F M I N N E S O T A
Parks
and Trails Plan
800 0 800 1,600 Feet
Existing Trails
Proposed Trails /Sidewalks
Natural Trails
Future DNR Trails
Future Upgrades to Trail
Future MNDOT Trails
Bridge
Underpass (Future)
Current Stairs
2030 City Limit
Existing Park
Future Parks
Golf Course
School Properties
Right -of -Way
Open Water
Updated December 2011
PLAN OF STILLWATER
I l lllllllllllllllllllllllllllnlllllllllllllllllllllllll MIlllllllllll MMIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIMMIIIIIIIIIIIIIIIM MIIIIII111111111111111111111
Chapter 8 : Parks and Trails
8 -8
Trail System
Communities across the country have worked hard
to improve their quality of life through developing
trail systems — connecting individual trail segments
to form larger recreation and transportation
networks. Creating more trail connections among
existing trails multiplies their effect and usage.
Trails provide opportunities for people of all
ages to walk to local destinations, bike to work,
exercise, meet neighbors, observe local wildlife,
and experience the outdoors with their families in
an efficient and safe manner.
A new trend in trail planning has emerged that
engages transportation engineers, water resource
specialists, ecologists, planners, and open space
advocates. Today, trails have become part of
greenway corridors that provide wildlife habitat
and movement corridors, open space vistas, water
treatment benefits, and the opportunity to interpret
local history and culture.
In November 2000, the city completed a
Comprehensive Trail Plan. The plan includes 51.25
miles of trails, 11 miles of which currently exist. The
goal of the plan is to develop and maintain a city-
wide interconnected network of trails to provide
recreational and transportation opportunities for
city residents and visitors. The proposed trail
network is shown in Figure 8.2 Parks and Trails.
"Trails" in the older Stillwater neighborhoods
are mainly sidewalks. Several trails have been
constructed that help link older Stillwater
neighborhoods with developing neighborhoods in
western Stillwater, including the following:
• The McKusick Ravine Trail (County)
• Trails and boardwalk around McKusick
Lake (City)
• County Road 12 and 5 Trails (County)
• Stonebridge Trail (City)
• Eagle Ridge Trail (City)
New trails have been developed in the Annexation
Area along Boutwell Road, Long Lake, and Brown's
PLAN OF STILLWATER
Chapter 8 : Parks and Trails
Creek and its tributaries. Washington County is
developing a trail along County Road 15 (Manning
Avenue) as part of improvements to the County
Road that is under construction.
Western Stillwater is the last part of city to
have pockets of open developable residential
and commercial land. In conjunction with the
development of this property, consideration should
be given to adding to and improving the current
trail system. One area of concern is around the
Rutherford Elementary School. Many school
districts are limiting bus service due to budget
constraints and require students to utilize other
means to get to school; e.g. walking and biking.
Currently there is no trail available on the north side
of County Rd 12, which would make it dangerous
to walk or bike to school from neighborhoods to
the north of Myrtle Street. The Park and Trail Plan
identifies the need at County Rd 12 for a future
underpass, which would safely connect future
trails north of Myrtle Street to trails south of Myrtle
Street.
The Trail Plan includes specific direction for trail
design, location, type, construction, maintenance
and signage. It also discusses priorities for system
improvements. Some of these priorities have been
completed or designed during the past five years.
The city is implementing the trail plan as a part
of new development, and as improvements to
roadways or other infrastructure occurs. The plan
notes the following system issues that the city is
continuing to work on:
• Some trails are unfinished, or do not
interconnect
• Trails are not available to some primary
destinations, such as elementary schools or
parks
• Trails are not sufficient to the St. Croix River
or proposed future trail loop
• Some older trails do not meet current design
standards
• There are needs for ongoing maintenance
and consistent signage
845
Jackson Wildlife Management Area
(Former)
The city has discussed the future of the Jackson
Wildlife Management Area (WMA) with the
Minnesota DNR several times in recent years. In
April of 2011, based on a legislative mandate, the
property was transferred to private ownership.
The property has a number of wetlands on it and
the southern portion of the site provides upland
habitat and open space. A rare plant species (a small
population of Tubercled Rein - orchid, Platanthera
flava) was identified within the upland area of the
property by a local resident.
Proposed New Trails of Local and Regional
Significance
In addition to these overall issues, two significant
opportunities have emerged to expand the city's
trail system, provide additional linkage between
the Downtown and other neighborhoods, and link
the city with other communities and destinations
in the eastern Metro Area. These proposed trails
are shown on Figure 8.2, and include the following:
• Conversion of the historic Lift Bridge
to pedestrian and bike connection, and
development of new trails along the St.
Croix between the Lift Bridge and the
new St. Croix River Bridge, on both the
Minnesota and Wisconsin sides of the
Riverway. These trail projects are proposed
as a part of the St. Croix River Crossing
Project. Construction of this project is
dependent on funding, but is possible to
begin by 2014.
• Development of a potential Brown's
Creek State Trail. In 2007, the Minnesota
Legislature authorized the Browns Creek
State Trail as part of the Willard Munger
Trail System along the Minnesota Zephyr
rail corridor. This is a 5.9 -mile trail corridor
that will connect the Gateway State Trail
in Grant at Duluth Junction to Downtown
Stillwater terminating north of Laurel Street.
The Minnesota Zephyr officially made its last
trip on December 31, 2008. A partnership
amongst The Minnesota Department of
Natural Resources, The Parks and Trails
Council of Minnesota, and Washington
County are purchasing the former Minnesota
Zephyr corridor. The sale is expected to close
in late 2011 or early 2012. Since the trail will
be constructed on the former Minnesota
Zephyr railroad grade, it will be generally
level and accessible to users of all abilities.
Construction on the line is set to begin
in 2012 starting in Downtown Stillwater
and be constructed until current funds are
exhausted. The City is hopeful additionally
funds can be secured for the trail so it can
be completed and connected to the Gateway
Trail as soon as possible.
The Metropolitan Council has required the city
to include two additional trail segments on their
master trail plan. These include the following:
• Washington County Greenway Regional
Trail (Future): This regional trail runs
north -south in Washington County. It is
intended to connect the City of Hastings to
Cottage Grove Regional Park, Lake Elmo
Park Reserve, and Big Marine Park Reserve.
Part of the trail is located within Stillwater.
In the future Washington County will be
working with the City to plan more of the
trail alignment.
• Browns Creek State Trail, formally known
as the White Bear Lake - Stillwater Regional
Trail (Future): With the new Browns
Creek State Trail, the White Bear Lake -
Stillwater Regional Trail alignment has been
moved from running along Highway 96
in Stillwater and now follows the Browns
Creek State Trail alignment. A Regional
Trail is still proposed to connect the
Gateway Trail and White Bear Lake.
• Middle St. Croix Valley Regional Trail
Search Corridor (Future): This is a proposed
PLAN OF STILLWATER ❑
8 -16 Chapter 8 : Parks and Trails
regional trail search corridor that will
stretch from the planned Browns Creek
State Trail in Stillwater to Interstate 94 and
will connect to local trails in Lakeland. Due
to topography and important natural and
historic resources, the trail will follow a rail
corridor purchased by the City of Stillwater
from the terminus of the Browns Creek State
Trail south to the City's southern corporate
limits. A majority of this trail within the
City of Stillwater will be built with the
new St Croix River Crossing Project as
required by the Section 106 Memorandum
of Understanding for the project. The City
actively supports this trail and will work
with our partners to complete the trail as
soon as possible.
Implementation
To implement the Parks and Trail Plan, the city will
consider the following implementation measures,
which were developed from the goal and policy
categories, listed in the beginning of this chapter:
Park Standards: To increase the amount of public
park land the city will:
• Study and pursue various means of funding
the acquisition, operation and maintenance
of park, open space trail, and recreation
facilities. (Program 1)
• Acquire and develop land in the western
part of the city for community park
purposes. (Program 2)
Efficient Use of Facilities: To maximize
opportunities for the joint use of public land and
facilities and efficient use of such facilities the city
will:
• Consider cooperative efforts with the
school district, athletic organizations,
public utilities, and other public agencies in
order to acquire and /or develop parkland,
retain open space areas and recreation
facilities and provide programs. This would
include considering acquisition of the Old
PLAN OF STILLWATER
Athletic Field and Jaycee's Fields from the
school district should the school district
ever entertain the possibility of divesting
themselves of those properties important to
the community.
• Periodically update and distribute the list
of available public park facilities, park
maps, and trail maps to the community and
interested groups.
• Develop and implement a program for year -
around use of some recreation facilities.
(Program 3)
• Explore methods to integrate parks and
trails with the systems of surrounding local
governments.
2009 - 2018 Park Improvement Priorities
Approved by Stillwater Park & Recreation
Commission on July 28, 2008
Community Parks
Lowell Park
• Major redevelopment
Millbrook Community Park
• New park development
Pioneer Park
• Continue park improvements
• : Renovate band shell (roof and west wall)
Northland Park
• Replace upper play equipment
• Make an "entryway" park
• Replace irrigation systems
Aiple Park
• New park development
Brown's Creek Park
• New irrigation systems
Lily Lake Park
• Replace irrigation systems
I I I I I I I I I I I 1 111111111 1 111 11 1111111111 I I I I I 11111 I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I 1 11111111 1 1 1 1 1 11111111111 I I I I I 11111111111 1 111 11 111 1 111111111 I I I I 111 I I I I I I I I I 1 1111 I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I 1 11111111 1 1111111 I I I I 1111 I I I I I I I I I I 1 1111 I I I I 111111 1 111 1 1111 I I I I I I I I I I I I I I I 1 1111 1 111 I I I I I I I I I I I I I I I I I I I I I I 1 1111 I I I I I I I I I I I I I I I I I I I I I I I I 1 111
Chapter 8 : Parks and Trails
8 -17
Neighborhood Parks
Long Lake Open Space
• Add Picnic Shelter
• Add Nature Trails
• Consider adding parking on north side
Millbrook Neighborhood Park
• New park development
Boutwell Cemetery
• New park development
Staples Field
• Acquire additional park property
• Add additional facilities
• Reopen basketball court or convert the
courts to another park use
Legends Park
• Add additional equipment
Bergman Park
Add addition equipment (play structure
on north side of park)
Triangle Park
• Replace play equipment
Ramsey /Grove Park
• Replace play equipment with a structure
for children 5 to 13 years of age
Public Works Park
• Continue baseball field improvements
• New irrigation systems
Trail Improvements
• Replace steps at Chestnut Street, Laurel
Street, Willard Street, Broadway Street
and Quarry Lane Stairs
Park Design: The city will:
• Design, install and maintain standardized
park signage for all city parkland and trails.
• Develop and implement neighborhood park
plans based on the following priority list
developed by the Park and Recreation Board
and level of service needs. These plans shall
reflect neighborhood input into the planning
process. (Program 2)
• Require park land dedication or cash in
lieu for all new residential, commercial and
industrial developments.
• Acquire the Jaycee's Fields and the Old
Athletic Field from School District 834 if
the school district ever considers selling
them. It is the city's desire to continue to
offer these two sites for public recreation
purposes.
• Seek opportunities through public or
private funds for the establishment of new
neighborhood parks and /or redevelopment
of existing neighborhood parks.
Trails and Pathways: To effectively maintain and
expand a city -wide trail system that connects to all
major activity centers, schools, downtown, scenic
open space areas and lakes and other adjacent
community systems the city will:
• Continue to implement the comprehensive
trails and pathways corridors plan.
• Continue working with the state and county
for the development of a potential Brown's
Creek State Trail.
• Continue to improve trails and sidewalks
as local roadways are improved or
reconstructed.
• Create improved trail and pedestrian
connections into downtown from the west
and from the north through Lowell Park to
the Aiple property south of Nelson Street.
• Consider improving trail systems around
the city's lakes including completion of the
trail around McKusick Lake and Long Lake,
as well as between the lakes.
PLAN OF STILLWATER
11111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111 I I I I I I I I 1 11111 I 1111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111 I I I
8 -18 Chapter 8 : Parks and Trails
Transit
With the projected increases in population,
households, and employment, the need for
additional and expanded transit facilities is
apparent within the City of Stillwater. With the
increase in population, there will be a need for
improved transit service to transport residents to
the Twin Cities and other major employment areas.
The transit objectives and programs listed in the
first section of this chapter outline the transit needs
of the city.
The City of Stillwater falls within the Metropolitan
Transit Taxing District. Areas of Stillwater south
of Myrtle St and in the Downtown area are within
Transit Market Area 3. Service options for Market
Area 3 include express, urban radial, suburban
local, circulators, and general public dial -a -ride.
Areas of Stillwater north of Myrtle, exclusing the
Downtown area, are within Transit Market Area
4. Service options for Market Area 4 include peak
period express and general public dial -a -ride.
The existing transit service in Stillwater is shown
in Figure 9.10. The city is currently served by one
express bus route (No. 294). This route provides
express commuter bus service to Downtown St.
Paul during rush hours on weekdays at a 30 minute
frequency and serves the communities of Bayport,
Oak Park Heights, Stillwater, Lake Elmo, Oakdale
and 3M. There is one park and ride lot located at
the St. Croix Valley Recreation Center. An informal
car pool parking area also exists on TH 36 at
Manning Avenue. The park and ride facility at the
St. Croix Valley Recreation Center (Market Drive
between Orleans and Curve Crest Blvd.) utilizes
the south half of the lot and has a capacity of 100
vehicles. The TH 36 & Manning Avenue car pool
area (located on the TH 36 northern frontage road
just west of its intersection with Manning Avenue)
has a capacity of 15 vehicles.
PLAN OF STILLWATER
Chapter 9 : Transportation
As of February of 2012, Metro Transit also operates
a dial -up service called Transit Link. Transit Link is
available in all communities in Washington County.
Transit Link is for trips that can't be accomplished
on regular transit routes alone, and may combine
regular route and Transit Link service. In Stillwater
teh service allows residence to connect to St. Croix
Mall and the Target /Cub Foods shopping areas.
Additionally, it also connects with Route 294.
Transit Link operates Monday through Friday
from 6:00 am to 7:00 pm with the last scheduled
pickup at 6:45 pm. Currently dial -a -ride services
in Washington County are contracted to Midwest
Paratransit Services.
Metropolitan Council's 2030 Transportation Policy
Plan identified TH 36 as a future express commuter
bus service thoroughfare called the "TH 36 /NE
transitway corridor ". The route will originate
at either the existing St. Croix Valley Recreation
Center Park and Ride lot (Option A - Figure 9 -10)
or, after completion of the St. Croix River Crossing
project, the route will originate at the intersection
of Highway 36 and Highway 95 (Option B -
Figure 9 -10). Final determination will be made
by the Metropolitan Council and Metro Transit
after completion of the Transit Feasibility Study
as outlined in the St. Croix River Crossing Project
Supplemental Final EIS dated July 2005.
9 -25
illwater
THE BJRTHPEACE Of MINNESOTA
Memo
Community Development Department
To: Planning Commission
From: Michel Pogge, City Planner
Date: Friday, February 10, 2012
Re: Ornamental and picket fence height
Message:
The City Staff has received a number of complaints concerning the height of fences in
the Community. A number of these complaints have been targeted toward ornamental
and picket fences located in front and exterior side yards.
City Code permits fences in front and exterior side yards up to 42 inches of height. This
includes ornamental and picket fences. The following are a few example of ornamental
and picket fences that are in the front yards and that exceed the 42 inch height
limitation:
From the desk of...
Michel Pogge, AICP • City Planner • City of Stillwater 216 N. 4th Street • Stillwater, MN 55082
651.430 -8822 • Fax: 651.430 -8810 • email: mpogge @ci.stillwater.mn.us
IIIIl IRIH NI
`NIInIpIIIP
IIIIIIIPIIIO !tliltllll IIIIIIIIIIIIIBnnnliul inom".".o ..................
Some of the primary purposes for limiting fences in the front yards to a height that is no
taller than 42 inches are to keep the fronts of the home open and to eliminate hiding
places along public walkways. Ornamental and picket fences that are open meet these
public purposes. Staff is reluctant to pursue enforcement of these types of fences even
after a complaint has been filed with the City.
With the Commission's approval, staff would like to explore making a change to the
City's fence code that permits ornamental and picket fences in a front yard that are
taller than 42 inches in height.
REQUESTED ACTION
Review and discuss.
From the desk of...
Michel Pogge, AICP • City Planner • City of Stillwater • 216 N. 4th Street • Stillwater, MN 55082
651.430 -8822 • Fax: 651.430 -8810 email: mpogge @ci.stillwater.mn.us
water.
THE BIRTHPLACE OF MINNESOTA
PLANNING REPORT
DATE: February 7, 2012
APPLICANT: City of Stillwater
TOPIC: Marina Rezonings
MEETING DATE: February 13, 2012
CASE NO.: 2012 -02
AUTHOR: Bill Turnblad, Community Development Director
BACKGROUND
As part of the zoning map review for the Comprehensive Plan consistency project last year, staff
noticed that all four of the marinas, and the St. Croix Boat and Packet docks, are non-
conforming. The process to correct the non - conforming status was initiated. However, since
the marinas were in the middle of their busy season, they requested that the matter be tabled
until the winter.
COMMENTS
1. All marinas within Stillwater are currently legal, but non - conforming.
a. The base zoning for all Stillwater marinas (as well as the St. Croix Boat & Packet)
is RB, Two - Family Residential
i. Since about 2004 marinas have not been permitted in the RB zoning
district.
ii. Until 2004 a Special Use Permit could be issued for any use the City
Council thought appropriate within any zoning district in the City. All
four of the current marinas, as well as the St. Croix Boat & Packet, were
issued Special Use Permits under this "general Special Use Permit
provision ". The provision was struck from the City Zoning Ordinance in
about 2004. Since that time, a land use must be specifically listed in a
zoning district's use table as "permitted" or "allowed with Special Use
Permit" or else the use is prohibited in that zoning district.
iii. Consequently, in 2004 all of the marinas became "grandfathered" legal
non - conforming uses.
Marina Zoning
Page 2 of 3
b. All riverfront properties also lie within an overlay zoning district known as the
"St. Croix River Overlay District ". This overlay district allows marinas with a
Conditional Use Permit.
i. When there are conflicting regulations in the Zoning Ordinance, the most
restrictive regulation applies. Therefore, even though the overlay district
allows marinas by Conditional Use Permit, since the RB zoning does not
allow them, they are prohibited.
ii. Grandfathered uses are allowed to continue, but they are generally not
allowed to expand or substantially change their property usage.
2. Since there are no base zoning districts that allow marinas, how can the legal non -
conforming status be removed to give greater flexibility to the marina owners and
operators?
i. Amend the Zoning Ordinance to allow a marina with a Special Use
Permit in one or more of the base zoning districts.
ii. The marina owners have requested the City to allow their properties to
remain zoned RB and amend the ordinance to allow marinas in this
district with their existing Special Use Permits.
iii. City staff supports the owners' request for a number of reasons:
1. It would remove the non - conforming status of the businesses so
they could grow on their sites.
2. It would not offer the ability for other riverfront property owners
to start new marinas, since the only sizeable riverfront properties
zoned RB are already in the ownership of the existing marinas.
This is important because neither the National Parks Service nor
the Minnesota Department of Natural Resources (DNR) supports
adding new marinas to this stretch of the St. Croix River.
3. A performance standard section would be added for RB zoned
marinas. The performance standards could include a minimum
property size (say 5 acresl), a statement that marinas are only
allowed on RB zoned property on the St. Croix River, that
accessory uses such as ships' stores and club houses are allowed,
etc.
4. The DNR supports the marina owners' request, as long as
performance standards are included in the ordinance amendment.
5. St. Croix Boat & Packet does not fit the use profile of the other
four properties. Rather than leave it zoned RB as suggested for
1 The Stillwater Marina and Yacht Club has 5.6 acres; Wolf Marine has 7.4 acres and Sunnyside (with its Oak Park
Heights property) is over 11 acres. Only Evans Marina has less than 5 acres. It only has an acre of land. If a 5 acre
minimum is adopted, the Evans property size would be considered substandard, though the use would be considered
conforming. Changes can be made to structures on properties that have a substandard size as long as all other
dimensional and performance standards can be met.
Marina Zoning
Page 3 of 3
the other four, staff suggests rezoning this one to PROS (Park, Rec
or Open Space) and allowing the use by Special Use Permit. This
would be more compatible with the zoning of surrounding
properties and the DNR supports this.
ACTION REQUESTED
Staff requests the Planning Commission to discuss the proposed solutions to the non-
conforming status of the marinas. A draft ordinance is planned to be ready for review next
month by the Planning Commission, DNR and marina owners. When solutions are generally
agreed upon, staff will schedule public hearings.
Attachments: zoning maps
____ :�
11water
/
/
•
-`
: ; �
;'
;'/
ii
TSPP•
e•'ry / ; -
••
.00.
........ ; �
,errrrrn
HE BIRTHPLACE O ESOTA
Dutchtown Marinas
Zoning Map
Zoning Districts
A -P. Agricuttural Preservation
RA - Single Family Residential
RB - Two Family
TR. Traditional Residential
LR Lakeshore Residential
CR. Cottage Residential
1.11 CTR. Cove Traditional Residential
- CCR. Cove Cottage Residential
- CTHR. Cove Townhouse Residential
TH. Townhouse
RCM - Medium Density Residential
I RCH - High Density Residential
VC. Village Commercial
_ CA - General Commercial
- CBD - Central Business District
BP -C. Business Park - Commercial
_ BP -O. Business Park - Office
BP -I. Business Park - Industrial
IB - Heavy Industrial
111111 CRD - Campus Research Development
PA - Public Administration
OM PROS - Park. Rec or Open Space
Public Works Facility
ROAD
WATER
2030 City Limits
June 1. 2011
•
r.�
Wolf Marine
.•`
.:d
- ----------- 1 .r,
Chti 1u
t(jjj, �flllnns r r '
111,1111111111111 Will
I• Will
'
,
...
t
1
1 r
Evan's Marine
Is
^s
i
• • ' 1
•
1
1
1
1
1
•; 1
1 %
\ 1
1
•
1 •
1 •
•
1
i
It
• 1
1 1
• O•" 1 j
--A---"• "
T
s 1
•• 11
1 ♦
„'• .... f
1 1 1 ..•
tit
•
•
•
• _ �� .~ •
s t
■ \..,• • ♦ • • s • t
ry 111 ♦* ••1
1 1 1
1 \ ♦ \
♦ • 1
As t
ia II 1,t
•' i 1 Ili
y
,, i
••••• ....- ♦ • i
\__
••
••••
Stillwater
Marina
•
•
1
i1!war
T H E B I R T H P L A C E O F M I N N E S O T A
Downtown Marinas
Zoning Map
1
1
••
1
1
•
1
1
Zoning Districts
A -P, Agricultural Preservation
RA- Single Family Residential
RB - Two Family
TR, Traditional Residential
LR, Lakeshore Residential
CR. Cottage Residential
- CTR. Cove Traditional Residential
- CCR, Cove Cottage Residential
CTHR. Cove Townhouse Residential
TH, Townhouse
RCM - Medium Density Residential
RCH - High Density Residential
VC. Village Commercial
IN CA- General Commercial
CBD - Central Business District
BP -C. Business Park - Commercial
- BP -O. Business Park - Office
BP -I, Business Park - Industrial
IB - Heavy Industrial
— CRD - Campus Research Development
PA - Public Administration
PROS - Park, Rec or Open Space
Public Works Facility
ROAD
WATER
Q 2030 City Limits
'r
1 .
• •
.0 •• •••• •
•• 1 ••-
s•
•
t
♦
•
i
•
1 • •'•"-1 1 1
•
•
1
'••• °•
June 2011
St. Croix Boat
& Packet
Sunnyside Marina]
t
- -t
1
1 Y
1
1
1
Si liwater
Tk., al RT11 ALACE Of MINNESOTA
Sunnyside Marina
Zoning Map
DCity Limits
A -P, Agricultural Preservation
RA - Single Family Residential
RB - Two Family
TR, Traditional Residential
LR. Lakeshore Residential
CR. Cottage Residential
- GTR. Cove Traditional Residential
- CCR, Cove Cottage Residential
• CTHR, Cove Townhouse Residential
TH, Townhouse
RCM - Medium Density Residential
RCH - High Density Residential
VC, Village Commercial
_ CA - General Commercial
- CBD - Central Business District
BP -C, Business Park - Commercial
IN BP -O. Business Park - Office
BP -I. Business Park - Industrial
▪ IB- Heavy Industrial
CRD - Campus Research Development
® PA - Public Administration
PROS - Park. Rec or Open Space
Public Works Facility
ROAD
WATER
City limit
June 2011
THE BIRTHPLACE OF MINNESOTA
PLANNING REPORT
DATE: February 9, 2012 CASE NO.: 2012 -04
APPLICANT: City of Stillwater
TOPIC: Armory Project Update
MEETING DATE: February 13, 2012
AUTHOR: Bill Turnblad, Community Development Director
The Open House for the armory and fire station project was well attended on February 1 st. We
estimate that about 70 people stopped in to talk about the conceptual plans and timeline. Besides
sharing information on the project and its status, the gathering provided an opportunity for
residents to make comments that will be used as the design work begins.
Attached are the comments that were submitted. The other attachments to this memo are the
project timeline and the conceptual site plan.
National Guard Readiness Center & City Fire Station Comments
February 1, 2012.
1. An armory is a very inefficient land use for such a central geographic location. There
needs to be an exercise to redesign /plan the immediate area. See site plan in comp
plan. The inefficiency of the armory needs to be offset by an efficient surrounding land
use. The large parking lot needs alternative uses or alternative surfaces (pervious vs
impervious).
2. David Hanson. Putting a very high berm topped with trees, bushes along Boutwell side
to block sound and parking lot lights (lights should be less elevation than berm). Please
do computer modeling for lighting and sound to make sure mitigation is effective.
Traffic control @ Boutwell and CR 12 (I imagine the back -ups there - I have to believe
there is technology that would allow a traffic signal to operate when it senses more than
x cars in line. 1 know the county will not like this, but please give it a try). Stop sign at
intersection of new road and Boutwell Road. No activity that would require use of the
north lot after 5 PM (except fire and Guard emergencies). All lights except minimum
security lights off no more than 30 min after last event. Finally, please tear down the
derelict house and Barn. We have lived with this thing for too long. I know you
mentioned the LEED issues the current hold up, but I have to believe it is there is a way
around it. What about a good old fashioned fire training exercise ?? That would, in
some sense, be recycling of materials.
3. Jeff Johnson. I am against the relocation of the fire station. It will reduce response
time to the highest density population areas in Stillwater and most vulnerable aging
persons and buildings. This leaves the historic parts of the city with greater exposure to
fire. Ward 1 and 2 will have slightly increased response time for both fire and medical
and will pay an increase in property tax to pay the bond. Is this taxation without benefit
to Ward 1 and 2?
4. As a resident of the North Hill, I have deep concern for the increased response time that
would result in the relocation of the fire hall. We do have a renowned historic city that
would, in effect, be given reduced service. Why not keep the existing fire hall and
consider another one on a smaller site? Also, quite concerned that these 18 acres
would be removed from the tax base. Since this parcel has already been purchased,
could you consider working with local farm based organizations such as the Minnesota
Food Association to utilize the open land on the site for small scale farming /gardening?
Consider also using a pervious surface for all parking lots similar to the east trail portion
on Lake McKusick.
5. Angela Brown. Please consider space for B- Ball /V -Ball (2 -4 courts), wood courts with in-
ground pole system for volleyball nets. We have a severe shortage of available courts
for our youth programs. This keeps off season costs high, limits practice times and
Page 2 of 3
tourney dates and causes families /clubs to spend travel money /time as well as put
rental dollars in other cities' pockets. We could afford to grow the sport of volleyball in
our community and offer more opportunity to young girls and boys (which has been
ignored due to lack of space) as well as adults in Stillwater. Help put us back on the
map.
6. I read in the Minneapolis paper that the fire station is costing $7.9 million with shared
facilities, like kitchen, locker room /shower, gym, etc. How can a six bay box cost so
much? We can't help but think that pockets are being lined with kickbacks and the like.
How can you possibly think we are ok with that kind of expenditure of money you don't
have. You need to tell us why we need the most expensive fire station in the state. This
kind of thing is why we don't trust the government city, state or federal. Get your hands
out of our pockets and out of our kids and grandkids pockets. Make do with what you
have!
7. My concerns are: Traffic control at Maryknoll (similar to Deerpath). Currently need
traffic to slow down when heading west up the hill to Maryknoll. Would like to see trail
from 12 to Boutwell. Trees on the south side of the fire station would help reduce
noise. Pines would be preferable.
8. Patty and Stephen Ogborn. Would like to have included within the armory the capacity
for a wood ballroom dance floor. We belong to Stillwater based LaDanza which has
been dancing at the Stillwater VFW since 1972. Currently, the VFW is for sale. Should or
when the VFW is sold, LaDanza may need a new venue for our membership and club. I
appreciate your consideration in this matter.
9. Biggest concern is with traffic control at 12 and Maryknoll. I do not want an intersection
built that enables public traffic to start using it as a route through Croixwood to 5. I like
the triangle pad concept used on Deerpath. But also concerned for potential increase in
traffic on the hill just east of Maryknoll. Cars come up the hill making it difficult to get in
or out of Maryknoll. I have a concern for accidents on the hill endangering emergency
staff. I do like the idea of a trail between 12 and Boutwell. Landscaping around the fire
station could buffer sound.
10. It looks like the north end parking lot is going to destroy a lot of trees (beautiful pines).
Also, the increase in traffic on Boutwell Road because of the parking lot there does not
look good. Why the extra exit onto Boutwell Road?
11. As a Ward 2 resident, I am stunned that response time will increase as much as 3
minutes to downtown Stillwater. As a valued historic district that garners a $700 million
dollar bridge to remove through traffic and protect historic buildings, the city should at
least maintain fire protection to protect such a massive public investment. Build a
substation downtown and correspondingly reduce the initial size of the fire station
Page 3 of 3
complex on Boutwell. You owe this to taxpayers all over Minnesota, Wisconsin and the
nation that ponied up $700 million to promote the interests of Stillwater.
12. Is there a plan to put a stop light on 75t" St N (Myrtle)? Is there a plan to lower the
speed limit on Myrtle?
13. It's about time we get some better fire protection on the western side of the City.
14. Bill Baker.
• FYI Open House for public — Lacked advanced coverage in the media (all papers, not
just the Stillwater Gazette — (which many don't subscribe to). The public affected by
this (Croixwood residents) should have been mailed a notice one or two weeks in
advance.
• Most of the people at the open house weren't concerned by the location or design
of the structures. They were concerned about the traffic patterns. Traffic flowing
from the facility to serve the North Hill, east to downtown and the commercial areas
to the south along Hwy. 36. When, Where & Why would traffic be routed
to /through /around Croixwood. Which streets would be affected (Maryknoll Dr. Deer
Path & Brick Streets)?
• How would the intersection at Maryknoll Dr. & Cty. Hwy 12 be affected (Turn
Patterns). Will there be blinking red emergency lights announcing fire trucks leaving
the facility?
• If the ultimate design decision will be made by the County, then why weren't the
Cty. Engrs. at the open house?
• At the next Open House for the Stillwater public, please present some answers to all
the above issues. Also, a little more effort into 'Getting the Message Out to the
concerned public', would be appreciated. Send a mailer to All residents within a mile
radius of the proposed project.
• P.S. Is the Police Dept. moving into this site as well?
15. Priorities for new armory /fire hall design: Mary Piontek, 197 Maryknoll Drive, Stillwater
• Minimize increased traffic on surrounding residential roads; particularly Maryknoll
Drive
• Minimize sound impact to surrounding neighborhoods
• Minimize night lighting of parking lots and buildings (light pollution)
• Concerned about turning in and out of Maryknoll on to Cty Rd. 12
• Architectural design should blend with the residential community ... avoid industrial
or commercial look
• Strongly in favor of paved path along New Road between 12 and Boutwell.
• Strongly in favor of safe pedestrian /bicycle crossing (tunnel ?) at intersection of Cty
Rd 12 and either Northland, Maryknoll or Interlachen Way /Eagle Ridge Trail
National Guard Readiness Center
City Fire Station
Concept Site Plan
0
0 00 0
0
0
Legend
- Readiness Center (Armory)
- Fire Station
Existing trails
- New Trail
17.7] J extra r -o -w needed
Parking lots
_Sidewalks
wetlands
wetland buffer 50 feet
wetland buffer 30 feet
® wetland buffer25 feet
11111 New public street
ARMORY & FIRE STATION PROJECT SCHEDULE
The timeline, though subject to change, looks like this:
Date
Meeting or Task
October 12, 2010
Environmental investigation: site visit
October 20, 2010
Environmental investigation: Drilling team on site
October 21 -22, 2010
Cultural survey
November 1, 2010
Closing date on purchase of property
December 22, 2010
Informational meeting with Joint Planning Board
January 2011
City Council adopted a Resolution of Intent to provide the National Guard with land for an
armory facility.
January 2011
National Guard submitted host city information to National Guard Bureau for budget.
March 2011
City zoning and design /performance standards forwarded to the National Guard.
May 25, 2011
Tour of Inver Grove Heights armory
June 7 - 9, 2011
Planning Programming Design Charette (PPDC) - National Guard conducted planning
charette (this included any partner organizations that would share the facility to capture all
requirements in conceptual layout /orientation of the facility). General public attended for
observation and occasional comments.
August 16, 2011
National Guard discussed PPD charette results with City Council & discussed project
scheduling.
Sept 12, 2011
Received Final Report on the Project Planning Document Charette
Oct 4, 2011
Proposals for Fire Station programming and feasibility study were submitted to City.
Oct 18, 2011
Fire Station programming and feasibility study awarded to Buetow and Associates
Dec 6, 2011
City Council reviewed draft of Fire Station feasibility study and decided to design at least
35% of Fire Station together with the armory.
Feb 1, 2012
Open House for the concept armory and concept fire station plans. City Council Chambers
7PMto9PM.
March 2012
State awards contract to complete a 35% design of facility.
April 2012
Design charette conducted by State's consultants.
June 1, 2012
Transfer of title for Readiness Center. (With conditions: 1) If not built within five years, land
reverts back to City; 2) Land for Fire Station will revert back to City when its lot lines are
defined; and 3) The City retains the right to lease the two homes on the property.
Aug 2012
35% design of facility completed
Sept/Oct 2012
Public hearing before Planning Commission on: 1) annexation, 2) ordinance amendment
allowing armory by SUP in RA/RB zoning district(s); 3) rezoning from TZ to RA/RB; 4)
SUP for armory
Sept/Oct 2012
Public hearin. before Joint Plannin. Board
Oct /Nov 2012
Public hearing before City Council
Nov /Dec 2012
Begin process to acquire necessary access points
December 2013
65% design complete
June 2013
95% design complete
April 1, 2014
Likely construction start
October 2015
Likely completion
Dec 2015
Likely occupancy
January 24, 2012