HomeMy WebLinkAbout2012-019 RESOLUTION NO. 2012-019
RESOLUTION ORDERING PREPARATION OF FEASIBILITY
REPORT FOR THIRD ST S RECONSTRUCTION PROJECT
FROM ORLEANS TO WALNUT STREET
(PROJECT 2012 -04)
BE IT RESOLVED BY THE CITY COUNCIL OF STILLWATER, MINNESOTA:
That the proposed improvement be referred to the City Engineer for study and that he is
instructed to report to the Council with all convenient speed advising the Council in a preliminary
way as to whether the proposed improvement is feasible and as to whether it should best be made as
proposed or in connection with some other improvement, and the estimated cost of the improvement
as recommended.
Adopted by the Council this 17 day of January, 2012.
en Harycki, Mayor
ATTEST:
Larry D. 4 en, Acting City Clerk