Loading...
HomeMy WebLinkAbout2011-02-07 HPC Packetr r m g r C k G to Heritage Preservation Commission Notice of Meeting Monday, February 7, 2011 A workshop meeting will begin at 6 p.m., Monday, February 7, 2011 in the Council Chambers at Stillwater City Hall, 216 North Fourth Street, Stillwater MN 55082. The purpose of the workshop will be to review and discuss the City's demolition process. The regular meeting will begin at 7 p.m., Monday, February 7, 2011 in the Council Chambers at Stillwater City Hall, 216 North Fourth Street, Stillwater MN 55082. AGENDA 1. CALL TO ORDER 2. APPROVAL OF January 3, 2011 MINUTES 3. OPEN FORUM The Open Forum is a portion of the Heritage Preservation Commission meeting to address subjects which are not a part of the meeting agenda. The Heritage Preservation Commission may take action or reply at the time of the statement or may give direction to staff regarding investigation of the concerns expressed. Out of respect for others in attendance, please limit your comments to 5 minutes or less 4. PUBLIC HEARINGS 4.01 Case No. 2011 -04. A demolition request for a two -story residence located at 607 Fourth Street South in RB, Two Family Residential District. Mark Balay Architects, representing Tim and Amy McKee, applicant. Continued from January 3, 2011 meeting 4.02 Case No. 2011 -06. A demolition and infill design review request of a single family home located at 1411 Carnelian Street North in the RB, Two Family Residential District. James Nelson and Elizabeth Whitbeck, applicants. S. DESIGN REVIEWS 5.01 Case No. 2011 -07. Design review for the construction of a 15,480 square foot single story medical office building located at 2900 Curve Crest Blvd in the CRD, Campus Research Development District. Dan Regan, applicant. 6. NEW BUSINESS 7. OTHER BUSINESS 8. ADJOURN City of Stillwater Heritage Preservation Commission Monday, January 3, 2011 but is more of a workman's house with not a lot of ornamentation inside or outside; he said the one saving grace on the interior is some of the wood floor work. Mr. Tomten noted the house has been divided into a duplex; he described some of the interior elements, such as 1950s tile, popcorn ceiling. He also described the basement and addition to the rear; he noted there is some pretty bad dry rot on the floor structure. Overall, he said there might be some question about the moveability of the structure based on the deterioration of some of the floor joists, but above the main level, he said the walls seem fine. He said, basically, the salvaging factor of the structure would be its shell and said he could understand where the costs would get high to renovate the structure. Mr. Tomten said what bothers him most is the request for a demolition to be turned to green space, and he noted that renovation will always cost more than new construction. Mr. Lieberman noted that, historically, Stillwater was made up not just of fine homes, but workers' homes and more modest structures and suggested it would be wrong if the City attempted only to save the so- called jewels. Mr. Pogge, who also went through the interior of the homes, agreed with Mr. Tomten that the flooring is the most attractive feature, but even with that, there are some issues, he said. He said the basement on the north side is beginning to cave in and there is a lot of deterioration with the floor joist system. He said, inside, there is no historic integrity; there are several window openings that are not original, but said there is still pretty good form of the home, with a lot of the characteristics of homes one sees in Stillwater. Mr. Pogge noted that no home from the 1800s is unmodified, but agreed that it will take a substantial amount of work to get the structure up to par. Mr. Lieberman opened the public hearing. No comments were received, and the hearing was closed. Mr. Lieberman said from the exterior, this structure appears to be a good example of a particular style of working persons' housing and he would have difficulty seeing this demolished. Mr. Zahren agreed with Mr. Lieberman's earlier comments about the importance of preserving workers' homes as well as the homes of the wealthy lumber barons. Mr. Goodman said he was not greatly impressed with the house, except for some merit in the street view; he said he wasn't sure the structure adds anything to the historical impact of the neighborhood to leave it there, given that it is next door to a somewhat similar house. Ms. Cook asked Mr. Balay if he had done any historical research regarding the house; Mr. Balay said he found no significant event or ownership associated with the house and found that it was turned into a duplex sometime in the 1930s. In discussion it was noted this home could quality as an Heirloom Home. Ms. Cook spoke of the need to protect as many older homes as possible. Mr. Johnson noted this home is in the Neighborhood Conservation District and suggested that designation speaks strongly, especially in respect to the Demolition Ordinance. He said the intent is to maintain the historic nature of the Neighborhood and each house, grand and less grand, have a presence in that Neighborhood. He said this house has, from the street elevation, straight lines that indicate that the building is sound, at least in its shell. What the HPC looks at, he said, is the exterior of the building; what has been changed or lost on the inside, he said isn't part of the public viewshed and not part of the HPC's charge to preserve. He noted that information had been submitted on all 9 items as required by the Demolition Ordinance, but the Ordinance also gives the HPC the ability to deny based on several rationale, one of which is that the house does contribute to the Conservation District is it part of. Mr. Johnson said good economies and bad economies are the two hardest factors in historic preservation; from an historic standpoint, he said he thought the structure was valuable to the block. In looking at the nine steps, he said he was concerned with the future use, which he said he didn't think was City of Stillwater Heritage Preservation Commission Monday, January 3, 2011 what the property owners learned is that the Commission likely would have denied the demolition permit so they have a month to work with that new information. Ms. McKee invited Commission members to take a look at the inside of the structure. DESIGN REVIEWS Case No. 2011 -01. Design review of signage located at 225 Chestnut Street East in the CBD, Central Business District. Mary Beth Johnson, applicant. The applicant was present. Mr. Lieberman reviewed the request for lighting of the existing sign. The applicant said there would be three fixtures. Mr. Johnson asked about the type of bulb that would be used, nothing there would be concern about using a white, fluorescent lighting. Mr. Johnson moved to approve, clarifying that three fixtures will be utilized, that the type of light bulb used be more of a warm light rather than fluorescent or hot light, and that the mounting not be on the brick or anywhere that would damage the parapet trim. Mr. Bracht seconded the motion. Motion passed unanimously. Case No. 2011 -02. Design review of a signage located at 1798 Market Drive in the BP -C, Business Park Commercial District. Crosstown Sign, applicant. A representative of the applicant was present. Mr. Lieberman reviewed the request. The applicant explained an issue related to replacement of an overhead door. Mr. Johnson said he thought the sign presents itself well through the sign band space. In discussion regarding lighting, the applicant stated the existing lighting will be utilized. There was discussion about the condition regarding the color of the paint of the overhead door; a representative of the applicant suggested matching the tan color of the service door. Mr. Tomten moved to approve as conditioned, clarifying condition No. 3 that the brick will be painted to match the adjacent brick colors and the overhead door painted to match other doors on the building. Mr. Krakowski seconded the motion; motion passed unanimously. Case No. 2011 -03. Design review of signage located at 1815 Greeley Street South in the BP -I, Business Park Industrial District. Airmed Biologics, Inc., applicant. Mr. Lieberman reviewed the request. The applicant was present, noting that there are two distinct business areas, with two separate manufacturing areas and many deliveries are made at the other end of the building. He said he tried to make the signage something people could see but was unobtrusive. In discussion, it was noted there were two previous businesses at the location, with a variance granted for two signs. Mr. Johnson moved to approve as submitted and conditioned. Mr. Goodman seconded the motion; motion passed unanimously. Case No. 2011 -05. Design review of signage located at 450 Main Street North in the CBD, Central Business District. Marty Larson, applicant. The applicant was present; she briefly explained the nature of her business as requested by Ms. Cook. Mr. Lieberman reviewed the request. Mr. Johnson noted a sign plan was previously considered for this building. Mr. Pogge said this sign does follow the other signage in the building. A representative of the applicant noted there is another location for the sign, which they would find preferable for visibility, and asked about the process for getting approval of the alternative location. Mr. Pogge noted that technically that would not be a street location; Mr. Johnson said he recalled the sign plan designated the band above the windows along the street side. Mr. Krakowski moved to approve as conditioned. Mr. Goodman seconded the motion; motion passed unanimously. City of Stillwater Heritage Preservation Commission Monday, January 3, 2011 this proposed building expansion and to show in architecture how things have evolved, both with the use as with the architectural style, but leaving the existing church in its form without removing the steeple or altering or burying it in the architecture. A church representative pointed out there is some deferred maintenance that needs to be done to the steeple, but the desire is to preserve that. Pastor Poffenberg suggested that what the HPC might see in plans might be bold, with a conversation with the past but not literal at all with what is there; he said the desire to express transparency and openness may result in something dramatically different than what is currently there. Mr. Johnson said he thought that would be possible as there are three different sides to the building that are visible and different ways of approaching it architecturally; he said he thought the Third Street side, near the Episcopal church and traditional part of the Trinity church has the historic element, but continuing around the other elevations which don't have the historic elements, there is more opportunity to do something dramatically different. Mr. Tomten suggested keeping an eye on the human scale. Mr. Tomen said no matter what style or approach is taken, the common element throughout a walkable, liveable community is the human scale and some feeling of humanism to the building; if that element is lost, he said, the public is lost. Mr. Pogge noted the Comprehensive Plan envisioned buildings close to the sidewalks so pedestrians can interact. Mark Balay said he thought the most dangerous thing for this building would be forcing it to mimic the historic elements; he noted that contemporary is completely acceptable in a National Register historic district because it calls out the differences between yesterday, tomorrow and today. Pastor Poffenberg asked at what point should they come back to the HPC, noting that they will be requesting the removal of the current Post Office building and the adjacent garages; Mr. Pogge noted that a demolition permit will be required for the garages and suggested that anytime the church gets to the point it has a good form to the building might be a good time to come back to the HPC. HPC members encouraged the church to come back as frequently as desired as plans progress. Election of chair for 2011 Mr. Lieberman said he would like the opportunity to serve as chair for another year. Mr. Johnson said he thought it is good to change things up from time to time and give others the opportunity to serve if anyone is interested; he said he thought it healthy to make rotations on occasion. Mr. Johnson and Mr. Tomten both said they would not be interested in the position. Mr. Bracht, seconded by Mr. Goodman, nominated Mr. Lieberman to serve as chair for 2011. Mr. Krakowski and Mr. Zahren both said they would not be interested in the position. Mr. Lieberman said he would accept the position for one more year only, agreeing that the position does need to rotate from time to time. Mr. Johnson said he would be willing to serve as vice chair again. Mr. Lieberman encouraged all members to feel more comfortable in participating in discussions. Mr. Johnson spoke of the need to be mindful of the HPC's charge in enforcing design guidelines and ordinances. Motion passed unanimously. Demolition Ordinance Review Mr. Pogge suggested setting up a subcommittee for this task as it will be a time consuming effort. He asked three members to serve on the committee, noting that the committee will likely meet several times a month in February and March. He said he would like the committee to complete its work by April or May, with a recommendation forwarded to the full Commission and Council. He said the recommendation could be anything from keeping the existing ordinance to making wholesale changes. Mr. Lieberman said he thought it would be important to have input from a long- standing member of the Commission along with someone who is relatively new to <° 1 P i 4 _ Q 'r E N N E S 0 i A. Heritage Preservation Commission DATE: Deee tuber - -28 2010 Februar 4 2011 PROPERTY OWNER: Tim and Amy McKee APPLICANT: Mark Balay REQUEST: Demolition Permit for a residential duplex LOCATION: 607 4th St S CASE NO.: 11 -04 HPC PUBLIC HEARING DATE: Feb 2011 REVIEWED BY: Community Development Director PREPARED BY: Michel Pogge, City Planned All char es are in le 'slative format. Additions are underlined and subtractions are struck through BACKGROUND Tim and Amy McKee, property owners of 607 4th St S, are requesting a demolition permit for the existing residential duplex on the property. The property is in the Neighborhood Conservation Design District. In the future, any new structure would require a NCD design review permit. The current structure was built in 1880 according to the Washington County Assessor's office. Currently the McKee's own the home immediately north of this site at 601 4th St S. The intent of the property owner is to use the property at 607 4th St S to expand their current yard. 607 4 St S Demolition Permit Page 3 (4) A description of the building or structure or portion of building or structure to be demolished; The entire structure is proposed to be demolished. (5) The reason for the proposed demolition and data supporting the reason, including, where applicable, data sufficient to establish any economic justification for demolition; The applicant included a bid from Mark Wendt Construction to renovate the structure. The scope of work in the quote lists a number of items to be addressed including gutting the entire home, installing a new foundation, addition new appliances and nezv fixtures. The total cost to complete the renovation is estimated to be $237,000. The home at 607 4th St S is 2,032 square feet of living space according to the Washington County Assessor's office. It is difficult to evaluate the economic justification criteria for any demolition. In most cases, a historic renovation will cost more than a demolition and nezv construction. Additionally it is impossible to set the value a demolished structure has on the fabric of a neighborhood once it is lost. With that said, a similar sized home (2,109 square feet) that zvas rebuilt at 702 Churchill St W zvas sold on December 3, 2010 for $330,000. The property at 6074th St S zvas purchased for $82,000 by the McKee's on December 14, 2010. With repairs estimated to be $237,000 the total investment in the property would be $319,000. There zvoulc- m ay_appear to be a market for the home with that value therefore the data supplied by the McKee's may not support the economic justification criteria for a demolition at this time. Hozv�ort o co m letin a 11 a raisal on the home at 702 Churchill St W which com ores the material and nishes used on it with the material and nishes ro osed in the bid om mark Wendt it is di cult to airy make this comparison. In the aplicants su application m aterial they showed three options or rehabilitating the_ existing home. In each scenario t hel believe the cost of c om 1p etinga rehabilitation is more than what the home and property is worth. (6) Proposed plans and schedule for reuse of the property on which the building or structure to be demolished is located; The applicant stated in their application that they plan to incorporate the vacant lot as green space as part of their home at 601 4th St S. In the a licants su lemental a lication material the shozved how a nezv home could otentiall be develo ed on a ortion o the o ens ace and a tune otential ex ansion o the McKee's home. 607 4 St S Demolition Permit Page 5 Demolition Findinas Section 34 - Su bd 2 outlines the crit f or ap or deni of a dem olition permit. There are two criteria the Comm ission m ust cons in either appr oving or denying a ermit. 1. Is the building or structure historically significant? The co defin hi storically si • icant as "an b uilding or structu o por tion of a buildin or structure on the National Historic Register a desi ated local landmark or a contributin structure or buildin in a desi ated national re ister historic district." This buildin is not a historical) si ificant buildin er Ci Code__requirements 2. The owner has made a reasonable eff to sel or preserv the stru cture and there is no alternative to dem In this case the owner has documented ste all nine ste s. Additional) the have completed a review of the cultural and historical si m-dficance of the ro er which is su ested but not re uired. Staff believes that the applicant has made a reasonable effort in findin an alternative to d without success Since 1 the structure is NOT a historicall si cant buildin er Ci Code re uirements 2 that the owner has made a reasonable effort to sell or preserve the structure; and 3 there is NO alternative to demolition staf fin ds that the a pplicant has met t he requirem of Cha ter 34 of the Ci Code related to buildin demolitions. As such if the Commission a rees with this findin then the Commission must no the buildin officinal in writin that the permit may be issued. Figure 5. Area of Potential National Register District. Shaded properties arc those which appear to be potentially "contributing" to the significance of the district. �p14y 45 Mark S. Balay, RA S t 4 I I w a t e r 110 East Myrtle Street, Suite 100 Stillwater, Minnesota 55082 (651) 430 - 31/112//10 i n n e t 0 t a City of Stillwater Attn: Michel Pogge 216 N. Fourth St. Stillwater, MN 55082 I n d i s n a R 0 1 i Dear Mr. Pogge and Heritage Preservation Commission Members: Michael E. Balay, RA S i n d i a n a 8878 South Street Fishers, Indiana 46038 (317) 845 -9402 Tim and Amy have asked me to respond to your request in our first meeting that they take further steps to investigate the disposition of 607 S. Fourth and provide you with supplemental information as you directed. As a part of this further evaluation John Brach, Jeff Johnson, Mike Pogge were able to tour the house on Saturday 1/22/11. We are glad to have more members of the UPC getting a further first hand view of the conditions at the property. Your requests for additional information were in regards to Plan Review requirement items : 5) Economic Justification 6) Proposed Plans for reuse of property. 7) Relationship to Comprehensive Plan and zoning requirements. 8) Demolition alternatives 9) Proof of solicitation of offers for reuse. Additional Historical Research We shall address those items specifically in this letter, its attachments and further illustrative materials presented to you at your next meeting. #5 Economic Justification/ We have researched with local realtors the sale value of this level of quality of home in the current market. We have been told that a finished product completed would have to compete in a market where properties of this type have been offered and are selling for $100 -125 per gross sf of house. That means that assuming a fully restored house of 2,000 SF we would be competing with properties in the market for a range of $200,000 to $250,000 at the highest. In the meeting, we can provide you with a copy of a city wide real estate search for these types of sales prepared by Cheryl Larson, an active local realtor, to back up these market value conclusions. #6 Proposed Plans for Reuse of the Property/ We have attached an illustration of the entire property which the Mc Kees now own, with additional preliminary design determinations of their future development plans. They include a one or two story wing addition in the position illustrated, and the retention of a buildable lot configuration to the south for potential infill housing development. The design of the infill housing would then be accomplished under the regulations of the Neighborhood Conservation District and be fully subject to Design review and approval. page 2 #7 Relationship to Comprehensive Plan and Zoning Requirements/ The concern was with meeting the density range in the plan. If you look at the development plan drawing described in the paragraph above. The proposed future property line expands the size of the McKees current parcel and reserves a buildable lot to the south. We believe that two sites are created that actually fall within the desired range for density. #8 Demolition Alternatives/ You asked us to look at the demolition alternative of relocating the existing structure to the south and establishing a separate parcel there that added land to the current McKee house lot too. This was accomplished by further discussing budgets with Mark Wendt and Terry Semple, house mover, both previously included in the first estimate. A description of both revised budgets is attached, which shows the cost of both alternatives. Neither alternative is potentially profitable. 49 Proof of solicitation of offers for reuse/ Ads in place at the time of our last meeting were continued for this additional month without response. In addition a current local old house renovator in the vicinity was contacted and Alternative B was discussed with him. He had looked at the house when it was for sale and determined that the foundation needed to be replaced. He indicated his project profit model does not include money for that extensive a repair. This also eliminated the "move to the south" alternative from his consideration and he declined to participate further. ADDITIONAL HISTORICAL RESEARCH was accomplished. by Amy McKee who carried out research at the County records office and we have a list of additional owners which remained without merit. We were able to examine the South Hill Residential Study done in 1996. It analyzed for national register nomination and established individual evaluation of properties. The study categorizes 607 South Fourth St. as " potentially "non- contributing " to the significance of the district ". We contacted the MHS archives in regards to acquiring the Individual Evaluation Form. They indicated that the form they have is blank. The city planning department files are also missing this and several other property forms from this study. We will have partial copies of that 70 page report at the meeting. We are glad to provide additional data for your points of review and believe that we have made extraordinary efforts to help you evaluate our careful determination that our purpose in demolishing this house is prudent. I request that you review these supplemental materials, and support my client's continued investment in, and improvement of, their historic home and property at 601 S. Fourth St., by approving the demolition of 607 S. Fourth. Please do not hesitate contacting me prior to the meeting if you have any questions. Sin 1 ark S. Balay, A Enc. i n a n a I c i ❑ B `A L A Y 5 t I ? w a t e M n n e s o t a ARCHITECTS FO rfH S1 x!141 AnW-Wf TWO SRY"Y CALCULAtlON5/ LOf (3 LOfAREA 6,500.5F PUIL A% COWPAa 1.625 / 257 1Mp. GROUNt7 covW 1,0.40 5E / 227 N Z �S CALCULATIONS/ L(Of A NEW LOf AREA 9500.5F EX6,PUILVIN6 covWAL 2,536 5F / 24.67 IMp. 1,490 5F / Ili FFOF05� b P�V�LOFM�Nf PLAN I 706 Fourth St. Project A/B /C Project Budget Cost Project A/ Renovation on existing location Initial Purchase cost 83,000 Basic whole house renovation including new foundation 237,000 Mark Wendt Construction Proposal dated 12/17/10 Renovations to garage 4,000 Site work and landscaping 2,000 Projected Sales Costs 7% of Sale Price 24,000 House must sell for this price to make a 5% profit Project B/ Relocation to South Initial Purchase cost Basic whole house renovation including new foundation Mark Wendt Construction Proposal dated 12/17/10 Additional Moving Cost for Relocating House South Semple House Movers Phone Add Quote 1/24/11 Demolition of existing Garage and Driveway/ Pete Miller Utility relocations New Two Car Garage and Asphalt Driveway Site work and landscaping ( including old foundation fill) $367,500 83,000 237,000 5,000 3,500 6,000 17,000 8,000 Projected Sales Costs 7% of Sale Price with 26,400 House must sell for this price to make a 5% profit $4059500 2 Project C/ Relocation to South and New Owner Occupied Initial Purchase cost leaving 25 Ft. to McKees for 701 83,000 - 28,000 Basic whole house renovation including new foundation 237,000 Mark Wendt Construction Proposal dated 12/17/10 (10 0 /oSweat equity factor) - 23,700 Additional Moving Cost for Relocating House South 5,000 Semple House Movers Phone Add Quote 1/24/11 Demolition of existing Garage Slab and Driveway 2,500 Utility relocations 6,000 New Two Car Garage and Asphalt Driveway 17,000 (50% Sweat Equity Factor) -8,700 Site work and landscaping ( including old foundation fill) 8,000 (20% Sweat Equity Factor) -1,600 "Urban Pioneer" Owner Occupied Cost $2969500 Heritage Preservation Commission Demolition Request Permit Demolition Permit No Fee $150* Receipt No. Address of Project: S'� ..� Paru No.: 501401 V I Sl 0 to L '06 10 Subdivision C� �� i���� Applicant: Address: I /-) r- ,ft:k S;r Owner if different than Telephone No.: ������ Address: At" S , �7 Telephone No. 60 i& t 36 N - C ? I 1 of Structure: (pC V (� of Structure: Condition of Structure: T Intended Use of Site after Demolition: Signature of Ap licant Signature of Own r 10 i Date Date *After Heritage Preservation approval, there is a 10 -day appeal period. Once the 10 -day appeal period has ended, the applicant will receive a design review permit which must be signed and submitted to the City to obtain the required building permits. A building permit must be obtained with the City of Stillwater Building Dep artment The fee for the building permit is based on the valuation of the demolition p roject Office Use Only HK Review Date: ❑ Approved ❑ Denied City Planner /Community Development Director Date page 2 6) The re -use plan is to utilize the separate property as additional landscape, yard and service space for our current home next door. As you know, we successfully renovated the historic carriage house with your assistance and guidance, avoiding demolition of that historic accessory structure. We plan to remove the house before spring and fully redevelop the yard next summer. 7) Our neighborhood block is entirely residential and shall remain so with this project. This fully supports the current comprehensive plan and zoning requirements. 8) We examined the possibilities of re- locating this house further south on the lot to provide more yard to our house. We also looked for any individual willing to remove the house from our property to another lot for $150.00. Based upon current economic conditions neither turned out to be desirable. 9) The property has been advertised on Craig's List, local Ebay, and in the Stillwater Gazette for removal. In addition, as your application packet suggests, we have had our architect examine and research all historical aspects for the house to determine any architectural significance in regards to architectural style, occupancy, or occurrence and have found very little. A report of his research efforts are attached for your review. We request that you review these materials, and issue our permit. Please do not hesitate contacting us prior to your meeting if you have any questions, You are welcome to come and observe the existing conditions of both our properties at 601 and 607 Fourth St. South. Sincerely, Amy and ,tim McKee Enc. Northstar MLS Matrix Page 1 of 1 N To �/ TD -gyp �sT/ �g AT s F 1 � I cll littp:llmatn'x.nortlistarmis.com/ Matrix /Publ is /InteractiveMapPopup .aspx ?Record1D = 3579... 12/16/2010 4 F ,a a srf s� Vg 41 page 2 Cultural Significance Analysis There are three main ways to look for the cultural significance of this home based upon occurrence or occupant, deed records, city directories, and historical archives. We have examined two of the three. In the context period of Stillwater History we were able to attach the surnames of Lohmer, Kuhlman and Whalen to the house. In referring to historical archives we found this houses image in one picture involving a courthouse function, but nothing close enough to give us a confirmation of a significant resident or occurrence , or add to our knowledge of the original architectrual detail of this housel. This house will not qualify for the national register based upon these contexts. The loss of any part of the "whole ", being the entire 19` and early 20 century housing stock in Stillwater, is a point that needs to be looked at carefully in a town like Stillwater, where it is important to maintain that critical mass of historic housing that makes Stillwater an important remaining icon of the 19 century in Minnesota. In historical appraisal of this house, I can see very little to justify the historical preservation value that would be necessary to offset the extreme costs of an overall historical renovation of this house. There is also very little to base restorative practices on because of little detailed historic fabric remains of what was there. .. �., B!A L Al ARCHITECTS Washington County Assessor - General Parcel Info Washington County Assessor G , e neral linformation Pin: 28.030.20.43.0066 Address: 607 4TH ST S STILLWATER MN 55082 Class: Residential Map Area: Stillwater MFR PART OF 045 BEG AT PT IN E LINE OF 4TH ST IN SD ORIGINAL TOWN OF STILLWATER 100FT S OF NW COR OF SD BLK 45 & RUNNING THN E ON LINE PAR WITH N LINE OF SD BLK 11 OFT TO PT THN N ON LINE Legal: PAR WITH E LINE OF SD 4TH ST 50FT TO PT THN W ON LINE PAR WITH N LINE OF SD BLK 11 OFT TO E LINE OF SD 4TH ST & THN S ON SD E LINE OF SD 4TH ST 50FT TO PLACE OF BEG SubdivisionName STILLWATER BLOCKS 38 -46 Block 45 SubdivisionCd 10694 Page 1 of 2 7 kr -1 ) SC � rw Year Valais inior a1ion Year Land Value Dwelling Value Improvement Value Total Value 2010 80,300 119,200 0 199,500 2009 81,000 131,200 0 212,200 2008 80,000 143,100 0 223,100 2007 80,000 129,300 0 209,300 2006 82,700 111,700 0 194,400 2005 80,000 108,100 0 188,100 2004 57,200 117,400 0 174,600 2003 47,300 114,100 0 161,400 2002 40,000 105,000 0 145,000 2001 35,000 96,100 0 131,100 2000 31,200 89,200 0 120,400 ■ Minnesota Abstract & Title Site Inspection Sheet 1010 Dale St. No St Pauk Mn 55117 Phone: 6514884300 Fax: 651488-0200 File No• 'SW'Z - M V Inspection Date• L) I la By: f t i J { rp Lr- � y L ao I� i oov. uuVvPA lvi naivoi iv "i: iriv vuL UVUl Uau t cup tan.auvu l mullw aacl... uuY. wr 11V111Gb - bttly /bull W tit... e R egister I Sn__in I Manag my ad I F121D Free classifiedsm Minneapolis -St. Pau( Ch anoe What are you looking for? j All Categories Post_ your FREE ad t2 assifiedS — -- - -- - -- -- GO Free, Friendly, Local , In 1 All Minneapolis -St. Paul j Or I ZIP Code, City or Address miles! eBay Classifieds_ Minneapolis -St. Paul Housing Homes for sale 1880 duplex for sale TO BE MOVED from current location - $150 (stimater) Flag this Ad Details for 1880 duplex for sate TO BE MOVED from current location Address: Stillwater, MN, Stillwater, MN 55082 ( map ) Date Posted: 12116/10 Bedrooms: 2 Bathrooms: 2 Size (sq ft): 2032 Year Built: 1880 View larger image Here are some similar arts 198MO Duplex in St. Paul near Lake Phalen - Fully Rented - Positive Posted: 11/05/10 Posted by: Unregistered user I View all ads Acthm since 1212010 Description Up /down duplex with unfinished basement and attic, 1 br /ba in each unit. Wood construction, newer roof. Buyer must relocate entire house away from its current lot within 30 days of purchase. Ad ID: 7957000 Share in t- ,: I More Like Sion Up to see what your friends lice, S11a4,s00 Cul -de-sac Location Close to a School! Posted: 11/02/10 � Nleed heID? Why Est 1880 duplex for sale TO BE MOVED from current location on eBay Classifieds? Its Free, Friendly & Local Help Abad Blog Mobile Apps Privacy Policy • Terms of Use Contact Lis Popular Searches Twitter Facebook Copyright ® 2007 - 2010 10jij International Limited. 1 of 1 12/17/2010 9:39 AM Mark D. Wendt Construction 142 Boutwell Court Stillwater, MN 55082 651 - 351 -0939 Stillwater, Minnesota Dec. 17, 2010 Tim and Amy McKee Rage 2 of 2 22. Apply cement "parging" to above grade portions of ICF foundation. 23. Dispose of all waste materials generated by this project. Price for above noted items: $237,000.00 Two Hundred Thirty Seven Thousand Dollars. Payment Schedule: 25% to start 11, 25% when framing inspection is complete 25% when drywall is in and exterior completed Balance upon completion and Certificate of Occupancy Permits are an extra cost, and will be billed at cost. Mechanics Lien Notice: ANY PERSON OR COMPANY SUPPLYING LABOR OR MATERIALS FOR THIS IMPROVEMENT TO YOUR PROPERTY MAY FILE A LIEN AGAINST YOUR PROPERTY IF THAT PERSON OR COMPANY IS NOT PAID FOR THEIR CONTRIBUTION. UNDER MINN LAW YOU HAVE THE RIGHT TO PAY PERSONS 7 - 1 WHO SUPPLIED LABOR OR MATERIALS FOR THIS IMPROVEMENT DIRECTLY AND DEDUCT THIS AMOUNT FROM OUR "'': "= CONTRACT PRICE, OR WITHHOLD THE AMOUNTS DUE THEM FROM US UNTIL 120 DAYS AFTER COMPLETION OF THE IMPROVEMENT UNLESS WE GIVE YOU A LIEN WAIVER SIGNED BY THOSE PERSONS WHO SUPPLIED ANY LABOR OR MATERIALS FOR THE IMPROVEMENT AND WHO GAVE YOU TIMELY NOTICE. INITIALS: Submitted: z 1 1 4..e 7 Accepted: Licensed • Bonded • Insured Lic # BC 20195081 December 30, 2010 To the members of the Heritage Preservation Commission As neighbors of the McKee's and next -door neighbors of 607 Fourth Street South, we fully support their intention to demolish the run -down, vacant house at this address. For some time, this house and property have not been ideally maintained. Further, we have observed undesirable activities involving the renters such a property attracts. We have seen the condition of the home inside and out and do not believe it is reasonable to restore. We would prefer to have more green space on our block. Please approve the McKee's request for a demolition permit. Thank you. Regards, Ju it d Ernesto Luna 613 4' St. So. Stillwater, MN 55082 (directly adjacent to 607 4 th St. So.) �N 55 4 WIN water Heritage Preservation Commission DATE: February 3, 2011 CASE NO.: 11 -06 APPLICANT: James Nelson and Elizabeth Whitbeck REQUEST: Demolition Permit for a residential single family home and an Infill Design Review Permit for a single- family home LOCATION: 1411 Carnelian St N HPC PUBLIC HEARING DATE: February 7, 2011 REVIEWED BY: Community Development Director PREPARED BY: Michel Pogge, City Planned BACKGROUND James Nelson and Elizabeth Whitbeck, property owner of 1411 Carnelian St N, are requesting a demolition permit for the existing single- family residential home on the property. The property is in the Neighborhood Conservation Design District and as such needs an infill design review permit for the new home. 1411 Carnelian St N Demolition and NCD Permit Page 3 (5) The reason for the proposed demolition and data supporting the reason, including, where applicable, data sufficient to establish any economic justification for demolition; The applicant has included a number of items in support of their request. 1. A letter from David Morris, a Licenses Professional Engineer, Was submitted listing a number of the defects within the current structure. 2. Cates Fine Homes submitted a quote noting that it zvould cost $16,550 more to rehab the existing home rather than demolish and build anew. (6) Proposed plans and schedule for reuse of the property on which the building or structure to be demolished is located; The applicant stated in their application that they plan to build a nezv single-family home in its place. Elevations of the home are included in the applicant's packet and will be discussed further later in the report. (7) Relation of demolition and future site use to the comprehensive plan and zoning requirements; The current comprehensive plan land use designation for the property is Single Family Small Lot and is zoned RB, tzvo family residential. The plans as submitted would meet all zoning requirements. This site is in the Neighborhood Conservation Design District and since the main structure is being removed the nezv home is subject to the infill design criteria. (8) A description of alternatives to the demolition; The applicant included tzvo alternatives to demolition, however, they each come at a higher cost as opposed to demolishing and building anew. (9) Evidence that the building or structure has been advertised for sale for restoration or reuse and that sale for restoration or reuse is not economically feasible. The applicant did not submit any information that they attempted to advertise the building for sale for restoration or reuse. Demolition Findings Section 34 -5 Subd 2 outlines the criteria for approval or denial of a demolition permit. There are two criteria the Commission must consider in either approving or denying a permit. 1. Is the building or structure historically significant? The code defines historically significant as "any building or structure or portion of a building or structure on the National Historic Register, a designated local landmark or a contributing structure or building in a designated national register historic district." This building is not a historically significant building per City Code requirements. 1411 Carnelian St N Demolition and NCD Permit Page 5 Building and Site Again, due to the unique lot situation, many of the elements on site layout don't apply to this case. The home shows good four -sided architecture in the type and style of trim, detail and roof elements as required for these criteria. Architectural Details The level of detail shown on the plans overall reflects appropriate choices in trim and detail and is appropriate for the neighborhood. In an email to staff, the applicant indicated that they plan to use cement board lap siding, similar to Hardie Plank, with 4" reveal. The windows will be Marvin Windows as outline on the attached window schedule. All windows will be as close to what is represented on the elevation drawings as possible. The lighting will match what is on the house today, lanterns by the exterior doors except for the front door. Recessed overhead lights on the front and back porches. Since the type of siding, specifics on the windows, and a lighting plan were not included in the application, conditions related to these items have been added. Neighborhood Conservation District Design Review Findings Overall the plans are appropriate for the site and neighborhood. The applicant should submit additional details regarding the type of siding, specifics on the windows, and a lighting plan prior to issuance of a full building permit. ALTERNATIVES The HPC has several alternatives related to these two requests: A. Approve. If the proposed demolition and infill design review requests are found acceptable to the HPC, they should be approved. Staff would recommend the following minimum condition for approval. 1. All minor modifications to the plans shall be approved in advance by the Community Development Director. All major modifications shall be approved in advance by the HPC. Determination of the distinction between "major' and "minor" shall rest with the City Administrator. 2. The siding shall be cement board lap siding, similar to Hardie Plank, with 4" reveal. 3. The windows will be Marvin Windows as outline on the attached window schedule. All windows will be as close to what is represented on the elevation drawings as possible. 77: 15 1�Cj �- � a w LL W 4"" 77:1L2 am .7V ib .a% g E t ali tk- X In 10- q ...... ...... UJ M 0 W 0 Az vmQ1 Ing NiW4 *2vii wa,;I� ✓�L+ I 77: 15 1�Cj �- � a w LL W 4"" ....... .......... ali tk- X In ...... ...... UJ W 0 77: 15 1�Cj �- � a w LL W 4"" ali tk- tk- UJ W 0 UJ W 0 vmQ1 Ing NiW4 *2vii wa,;I� 18 January 2011 City of Stillwater Heritage Preservation Commission 216 Fourth Street North Stillwater, MN 55082 Dear Members of the Heritage Preservation Commission: Through this letter and the attached application we are requesting a demolition permit for the structure located at 1411 Carnelian St North. This house has been in our family for 90 years and has been home to 3 generations so this is not a request that we make lightly. The house is a balloon framed structure that Washington County records indicate was built in 1878, although the roof slopes and the now exposed skeleton indicate two different construction events. The attached pages contain the additional information about the house and how we have come to make this request as follows: Demolition request permit .................................................... ............................ . * .. l Description of the property and history ..................................... ..............................2 Photographs of the elevations of the house ................................ ..............................4 Description of the project and how we came to make this request ..........................6 Economic justification and thinking behind the demolition request .......................9 Description and elevation drawings of the proposed new structure ......................10 Structural engineering report on the condition of the existing structure ...............13 Construction cost estimates on the two options ........................ .............................16 Topographic survey of the property .......................................... .............................17 Note from City of Stillwater engineer about sewer depths ....... .............................18 We ask that you consider this request and grant this demolition permit in an expeditious manner as we are anxious to move forward with this project and being able to live in our home again. Sincerely, James H Nelson and Elizabeth C Whitbeck 1411 N Carnelian St Stillwater, MN 55082 Heritage Preservation Commission Demolition Request Permit Demolition Permit No. Fee $150* Receipt No. Address of Project: 1 lvi CAQP IA-fJ ST; Parcel No.: 2 03 Zd 33, Q d S Lot Block Subdivision C o A d J, b y Applicant: -mil A m o s (- PJ t� L -sor3 L L r z X, eJP C: (., k Address: t4 l l /� � Sl', Telephone No.: ( 17- ° V (o " 4 7 C) 2-1 Owner if different than Applicant: Address: Telephone No. Type of Structure: 5 i 1 r �A-rn 7 z nfNn e_ Age of Structure: J 32 XA� Condition of Structure: -Zi ®9 M, ( 0, - Z l < o,W - 4)4 5k �- I:1 k*tl c c , , n fD S n, M a i g ' a ' n 1'?" M Arl y To ry"I 4 bu i L of r� r C. � Intended Use of Site after Demolition: S3 PJ! 1t� r AA► i r- h o m e— Signature of Ap* -ant Chjjt Date Si nature of O er Date *After Heritage Preservation approval, there is a 10 -day appeal period. Once the 10 -day appeal period has ended, the applicant will receive a design review permit which must be signed and submitted to the City to obtain the required building permits. A building permit must be obtained with the City of Stillwater Building Department. The fee for the building permit is based on the valuation of the demolition p roject. Office Use Only HPC Review Date: ❑ Approved ❑ Denied City Planner /Community Development Director Date 0 1411 Carnelian St N. Stillwater, MN 55082 Map showing approximate nearby property boundaries per Google Maps Property ID: 21.030.20.33.0082 Property Description: Lots 1 -2 -3 -4 & 6 of Block 16 & S 15ft of lot 7 & pt of vacated Sycamore St & pt of vacated Carnelian St except S 25ft of lot 6 in Cooper's addition to the City of Stillwater. Owners of record: James H Nelson and Elizabeth C Whitbeck PA Moore St W Sycamore St w Z St Croix Ave W Map showing approximate nearby property boundaries per Google Maps Property ID: 21.030.20.33.0082 Property Description: Lots 1 -2 -3 -4 & 6 of Block 16 & S 15ft of lot 7 & pt of vacated Sycamore St & pt of vacated Carnelian St except S 25ft of lot 6 in Cooper's addition to the City of Stillwater. Owners of record: James H Nelson and Elizabeth C Whitbeck PA Property History: The Washington County records indicate that the house on the property was constructed in 1878 and we have no reason to question that date except to note that the west most wing of the house was constructed at some point after the east wing. In the time period from 1901 to 1906 Martin Christensen acquired the property in a series of 3 transactions consolidating the ownership under a single party after many years of portions of the property passing through numerous parties. It is our understanding that Mr. Christensen and his family resided on the property for some years before this, renting it from the prior owners of the various parcels. In 1921 Henry and Cecilia Whitbeck rented the house at 1411 Carnelian from Eliza Christensen, the widow of Martin Christensen, and moved there from Bayport. In 1929 the Whitbecks purchased the property from Eliza Christensen and raised their sons William and Philip there. In 1959 Henry and Cecilia sold one and a half of the lots to Vernal and Jo Ann Johnson so they could build the house currently at 1404 William Street where Jo Ann still resides. The Whitbecks continued to reside on the property through Henry's death in 1969 and Cecile's death in 1982. At that time ownership of the property was transferred to their son William Whitbeck. From 1983 to 1996 the property was rented to a series of tenants. In 1996 ownership of the property was transferred to William Whitbeck's daughter Elizabeth and her husband James Nelson. Betsey and Jim moved into the property in 1997 and have continued to reside there since. 1411 Carnelian St N. Stillwater, MN 55082 East Elevation South Elevation q 1411 Carnelian St N. Stillwater, MN 55082 West Elevation North Elevation .5� Project Description Goals: In the fall of 2009 we started working with an architect to renovate the property and accomplish a number of goals: • Raise the elevation of the structure by approximately 3 feet The structure currently sits in a bowl formed by the existing topography (see the attached topographic survey for details). The result of this is that there have been increasing incidences of water infiltration into the house over the last 40 years and significant damage has been done to the structure of the house. After reviewing the issue with a civil engineer and several building contractors it was determined that the course of action that would cause the least disturbance to the surrounding property would be to raise the house. Since the lifting of the house would need to be done to achieve the goal of putting a foundation under the entire structure raising the elevation of the structure would be easily done at that point. • Put a foundation with frost protection under the entire structure The current structure has a foundation under approximately half of it. A foundation exists under the kitchen, the stairway area and about half of the dining room area. The living room has a shallow limestone foundation, the other half of the dining room appears to be resting on shallow piers of piled stones and the den has a slab foundation without any frost footings. In the 1940's the current foundation was dug to underpin the kitchen and stairway as the western most section of the house was in the process of sinking as the house hinged at the junction of two different additions. At that point the western wall of the structure was almost 5 inches lower than the eastern wall. The portion of that addition that was not underpinned has continued to sink until now the southwest corner of the structure has sunk several more inches and is in direct contact with the ground (see attached report from structural engineer). After discussions with several building contractors it was determined that the most effective way of putting a foundation under the house was to raise the structure and have the foundation dug and constructed all at one time. • Modernize the plumbing The house currently is attached to the city water supply but also has a septic tank and drain field that was installed in the 1950's. The house has a single full bath and a separate small room with only a stool off the kitchen and we want to have a full bathroom on the first floor of the house. We also would like to install a dishwasher in the kitchen. The existing plumbing in the house was done with galvanized pipe that has rusted to the point where water pressure is a significant issue so there is also a goal of replacing this with more modern plumbing. Although the septic tank and drain field are still in good repair, they have a limited life expectancy and would not support having additional bathrooms installed in the house plus any increase in water usage from other appliances. Y The City of Stillwater will not allow new septic tanks to be installed with the city limits and is requiring that we connect to the city sewer. Connecting to the sewer system creates another challenge that also fed into the first two goals (raising the structure and installing a complete foundation). The current elevation of the structure and surrounding topography does not provide enough of a downhill run to reach either of the two connection points with a normal 4 inch drain pipe and still have that pipe remain 48 inches below ground at all points of the almost 300 foot run (see the attached topographic survey and city engineers note about sewer main depths). This would require either raising the elevation of the structure and some of the surrounding topography or obtaining a variance to connect using a larger diameter pipe and installing that pipe at a significantly higher cost. • Install a staircase that meets building code requirements The existing staircase can best be described as a slightly inclined ladder. The rise verses the run is significantly greater than any standard staircase and there is only 5 feet of clearance as it transitions between the first and second floors. As we get older these stairs will become increasingly difficult to climb and the low clearance will make it difficult for anyone providing emergency services to reach the second floor. We would like to have a staircase with a normal incline and that provides the 6ft -8in of clearance that is required by code. • Add a first floor family room, first floor bathroom and master bedroom suite The house is currently just over 1200 square feet in size. After living in the house for over 13 years we would like to add the additional space to make the house more livable for us and to add the first floor bathroom so that we can continue to live in the house as we get older and can no longer navigate the stairs. Progress To Date: By November 2010 the construction plans were finalized, a structural engineer had been engaged to ensure that the old structure would support all of the changes, a contract was signed with Cates Fine Homes to do the construction and a building permit was applied for with the City of Stillwater. In December 2010 Cates began the interior demolition on the structure that was called for in the plans under a permit obtained from the city earlier in the year. By mid - December they had largely finished that demolition. About that time they were also notified by the City of Stillwater that the building permit had been approved and was available to be picked up. IN Current Status: After the demolition was completed the structural engineer, David Morse, visited the site to look at the existing structure now that it was exposed. At that point he saw several issues with the existing structure being able to support itself through the process of being raised, much less supporting the planned modifications. He requested that the floor boards be removed from the first floor of the structure so that he could see the condition of the joists and sills since he saw issues in the structure above that made him question their viability. The floor boards were removed a few days later and the exposed areas showed that his concerns were justified. Photographs of the exposed areas were sent to the engineer for review. The final report from the structural engineer (see attached copy) indicated that the existing structure was not sound enough to support the planned modifications and that effectively a new building would need to be constructed inside the shell of the existing structure if we wanted to continue in the way we had planned. 8 Demolition Justification: After reviewing the report from the structural engineer (see the attached copy of the report) which indicated that extensive work would be needed to strengthen the existing structure, work which was not included in the original construction contract, we asked Cates Fine Homes to put together an estimate of three different options. • Option #1 — Perform the work outlined by the structural engineer to strengthen the existing structure. • Option #2 — Remove the second floor of the house, strengthen the first floor per the structural engineer and build the second floor and roof as new construction. • Option #3 — Tear down the existing structure and construct a new house Part way through the estimating process it became clear that Option #1 and Option #2 were essentially the same thing and would require the same amount of materials and labor so Option #2 was disregarded. The resulting estimates (see attached estimate from Cates Fine Homes) showed that it would be significantly more expensive ($17,000) to strengthen the existing structure than to demolish the existing structure and start from scratch. Note that these estimates reflect cost increases to the project as it was originally conceived and not total dollar amounts for the project. A number of other economic factors also come into this decision: • We have already spent in excess of $20,000 in designing and labor to save the original structure • Additional money would need to be spent having the structural engineer and architect specify and draw out exactly what would need to be done to the structure to strengthen it correctly • We have already scaled back our original plans substantially in order to bring this project in within an affordable budget • Even the least expensive of these options adds almost $25,000 to the planned construction costs The only option that we believe makes sense is to tear down the existing structure and build a very similar home on the same site. 9 Plans for A New Structure: In reviewing the existing building plans there were only a few changes that we wanted to make that would be visible on the exterior if the entire structure was going to be built from the ground up: Change the pitch of all the roof sections to be 12/12 so that they would match the steepest slope of the existing house and be more in line with the 1870's heritage of the original house. Raise the ceiling heights of the entire second floor so that there could be flat 8ft ceilings without any knee walls or rafters cutting through. This would increase the height of the building by about 2 feet. Add a second story above the den to add some additional space to the second floor and allow the guest bedroom to be larger and the floorplan to be less cluttered. The footprint of the house will remain the same as the footprint on the plans that have already been approved by the city, so no additional changes are needed to the drainage plans. The structure will be slightly taller than the original plans but is well within the height permitted by the zoning regulations. The new house will also retain much the same look and feel as the old house. The architect has developed some elevations of what the new structure would look like that are on the following pages. E EAST 01 1/8" = 1' -0" 2 SOUTH 01 1/8" = 1' -0" Proposed Elevati - Front and Main Side Whitbeck Nelson House 1411 North Carnelian Street Stillwater, MN 55082 Date 01/02/11 O Scale 1/8" = 1' -0" 3 NORTH 02 02 1/8" = 1' -0" 118" = 1' -0" 4 WEST Proposed Elevations - Back and Hidden Side Whitbeck Nelson House 1411 North Carnelian Street Stillwater, MN 55082 Date 01/02/11 Scale 1/8" = 1' -0" 02 -L-L JANUARY 10. 20 1 1 MEL.A.NJE A.. KuHN, RA, LE.ED AF 700 WASHINGTON AVENUE, #613 MINNEAPOLIS TIN 5401 DAVtO S. MORRIE1, P*A 6;940 TICONDEROGA TRAIL EDEN PRAfRIC, M'S S$3 46-2102 PHONE CELL I OsMpv@QWCSTOFFI0Z-NET 5u13,3Er-T STRUCTURAL Ass REQUESTED, f AM SUMMARIZING HERE MY OBSERVATIONS ANTS QPtNIONS RE453ARDINS THE CONDITION OF THE EXISTING SUI�-DING STRLICT"R —1 HE INTENTION LINDER-LYIN13 THE REPORT 19 TO DESCRIBE CURRECTIV9 WOt I-4EUESSAVY ik MY rlPtNBON TO MAKE 7*4E BUILDINO COMPLIANT WITH THE STRUCTURALL-Y PRD'VtWONS OF THE MINNESOTA STATE Corcm, THIS t$ 8ASC0 ON VISUAL INSPECTION! MAOP- ON 8-27-1 0 AND ON 1 0, AT WI- TIME PHOTO$ WERE TAKEN. IT IS ALSO BASeO ON A TO ME THAT WERE TAKEN AvTc�R THE REMOVA�- OF VvIEW L. PHOTOS R EST PORTIONS OF THE FIRST FLOOR SHCATRING.- WHICH ALLOWED AN INSPECTION- OF THE Flk!51 FLOOR PRAWN O AT THE 8UtLDtNG peRaMCT ER. THE DEMOLITION PLAN5 ISSUED By YOU ON 1 1 < 20-1 0 APE USCO, FOR REFERENCE TO Cif VARIOUS AREAS TAI SCOSEEO- Roth FRAMING At-40 SECONDSTORY WAt,t ROOF FRAMING TYPICALLY caNSISTS OF ZX4 RAFTERS AT 24 OX., rXaCPT AT THE CAST * *JING WHERE THEY ARE AT 36 O C. C04-LAR TIES TYPICALLY TIE THE RAFTERS TOGETHER AT THE CEILING HEIGHT- ROOF SHEATHtt'40' IS 5PACCO I x 60ARDS, WITH Cie:OAR SHAKES SHOWING IN THE MAPS 8ET WEEN THE: BOARDS. IT IS NOT KNOWN IF THERE ARE ANY OT14MR LAYERS OF MATERIAL 13ETWCACN THE CEDAR SHAI49 AND THE METAL REjoF. ROOF f AT 71-4E ENTRY PORCH AND AT THE WEST PORCH fS NOT VI S I OLS, qtI,4cv THE PORCH CEILtNJ3 IS STILL IN pLAUg SO THAT THIS FRAMING iS UNKNOWN. SCCONO STORY WALLS ARE TYPICALLY 2X.4 AT I S" O.C. WALLS ARE BALLOON-FRAMED, MZANj.NG THAT ST UOS ARE CONTINUOUS FROM THE TOP OF THF WALL AT ROOF RAFTER SEARtnF5 ELEVATION DOWN TO THE FOUNDATIOtq, WItqonw opEw:r4rs IN THE SER. ONO 'STORY WALLS 00 NOT HAVE ANY READERS. WALL SHEATHING CONSISTS OF 4-40RAZONTAL I X BOARD SHEATHING, IN -4Y OPINION, THE: FOLLOWINU CORRE=TWE WORK WILL BE REM12VE METAL RMOF AND CIEOAR SHAKES AND ROOF EReATI-41NG BOARDS AND PF-PLACK WITH PLYWOOD ROOF SHEATHINO� * ADD ADDITIONAL RAFTER SETS WITH COLLAR TIES AT THE EAST WING TO REDUCE THE 0AFTEP SPACINM FROM 36" 70 1 8"- UPP ER ROOF -S, ACID rqF-W ZX4 1 AT BOTH THE CENTER WING ANO THE WEST WING DIAGONAL mE S TO TI-4E RAFTER/COLLAR TIE BETS TO CONVERT THESE TO THE EQUIVALENT OF SCISSORS TRU C:S, WITH REPAIRS AL 50 4A:A09 TO EXISTING INADEQUATE CONNECTIONS eETWEEN COLLAR TIES AND RAFTERS. 1 3 . . . . . . . . . . . . . 1 3 Jam"arl lf) M I P4(ge ATTHe JUNCTURE BETWEEN Ttle: CENTER AND WEST WINGS, ADD A NEW RCTOF 89-AM AND POSTS TO FROYMION FOR THE PRESENT LACK OF SUPPORT ALONG THIS LINE. ' INSTALL NEW )4EADERS AT ALL WALL, OPENINGS THAT PRESENTLY HAVE No HEADER, '- ADD NEW WALL STUDS UN:OVR 1 AND AS REQUIRED TO HAVE WALL. STUDS AT 1 6" M.C. 5. 1 SECOND FLOOR JOISTS ARE TYPICALLY OPIENTED NIfIRTH/SOUTH AT THE CENTER AND WEST WINGS. THEY ARE ATTACHED TO THE BALLOO"IrRAMED EXTERIOR WALLS WITH BEARING ON A LF-T-IN I x4 LEDGER AN StOr NAILS INTO THE WALL STUDS, THE SOTYOMS OF THE JOISTS ARE NOTCHED WHERE THEY PLIN OVER , r HE I x4 LEDGER, THE BOTTOM NOTCHES ALSO OCCUR WHERE THE dDIST5 SEAR ON INTERIOR 2x4 STUO WALLS. JOISTS ARE SEVERELY DAMAG90 IN A NUMBER OF LOCATIONS WHERE THEY HAVE 91-F-EN CUT AROUND OaSTRUCTIONS SUCH AS THE CHIMNEY OR FOR PLUmBIN13 RUN'q !N My OPINION THE FOLLOWING CaRRECTIVE WORK WILL SIE REPUIRED. SISTER NEW jOjS ONTO ALL DAMA13ED JOrSTS. REINFaRCE CONNECTIONS AT THE SA.4„LOON- FRAMED WALt'S. INSTALL NEW FLYW000 FLOOR SHEATHING AFTER REMOVING ALL EXt5TINra I X 5OAQ`D -t- x INSTALL NEW HEAVE S AND WALL STUDS AT ALL rIRST STORY WALL OPENINGS' AND AS REQUIRED UNDER HEAOER SCARINM AND TO PROVIDE FOR WALL STUDS AT 1 6 11 T c, F'IRST FLOOR JOISTS --PAN NORTH/SOUTR Al-40 BEAR ON TfMWEP SILL BEA MS AT THE BUILDING PERImET,%R THE JOISTS ARE EITHIEO Sr,2TTOM NOTCHED FuR BEARING ON A 2X4 LEDGER THAT IS IN TURN ATTACHED TO YH TIMBER BILL VACAM OR THE JOISTS; BEAR ON NOTCHES CUT INTO THE GILL SEAMS. AT THE iNTCRIOR FOUNDATiON WALL AT THE SOUT" SIDE OF THE 13ASEMENT THE JOISTS ARE CONTINUOUS OVER THE FOUNDATION WALL ANN SFMPLY SEAR ON IT WHERE THEY mErT. THE JOISTS ARE GENERALLY IN GOOD CONDtTEON AT THE INTERIOR, OF THE BUILDING AND AT THE PERIMETER OF THE BASEMENT BUT SHOW SIC3NS OF ROT AT ALL OTHER PERIMETER CT NOITfUNS WHERE THE SILL BEAMS: BEAR ON SHALLOW STONE: FOUNDATfON WALLS OR HAVE UOM44 IN CONTACT WITH EARTH, THE -Sil-l- eEA-49 AT THE SHALLOW 5T0r4F- FOUNOAT104-4 WALLS ALL HAVF- ROT OR ARE SUSPECTED - 70 HAVE ROT. THE SHALLOW ST THE FOUNDATION WALLS APE NOT A 0000 TYPE Or FOLINDATtor-k IN THAT THEY ARE GENERALLY NOT, ir-ITACT, ARE NOT WATERTIGHT, PRO ABLY DO NOT EXTEND TO THE REqumEo DEPTH F FROST PROTECTION, AND an NOT PROVIDE A GOOD CONNECTION TO THE WOOD SUPERSTRUCTURE. THE ORIGINAL f WALLS AT THE !BASEMENT PERIMETER HAVE AT SOME PC34NT BEEN REINf'ORCE0 WITH AN INNER 4ACKCT OF EtTRER CONCRETE BLOCK OR POURED CONCRETE. THESE NEWER FOUNDATION WALLS APPEAR TO 6f, PEPFO14 MIN G WELL. IT 15 OBVIOUS THAT, THE FIRST FL13OR FRAMING HAS EITHER EXPERIENCED UNEVEN SETTLING OR THAT THE FLOORS WERE INSTALLED AT DIFFERENT ELEVATIONS AS THE W3NGS WERE BUILT ONTO THE ORIGINAL 8"ft-OiNG, OR A LITTLE OF BOTH OCCURRED. BUT iN ANY CASE THE FLOOR IS NOT LEVEL ACROSS 114C SUIL•NNS. IN My OPINION THE P - OLLOWfNG CORRECTIVE WORK WILL BE REQUIREDY PE MOVE AND REPLACE ALL ROTTED TIMBER SILL BEAMS WITH, NEW PPESSURE TREATZO SILL BEAMS, * CUT ROTTED ENDS Of-'.JOISTS AND SISTER ON NEW JOISTS AS REQUtRE0. H 'Alnuary 10, 20) 1 Page 3 .r REMOVE AND REPLACE ALL PERIMETER 5HALaLOW STONE FOUNDATIONS WITH NEW CODE FOUNDATION WALLS AND FEIOTINGS. -�' AD(> JOIST HANGERS AT ENDS OF JOISTS WHERE THEY BEAR ON TIMBER SILL REAMS AT THE BASEMENT PERIMETER. * RAISE THE UNEVEN PIfIRTIONS OF THE: FIRST 1 f AND RESET ON EXISTING OR NEW r WALLfA AFTER TREATED PLATES OR SIr--L SEAMS HAVE SEEN INSTALLED BETWEEN THE WC300 rRAMINM AND THE FOUNDATION V.'ALLS. OTHE Ts A MEN AT THE CAST WING A NEWER SHELL WAS 1&OOZ0 INSIDE T'*AF- FXISTfNO WALLS AND ROOF FRAMING IN AN ATTEMPT TO SQUARE UP AND LEVEL THIS WANOi. E ADVISED THAT THE ORIMINAL SHELL IS NOT SOUARC. S#NMCTHERE IS A S'LA.5 ON GRADE HERE, THERL WAS P40 OPPORTUNITY TO INSPECT THE FOUNDATION WALLS AND THEY SHOULD BE CONSIDERED SUSPECT WITH REGARD TO THEIR FROST PROTECTION DEPTH AND THEIR GENERAL CONOtTION. ROOV V FLOOR FRAMING AND FOUNDATIONS AT BOTH �01404 ARE NOT OBSERVABLE: AND NO COMMENT CAN BE MADE AT THIS TIME, REGARDING EITHER T"Vtk CONDITION OR THEIR NEED FOR CORRECTIVE WORK. IT IS HOPED THAT THIS REPORT WILL BE U5EFU6 FOR OOTH PLANNING THE DES113N OF THE BUILDING AND rOk DEVELOPING COST ESTIMATES FOR CORRECTIVE WORK. PLEASE CALL IF THERE ARE ANY f,UESTEONG OR IF I CAN A5515TFURTHER. SINCERELY, DAVID E9, Tyr ORR&B P.E% I CATES FINE HOMES 2000 Industrial Blvd Stillwater, MN 55082 James Nelson & Betsey Whitbeck 1411 N Carnelian St Stillwater, MN 55082 January 13, 2011 COST COMPARISONS: New house: Material $13,900.00 Material & install of 8 windows $ 3,600.00 Labor — carpentry $ 9,600.00 Dumpsters and labor (tear down) $ 3,800.00 House lifting ($6,000.00) Total $24,900.00 Fix of existing whole home: Material $11,900.00 Material and install of 3 windows $ 1,350.00 Labor $24,600.00 Dumpsters $ 600.00 House lifting $ 3,000.00 Total $41,450.00 Please note: In the 40 plus years of remodeling in the Stillwater area we have worked with many old homes and saved the core structure, i.e 1420 North 4 th Street, 1224 South Second Street. While we'd like to try to work with and utilize the structure 1411 N Carnelian we feel it's a detriment and more wasteful to save the structure than demolition completely. P , �C) � d� 3 o J z, wg ° °m n o rh N .� � ,�' � �+ .-. A d � a3 y N d O, c W G m m r.(� 1- � • C E E M m` o m WI C fD rn iu> w ? Z . o z O L7. z ¢ w u l�j�� ° °� ww l w 0 o�j a D�a� n DE°' tY ,�6vm '•ya� O v v o o ^� x � a ° C=°u w " o O H • $ ° mrnw m �g y O , 7 r � r � � - v -.— __ - -. _ S� ch .L ��7 „6D'O���AI T Vlrl'II�A M 0 a] � o ! i J X ! I� w 0 O SZ I 0 r s A li !! ! 01 M ,161,L£a00 S m J JAAj SZ - - �� m t L ' @ I x x szt C, Y� ! X � O x x X h l p m I O I j h O' m � q 0 ON 3v G m Lon Y W ! O LO X SL� SI; g IVY6 i! I! i e ! x ! -- l m I II e x $a X c & arc X M o� N a x x i es k ^ a x m X a z X X i C) J X ! O� X i w 0 O SZ I ! I t xm M ,161,L£a00 S x j of mv� 60'90I L ' @ I x x szt X X � O x x X � w I j X $ � n m F ! N I C r hn I t xm L ' @ I x x szt a mTLp`oa.. — _ —\\\ -- g —N en 0 0 0 0 m xx 0 ON 3v O CO 0 � 0 0� I virl[3mnv ,7 1-. o f I M N 6£ f z Al uOIjLoD0 S 9 uol ;nlosell je ;emlll ;s 3 o f4lo jed po ;eoen O M o£ of of i { t� 01 O { 1 - W 1 7 O w � i 0: N L V1 1 { { i � O i Z L Q 1 ca 01 W l 1 Oa o ca u I a 1 l 0 1 W o� of do HJLHON M 0 s w A O 1 7 From: Torry Kraftson (tkraftson @ci.stillwater.mn.us) To: jim_nelson @att.net; Date: Thu, June 10, 2010 12:00:27 PM Cc: cshilts @ci.stillwater.mn.us; bwhitbeck @att.net; Subject: RE: Contact info Jim, I got the bench mark from Dan (monument at William/Moore 948.72). I went out with one of our technicians and shot the sewer. Here are the elevations: Sewer manhole at William /Moore Rim: 949.29 Inv: 935.54 Sewer manhole at William/Sycamore Rim: 943.58 Inv: 929.89 The sewer flows south on William from Moore to Sycamore at 1.8% grade. Your driveway is about 100 feet south of Moore Street, so the sewer invert in William Street where your driveway comes out is approximately 933.74. It is much deeper than the sewer at Carnelian. Hopefully that will get you going. Sincerely, Torry Kraftson Assistant City Engineer City of Stillwater 216 North 4th Street Stillwater, MN 55082 Phone: 651- 430 -8831 Fax: 651- 430 -8810 Email: tkraftsongci. stillwater.mn.us f Heritage Preservation Commission DATE: APPLICANT: REQUEST: LOCATION: ZONING: HPC DATE: REVIEWED BY: PREPARED BY: BACKGROUND February 2, 2011 Daniel Regan Design Review for the construction of a 15,480 sq ft building in the Campus Research & Development Zoning Distinct 2900 Curve Crest Boulevard CRD, Campus Research & Development February 14, 2011 Bill Turnblad, Community Development Director Torry Kraftson, Asst. City Engineer Michel Pogge, City Planner/UlTe CASE NO.: 11 -07 Dan Regan of Airlake Development is proposing to construct a 15,800 square foot single story multiple tenant office building at 2900 Curve Crest Boulevard. It is designed to be a medical office building, to be known as The Curve Crest Health Center. The Airlake Development lot has two building sites. The medical office building will occupy one site and the second will remain vacant for now. The subject property is one of four lots in the Bradshaw Addition. The lot to the west is home to the Associated Eye Care facility. The lot immediately to the east has two building sites: one for an existing multiple tenant office building, the other is vacant. And, the fourth lot is the site of the Bradshaw Funeral Home. With professional office buildings on both sides of Airlake Development's lot, the proposed Curve Crest Health Center represents a compatible land use. Moreover, development of the four lot plat has already incorporated all of the infrastructure improvements necessary to accommodate the new building. Airlake Development Design Review Page 3 of 4 Exterior Lighting Building - All building lights, including security lights, must be downlit. Light sources will need to be shielded from direct view of the public. Cut sheets of the fixtures shall be provided to the Community Development Department and found satisfactory prior to issuance of a building permit. Parking Lot - As noted on sheet E1.1, the lighting at the southern edge of the residential properties to the north are calculated to be 0.0. Cut sheets of the fixtures are included in the HPC packet. Signage Enclosed with the design review permit is the overall sign placement and style proposed for this site. The location of the low profile monument sign and the building signs seem acceptable. A design review permit and sign permit will both be needed prior to installing any of these signs. ALTERNATIVES The Heritage Preservation Commission has the following options: 1. Approve the Design Review Permit with the following conditions: a. All changes to the approved plans shall be reviewed and approved by the Community Development Director. Any major changes will also need to go to the Planning Commission and/or Heritage Preservation Commission for review and approval prior to issuance of any building permits. b. All utilities and ground or roof top mounted mechanical equipment must be screened from public view. c. A sign permit is required for any monument or building signage. d. Any outside trash receptacles must be completely screened with the same building materials as the main building. e. All gutters, downspouts, flashings, etc. must match the color of the adjacent surface. f. The street address of the building shall be displayed in a location conspicuous from the public street. g. The site drainage shall be revised to be consistent with the approved drainage plan for Bradshaw Addition. h. There are two locations on the plan where gutters discharge across paved surfaces (Plan Sheet C3.1). This could result in icy conditions during freeze thaw cycles. Additional catch basins should be considered to avoid this pedestrian hazard. i. Plan sheets C1.1 through L1.1 must be signed prior to issuance of a building permit. DESIGN REVIEW APPLICATION FORM COMMUNITY DEVELOPMENT DEPARTMENT CITY OF STILLWATER 216 NORTH FOURTH STREET STILLWATER, MN 55082 Case No: ®lZ CSI 7 Date Filed: I ?-1 D I/ Receipt No.: Fee: $25.00 The applicant is responsible for the completeness and accuracy of all forms and supporting material submitted in connection with any application. All supporting material (i.e. photos, sketches, etc.) submitted with application becomes the property of the City of Stillwater. Photos, sketches and a letter ofintent is required. Fourteen (14) copies of all supporting materials are required. All following information is required PROPERTY IDENTIFICATION Address of Project �q°d (44rye Cres4 Bl Assessor's Parcel No. )' 0 30 - 24 Oa (Required Zoning District Description of Project in details�G 1�2v -eu, 7 14XP C d n�S {� �! c 7 a� � ` �. r,5" �8� Sl• 4 r-e )CA0 7 C.�C 7 hereby state the foregoing statements and all data, information and evidence submitted herewith in all respects, to the best of my know /edge and belief, to be true and correct. I further certify I wi // comply with the permit if it is granted and used" If representative is not property owner, then property owner's signature is required Property Owne e U4 Representative A a Gt Mailing Address GJ4;fP Mailing Address a86 4Ji 4 8eai- /}v-- City State Zip If wood MN �S /off Telephone No. Signature (Required) City State Zip _do % wood . ,W /t/ 53 - o? Telephone No. Signature (Re uired) H: \mcnamara \sheila \2005 \design review permit.wpd July 13, 2005 Jk,aGTnfl30H90 WDICHK X& LVMTIIJS/1VdJMllnS iM /mIdO'SWOVINMUaIR aM(VTdIV C C m Q U � � = t C U L Q H H cn U riors R q a o ?A U I gg ass o O; O wi O O� O � w III �F2 O tN-4 U N =� IRE !9 M � Z � � f m om W U �C4 who {y � .� W-4 7 0Lr) z �wy E CO 0-� O U WW CL w CL oLL M w MEMEMEMEMMENOMME OMEN �o No � z 0 H \� W Cie o w `� � Q�3 o x � z ` f'1 Z N riors R q a do 00 � � C U 0�u c H H O1 m m 0 LL 0 4 3 0 0 0 o ?A U Q gg ass O; wi O� s g � w III �F2 O U N =� IRE !9 Z � � f m om `gb 8 C U who {y � U W 7 Z �wy E CO U CL CL oLL M MEMEMEMEMMENOMME OMEN �o No \� W Cie V � z Z o m i do 00 � � C U 0�u c H H O1 m m 0 LL 0 4 3 0 0 0 o ?A U Q gg ass O; wi O� s g � w o d �F2 O U N =� IRE !9 Z � � f m om `gb 8 C U who {y � U W 7 Z �wy E do 00 � � C U 0�u c H H O1 m m 0 LL 0 4 3 0 0 0 o ?A U gg O; s g � w I'L' �F2 O U N =� °" do 00 � � C U 0�u c H H O1 m m 0 LL 0 4 3 0 0 0 U < O �S d sgasssssss "' oe W o � °" O � � f m om m U who J 0 9� Z CO U CL CL oLL do 00 � � C U 0�u c H H O1 m m 0 LL 0 4 3 0 0 0 O LU Z o O o U � g 3� d U � �S d V M 3 � 95 b �o \� W Cie V � z Z o m O LU Z o O o U � g 3� d U � �S d V 3 � �o � g 3� d U � ■ p p S < Z m W _ 1 9-. -,L ,b -,ZZ ° I - - - - - - -- - - - - - - 4 I i i LL �n , 9 °RE `\ \\ I I V n • OL W OC �wH9 W W ` w 9z O I I � I I • - - - - - - .0-,Z .0 -,6 I I � ^ i I ^III e l •< ___ I . 1 I I � � •' • p Y 'Y I . o m ^o m v C C n ��- fW° -w Q °° U a ��� ova Wc o goo< ogosa = ow Y _- I I ,0 - ,OZ ,0 - ,4, 9 - , ,b -,S ,9 - ,4 „b -,S ,9 - ,b „4 -,5 „Z- - ,b - ,ZZ ,0 - ,9 I I I „0 -,0£ N L W s g -z �LU > 3 _ J W r d _�� a = z w � o w N N I I I I I I te 0 o Y E O O N LLL o U 3(A a �� � o �� o- W W W U a o L u tn ml N Q Q Q LILJ g � v �—Li Z Z ■ C I C L I L C C p p S ,4 -,9 1 9-. -,L ,b -,ZZ ° I - - - - - - -- - - - - - - 4 I i i LL �n , 9 °RE `\ \\ I I V n • M K d O m m G O I I � I I • - - - - - - .0-,Z .0 -,6 I I � ^ i I ^III e l •< ___ I . 1 I I � � •' • p Y 'Y I . o m v zzz I I ,0 - ,OZ ,0 - ,4, 9 - , ,b -,S ,9 - ,4 „b -,S ,9 - ,b „4 -,5 „Z- - ,b - ,ZZ ,0 - ,9 I I I „0 -,0£ ,0 -,Z£ ,0 -,9 C I C L I L C C � \ .8 , .W \7 O 11 v v U v v p p S ?rn G ° l? 9 °RE `\ \\ I I V M K d O m m G O I I o_ v zzz I I I I I I •� N N N I I I I I I te 0 I I Z W W W U N Q Q Q LILJ g � v Z Z Z != oN U U V N W Ln I I Z W 1 I 0 Z II I N01S !0 d01 OL 30VN0 MOtl� W O � J � 8 •r3� Z � i�w� o � N Z Z � w�o LL i O c p F W ✓ p � WSR �OwN I '^` Sa n O I ( Q I I I I I I W � I I I � <n O J W o I � \ .8 , .W \7 O 11 v v U v v p p S O o �UZSa � �o I 9 °RE V M K d O m m G O o_ v I I � 0 F g � v 5 � oN 3 W Ln I 0 I v W O � \ .8 , .W \7 O 11 v v U v v Q e a S pp J LLJ m Z H flio 6 Z got X30 8Q cG J W LU w ` W ad W wozW Rp 3 a Z C m C C a �°� w m V F— �� J_ ' W C'C� 'B�opO "s 7 Coo< 0 U D In 9 W W ° o V 00 O Z W ;i _ i �° � m J LLJ Z N - a v yo �3��� o a v z g a U Z V } oC Q z_o W _ C. � 3 0 Its Sao ° • I C m W H \ z 0 a W W x ° I 0� \ 3 O $ p z 0 J ° W .I N W 3� z 0 a W W o n O Z m z � 0 r ~gI i v"� °v $ Tip �XS z U v m J LU H OG FW co u D C C Q� �o € w w� ;zU p k O LLA W W > W C b 3 U J w OS SS' °� W Q W } N w � � N N z` .41 V�10 U3Ln '�_ ii6m" _ c - - a o o W W U 3 0 Its Sao ° • I C m W H \ z 0 a W W x ° I 0� \ 3 O $ p z 0 J ° W .I N W 3� z 0 a W W o n 0 i v"� °v $ Tip �XS z U v m a 3 LLA W '7 N W p N N z` .41 3 0 Its Sao ° • I C m W H \ z 0 a W W x ° I 0� \ 3 O $ p z 0 J ° W .I N W 3� z 0 a W W o n J J Q 3 J ° I I CL n LLA Z m Z m tea= w� ° y{ Q LLJ LJJ W C C 4 a� - ED a °° U , li 13 �- - _ m� � T g�= < = G 7 O O g < 3 (� � N r E aF� w j F c °woo ffi o i W J J LL J O - ��� o Q 'n 0 U tAU) a� - a ° s w � V) U J J Q 3 J ° I I CL n �� W �uuu W - z aaa U z _a =� W - 11 a z z z Q W vu z m sisit J w o J i N N N - � n Z 8 1 N CC W oe W C C 0p u c 01 K I l w Z Z Q O/a ; c'o 3 W W W C O w CL J 00 O ='y Eio Flow uuu o N lI1 —j LL O U 3 W a o s ttn V) LLn NOIS 10 d01 {/� � Ol 30tlN0 WOEId 3! N U F a � 5� z� W �uuu W - z aaa z z z Q W vu o J i N N N - � n Z 8 1 N 1 3 I I l w Z F a � 5� z� F 0 vg 0 I I I I I I I I I I I I I I I I I I I I I I I Z I I U I I N I I LV I I � I I N I I F- I I Z Z J S r 0 - ,4 ?ill W W W - aaa z z z vu . N N N Z O Z Z Z Q uuu J W 0- NOIS 10 d01 {/� � Ol 30tlN0 WOEId F 0 vg 0 I I I I I I I I I I I I I I I I I I I I I I I Z I I U I I N I I LV I I � I I N I I F- I I Z Z J S r 0 - ,4 ?ill BO X 3yi Iwvbo 3r1 ava ua -1 N011dliIDS30 NOISLA38 1V111WBf1S OdH ON l m �oow6 w °a >ooi° 86 - . o 'oo aa'oor _ � i � a it � � < � � � 3 � — 11�2'..,.:,�wrM NW `dOOM3ldVW NW `IIUVMIILLS $ iff&Kk(M) -d ff68'Kf (1S9)-9d 3f1N3nV 21V3B 311HM 99BZ JNIQII(18 3JLil0 1VJ143W V ^t 305S M MM'H190AI3TMHL55SMI ^• �i t �xtc� xns D `1NIMOBARI INMIV NVId NAOR $ SNOWOO DNIlAX3 U � ®p OMNxtl1d (1xV1 o Pt � 'ouI `uosx�ug 'usuxaai3 •zlo3 ��� �� w + ,--mmmv— Z Y Vr w 'J - � s , s . i e a ti e m 0 D R t z a� � `{yl W o�e IV � ti �1 � 1 I 1 • r♦V s ` r W 3 e y 1 za a 3 ° O �vl> U oua U H � 3 l �• I 1 I� - F G d 3 o a o j fr O a� w m o o o o o o o o o I � p • �r ._ 1 ti E K � I � � e 1 0 O 4 v r In 2 N o o L w U r =0 K m< 2 5z� J ZOO � O>> O K Z O_ JOa z K Z LL K 0 a �Op > Q' LL U z O w LL ~ pro zz z3a a� O1 U �O¢ ° nm W E~ 2 Ilk v . 1 f ' � N �, !' 'q O V }} h�ti 37 IC 3YI WVdal 3VI 3lVa It U-1 I N(Dlid]?IOSM N01W3H iviimens OdH ON L i 'E ZHO E g -e NW '(3oom3ridm NW 'SUVM11US 3nN3AV TVM 31JHM 99OZ 30S5 KK'OW OM'HI'JOX LTMS H155 SfbZ I ONialing 3XHO IV:)1(33W - I N CW4 "4 ORMAUnS ONI 'IN3Wd013A3(l 3NY111V NVId inoAv Z)u l'Uos3 IZ I IL I i 1 - Nuumamum 0 .4 P I h if lit t w LL I I z ------ (j fn U) U) • w A. W 2 W I Fl U, O r- a w z 8 zt U, U) In N w z w 153 S 09 0 0 2 0 En CID W) w LU a LL C Z T 'n d --4 U) w w w w 0 U- L 0 "n w w En U) W w (7i U) < z U) 2 U -, U -, 8) " In U) z X 14, (n 41, L U- 'D 0 n " i q, ZP LLI @ � w U- LL I a-, LL " 1 ; ' E w cn U, 00 2' rY Q z '40 cn In U) 0 a e UU CC w 0 a m ' (n + N m C n w > 4 A S!.t L kk ' R I 1 ,,- 1 a � Ill z -i C) 6w o uj In U) w w 144 L) Q w co l o q ;Zr V A- a w X - I z - O - Z W W cQ Z t= C-4 (n Z lz W - o co -- — �r- 't_r�l °Tl�r� w v o n P � J 1 � 11 \ 1 � W , N � W U > J . , - W 114 W 0A - : 8 5 w 0o w '4 PA �- w Z 0 t-4 LL \0 0 o , Z w 0 EL 'KI z u h "ZI Z CO U3 Ln z W Z < a W cn 0� < cn,tj W z w N M �-4 3�C � J � � I �� R N 4. '4 0) C 6 LL: V � L'� C6 L� L� o In cl) 0 U) M 0 L� .0 C6 c"i -7 in . .......... , z Z a 0 rl i w W as d U) U) D 0 z i w o 0 ES 0 w w W 0 x < Q It w IS m (j) 0 M (L TX 3K I1WVtl0 3LVa NOLW183S30 NOISIA3i1 'ON NW `dOOM3ldb'W m 3+, 3n 11 - 9 -1 u -0t -� �viwens 3dH 1 � � w ' m NW `213.LVMl1LLS .6 ow a 8, Iff69f611591 Yef ff89'60 (I59) '®9d 3nN]" lIV39 IUHM 99OZ DM(nn8 DI3d0 lV:)143W �— 26055 MW 'own DM 'Hi'dox LTM a ss SW I ' u o a J = ti ti °. ti 'JxRi93xi'JxT r l R. * Ox NVUO[K vt �xfxxvTaan 'ONI `1NIM011AM INYlNIV NVId IOXLNO3 NOISON] $ DNI(IM v a - � Z � � � o � � � � •�uI 'uos�aug 'usuiaaa3 ' =I °3 vai 1� o N � ❑ > 4 z z w ow w O o ° N z a� O K N O ..1 22 t: w Y ❑ O a O K w U J p y z rc O cyW3 W z W a? � O z m W =1 m O 3w ❑ o O a °O (J ❑ w o Q w m� LL & O Jow g ❑ �< m � m w < aw ❑ ° rra ❑ z W ❑ Z N 2 w o K p � w � a ❑ Z Z a � =o w, < a p N o =� z¢ O tw v mw ❑m �o w Fa O ~d O 3a mw it q I- ago m 2 w < X S2 z j� C y a� w w U III < q w < az Oj Op o p z c o w d < w O w � O J U 0 D o m ❑ Q ao �� < �� �a a ❑ W I I I aQ o tE !2� a> �� 3 Rw m z 1 rZ o > m2 ❑2 �� �<z �O I I 0 ao a F J a6 � 0 nj mw 6z m a ° 1 1 I 11 1 1 1 QQ Go W 1 II a z i 0 <. ta bu ' o sy � II' O e 11 £N 1+ £sue o I � �s I W L_ a ° i.-� tV m 1 X Q o 9 aP + ^ I I I I I I I I I w.�aa ronv '�i'oA�p�a +rvu,� •zlo nmzs NI NNVNa 3V1 3LV!! u - 9i NOI1dINDS30 NOISLA3N 1vilime1S OdH 'ON L � mF iS W W i w � F r°qwu �� Y$ w 3 'd z ' w a sw o _ ���« §� ` � 7 ' Q O z ti ti � � I " ° `" . lfl NW `dOOM3ldVW NW `i131YM11LL5 $ l fE6 (I59) -d 1188 (159) ° 2405 KW OWUMM'HiHONJI USKS5SWI 3(1N3/�V MG 311HM 99BZ 'JNI411�19 3JI 0 1VJI43W O ti � 5��10 VS101Lk wwwfzm 1 ti D, JNIH33NION3 r ' �Sd, 9 N ONI `1N3Wd013A30 3NVlNIV Nb'ld .111111(1 v � 'ouI'uos�oug'usuxaa�3 °zjo3 8ld0�FWLa �W171$6 a ❑ z a r m a LL p O Q LL w LLC j ❑ a LL o z y 2 ❑ U N Lv Q z N y Q Q 0 t W O J= O' U 0 w ¢ < z z a 5r m 3 m m U n m w 3 Z > m 3 m ❑tq ❑ ❑ m 3 a W ? K 2 C7 Z tw ❑ it"' y h h 2 O C Nw UZ h a r r dab 0 a U as w N rj w~ t1' I< a w w O • 2 o w a 3 U m U W -1 o U aa 2 2 U w H w W U R W E; r z ❑w a w w r r F z z I 3 m > �, o Z 2 W0 m o a v o r w z w Or w N wo Oz r 1 z F o N y z z TOO t ; 1 T m ti 0 0 0 o w F LL a ft v I 1 I O O O Z d U it j ^ a a a f a t w it a> 0 z 1.J N m a h m n m 1 �s4 1 1 3 i -�i r y W � 1 I ` h o o� 4 r'i r•7�-- ��� Tom° 1 \` ° \ \� I �� � ��W _ ,� o Rte f I 1 R I v V y I � V IZ3 8 "5 ; V � I IS,� I �W P--Ws m llv UIOZ'.S B03K 3Il rmvaa 3v1 3LVa nice - 1 NOLLd180530 N0151A3?J 1V111Wens OdH L m - Q o o w a w F w; ~ � ° w w w` w< a3� � oow o ti uuu•am•ay.xvn :a1w�p,H NW �(300NMdM NW `213.LdMl11.L5 YS O I££6.0£b (159) YBd ££88.6£6 (159) auo9d R 3(1N3AV bd38 31JHM 9982 DNIUlU18 3X-H0 1YJIQ3W ti ztass rev �ow•n �nn'�xuon s��us cuss scat) s�aa ti ti 2 1 , uuacuu�xa � dUN 3 ONI `1N3Wd013A3a 3NYIVV 571d13a U 'I � ���a��, Q g o a m > V U) A a u s Z a \\ Q — - CL w _ c.E° F— LLA 3�T W 3 NV �E �� mo \\ ° 3 o¢ $ O o N o O N \\` Z \ \ \ m G LLI V) ?o O , z Z �d v 3 a 0 m - ° E a m mN o 0 E c ° a o .[ai U 0— "V N o E LLI °w p o o- po Iil Q Um Zm O -d E J LU a v1 -[ N Z 0 DC •* Q o v ` ° V � m* m z p < U) V ° Z I " Z) W r� o m ° g Z N � W o v� — Va - W c 0 1 - W o° Q V) W n a co a aQ LLI E ma Nz g a U (n m W V) n < a Z o Z CL r Q N ^ V a5 N V) m z r w� m U WK w NUD N Z zcD \m m O W mUJd J o o O ao LLA E! > > U v Z _ o O a W O o o in UP F x o W p J > f Q W U a Z Z r> a O ® N m J ¢ Qo m O W xm U a. 1 Ow m Q w m � rn U Na N LLJ Z N w ° ~ ¢ F u F.. o ° 3; c m 10 z co3 < °z W O a , ° o m a e i = � z N E ip U O OJ < O v O P _ V O C _e °� Q LLJ J ° °3 1— 'n Z U 3 mo VM VLV d+�� �d CmV Q y Z to u n 3�N O O cYr Y•n o ° a (� U � O 2 °oo� cv �vocc wa° o= cn row t�' = z w w j�° o ° o ;o - urn c� p1O ° o z - v M. E926 ° rn 2 r �a ° o om. co o oc� oez c- mcv G z UZn f E o'�a m =.'3 o M 3 wo o r N 1� = w U j I w < V � w Z °i m m v' a o r m Q w U ° m �O r .� O 3 M D! U V ° W U W 3 ~ Q Q W ° ¢ ¢ � o o w a�x`�c� V z �a in o it z a- w W - O Q a N m Qa p pn N Jar- N m °, m w> Z_ U� ¢� m U x - 3o z io v V Q O N x o Z ¢ g U J �n an NK ° a��w Z I m o N (� d W O N m m N ¢ O w x O y w < W ? n n m ��o o� , a a 6 Y N 0 jW M O� > ° N \ 3 w j J N mN a Z� w o_ o�< Q o r 21 0 oo!o�° U o v� W No o r - o V< awao� 0 a a a o O / U CL O a U '� d og wOU O Q - - O W W � aoa Z v v a v p[ ! m o w J � w to V Q I W fay Z a zz a Z s:. vl �o cc °Y m V)i N O O '.` sm win �_ 4: U z JOQ W X OC O Z a� wmx G 1 w. r r .0¢O ODU P— Vqsmuv 'aur m*uq •ueuuw.I • ula:I oloz3 D om wevao 3vi wvo a- NOUdI80S30 NOISIA321 viiiwans 06H 'ON < < <o °w< W _6. p -p - z a u Ht a i o v NW �QOOM3ldVW [t teo �L9B (159) -9d NW `2131VMllI1S NO [ 0 3nN3" 9 311HM 9992 Wallf29 3J1330 wDia3W o ti Zi05SNWO /e19ID1V11ILBOxZ�iSHi55Styli 2143 ' `1NIMOUAKI 3NV1bIV NVId DNIIHDII W --Jul[ 'aosgg `semaaa3 `zi °3 vouWaMEW 3" 13M W W D snoa � 4 4 I N 0 K LL LL P. yy �YYit� �t + F- 14;i , 4; Q � z O m w 0 a E 3 U 0 LL �u O <z y Q N 300 0 w o .oz 2 z W ~ o.w 7w= N O zo S W N2 XW�¢ LL J a O th�Qm wNm3 W W ¢HFO N � � wows aE 0 w a�yo= w �O H��z Woo b w w w o 0a . w LL � zwom D aa ~ zo w2 m w' owo o ti w A� s ���� s� Z s 9; e yy t s R 1 5 z 4 { ■ S A�E 9R .i! H i m � m N C] I Q 3 W N w W W D snoa � 4 4 I N 0 K LL LL P. yy �YYit� �t + F- 14;i , 4; _. _ jo 4.1 ¢ ap '{ -0?y pgF sB a m u a u A� s ���� s� Z s 9; e yy t s R 1 5 z 4 { ■ S A�E 9R .i! H i m � m N C] I a 0 U O 2 Z F x y W 0 Z 7 O f N 0 3 z 0 of w U P UO z� z F z0 =a io ~ w a ' 0 LL z 0 R 3 W e�i W a� MU 0 H N N C] Q 3 W N w W W D snoa � 4 I N 0 K LL LL P. yy �YYit� �f lR 4 _. V a m u a u xx IMJI W e�i W a� MU 0 H N x■ • ;i 5 M 11L e$ pF #ggpg €�3 � kazz A 9 Nora _ . , . . •• I:��o. _��ry °. o — o moo ♦ ♦ ♦ o r , ♦ ♦ I.o %. C , �, ', '• ♦ ♦ ♦ ♦ ♦o `\ ° 4 ♦ 01 0 p ♦ ♦ ♦ , o : � � � § � . ... . , , . • I of o R m` :a 0 m 7 •r 7 1 1 :1\ �1 „11 Q ♦ d o �O o�o of h o m m \ t" C'. I m 1 m w J ofo I m , ' ,° I .° o mom )m I o o . ° ry , . „ ° . ♦ m v m n ,a m m m m ry I m 0 0 ,o ,o ,o ,0 0 0 0 1,.- ry �u u m a. , • , r ♦ , ol. . moi °. °m ° �o ro . ° . °. ,.♦.,..,, , ...... , � �. ° off 6 °000aoe0000ao °000000eo o.mo�n 2 .m000 ell p snoa � 4 I H yy �YYit� �f lR 4 xx IMJI � € � p � 4 S a x■ • ;i 5 M 11L e$ pF #ggpg €�3 � kazz A 9 Nora _ . , . . •• I:��o. _��ry °. o — o moo ♦ ♦ ♦ o r , ♦ ♦ I.o %. C , �, ', '• ♦ ♦ ♦ ♦ ♦o `\ ° 4 ♦ 01 0 p ♦ ♦ ♦ , o : � � � § � . ... . , , . • I of o R m` :a 0 m 7 •r 7 1 1 :1\ �1 „11 Q ♦ d o �O o�o of h o m m \ t" C'. I m 1 m w J ofo I m , ' ,° I .° o mom )m I o o . ° ry , . „ ° . ♦ m v m n ,a m m m m ry I m 0 0 ,o ,o ,o ,0 0 0 0 1,.- ry �u u m a. , • , r ♦ , ol. . moi °. °m ° �o ro . ° . °. ,.♦.,..,, , ...... , � �. ° off 6 °000aoe0000ao °000000eo o.mo�n 2 .m000 311 wAVat) 3vi 31v0 uA -! Nolldl80S30 NOISN321 1V11IWBfs JdH ON l _ m � - T o w u o _ O F ( =J y 0 N unir:m,•og.,u,.n : !-F& lE£bl1Et 1!591 �T3 E£a8•b£b (f59) °�Vd 26055NW'OW733?I VIU0A.I33ESH.555OZI -oui �uos��ug 'usuxaai3 •zio3 NW `aOONMddW 3l1N3/�V bY38 311HM 9982 '3NI `1N3Wd013ma 3NY111V ���,� NW 'MVM11US Waling 3X-H0 W:)Ia3W NVId 3dd:)SdNV �� O m m ° Z c m m a rz w w W a N bo 5o O ? ' ug En U x a Q r K w rz p¢ w ° z° O w d s o a ° > m w w W > r a o o o f ^ o O <C o o U a m �N 8 W m w a Z 5 0 Z w Q a w O w a U a Fl OO O ? O O U o W o O M 7= Q ��rIh� W n w u V u_ z a w a a mx ua N o o f� ti Z �►y !�- Q Z O U ❑ Z J ¢ W x w w U m N Z a oy ^ w x O J ~ w o �2 1 6 o ° z �o o z O c� $ 3� 2 ° a o Rl w oo �w a a � W Y Z Q Z J Z U C5 0 v Owl U d w w N p Z O ar, z � w w fY, o i 1 1 11 � a S1 c 1 .. .. i 11 a 1 1 1, 4 IS " tq 1 Q o O 7 ZZ k I �o 1 I h C ` ell Z, 4 ys Z � y O® O 1, � � 44 1 8 Coro a � I N o Q' ti I L - -- - --- \VVV O � r oQ b W+�'uN U4 !N IIV 'aul'um�uN LSww;l'na;l IIIIZ �Y O F -F-I -H FH HH HH HH HHH �aaaaaaaaaaaaaaa W J J J J J J J J J .J J J N aaaaa aaaa aaa C7 C7 C7 C7 C7 C7 C7 C7 C7 t7 f7 t7 N z U� zp m u1 z�J azo o ma_ w �U¢ � w � W d' �Z mZ ~ OZ��� W � ZI- OQpw O O Oxw� W(=q W =�?¢tn�O�H _� z Wzo ;om ��� O w J z 0 z O z p J � L � >Q }w¢C�m— >U F - UJ w Q m QY �Y w (q (/1�m �w � C3 "3 Q (n � 2' a�g�Jaoowa U F� r m O J Z= J J p�aammWmY�xw�3� NCO f0 f0 fh Ln Mth V (ONMa fh p¢mUwWx_�YJ�zO ►a za; s $ zs V o yq O F. h FS bSS ao N � �� o :� �� •� g � g � � s�E QE — ®� 3 Aid o °$ o B 3 a z ji r m isYs� a � o w B � A� Im p 28 o `� `d' 'a'S9in <� z$z <� m o z �5 :: 8 2 .a �• Jj o • t §�4 <� 8 E P c da x n A A rev A a "� ��3 x "� � � wz � �eH 44 44 3 s t I 1 1 .R - 4 0A � 1 � . ^I o r' � a Gm 3 z` z s fA L /TNON /A L /GNT /NGm FEATURES & SPECIFICATIONS INTENDED USE — Ideal for car lots, street lighting or parking areas. CONSTRUCTION — Rugged, .063" thick, aluminum rectilinear housing. Formed for weather -tight seal and integrity. Naturally anodized, extruded aluminum door frame with mitered corners, is retained with two .188" diameter hinge pins and secured with one quarter -turn, quick - release fastener. Weatherproof seal between housing and door frame is accomplished with an integrally designed, extruded silicone gasket that snaps into the door frame, and another gasket applied to the housing. Finish: Standard finish is dark bronze (DDB), polyester powder finish with other architectural colors available. OPTICS — Reflectors are anodized and segmented for superior uniformity and control. Reflectors attach with tool -less fasteners and are rotatable and interchangeable. Five cutoff distributions available: Type II (roadway), Type III (asymmetric), Type IV (forward throw, sharp cutoff), Type IV (wide, forward throw), Type V (square). Lens is.125" thick impact- resistant tempered glass with thermally applied silk- screened shield. ELECTRICAL — Ballast: Constant wattage autotransformer for 250 -400W. Super CWA pulse -start ballast required for 320W and 35OW (S(WA option). Super CWA (pulse start ballast), 88% efficient and EISA legislation compliant, is required for 250 -40OW (SCWA option) for U.S. shipments only. CSA or INTL required for probe -start shipments ouside the U.S. Ballasts are 100% factory-tested. Socket is porcelain, horizontally mounted medium base socket with copper alloy, nickel- plated screw shell and center contact UL listed 1500W-6OOV. INSTALLATION — Extruded aluminum arm for pole or wall mounting is shipped in fixture carton. Optional mountings available. LISTING — UL listed (standard). CSA Certified (see Options). NOM Certified (see Options). UL listed for 25 °C ambient temperature and wet locations. IP65 rated. Note: Specifications subject to change without notice. Catalog Number Notes 10 Area Lighting KSF2 METAL HALIDE: 250 -40OW HIGH PRESSURE SODIUM: 200 -40OW Specifications 15'to 25' Mounting EPA: 2.0 ft' (.28 m') 1 These wattages the REGC1 option to be for shipmen (includes arm) ta rim 2Oco 480into Glibmb faTitle 20 mmpranm.250M RK,(16 mtaibNe in 34N aV. 10 Must specify voltage. Not available with TB. Length: 24 -19/32 (62.5) 11 Maximum allowable wattage lamp included. D Width: 17-25/32 (62.5) Arm 4 L Voltage Depth: 8-5/16 (21.1) Mounting 6 Must specify CWl for use inCanada. Arm: 4(10.2) Mounting option Drilling template *Weight: 52 lbs (23.6 kg) Metal halide R2 Type II roadway SPxx, RPxx, DAl2P 5 *Weight as configured in example below. WBxx DAl2WB 6 All dimensions are inches (centimeters) unless 250MI 350Mz T pe III asymmetr' otherwise specified. WWxx 7 For shortest lead times, configure product using bolded options. Example: KSF2 400M R3 TB SCWA SPO4 LPI KSF2 drilling pattern. 1 These wattages the REGC1 option to be for shipmen ta rim 2Oco 480into Glibmb faTitle 20 mmpranm.250M RK,(16 mtaibNe in 34N aV. 10 Must specify voltage. Not available with TB. Accessories: Tenon Mounting Slipfitter 11 Maximum allowable wattage lamp included. Series Wattage Distribution Voltage Ballast Mounting 6 Must specify CWl for use inCanada. Tenon O.D. One Two @180° KSF2 Metal halide R2 Type II roadway 120 347 (blank) Magnetic I= Arm length Shipped separately 2- 7/8 "(7.3) 250MI 350Mz T pe III asymmetr' 208 480 CWI Contant wattage SP_ Square pole 04 4" arm DAl2P Degree arm, pole T35 -280 3201111 400M R4SC Type IV forward 2406 TB' isolated RP— Round pole 06 6" arm DAl2WB Degree arm, wall High pressure throw, sharp cutoff 277 23050HZ° 277 �. >••,..- •.- ..... .. O WB_ Wall bracket 09 9" arm KMA Mast arm adapter sodium s R4W Type IVwide, forward throw SCWA Super CWA pulse- WW_ Wood pole P 12 12" KTMB Twin mounting bar 2005 4005 start ballast wall bracket arm RS Type VSquare 2505 NOTE: For shipments to U.S. territories, SCWA must be specified to comply with EISA. Options Finish Lamp Shipped installed in fixture EC Emergency circuit" Shipped separately (blank) Dark bronze CR Corrosion LPI Lamp PER NEMA twist-lock receptacle CSA CSA Certified PEI NEMAtwist -lock PE(120,208,24OV) DWH White resistantfinish included only (no photocontrol) NOM NOM Certified' PE3 NEMA twist -lock PE (347V) DBL Black CRT Non -stick ULP Less lamp SF Singlefuse (120, 277,347V) INTL Available forMH robe -start PE4 NEMA twist-lock PE 480V ( ) DMB Medium protective coating OF n /aTB Double fuse (208, 240, 48OV) shipping outside the U.S. 9 KW1 KiloWatch®120V control relay PE7 NEMA twist-lock PE (277V) bronze DNA Natural n /aTB10 SC Shorting cap for PER option r QRS Quartz restrike system" KW4 KiloWatch ®277V control relaylZ 1475 HS House side shield (R2, R3) 14,11 aluminum NIGHTT °11 REGC1 California Title 20 effective VG Vandal guard" I rY QRSTD QRS time delay 1/1/2010 o..tisrP, n,xi. Notes drilling pattern. 1 These wattages the REGC1 option to be for shipmen ta rim 2Oco 480into Glibmb faTitle 20 mmpranm.250M RK,(16 mtaibNe in 34N aV. 10 Must specify voltage. Not available with TB. Accessories: Tenon Mounting Slipfitter 11 Maximum allowable wattage lamp included. 3 Must be ordered with SCWA. 12 KiloWatch' controlsareavailableonlywith250Sor400S. 4 These wattages do not comply with California Title 20 regulations. 13 May be ordered as an accessory. Number offixtures. 14 Prefix with KSF2 when ordering as anaccessory. 6 Must specify CWl for use inCanada. Tenon O.D. One Two @180° Two @90 ° Three @120° Three @90 °" Four @90 ° 2- 3/8 "(6) T20 -190 T20 -280 T20 -290 T20 -320 T20 -390 T20 -490 2- 7/8 "(7.3) T25 -190 T25 -280 T25 -290 T25 -320 T25 -390 T25 -490 4 "(10.2) T35 -190 T35 -280 T35 -290 T35 -320 T35 -390 T35 -490 Notes drilling pattern. 1 These wattages the REGC1 option to be for shipmen ta rim 2Oco 480into Glibmb faTitle 20 mmpranm.250M RK,(16 mtaibNe in 34N aV. 10 Must specify voltage. Not available with TB. 2 Use reduced jacketed lamp. 11 Maximum allowable wattage lamp included. 3 Must be ordered with SCWA. 12 KiloWatch' controlsareavailableonlywith250Sor400S. 4 These wattages do not comply with California Title 20 regulations. 13 May be ordered as an accessory. 5 Not ava i lable with SCWA. 14 Prefix with KSF2 when ordering as anaccessory. 6 Must specify CWl for use inCanada. 15 Available with R2 and R3 distributions only. 7 Optional multi -tap ballast (120, 208, 240, 277V); (120, 277, 16 Seewww.Ixhonb.an/ar)colorsfaadd tkwIcobroptiars. 347V in Canada). 17 Black finish only. 8 Consult factory for available wattages. 18 Must be specified. 9 Use 9" arm when two or more luminaires are oriented on a 90° 19 Must use RP09 or RP12. OUTDOOR KSF2 -M -S oo �./ ( z NW NIIVM1111S 'M 'anl8 ISIS:) 3ASN) �Nlaiins 3� 1jj0 lbJ1a3W NI- LVM1lIIS :NOUdiaDSaD Mr+s BOIV 1s�DM1� s \B „OIJID \sgo(\:M. loud a.nawoD W03'uasuDyua D40W'MMM l6£SS NW D }D Dm OttlW N6 xDJ OOZ a}inS ONtit_ 9Z4 ZS6 lal A J0100 SIDO an19Ml 0001 � d,►oi /&Jr4--4W4a'” U98UB uea8 4��of1 `��w g3ZL3dd .a.S 'AS NMY80 IVIISbd :aaennN DNS a , v DSSrD� 'DN.Da�Dad uoz /oz /I I� ,0- ,1 =,4/ I :ass p 6' -0" FROM GRADE TO TOP OF SIGN 0 4' -p" " II Z C L -- - -- I " o I Li m ... Z � i � E O m I I I n cry I I L> N Co z 0 I x Z w z Z Cli I I I �_ _� I I to m n �� if^ m m I Z Co I C) I I I lm L J- - - r TI C7 o —I N D m _0 z N N N C m ( n 0 N 0 � j C) 0 )> CO z (D Z G7 z m z N Z m o 4 m m m Z y n z m N r- N m U) D z N p N p 0 s N O m x D rn r m �O D7rj zm Orn m Dz z� OD rnm �C �G) D n �O rn O C- m n ol cn Q o � N: y water Memo Community Development Department To: Heritage Preservation Commission From: Michel Pogge, City Planne Date: Friday, February 04, 2011 Re: 2011 -2012 CLG Grant to create a local designation district Message: As I have discussed with the Commission, it is my intent to apply for a CLG Grant this year to create the City's first local designation district. I have spent some time discussing this year's application with Mike Koop from the SHPO office. I originally was hoping to indentify three possible areas in the grant application then as part of the work with the consultant to select one of the three areas to create a local district. Mike expressed some concern with this method and recommended that the HPC select just one district for the grant application. To that end, enclosed is an excerpt from Don Empson's July 2006 report Designating Historic Homes and Historic District. In it he recommended three areas for the City to consider making local designation districts. (See Map A). Properties on Heirloom Home or Landmark Sites Program The City is now in the third year of its Heirloom Home and Landmark sites program. Throughout the City, there are currently 137 property owners who have voluntarily agreed to be part of the program. As we wrap up the year it is likely the number will go up to around 150 to 160 properties in total. Map B shows which properties have already signed up for the program. From the desk of... Michel Pogge, AICP • City Planner • City of Stillwater • 216 N. 4th Street • Stillwater, MN 55082 651.430 -8822 • Fax: 651.430 -8810 • email: mpogge@ci.stillwater.mn.us The following table shows the total number of properties in each potential local designation district, the number of properties in the heirloom home or landmark sites program, and a ratio of the total number of properties in the area to the number of properties in the heirloom home or landmark sites program. Map B: Overview of properties on Heirloom Home or Landmark Sites Program Area Total number of Properties Number of Properties in the Heirloom Home or Landmark Sites Program Percentage of total to number on Heirloom Home or Landmark Sites Program 1 213 22 10.3% 2 316 31 9.8% 3 126 19 15.1% Potential district 1 and 2 each have roughly the same participation rate around 10% while district 3 have a slightly higher rate of 15.1 %. Neighborhood Architectural Survey Areas Over the years, the Commission has completed 10 Neighborhood Architectural Surveys. As we move to create a local designation district these surveys will be an important resource for any consultant completing the work. The northern half of potential district #1 was surveyed as part of the East Half of the Churchill, Nelson, Slaughter Addition survey while the southern half remain unsurveyed. Potential district #2 is divided between two surveys, Greeley Addition and South Hill. Finally, potential district #3 was surveyed as part of the North Hill survey. Potential Heirloom Home or Landmark Sites As part of Don Empson s Designating Historic Homes and Historic District he identified potential heirloom home and landmark sites for the entire eastern portion of the City. The following table shows the total number of properties in each potential local designation districts, the number of potential heirloom home or landmark sites in each district, and a ratio of the total number of properties to the number of properties in the heirloom home or landmark sites program. Map D: Overview of potential Heirloom Home or Landmark Sites Area Total number of Properties Number of potential Heirloom Home or Landmark Sites Percentage of total to number of potential Heirloom Home or Landmark Sites 1 213 114 53.5% 2 316 155 49.1% 3 126 41 32.5% From the desk of... Michel Pogge, AICP • City Planner • City of Stillwater • 216 N. 4th Street • Stillwater, MN 55082 651.430 -8822 • Fax: 651.430 -8810 • email: mpogge@ci.stillwater.mn.us Recommendation Staff recommends that the HPC pursue developing a local designation district for the North Hill for the following reasons: 1. It is the smallest area and since this is the first designation district for the City it will allow us to work with a smaller group of property owners as we develop the district. 2. It has a slightly higher percentage of property owners that have elected to voluntarily participate in the heirloom home or landmark sites program which may show they have some level of support for historic preservation. 3. The entire area has been previously surveyed. Action Discuss and direct staff on which potential district to pursues a CLG Grant in order to establish it as a local designation district. From the desk of... Michel Pogge, AICP • City Planner • City of Stillwater • 216 N. 4th Street • Stillwater, MN 55082 651.430 -8822 • Fax: 651.430 -8810 • email: mpogge@ci.stillwater.mn.us EXCERPT FROM: Designating Historic Homes and Historic Districts. Report to the Stillwater Heritage Preservation Commission by Donald Empson, Consultant July 2006 Historic Districts With a view to determining the potential historic districts in Stillwater, I viewed every house in the old part of Stillwater (Conservation District) and indicated whether it was 1.) a house built since 1920; 2.) a pre - 1920 house that no longer had a significant portion of its original integrity; 3.) a pre -1920 house that did have a significant portion of its original integrity; 4.) potentially a Landmark House. The accompanying map shows the results. With this map, the members of the H.P.C. have pretty much the same basis I do in determining an Historic District, so my recommendations are pretty much just my opinion. Besides the concentration of houses shown in my map, there are other administrative and political considerations that the H.P.C. and city staff must reckon as well. Based on the accompanying map, and my knowledge, I would recommend establishing the following three historic districts. 1.) Beginning at S. Fourth Street and W. Willard Street; south along S. Fourth Street to W. Orleans Street; east on Orleans Street to S. First Street; north along S. First Street to E. Willard Street; west on Willard Street to S. Fourth Street. 2.) Beginning at S. Broadway and E. Willard Street; northwest on Willard Street to E. Pine Street; southwest on Pine Street to S. Third Street; northwest on S. Third Street to E. Mulberry Street; west on Mulberry Street to N. Everett Street; south on N. Everett Street to W. Myrtle Street; east on Myrtle Street to N. Harriet Street; south on a line with N. Harriet Street to W. Oak Street; east on W. Oak Street to S. Holcombe Street; south on S. Holcombe Street to W. Willard Street; east on Willard Street to S. Broadway. 3.) Beginning at N. Fifth Street and W. Mulberry Street; northwest on N. Fifth Street to W. Laurel Street; northeast on W. Laurel Street to N. Second Street; southeast on N. Second Street to E. Mulberry Street; southwest on a line with Mulberry Street to N. Fifth Street. 4.) In 1881, the Stillwater City Council voted to give the Seymour Sabin & Co. Company $100,000 to be financed by city bonds. In return, the company agreed to build 100 houses within the city. A series of these houses, ranging in value between $400 and $650 were built in Block 2 of Sabin's Addition, on Lots 1 -7, and Lots 12 -22. Today these houses have the addresses 501 to 717 on the south side of West Maple Street. Within three years, most of the homes had been sold to private owners, but it is conceivable that these two blocks of nearly identical houses could be considered as a "mill workers historic district." There are serious issues of integrity, and the fact most of the houses remain fairly small bodes badly for their continued integrity. More research should be done, and the home owners contacted to see what their sentiment might be. In order to implement these historic districts it will be necessary, I believe, to spend a good deal of time in the neighborhoods talking to people, being available to answer questions, having neighborhood meetings. A brochure or pamphlet could be created to distribute within the limits of the potential district. MapA: PotentialHistoric Districts CHERRYSTREET STREET MULBERRY STREET µ 2000200400Feet NORTHSTREET 2030CityLimit Right-of-Way OpenWater WESTRICEST Don'sHistoricDistricts Id 1 2 3 E.HUDSO EAST EAST MARSH WEST STREET STREETEAST MARSH Feb4,2011 MapB: PotentialHistoric Districtsshowing propertieson CHERRYSTREET HeirloomHomeor LandmarkSite STREET Program MULBERRY STREET µ 2000200400Feet NORTHSTREET 2030CityLimit Right-of-Way WESTRICEST OpenWater OnHeriloomorLandmarkSitesProgram Don'sHistoricDistricts Id 1 2 3 E.HUDSO EAST EAST MARSH WEST STREET STREETEAST MARSH Feb4,2011 C MapC: PotentialHistoric Districtsshowing Completed CHERRYSTREET Neighborhood D Architectural STREET SurveyAreas MULBERRY STREET µ 2000200400Feet NORTHSTREET 2030CityLimit Right-of-Way OpenWater WESTRICEST Don'sHistoricDistricts E Id 1 2 3 CompletedSurveys A.DutchtownAddition B.CarliandSchulenburgAddition C.StaplesandMaysAddition D.NorthHill(OriginalTown) E.GreeleyAddition F F.SouthHill G.HolcombesAddition H.WestHalfoftheChurchill, Nelson,SlaughterAddition I.EastHalfoftheChurchill, Nelson,SlaughterAddition J.HerseyStaplesAddition I E.HUDSO G H EAST J EAST MARSH WEST STREET STREETEAST MARSH Feb4,2011 MapD: PotentialHistoric Districtsshowing CHERRYSTREET DesignatedHistric HomesInventory STREET byDonEmpson MULBERRY STREET µ 2000200400Feet NORTHSTREET 2030CityLimit Right-of-Way WESTRICEST OpenWater Don'sHistoricDistricts Id 1 2 3 DesignatedHistricHomesbyEmpson NewerHome,builtafter1920 PotentialHerloomHome PotentialLandmarkHome CommercialBuilding Pre-1920homedrasticallyaltered. E.HUDSO EAST EAST MARSH WEST STREET STREETEAST MARSH Feb4,2011