HomeMy WebLinkAbout2010-04-15 DTPC Packetiliwate!
THE BIRTHPLACE OF MINNESOTA
DOWNTOWN PARKING COMMISSION
AGENDA
Thursday, April 15, 2010
8:30 AM; Riverview Room, City Hall
1. CALL TO ORDER
2. APPROVAL OF MARCH 18, 2010 MINUTES
3. NEW BUSINESS
3.01. POLICY ON SPECIAL EVENT USAGE OF PARKING
3.02. POLICY ON TOUR BUS PARKING
3.03. PAVING GRAVEL LOTS
3.04. 2010 LOT IMPROVEMENT PROJECTS
3.05. IBA REQUEST FOR FREE PARKING ON MAY 1ST
3.06. RIVERTOWN COMMONS REQUEST TO EXCHANGE RAMP SPOT #1
3.07. STATUS OF PARKING WEBSITE
3.08. 2009 PARKING REVENUE ENTERPRISE FUND REPORT
3.09. PLANS & SPECS FOR RAMP VIDEO SYSTEM
3.10. RIVER MARKET COOP REQUEST FOR NO PARKING SIGN
4. SPECIAL EVENT PERMITS
4.01. 34th MP MOTORCYCLE RIDE
4.02. FIRE MUSTER
5. OLD BUSINESS
5.01. RIVERTOWN COMMONS REQUEST FOR PARKING SPACES
6. OTHER BUSINESS
6.01 RECENT CITY COUNCIL ACTIONS
• Approval of wayfinding signage
• Approval of parking ramp voucher prices
6.02. CONFIRM NEXT COMMISSION MEETING DATE
7. ADJOURN
Agenda Item 2
Commissioners present:
Commissioners absent:
City Staff present:
Guest:
Submitted by:
Stillwater Downtown Parking Commission
Meeting Minutes
March 18, 2010
Curt Newcomb, chair/resident; Jeff Johnson, vice-chair/resident; David Korte,
Sherri Hopfe Franke, business.
Dave Junker, resident; Kevin LaCasse, business
John Gannaway, police chief; Dennis Pasket, parking enforcement
Mike Pogge, City Planner
Kathy Mielke, Rivertown Commons; Roger Tomten, Heritage Pr
David Korte
secretary/resident; Aimee Peletier, business;
d, community development director;
agenda
discussion
Now
opening comment
Curt thanked Bill for the excellent job he did preparing the •ting , ation
packets.
approval of February
minutes
A motion was made and seconded to approve the min • . The motion p -
unanimous voice vote.
Bill will forward a copy of the
approved minutes to the Stillwater
city clerk and to David Korte.
agenda items
John asked to have agenda items moved so vi•'.rs
first. Commissioners agreed.
coul• •r is ° es .dressed
Rivertown Commons request
for addition ramp spaces
Kathy from Rivertown Commons sai." _' ' a ed .ht-ram.." g places are
working great and are appreciated. S • ested tw ore sps in the ramp on a
temporary basis. It was mention; en the original were approved the
commission w • d a year to I • ` ' e ramp's finan°. re considering any
more reques ' mentio "'vate parking lot at the corner of Commercial
Street and lb et (west o • lot #10) as an option for Rivertown
Commons resident • Kathy ag . ' ' `'. mi * be a solution and will speak with
the lot's property • s agreed to . item.
Kathy will speak to the owner of
the property and see if some
arrangement can be made for
residents of Rivertown Commons.
Dennis volunteered to assist Kathy
if she needed help with contacting
and/or speaking to the property
owner.
parking ramp signage
Bill said the pr. ting si ommission '
Street entranc as 15 to 18 eet
commission ld need to senest to
for design re and then also a• . a variance.
to the protrud ' ` `•n for the co• `': ission to consider,
stating " Publi " • arking ramp
and a projecting king ramp that
Commissioners agree. wit the proposal and suggested
replaced with two wayfinding signs, one for north
bound traffic, both on a lamppost on either side
motion was made and seconded for a sign over
ted for the parking ramp's Second
e. As the code is six square feet the
the Heritage Preservation Committee
City staff will bring this
recommendation to the HPC for
Design Permit Review.
City staff developed an alternative
i.e., to have white lettering
structure over the second street entrance
would require no variances.
the protruding sign be
bound traffic and one for south
of the second street entrance. A
the second street entrance and two
agenda
discussion
action
signs on the lampposts. The motion passed in a unanimous voice vote.
Stillwater Criterium
John presented the Minnesota Bicycle Festivals request for use of a parking lot for
their 9th annual (seventh year in Stillwater) Nature Valley Grand Prix Stillwater
Criterium bicycle race on 06/20/10. Discussion suggested some extra traffic control
on Myrtle Street would be needed for this event and concern the organizers were
requesting the use of Lot 1, South Main St. lot, which could negat' - i ,act
downtown business. A motion was made and seconded to app re.
condition organizers use the parking ramp first and, if neede= en use L.
Riverview Lot. The motion passed in a unanimous voice v= -.
City staff will forward
recommendation.
Stillwater farmers market
John presented the Stillwater Farmers Markets request to u' • rking 1 • 4 Ri ,
Lot on Saturdays from June 12th through October 30th. A me ade and
seconded to approve this request. The motion passed in a una voice vote.
City s . ff will forward
eco endation.
Ragnar Relay
John presented the Anderson Race Management request to us- . .aces on
August 21, 2010. This event consists of 350 twelve -person :• nin: - ams going
from Winona to Minneapolis. Concern was expressed in that last yea ed mor-
spaces and for a longer time frame than they had requ- - d and paid for.
was made and seconded to approve their use of p. es at $6 per spa• .y
for 5 days. A deposit of $360 would need to b: ceive. - a permit wo . be
issued. The motion passed in a unanimous vo' vote.
taff will forward
recommendation.
34th MP Motorcycle Ride
John presented the 34th Military Police Comp • ide ques < =a.-. for July 24,
2010. This motorcycle ride is a fundr. ' to . ort olarshi t (e name of the
fallen soldiers from the 34th Military Compan veryo was highly
supportive of this request but thi- -v t is scheduled:: e s• r` time as Lumberjack
Days. John ste would 1' le this request for now and would contact the
organizers to f • lution. - d to table this item.
John will contact the organizers.
Lowell Inn request for
passenger loading spots
Bill presented th- I Inn s req o loading/unloading spaces across the
street from their bui .ing. afety conc - e e-ressed with hotel customers
needing to move t • it luggag across the pport was expressed for the idea of
several loadin: oading spaces b i a different location. The suggestion
was made to . the loading . g _ . s in front of the hotel entrance in the
place of seve handicap space ce two new handicap spaces in the space in
front of the n ddition. A mot • s made and seconded to replace the two
southern-mos cap spaces ' m ront of the hotel with two load/unloading parking
spots. Then a.. -. .. -,= handicap spaces in the area in front of the addition.
The Lowell Inn • e the City for any expenses related to drilling of
cement for a signposts. e motion passed in a unanimous voice vote.
Bill will contact the Lowell Inn and
see if they agree with the
recommendation.
prices for parking ramp
vouchers
Bill presented background information on parking ramp vouchers and requested a
recommendation on pricing for the vouchers. A motion was made and seconded to
Bill will forward the
recommendation.
page 2
agenda
discussion
action
prices for parking ramp
vouchers
Bill presented background information on parking ramp vouchers and requested a
recommendation on pricing for the vouchers. A motion was made and seconded to
offer $2.75 ramp vouchers for non -weekends and $4.75 for weekends. A minimum of
25 would be required for purchase. The motion passed in a unanimous voice vote.
Bill will forward the
recommendation.
parking ramp equipment
supplies
Dennis presented his concern over city staff having to handle the actual cash and coins
from the parking ramp machines when they get full. Everyone a - - • th' was no •
good use of staff. The solution is to purchase two more note v. on oin
vault that can be switched out when a vault gets full. A motiwas made
seconded to purchase two spare note vaults at $551.00/eac d one spar- t
at $381.00. The motion passed in a unanimous voice vote
Dennis will forward this
recommendation for purchase.
way -finding signage for
parking
Mike presented the review city staff completed on way -find to all of t .
downtown parking lots. Staff proposed to replace the old wa _ signs with ne
signs that reflect changes to downtown parking. A motion w. d seconded to
proceed with city staff recommendation to remove the old w. --fin . '• s and to
replace them with 14 new signs ($80 per sign and $150 for posts wher. ' •) in th-
locations recommended by staff. The motion passed'.; unanimous vol.
ity ff will forward this
endation for
-mentation.
2010 Downtown Stillwater
Public Parking Guide
Dennis stated the parking guide was soon going t• s and asked if ere
any more changes. It was suggested to place o ' Nk` e gui • ouchers are . : ilable.
There was a question if the "Events Calendar }; the gu = •mpl ' e.
Dennis will forward the suggestions
to the parking guide before printing.
Aimee and Sherri will contact the
Greater Stillwater Chamber of
Commerce to ensure the events
calendar is complete.
updated parking inventory &
15-minute parking spots
Bill reviewed the preliminary in t' of parking i "°` Stillwater. The
inventory fou otal of 3,10 g spaces in the ` r Central Business
District. A 1' 73 perc 4 c parking downtown is free.
Educate the public to change the
perception that downtown parking
is difficult.
agenda items tabled for until
next meeting
Agenda ite ' "Po special eve of parking" was tabled until next meeting
as time ran out.
Agenda items, "' . icy on parking, ' g gravel lots and 2010 Lot
improvement . jects" were -se =- •=.y John and he was called away from the
meeting. The : genda items w e until next month's meeting
Bill will include the tabled items in
next month's agenda.
adjourment
A motion wa de and seconde . journ until next months meeting. The motion
passed in a un ,us voice vo
next meeting:
The next meeti ay, April 15, 2010, 8:30 a.m. at City Hall.
Bill will send out agenda and
page 3
Agenda Item 3.01
!1!wate[
THE BIRTHPLACE OF MINNESOTA
TO: Downtown Parking Commission
FROM: Bill Turnblad, Community Development Director
DATE: April 13, 2010
RE: Renting Downtown Parking Spaces
BACKGROUND
Over the years various groups have requested the use of downtown parking spaces for events (on -street
spaces and parking lot spaces) as well as other private uses. Sometimes the Parking Commission has
approved the requests, sometimes not. If approved, sometimes a fee has been charged, but not always.
No consistent policy exists.
Therefore, the Parking Commission has decided to develop a policy for the private use of public parking
spaces downtown. At the January 14, 2010 meeting, the Commission reached a consensus on the issues
highlighted below in yellow. The remainder of the issues await discussion at the next Commission
meeting.
ISSUES
1. Should the City allow the private use of public parking spaces?
a. Some cities do not allow private use of public parking spaces, even for events. However,
Stillwater has traditionally allowed this, at least for many events.
b. The Parking Commission agreed that continuing to allow the use of public parking spaces
is acceptable under certain conditions. Those conditions include: 1) if the use is for a
Special Event, a Special Event permit must be applied for and approved by the City — the
Parking Commission would review such permit applications; 2) if a space or two are
being requested, the request could be approved by the City with a simple review by the
Parking Commission; 3) if more than a space or two are being requested, then the request
should trigger the need for approval by the City Council.
2. Should a fee for the use of the space(s) be charged?
a. In the past, most events that have requested exclusive use of public parking spaces have
been required to pay for that use. The amount charged is usually tied at least somewhat
to the amount of public parking revenue that would be lost to the private use. Examples:
i. Rumble on the Deck — Rents all of Lot 3 and the abutting on -street spaces on
Water Street. The spaces are used only one day during middle of a week in the
summer; 3 PM to 10 PM. The lot has 25 spaces and the street has about 5 spaces.
City charges $300. This is $10 per space.
ii. Anderson's marathon race — Rented one parking space in a south lot for a
portable vault toilet. The toilet occupied the space for 4 days. Cost to park in
this lot during high -season is $3. Assuming 2 sales of the spot per day, the
parking spot would lose $6 per day for 4 days. So, the Parking Commission
charged $24.
Parking Space Rental
April 13, 2010
Page 2
iii. Mainstream Development — This is an example of a non-event use. Mainstream
Developed requested use of parking lot spaces for a staging area for development
of their property at Main and Mulberry. Charged $75 per space for each peak
season month (since this was not a south lot, it was not charged $100 per month);
charged $25 per space for each off-season month.
b. Possible rental rates
i. Parking lot spaces
1. Special Events
a. Peak season rates
i. All downtown parking lot spaces- Charge per this
formula: Parking rate of the lot (or $3, whichever is
more), times 3 assumed sales per day, times two (to
cover overhead such as staff time, materials, etc). So, for
example, a Special Event space in Lot 2 or Lot 6 would
cost $3 x 3 x 2 = $18 per day per space. And, a Special
Event space in Lot 1 would cost $5 x 3 x 2 = $30 per day
per space.
1. The Commission identified a need to define a
"day". Should it be a 24 hour period? If so,
should it be midnight to midnight or noon to
noon? If not a 24 hour period, then what? No
conclusion was reached.
ii. Larger Special Events should probably negotiate a fee
for the rental of spaces. But, a starting point for the
negotiation should be with rental prices that are set using
the formulas above. At very least, the benchmark price
should cover base costs, which would not include the
overhead multiplier.
b. Off season rates
i. Staff suggested starting point for Parking Commission
discussion:
1. All downtown parking lot spaces = 3 hours or
less free; more than 3 hours charge $3 per space
per day (compared with $18 or $30 per day
during peak season). The cost to Brine's for the
Bocce Ball Tournament, for example, would be
$75, whereas today it is free.
2. Other private use
a. Should other private uses be restricted to construction dumpsters
and construction staging areas?
b. Peak season rates
i. Staff suggested starting point for Parking Commission
discussion:
1. Charge the same daily rate as for a Special Event
during the peak season, but do not include the
overhead multiplier. Qwest would have been
charged $270 for their 2 space construction
staging area for one month, whereas it was
approved in 2009 for $20 ($10 monthly permit
cost per space).
Parking Space Rental
April 13, 2010
Page 3
2. Do not allow this type of private use in any of
the pay lots.
c. Off season rates
i. Staff suggested starting point for Parking Commission
discussion:
1. Charge the same off season rate as Special
Events are charged: $3 per day. Mainstream
Development would have been charged $6,480
for their 8 space construction staging area (9
months), whereas it was approved in 2009 for
$2,600.
2. Do not allow this type of private use in any of
the pay lots.
ii. Street parkins spaces
1. Staff suggested starting point for Parking Commission discussion:
a. $18 per space per day for peak season. This is the same price as
pay lot 2.
b. $3 per space per day for off season.
2. No street spaces rented for private use of any kind on Main Street.
3. Requests must be approved by the Parking Commission. If request is for
more than two spaces, it would have to be approved by Parking
Commission and City Council.
c. What about bike races and parades that request "no on -street parking" along the event
route? If the route includes the downtown, should that portion of the route be required to
pay for the private use of public on -street parking spaces? Or, should it be negotiated
with the City Council an formalized with a contract.
3. If a fee is charged for the private use of public parking spaces, should all individuals or groups be
required to pay the fee? Or should specific types of non-profit groups be granted an exception?
bt
Agenda Item 3.02
Spot 4
Proposed
Spot 5
Proposed
n y'
EX(SfiiN,S'F{N/OOT CONTROL
P(SNT TO BE REISTABIJSHEO
PIER CONSTRUCTION (NIC)
5
Spot 2
Existing
Spot 1
Existing
- yr.
;terJ
Y p�1 T�. �� i
1
i _LETTERING- (WHITE
.-LETTERING (WI
alP
0 25 50
100
SCALE
LEGEND
IN
FEET
i
T
NOTES
PROPOSED 8518 CONCRETE CURB & CU'
SIGN PANEL SUPPORT
SYMBOL FOR SIGN TO BE SALVAGED & F
4" SOLID V-IITE PAVEMENT MARKING FOR
(STALL LENGTH = 21', 'MOTH FROM FOC
6" SOLID YELLOW TRANSVERSE LINES
AT 45' (6' SPACING) SURROUNDED BY
4- SOLID OOULBLE YELLOW PAVEMENT M,
1) SIGNS TO BE SALVAGED SHALL 8E REINSTALLED AFTER SIDEWALA
Agenda Item 3.08
LA.in etAACli-I¢d,
CITY OF STILLWATER, MINNESOTA
STATEMENT OF NET ASSETS
Parking Fund
December 31, 2009
Parking Fund
Parking Ramp Parking Adjusting
570 720 Entries
ASSETS
Totals
Current assets:
Cash and pooled investments $ (96,495) $ 522,949 $ - $ 426,454
Accrued interest receivable - 1,121 1,121
Accounts receivable 6,530 6,530
Due from other governments 148 659 a 807
Prepaid items 584 - 584
Total current assets (96,495) 531,332 659 435,496
Noncurrent assets:
Capital Assets:
Land 90,947 733,409 824,356
Building and other improvements -
improvements other than building
Machinery and equipment - -
Vehicles
Infrastructure
Construction in progress -
Less accumulated depreciation - (297,953) (297,953)
Total capital assets (net of accumulated
depreciation) 90,947 435,456 526,403
Total assets (5,548) 966,788 659 961,899
LIABILITIES
Current liabilities:
Accounts payable
Contracts payable
Salaries payable
Interfund payable
Due to other governments
Due to component unit
Compensated absences payable
Total current liabilities
Noncurrent liabilities:
Compensated absences
Net OPEB obligation
Total noncurent liabilities
Total liabilities
1,291 5,056 6,347
1,291
1,291
2,833 - 2,833
429 - 429
(659) 659 a -
1,939 1,939
9,598 659 11,548
16,405 16,405
4,482
20,887
30,485
659
4,482
20,887
32,435
NET ASSETS
Net assets, invested in capital assets 90,947 435,456 526,403
Unrestricted (97,786) 500,847 - 403,061
Total net assets $ (6,839) $ 936,303 $ $ 929,464
CITY OF STILLWATER, MINNESOTA
STATEMENT OF REVENUES, EXPENSES AND CHANGES IN FUND NET ASSETS
PARKING FUND
Year ended December 31, 2009
OPERATING REVENUES
Charges for services
OPERATING EXPENSES
Personnel services
Supplies
Other services and charges
Miscellaneous
Depreciation
Total operating expenses
Income (loss) from operations
NONOPERATING REVENUES (EXPENSES)
Interest income
Gain (Loss) on disposal of capital asets
Other income
Total nonoperating revenues
Income (loss) before contributions
and transfers
Capital contributions
Transfers out
Change in net assets
Parking Ramp
570
Parking
720
2,502 $ 176,086
7,913
1,428
9,341
(6,839)
(6,839)
(6,839)
95,221
6,109
49,389
2,152
35,869
188,740
(12,654)
8,035
8,035
(4,619)
(4,619)
Totals
$ 178,588
95,221
14,022
50,817
2,152
35,869
198,081
(19,493)
8,035
8,035
(11,458)
(11,458)
Net assets, January 1 940,922 940,922
Net assets, December 31 $ (6,839) $ 936,303 $ 929,464
CITY OF STILLWATER, MINNESOTA
STATEMENT OF CASH FLOWS
PROPRIETARY FUNDS
Year Ended December 31, 2009
Parking
CASH FLOWS FROM OPERATING ACTIVITIES
Receipts from customers and users $ 177,835
Payments to suppliers (66,061)
Payments to employees (90,701)
Net cash from operating activities 21,073
CASH FLOWS FROM NONCAPITAL FINANCING ACTIVITIES
Loans from other funds
Watershed subsidy
Net cash from noncapital financing activities
CASH FLOWS FROM CAPITAL AND RELATED FINANCING
ACTIVITIES
Acquisition and construction of capital assets
Transfer to other funds
Capital contributions
Proceeds from the sale of captiai assets
Proceeds from taxes, assessments, connections
Net cash from capital and related financing activities
CASH FLOWS FROM INVESTING ACTIVITIES
Interest received on investments
Net cash from investing activities
Net increase (decrease) in cash and pooled investments
Cash and pooled investments, January 1
Cash and pooled investments, December 31
429
429
(90,946)
(90, 946)
12,167
12,167
(57,277)
483,731
$ 426,454
RECONCILIATION OF OPERATING INCOME (LOSS) TO NET CASH
PROVIDED (USED) BY OPERATING ACTIVITIES
Operating income (loss) $ (19,493)
Adjustments to reconcile operating income (loss) to net cash
provided (used) by operating activities:
Depreciation expense 35,869
(Increase) Decrease in Assets:
Accounts receivable (200)
Due from other governments (553)
Prepaid items
Increase (Decrease) in Liabilities:
Accounts payable 5,670
Contracts payable (4,347)
Salaries payable 1,084
Due to other governments (393)
Due to component unit
Compensated absences payable 1,033
Net OPEB obligation 2,403
Total adjustments $ 40,566
Net cash from operating activities
The notes to the financial statements are an integral part of this statement
46
$ 21,073
Agenda Item 3.09
T H E BIRTHPLACE OF NIINNESOTA
TO: Downtown Parking Commission
FROM: Michel Pogge, City Planner
DATE: April 14, 2010
RE: Plans and Specs for Ramp Video System
Agenda Item 3.10
Since opening the parking ramp it has become clear to staff that some type of video surveillance is
needed. We have had a number of events in the ramp including graffiti, human defecation in stairway,
and driving though (and destroying) one of the gate arms to avoid paying.
The ramp was pre -wired to accommodate 38 separate video cameras. Additional locations are needed to
be installed to adequacy cover the lobby area (which is currently prewired for one camera and likely will
need three cameras) and the elevator to name a two. Staff believes the initial system should have around
20 cameras and a video recorded able to archive 30 days of video. This type of system will run in the
range of $30,000 to $60,000 to purchase and have installed. Additionally, the video recorder will be
design so that it can expand to a minimum of 48 cameras within the parking ramp and possibly serve as
the backbone to a future downtown camera system.
Staff has spent some time looking at various systems including systems at Washington County and a
Metro Transit Parking Ramp to see what options are available. Through these visits, it has become
apparent that the City does not have the knowledge required to effectively design an effective video
system. Therefore, staff is recommending the Commission hire an outside firm to develop a set of plans
and specifications for the system that can be sent out for bid to various vendors. Staff solicited and
received three proposals to complete this work. Their rates were as follows:
• Paulson & Clark Engineering, Inc. $5,120
• Bonestroo $5,414
• Dunham Associates, Inc. $7,000
Paulson & Clark Engineering came highly recommended by Washington County. As the low bid, staff
recommends entering into an agreement with Paulson & Clark Engineering, Inc. to complete plans and
specifications for a video surveillance system in the parking ramp.
Paulson & Clark Engineering, Inc.
2352 East County Road J, White Bear Lake, Minnesota 55110
Phone 651/407/6056 Fax 651/407/6476 Em ail dpaulson@paulsonclark.com
4/14/10
Michel Pogge, AICP
City Planner
City of Stillwater
216 North Fourth Street
Stillwater, MN 55082
RE: Proposal for Security Design Service
Stillwater Municipal Parking Ramp
Dear Michel,
Paulson & Clark Engineering, Inc., (Consultant) is pleased to submit the following proposal for
your consideration on the above referenced project. This proposal is based on our Project
Understanding and Basic Services, as identified below.
PROJECT UNDERSTANDING:
The City of Stillwater (Owner) intends to install video cameras in the newly constructed
municipal parking ramp. The video system design will call for an initial installation of
approximately 20 cameras and a new digital recording\monitoring system.
The ramp has been pre -wired for 38 cameras and the owner has identified additional areas where
cameras with new wiring will be required. The system will be designed to scale to
approximately 48 total cameras.
The owner will compile, publish, and administer all contract documents. The consultant will
provide a specification and drawings.
The project design is expected to be completed within 4 weeks of authorization to proceed.
Paulson & Clark Engineering, Stillwater Municipal Ramp Security Design
Page 1 of 5
The following basic services shall be provided to the owner when requested by a written
authorization.
BASIC SERVICES
• One meeting with the owner to review requirements
o DVR vs. Software Solutions
o Server and Storage requirements
o Power and HVAC considerations
o IP Cams vs. Analog camera on UTP cable
o Use of mega pixel cameras with newer H.264 compression
o Monitoring of live video
o Display of recorded video
• Provide one project spec section (Video Surveillance) and drawings to include floor
plans, device details\schedules, and riser diagrams. All deliverables will be sent in
electronic PDF format.
• Paulson and Clark Engineering is not providing electrical drawings, electrical circuiting,
or conduit design. It is assumed that any electrical work that may be required would be
minimal and would be contracted directly by the owner.
• Assist with bid clarifications and bid award
OPTIONAL SERVICES
• Attend up to 3 construction meetings as follows:
o Kickoff
o Midpoint
o 90% Review
• Review shop drawings
• Correspond with contractors\owner during construction
• Review As-builts as provided by contractors.
• Provide an on site acceptance test
Compensation
Our proposed fees for basic security design services are $5,120 and will be billed on an hourly
not to exceed basis.
Our proposed fees for optional security designs services are $2,700 and will be billed on an
hourly not to exceed basis.
Paulson & Clark Engineering, Stillwater Municipal Ramp Security Design
Page 2 of 5
Our fee is based on the following estimate of services:
City of Stillwater Design Estimate for Basic Services
Systems
Description Design System CAD
Determine Requirements with Owner 8
Video System Specification and Drawings 20 8
Bid Clarifications, Review and Award 4
CA Meetings \ Changes 0 0
Acceptance 0
Total Hours 32 8
Rate $ 135 $ 100
Hours x Rate $ 4,320 $ 800
Total Fee $ 5,120
City of Stillwater Design Estimate for Optional Services
Systems
Description Design System CAD
Determine Requirements with Owner 0
Video System Specifications and Drawings 0 0
Bid Clarifications, Shop Review, and Award 0
Construction Admin, Changes 16 0
Acceptance Testing 4
Total Hours 20 0
Rate $ 135 $ 100
Hours x Rate $ 2,700 $
Total Fee $ 2,700
ADDITIONAL SERVICES
Services not included under basic services include but are not limited to:
• Additional site meetings
• Electrical Drawings
• System Re -design
• Drawing reproduction or Hard Copies
• Contractual front end documentation
Paulson & Clark Engineering, Stillwater Municipal Ramp Security Design
Page 3 of 5
Additional services can be provided with written authorization at standard hourly rates.
STANDARD HOURLY RATE SCHEDULE
(Effective through December of 2010)
Principal in Charge $135.00
*Senior Systems Designer $135.00
Senior Engineer $120.00
*Systems Designer/Drafter $100.00
Senior Designer $ 90.00
Engineer $ 85.00
Designer $ 75.00
CADD Drafter $ 65.00
*Staff intended to work on this project.
For Additional Services performed by others retained by Paulson & Clark Engineering,
Inc., the client shall be billed the amount billed to Paulson & Clark Engineering, Inc.
times a factor of 1.15.
REIMBURSABLE EXPENSES
Reimbursable expenses are not included under fees for basic services. Reimbursable
expenses include, but are not limited to:
1. Special delivery, postage, etc.
2. Mileage to and from meetings, site, etc.
REIMBURSABLE SCHEDULE
(Effective through December of 2010)
Mileage per IRS Standard Mileage Rate
Vellum Sheets $1.25/sq. ft.
Reproducible Bond Sheets $0.70/sq. ft.
Photo Copies $0.05/sheet
Reimbursable expense other those listed above (i.e. deliveries, travel
expenses, outsourced reproduction services) will be billed at cost.
Paulson & Clark Engineering, Stillwater Municipal Ramp Security Design
Page 4 of 5
Miscellaneous
The following shall be submitted to Paulson & Clark Engineering, Inc.
• Auto CAD Backgrounds and title block requirements
• A template for the project manual specifications
Paulson & Clark Engineering, Inc. and associated consultants shall not be responsible for the
means, methods, procedures or sequences of construction, safety on the job or have direct
control of the contractor during this project.
It is acknowledged by both parties that Paulson & Clark Engineering, Inc. services do not
include any services related to asbestos, lead paint, or hazardous or toxic materials.
All claims, disputes, and controversies arising out of or in relation to the performance,
interpretation, application, or enforcement of the Agreement, including but not limited to breach
thereof, shall be referred for mediation under the then current construction industry mediation
rules of the American Arbitration Association, prior to any recourse to arbitration or litigation.
All claims, disputes, and controversies arising out of or in relation to the performance,
interpretation, application, or enforcement of the Agreement shall be decided in accordance with
the laws of the State of Minnesota.
This proposal will remain open for acceptance for a period of thirty days. If this proposal is
acceptable, please sign below and fax a copy back to our office so that we may proceed with the
work. This proposal will serve as a letter agreement and the terms of this agreement will be per
the provisions outlined in AIA C141-1997. If there are any items of conflict between this letter
agreement and the AIA C141-1997, this agreement shall supercede.
Consulting Firm: Client:
4/14/10
Signature Date Signature
Dan Paulson Michel Pogge
Paulson & Clark Engineering, Inc. City of Stillwater
Date
Paulson & Clark Engineering, Stillwater Municipal Ramp Security Design
Page 5 of 5
April 14, 2010
Mr. Michel Pogge
City Planner
City of Stillwater
216 North Fourth Street
Stillwater, MN 55082
Re: Proposal for Parking Ramp Security Camera Design
Dear Mike:
Thank you for the opportunity to propose our professional services for this project. We look
forward to working with you.
2335 Highway 36 W
St. Paul, MN 55113
Tel 651-636-4600
Fax 651-636-1311
www.bonestroo.com
Bonestroo
PROJECT UNDERSTANDING AND SCOPE OF BASIC SERVICES
Mike FitzPatrick reviewed the proposed work with Mike Pogge. Based on that conversation and
subsequent clarifications, we understand that the project involves providing bidding documents,
including drawings and specifications, for approximately 20 color cameras and possibly one or
two license plate recognition cameras. Bonestroo understands that the City is meeting with Metro
Transit and touring the parking ramps recently completed by Bonestroo and that final camera
selection may be impacted by this tour.
Bonestroo will provide the required bidding documents for the cameras and head -end equipment
as required for a complete and operable system. We understand that the conduit and CAT6 cable
have been installed and that few modifications are required to the existing system.
Bonestroo will design the required modifications to the existing conduit and wire system, and will
prepare drawings and specifications accordingly. This includes mid -span switches in areas where
multiple cameras may be required, but only one cable is existing. Most of the cameras are
located outdoors, and equipment specified must be appropriate for that environment.
Bonestroo will design the 120V system for the cameras, if necessary. This will include receptacles
for the head -end equipment and 120V power to the cameras as needed. We will work with the
City to provide IP and POE compatible cameras, which will reduce the need for 120V wiring and
power supplies for each camera.
City of Stillwater
Parking Ramp Security Camera Design
We understand that the City will:
• Use the bidding documents created by Bonestroo to solicit bids from vendors
• Be responsible for the bidding process
• Be responsible for construction services
Meetings/Site Visits
1. Orientation meeting/data gathering — kickoff meeting and site visit
2. 50% detailed design review meeting
3. 95% detailed design review meeting
ADDITIONAL SERVICES
Page 2
April 15, 2010
Any services not identified within the above scope of basic services would be considered
additional services. The following is a partial list of potential additional services:
1. Our proposal does not include heat/cooling calculation in the rooms in which additional
equipment is to be installed. If the City would like to have a mechanical engineer reevaluate
space heating/cooling requirements, Bonestroo can provide that service on an hourly basis if
requested.
2. Our proposal does not include programming, maintenance, or commissioning of the security
system. We have assumed that these services will be provided by the contractor under the
bidding contract.
3. Our proposal does not include additional meeting beyond those listed above. Attendance at
additional meetings can be provided on an hourly basis if requested.
4. Our proposal does not include services during the bidding or construction services phases of
the project. Bonestroo can provide these services on an hourly basis if requested.
KEY STAFF
Mike FitzPatrick: Mike will manage the project and lead the design efforts. He specializes in
lighting, security, and data system design and drafting. Mike has designed lighting and security
systems or retrofits for the Kenrick Avenue, I-35W and County Road C, 28th Avenue, and Foley
Park and Rides.
Aaron Mueller, PE, LEED AP: Aaron will oversee the project. He is Bonestroo's electrical team
leader and is a LEED accredited design professional. Aaron is experienced in many types of
electrical design, including lighting, backup power generation, power distribution, and process/
equipment controls.
City of Stillwater
Parking Ramp Security Camera Design
SCHEDULE
Page 3
April 15, 2010
We are available to begin working on this project immediately upon notice to proceed. We are
committed to completing the project on a mutually agreed upon schedule.
ESTIMATED FEE
We propose to provide the services described above for a lump sum fee of $5,414, including
expenses.
If you would like additional information or have questions regarding this proposal, please call me
at 651-604-4896. We appreciate this opportunity to serve the City of Stillwater.
Sincerely,
BONESTROO
GU -
Mike FitzPatrick
Project Manager
Attachments: Resumes, Project Experience
copy: Tina Goodroad, Bonestroo
Aaron Mueller, Bonestroo
EDUCATION
Dunwoody College
Associate Degree Electrical
Century College
Associate Degree Arts
COMPUTER EXPERIENCE
Architectural Desktop
AutoCAD
Visual
PROFESSIONAL ORGANIZATIONS
Illuminating Engineering
Society of North America
(IESNA)
TRAINING
Work Zone Traffic Control
Safety and Roadway Lighting
Course - Level I
Roadway Lighting Design
Manual Course
ELECTRICAL DESIGNER
Michael T. FitzPatrick
- Qualifications for
Stillwater Parking Ramp Security Camera Design
Mr. FitzPatrick joined Bonestroo in 1999 and currently serves as an
Electrical Designer. Mike specializes in lighting design and electrical
drafting and design. His responsibilities include project layout,
preparing detail design drawings and specifications for all electrical
segments of civil engineering and architectural projects; shop
drawing review; and site inspections, such as preliminary
inspections and final inspections.
Relevant Experience
METRO TRANSIT - I-35 LAKEVILLE PARKING STRUCTURE
Mike was the electrical designer for the project. He was
responsible for developing the electrical portion of the
constructions documents, handling questions and addenda during
bidding, and construction services including any RFI, CO, site
observations, and shop drawing review. Bonestroo provided
design, bidding, and construction support for a new parking
structures constructed on an existing park and pool lot on the
east side of I-35 in Lakeville. The project consisted of a multi -level
parking structure to accommodate up to 500 parking spaces.
METRO TRANSIT TWIN LAKES PARKING STRUCTURE
Mike was the electrical designer for the project. He was
responsible for developing the electrical portion of the
constructions documents, handling questions and addenda during
bidding, and construction services, including any RFI, CO, site
observations, and shop drawing review. Bonestroo provided
design, bidding, and construction support for a new parking
structure constructed in the Twin Lakes development in Roseville
near County Road C and Cleveland. The project consisted of a
multi -level parking structure to accommodate 460 parking spaces.
65TH AND BROOKLYN BLVD PARK AND RIDE SECURITY AND
IRRIGATION
Mike was the electrical design for the project. He was responsible
for developing the electrical portion of the construction
documents, handling questions and addenda during bidding, and
construction services, including any RFI, CO, site observations,
and shop drawing review.
CENTURY COLLEGE - WEST CAMPUS PARKING LOT RECONSTRUCTION
Mike was the electrical designer for the project. He was
responsible for developing the electrical portion of the
construction documents, handling questions and addenda during
bidding, and construction services, including any RFI, CO, site
observations, and shop drawing review. This project features the
phased reconstruction of a 2,000+ stall parking lot, including
lighting and stormwater management improvements.
Bonestroo
EDUCATION
North Dakota State University
Bachelor of Science Electrical
Engineering
CURRENT LICENSES
Professional Engineer —MN
Engineer In Training —ND
Professional Engineer —WI
Professional Engineer —IL
CERTIFICATIONS
Leadership in Energy &
Environmental Design
Accredited Professional
PROFESSIONAL ORGANIZATIONS
Institute of Electronics and
Electrical Engineers (IEEE)
Minnesota Society of
Professional Engineers (MSPE)
ELECTRICAL ENGINEER
Aaron R. Mueller, PE, LEED AP
- Qualifications for
Stillwater Parking Ramp Security Camera Design
Aaron specializes in the electrical design of various building types,
lighting applications, and SCADA designs. His main responsibilities
include managing our electrical designers and drafters, project
management, power distribution design, standby power systems,
lighting designs for buildings, pathways and roadways, SCADA
systems, Arc flash surveys, power quality studies, product
research, specification preparation, quality assurance, and
construction inspections. Aaron's experience includes a variety of
projects involving existing building improvements and new
construction.
Relevant Experience
METRO TRANSIT - I-35 LAKEVILLE PARKING STRUCTURE
Aaron reviewed the electrical design and signed the plans.
Bonestroo provided design, bidding, and construction support for
a new parking structures constructed on an existing park and pool
lot on the east side of I-35 in Lakeville. The project consisted of a
multi -level parking structure to accommodate up to 500 parking
spaces.
METRO TRANSIT TWIN LAKES PARKING STRUCTURE
Aaron reviewed the electrical design and signed the plans.
Bonestroo provided design, bidding, and construction support for
a new parking structure constructed in the Twin Lakes
development in Roseville near County Road C and Cleveland. The
project consisted of a multi -level parking structure to
accommodate 460 parking spaces.
65TH AND BROOKLYN BLVD PARK AND RIDE SECURITY AND
IRRIGATION
Aaron reviewed the electrical design and signed the plans.
CENTURY COLLEGE - WEST CAMPUS PARKING LOT RECONSTRUCTION
Aaron reviewed the electrical design and signed the plans. This
project features the phased reconstruction of a 2,000+ stall
parking lot, including lighting and stormwater management
improvements.
RICHFIELD SECURITY AND EXTERIOR LIGHTING UPGRADES
Aaron was responsible for building exterior security lighting and
controls design. Bonestroo provided electrical engineering
assistance with site security lighting and interior security issues.
The project also included short review and recommendation on
the generator enclosure.
Bonestroo
INVER GROVE HEIGHTS, MN - WATER TREATMENT PLANT
EXPANSION
Aaron was responsible for the electrical design of this water
treatment plant expansion, which included conference room
lighting and controls, innovative display lighting, filter cell lighting,
and weir lighting. His work also included SCADA controls and
monitoring and power distribution. Bonestroo designed the
original 6.02 mgd facility in 1999 to economically accommodate
expansion that would double the plant's total capacity. We also
designed the facility's expansion project, thereby doubling the
facility's capacity.
OAK PARK HEIGHTS, MN - WATER SYSTEM SCADA IMPROVEMENTS
Aaron aided the City in developing a new SCADA system for its
water distribution/treatment system. The project involved design
of new telemetry to the remote sites, modified controls, new
master PLC equipment, and a SCADA computer monitoring
station. The system also included capabilities to add future
monitoring and controls of the City's sanitary lift station.
WOODBURY, MN - 2009 SCADA UPGRADES
Aaron performed a review of the City's existing SCADA system for
its water treatment/distribution system, sanitary lift stations, and
stormwater lift stations. During the review, the City and various
product vendors were consulted and problem areas identified.
After the review was completed, Aaron assembled a report that
proposed multiple options to improving the City's monitoring,
controls, trending, and reporting capabilities. Included in the
report various advantages and disadvantages were presented, as
well as installation cost estimates and a 15-year cost analysis. The
report led into the development of construction documents for the
installation of the SCADA upgrades.
SARTELL, MN - SW WATER TREATMENT PLANT
Aaron performed the electrical design for the new water
treatment plant. Design items included power distribution,
standby power generation, lighting, SCADA, electrical design of
three remote submersible well sites, and remodel of existing
chemical rooms in the existing treatment plant. Work also
included providing a security system at the new plant, which was
integrated into the City's existing security system network. Aaron
reviewed shop drawings, responded to contractor's questions, and
assisted with construction observations. The overall project
involved design and construction of a new 6 mgd conventional
gravity filter plant for iron and manganese removal. The plant was
designed to be easily expanded to 16 mgd.
Bonestroo
PROPOSAL
Representative Experience
METRO TRANSIT - 28TH AVENUE PARKING STRUCTURE SECURITY/
CAMERA SYSTEM UPGRADE
Bonestroo is providing bidding documents, including drawings and
specifications, for 25 color cameras and two license plate
recognition cameras for ten new IP type emergency call stations.
Our work includes electrical engineering design, bidding assistance,
construction administration, and meetings and site visits.
METRO TRANSIT — 65TH AND BROOKLYN BOULEVARD PARK AND RIDE
SECURITY AND IRRIGATION
Bonestroo recently designed a new security system for the existing
65th and Brooklyn Boulevard Park & Ride facility. This project
included five megapixel cameras, two standard pixel cameras, and
two license plate recognition cameras for a total of nine new
cameras. The megapixel cameras and standard pixel cameras were
all IP type outdoor rated cameras. Our work included electrical
engineering design, bidding assistance, construction administration,
meetings, and site visits.
METRO TRANSIT — ROSEVILLE, LAKEVILLE, BURNSVILLE, AND
BROOKLYN CENTER PARKING RAMPS
Bonestroo designed and managed the installation of two new
parking ramp stretchers in Roseville and Lakeville for Metro Transit.
The two new parking structures included a security camera system.
We also designed an expansion to an existing parking ramp
security cameras system in Burnsville for Metro Transit. Bonestroo
also designed a new cameras system for an outdoor park and ride
for Metro Transit in Brooklyn Center. The cameras systems at each
of the locations included both megapixel cameras and standard
pixel cameras, IP and analog cameras, and license plate cameras.
CENTURY COLLEGE - WEST CAMPUS PARKING LOT RECONSTRUCTION
Bonestroo designed and managed the installation of a 2,000-car
parking lot improvement project for Century College. Bonestroo
successfully designed a camera system that was installed at the
Century College parking lot. The cameras installed were IP cameras
both pan -tilt -zoom (ptz) and fixed cameras. Due to the distance
limitations of the IP system (330m), a fiber wiring solution was
used. The new cameras were integrated into an existing security
system for access via the security system from any computer on
campus for live monitoring, camera pan -tilt -zoom control, or video
playback. This project also included six"code blue" emergency call
stations that were integrated into the cameras system so the
cameras automatically rotated and zoomed to the code blue station
that is under the emergency call.
Bonestroo
RICHFIELD WATER TREATMENT PLANT
Bonestroo provided engineering assistance with the water
treatment facility staff to improve the site's security. We
collaborated with City staff and the local police department to
develop a more secure facility. Items included replacement of
windows, motorized gate, new card readers, CCTV system, and
improved interior and exterior lighting. The new equipment allowed
the City to easily identify visitors and control the access to the site
and buildings. In addition, the lighting levels around the facility
were greatly enhanced assisted local police and plant operators to
view the site during night time events. In addition, the design was
pleasing to local residential property owners.
4 Bonestroo
DUNHAIVI
'DELIVERS.
April 14, 2010
Michel Pogye, AICP
City Planner
City of Stillwater
216 North Fourth Street
Stillwater, MN 55082
Subject:Video Surveillance System Design
PRI
Dar Michel:.
Dunham Associates, Inc. hereby proposes to furnish electrical engineering services for the following project:
Pit Desciiption
Provide a video surveillance system to be -nstalled in the new Sti heater Parking Structure located at 200 21"
Street, Stillwater Minnesota. The video surveillance system will utilize No cabling infrastructure designed and
irstalled during the bui±ding's conetructon process,
Sect Bas c Services
Services for the various phases of the project shall be as described below:
1. Consuaing and Design Period Services:
I. Video Surveillance System
a. Services include preparing plans and specifications for the solicitation of bids for the
procurement and installation of video surveillance system equipment. The system wit= be
designed for the Stillwater Parking Structure, but will allow for future connection to othrr
sites via LAN/WAN systems. The final system shall consist of cameras, 0 gital Video
Recorders, data transmission wiring, and the ability to integrate with access
controlfintruson detection systems for a completely integrated and functioning system.
The design to, camera cabling, terminations, racks, cutlets_ and power sources was
included in the base building's construction contract.
b. System size to be determined dunng Owner meetings, with an astirnatsd maximum Ievel
of iorty (40) cameras in the system.
c. Services nclude the time for Iwo (2) meetings with the Owner ario oocedinatior with the
Owner's representative and Contractors.
II. Bidding Period Services:
1. Ass et the Owner in reviewing and evalu
n
the bids for the systems fisted above.
DUNHAM
itl SotSizlh 5Ireet) SWIG t 100
Minieepolia, Micnesc'ts 55402.154D
PNIJAE 8r2.466,7560 ACC 812 465. tt
Ck'.Ir tiamocg.f,On1
Michel Pogge
City of Stillwater
III. Construction Period Services:
April 14, 2010
Page 2
1. Review of shop drawings.
2. Answer contractor questions during construction.
3. Construction Observation/Punch List at project completion/
Optional Additional Services
The services identified below are not included in Basic Services and shall only be provided if authorized in
writing by The City of Stillwater.
1. Design services for or modifications to any existing buildings and their systems.
2. Preparation of detailed construction cost estimates.
3. Restart costs if project is delayed over 30 days.
4. Design of owner or architect initiated changes to the project during construction, or significant changes
to the project scope during the design phase.
5. Redesign or design services in response to Contractor generated errors or construction not in
accordance with the contract documents.
6. Construction observation trips beyond the quantity stipulated in the Project Basic Services.
7. Commissioning of the building mechanical and electrical systems.
8. Services not listed as Basic Services.
Compensation
Our compensation for Basic Services will be:
Hourly at the rates outlined in our current rate schedule attached in Appendix A not to exceed a maximum of
$7,000, plus normal reimbursable expenses including postage and courier, reproduction for out -of -office use,
and any expenses associated with out-of-town travel for the project, billed at cost.
Additional Services Compensation
For additional services beyond those defined as Project Basic Services, and when these Additional Services
have been prior approved in writing by City of Stillwater, our compensation will be hourly at the rates outlined
in our current rate schedule attached in Appendix A, plus normal reimbursable expenses, billed at cost.
Invoicing
1. We will invoice you for our services monthly, for services performed during the previous month.
1:\Proposals\2011\Commercial\Pro-City of Stillwater Parking Ramp Video Surveillance.docx
Michel Pogge
City of Stillwater
Payments
April 14, 2010
Page 3
Payments are due and payable 30 days from the date of our invoice. If payments are not received when due
and payable, then we may assess interest on the outstanding balance at a rate of 1.0% per month, with
interest accruing beginning thirty days from the date of the invoice.
Miscellaneous Provisions
Insurance
Dunham Associates shall keep in force for the term of the project, a professional liability insurance policy
insuring it against negligent acts, errors, or omissions in the maximum amount of $1,000,000.
Allocation of Risk
The risk involved in this project, has been allocated such that the Client agrees that Dunham Associates' total
liability to Client for any and all injuries, claims, losses, expenses, damages or claims expenses arising out of
this Agreement from any cause or causes, shall not exceed the total amount of our fee. Such causes include
but are not limited to: design professional's negligent acts, errors or omissions, strict liability, breach of
contract, or breach of implied or express warranty.
Hazardous Materials
It is acknowledged by both parties that Dunham Associates scope of services does not include any services
related to asbestos or hazardous or toxic materials. In the event Dunham Associates or any other party
encounters asbestos or hazardous or toxic materials at the jobsite, or should it become known in any way that
such materials may be present at the jobsite or any adjacent areas that may affect the performance of Dunham
Associates' services, Dunham Associates may, at their option and without liability for consequential or any
other damages, suspend performance of services on the project until the Client retains appropriate specialist
consultant(s) or contractor(s) to identify, abate and/or remove the asbestos or hazardous or toxic materials,
and warrant that the jobsite is in full compliance with applicable laws and regulations.
Disputes
All claims, disputes, and other matters in question arising out of or relating to this agreement or the break
thereof, shall be decided in accordance with the laws of the State of Minnesota.
Any controversy or claim arising out of or related to the contract, or the breach thereof, shall first be submitted
to the American Arbitration Association Mediation Department. A mutually agreed upon qualified dispute
organization may be used. Mediation shall continue until resolution of the dispute or until the mediator notifies
the parties that it is unlikely that the dispute will be resolved through mediation.
Termination
This agreement may be terminated by either party giving written notice to the other party ten (10) days prior to
the termination date. Dunham Associates shall be paid for work completed through the date of termination
notice for services performed on an hourly basis at two and one-half times the direct personnel expense
incurred, and reimbursable expenses incurred up to the termination date, plus any termination expenses.
J:\Proposals1201 11Commercial\Pro-City of Sill'water Parking Ramp Video Surveillance.docx
Michel Pogge
City of Stillwater
Outer
April t 4, 2010
Page 4
Dunham Associates' sole contractual relationship shall by with the Client and nothing herein shall be
construed to create any obligation or contractual refat unship between Dunham Associates and any third party.
Dunham Associates relies solely and exclus vely on the Client to provide compete accurate and t rnely
information o4 the Owner's design criteria
YerikalkaStiallfinfig..92411i2Ete
Inasmuch as the remodeling andior rehabilitation of an existing structure recuires that certain assumptions be
made regarding existing conditions, and because some of these assumptions may not be verifiable without
expending additional sums of money or destroying otherwise adequate or serviceable portions of the structure,
the Client agrees to bear acosts, losses and expenses. including the coat of the Design Prolessional's
additional services, a isirig or allegedly arising from the discovery of concealed or unknown conditions in the
existing structure,
This proposal s val,d for 60 days. h it is acceptable to you, please authorize us to proceed by signing both
original documents and returning oio to our office. We w II proceed with our work upon} rece pl of your
signed proposal.
Thank you tor the opportunity to provide you wits this proposal. We look forward to working with yo, on this
project.
S neerely,
Nathan Wriedt, PE. RCDD, LEED AP
Senior Assaatate
Eiectrical Engineer
DUNHAM ASSOCIATES, INC.
copy: Accounting Department
Marketing Department
Attachments. Appendices A and B are attached and part ct th
a
regiment.
ACCEPTED FOR ACCEPTED FOR
DUNHAM ASSOCIATES, INC.
BseAerPf
BY
Darrell Martin, Partner
DATE ."I7 ' ?`'tom
City of Stillwater
Authorized Signer for the City of St water
DATE
1;rt k <�I ei t ` :tw riatoi r1�rcr Ily at rrnnrwatn� ParleilJ RrmN')IiI o Sui,vulllu•h
APPENDIX A
DUNHAM ASSOCIATES, INC.
HOURLY RATE SCHEDULE
Through March 31, 2011
Hourly billing rates are:
Principals $180
Project Managers $160
Engineer III $160
All other employees on an hourly basis of 2.5 [ ] times direct personnel expense (DPE). Direct personnel
expense is defined as the direct salaries of the employee and their mandatory and usual benefits such as
taxes, vacation, sick leave, and insurance.
Typical hourly billing rates for these employees are:
Engineer II
Engineer I
Designer III
Designer II
Designer I
Drafter II
Drafter I
Energy Modeling Specialist
Commissioning Specialist
Support Staff
$100.00 - 145.00
$80.00 - 120.00
$110.00- 160.00
$70.00 - 115.00
$60.00 - 85.00
$50.00 - 80.00
$45.00 - 70.00
$120.00 - 145.00
$95.00 - 120.00
$50.00 - 65.00
APPENDIX B
LIST OF BASIC SERVICES WHICH WILL BE PROVIDED
ELECTRICAL
A. Specifications
1. Standard Divisions 26, 27 and 28 format.
B. Electrical Service Provisions
1. Existing System.
C. Electrical Distribution System
1. New Surveillance shall be coordinated with the existing distribution system.
D. Emergency Power
1. Selection of emergency power system.
F. Special Systems
1. Video Surveillance System layout and specification.
G. Construction Support
1. Review contractor's shop drawings.
2. Construction observations, besides Final Punch List, will be an additional service, as requested
by the Owner.
Agenda Item 3.10
RIVER
MARKET
Community. Co-op
221 North Main Street, Ste. 1
Stillwater, Minnesota 55082
Telephone: (651) 439-0366
Facsimile: (651) 439-9389
April 13, 2010
Bill Tumblad
Community Development Director
216 North Fourth St.
Stillwater, MN 55082
Dear Mr. Turnblad,
Please consider putting up a no parking sign(s) on Water Street, directly east of our receiving dock area.
We will try to send you a picture as soon as we can, but there is a danger for cars parked directly east of
our loading dock when 40 foot semi trailer trucks try to back into our dock.
I think one answer could be a "No Parking Before Noon" type of sign.
I write this as a result of another concerned driver talking to me about the problem this morning.
Thank you for your time and consideration,
Mead Stone
General Manager
River Market Community Co-op