Loading...
HomeMy WebLinkAbout2008-09-08 PC Packet - Part 2 - Lakeview Hospital cSii llwate~, ~._-=--~ . ~, fHE 8IRTH~L^CL or MiNI-~L:;OJA. J Planning Report DATE: September 5, 2008 CASE NO.: 08-43 APPLICANT: Peter Smith, BWBR Architects PROPERTY OWNER: Lakeview Hospital REQUEST: 1) Special Use Permit for Master Facilities Plan 2) Height Variance 3) Lot Coverage Variance LOCATION: 927 W. Churchill St. PUBLIC HEARING: September 8, 2008 REVIEWERS: City Administrator, City Attorney, Deputy Fire Chief, City Engineer, City Planner, Building Official PREPARED BY: Bill Turnblad, Community Development Director 1./j .' BACKGROUND Lakeview Hospital has retained BWBR to develop a master facilities plan to accommodate the projected growth needs of the hospital on their current property for the next 20 to 25 years. The resulting plan shows facilities improvements in four phases. The first phase is estimated to be implemented in the 2009 to 2010 time frame. The fourth phase is estimated to be implemented in the 2020 to 2025 time frame. The hospital is requesting approval of a Special Use Permit that would be valid for the first three phases of the master plan. In addition, conceptual approval is being requested for the fourth phase ofthe plan. Since construction approved with a Special Use Permit must begin within two years of city approval, an ordinance amendment is being reviewed separately to address the timing matter. Specifically, the ordinance amendment is proposed to allow a longer validity period for Special Use Permits that have phased plans approved by the city. The public hearing for the ordinance amendment was opened by the Planning Commission on August 11, 2008 and continued to the September 8, 2008 commission meeting. Lakeview Hospital Page 2 of 8 SPECIFIC REQUEST In order to implement the phased master plan as proposed, Lakeview Hospital requests the following: 1) Approval ofa phased Special Use Permit valid through 2020, or Phase III ofthe hospital's master facilities plan, whichever comes first. 2) Conceptual approval of Phase IV of the hospital master facilities plan. 3) Approval of a variance from the 35 foot height limit in the RB Zoning District to allow 42 foot tall additions in Phase II and III of the master facilities plan. 4) Approval of a variance from the 25% limit on building coverage and 25% limit on other impervious coverage in the RB Zoning District to allow more than 25% other impervious coverage. The Planning Commission is responsible for reviewing and making a decision on the variances, and for making a recommendation to the City Council on the Special Use Permit. EVALUATION OF REQUEST The hospital site is covered by two different zoning districts. The northern portion of the site is zoned RB, Two-Family Residential. The southern portion of the site is zoned RA, Single Family Residential. All additions and exterior facility improvements are planned only in the portion of the site zoned RB. Hospitals are allowed by Special Use Permit in both the RB and the RA Zoning Districts. Each expansion project since 1976 has been by Special Use Permit. Summary of Phasing The Lakeview Health System Board has chosen to keep its hospital in Stillwater and expand it on the current site. In order to accommodate projected needs, the board's consultants have proposed a four phased master facilities plan. The first three phases of the hospital plan are quite firm and the board is requesting final approval for them. The fourth phase is not as firm and therefore the hospital's board is requesting only conceptual approval for that phase. Phase 1. The first phase is a horizontal expansion that would increase the hospital footprint by 23,400 square feet. Since two levels are planned with 23,400 square feet on each level, this first phase would create 46,800 square feet of new space. The space would be used largely for surgery, oncology and endoscopy. Estimated implementation ofthis phase is 2009-2010. 60 parking spaces would be eliminated for this phase. However, given the current number of parking spaces on the property, a parking surplus will still exist. Originally, this phase was to have two levels with 33,400 square feet per level. But in response to comments at the neighborhood meeting, the building setback from Everett Street has been increased. This has reduced the square footage for each level to 23,400 square feet. The Lakeview Hospital Page 3 of8 increased setback has also allowed the existing Everett Street access point to stay where it is today. This is important to the neighbors who do not want to bring hospital traffic any further south into their neighborhood than is necessary. Phase II The second phase is a vertical expansion that would add two stories to the Phase I addition. 46,800 square feet of total space would be added in this phase, with 23,400 square feet on each of two new floors. The space would be used largely for patient beds. These beds already exist in the hospital, but would be relocated onto these two floors. Estimated implementation ofthis phase is 2012-2013. No parking spaces will be added or removed during this phase. None the less, the current surplus of spaces will suffice to service the parking need through construction of this phase. Originally, this phase was to have three stories which together with Phase I work would have resulted in a four story addition. But in response to comments at the neighborhood meeting, this addition was reduced to a total of three stories instead of four. Phase III The third phase is the replacement of the former two-story clinic with a three story expansion (total of four floors including the basement level parking). Each of the four floors would have 25,200 square feet for a total of 100,800 square feet of space. 75,600 square feet would be program space; 25,200 square feet would be for underground parking. The space would be used largely for outpatient services. Estimated implementation of this phase is 2015-2020. The underground parking facility in this phase would have 50 spaces. In addition, the upper level deck in the parking ramp south of the hospital would be extended westward to add 34 more parking spaces. Loss of four existing spaces in this phase creates a net increase of 80 spaces and a parking surplus of 26 spaces. Phase IV The fourth phase is a three level horizontal expansion with 32,000 square feet on each of the above ground levels. The space would be used largely for public spaces such as a cafeteria, entrance and waiting areas. It would also be used for radiology. The lower level will be underground parking. Estimated implementation of this phase is 2020-2025. To develop this phase would require the purchase ofthe two single family homes at the corner of Everett and West Churchill. In place of the homes would be a two level parking ramp with 103 stalls. In addition, 39 basement level stalls would be added under the addition created during this phase. A parking surplus of20 is projected by the end of Phase IV construction. Key Issues Public discourse for the hospital facilities plan has included a number of meetings with the Planning Commission, the City Council and a neighborhood meeting. Throughout those discussions several key issues have been identified. Each is discussed briefly below. a) Validity period for Special Use Permit & Variances Lakeview Hospital Page 4 of 8 The Lakeview Health System Board would like to have approval of the first three phases of their master plan. This would bring them to somewhere in the time frame of2015- 2020. However, the current City Code only provides a two year validity period. Consequently, a City Code amendment is working its way through the public review process on a more or less parallel track to that of this Special Use Permit (SUP) request. The Code amendment will address the issue of validity period for the SUP and varainces. 1. The hospital's board position is that they would like to have assurances they can build Phases II and III if they invest in Phase 1. Therefore, they would like approval of all three phases. They are also asking for conceptual approval of the fourth phase of the plan. 2. The opposing position is that the neighbors and city officials should retain the authority to review every phase of the project. 3. As the pending City Code amendment works its way through the process, the validity period for this phased plan will be determined. b) Building Height Variance Buildings in the RB Zoning District are limited to 35 feet or less. This is typically a three story building. The height of the first addition (including both Phase I and II construction) and the second addition (Phase III construction) will both be about 42 feet. Therefore, the Lakeview Health System Board is requesting a 7 foot height variance for each of the additions. The Planning Commission may grant the variances if the following conditions are found to be satisfied 1 : 1. A hardship peculiar to the property, not created by any act of the owner, exists. Personal, family or financial difficulties, loss of prospective profits and neighboring violations are not hardships justifying a variance. In this case, the hospital property is small relative to its long standing use. The hospital is one of the oldest in Minnesota and has grown in place since its founding. If the property were larger, the hospital could consider a two-story structure that met the 35 foot height limit. But it is not. Moreover, a large percentage of the southern area of the property is steep slopes and open water. This further limits options for spreading building out as two stories, rather than expanding to three stories. 2. A variance is necessary for the preservation and enjoyment of substantial property rights; and, if granted, would not constitute a special privilege not enjoyed by neighbors. In the RB Zoning District, a three story building is permissible. However, since a hospital needs greater ceiling cavity height to accommodate specialty equipment, it is not possible to build three stories within 35 feet. 3. The authorizing of the variance will not be of substantial detriment to adjacent property and will not materially impair the purpose and intent of this section or the public interest nor adversely affect the comprehensive plan. I City Code Section 31-208( d) Lakeview Hospital Page 5 of 8 The building height has been reduced from four stories to three stories in response to neighborhood concerns. This has greatly reduced the potential impact upon the surrounding residential neighborhood. The setback from Everett for Phases I-III was also increased in response to neighborhood concerns, reducing the impact of the massing on the neighborhood by setting the 42 foot structure further back from the street. Moreover, the current penthouse on the hospital is already 50' 3" high. None of the proposed expansion areas will be this high. c) Parking Parking is a critical component of the facilities plan. In order to increase confidence in the parking requirement numbers, three different approaches to determining need were analyzed: 1) current city code parking standards; 2) comparable facilities parking spaces in the metropolitan area; and 3) analysis of parking need based upon the actual functions occurring within the various areas of the facility. The city code standards and the needs analysis approach are both tracked below through all four phases of the master plan. Details of the function analysis can be found on Pages 42-46 of the attached applicant's booklet. Existing Phase I Phase II Phase III Phase IV Spaces required by zoning 377 440 464 508 540 Spaces needed by program 338 452 505 566 660 analysis Net of spaces added and 0 -60 0 +80 +88 removed this phase Spaces available after phase 572 512 512 592 680 completion Zoning deficit or surplus +195 +72 +48 +84 +140 Needs analysis deficit or +234 +60 +7 +26 +20 surplus It appears that there will be a surplus of parking spaces after completion of each phase. To add another level of confidence to these numbers, staff retained SEH to review them. In their estimation, the parking to be provided will generously meet the need generated by the expansion. Their review is attached. d) Traffic The City Engineer together with SEH has been working with the hospital's engineering consultant to revise the traffic analysis provided in the applicant's booklet. As noted in the attached review from SEH, the applicant's estimate of increased traffic volume appears to be too low. None the less, SEH concludes that even with SEH's higher estimate, the increased traffic volume is "relatively small" and the city's existing street system would likely accommodate the traffic increase generated by the hospital. SEH notes however that "the ability of streets to accommodate traffic is best determined by Lakeview Hospital Page 6 of 8 analyzing street intersection operation with peak hour traffic volumes. At some point peak hour intersection analysis should be done." Staff concurs. In order to assure a satisfactory level of service at Churchill and Greeley as well as at Everett and Greeley, those intersections should be studied. This study should be completed prior to approval of the Special Use Permit by the City Council. The applicant's engineer has had additional analysis done and it will be available at the public hearing on September 8, 2008. e) Landscaping Though opportunities for improving landscaping are somewhat limited, landscaping should be addressed for each of the proposed phases. When the pending permit timing ordinance amendment is acted upon by the City Council, and the number of phases that can be given final approval is determined, landscaping plans should be submitted for those phases that can be given final approval. The landscaping plan for those approved phases should be submitted and considered by the city council at the same time as the second reading of the ordinance. .f) Impervious cover variance i) Total impervious coverage on the project can be 50%. Currently it is 47.2%. After Phase III construction is complete the impervious coverage would increase slightly to 47.9%. This would not need a variance. However, in addition to specifying a 50% cover, City Code also limits types of impervious cover. No more than 25% ofthe coverage can be building; and no more than 25% coverage can be other impervious surfaces. Currently the building coverage is 15.1 % and other impervious cover (parking lots, sidewalks, etc.) is 32.1 %. So, the other surface coverage is non- conforming. After Phase III construction the campus would still have no more than 19.3 % building coverage. And the other impervious surface coverage will be reduced to 28.7%. None the less, that is still higher than 25%, so a variance is being requested. (1) An argument could be made that the current 32.1 % miscellaneous impervious surface coverage is legally non-conforming ("grandfathered"). But city records are not detailed enough to track when the miscellaneous impervious cover went above 25%. So, rather than try to reconstruct the record, staff recommended simply making application for the variance. (2) The Planning Commission may grant the variances if the following conditions are found to be satisfied2: 1. A hardship peculiar to the property, not created by any act of the owner, exists. Personal, family or financial difficulties, loss of prospective profits and neighboring violations are not hardships justifying a variance. In this case, there is a presumption that the city issued the requisite grading permits for the existing parking lots and sidewalks. Requiring the hospital board to remove more miscellaneous lot coverage than they will already be doing by Phase III would be requiring them to remove parking surfaces that 2 City Code Section 31-208( d) Lakeview Hospital Page 7 of 8 have existed for a good number of years. And, presumably they have existed with full knowledge and approval of the city. 2. A variance is necessary for the preservation and enjoyment of substantial property rights; and, if granted, would not constitute a special privilege not enjoyed by neighbors. Since the parking and other hard surfaces have existed for a good number of years, if a variance is not granted to allow what is there to remain, it could be argued that property rights are not being preserved. 3. The authorizing of the variance will not be of substantial detriment to adjacent property and will not materially impair the purpose and intent of this section or the public interest nor adversely affect the comprehensive plan. As mentioned above, the amount of miscellaneous hard surface will be reduced. To staff s knowledge the exiting 32.1 % cover has not been a substantial detriment to adjacent property. Therefore reducing the coverage to 28.7% can only improve the situation, not worsen it. Miscellaneous Notes 1. Phase IV impervious coverage will need a separate variance. It will have to be approved when the final SUP approval is given for that phase. 2. Patrick and Jo Ann Poshek, neighbors to the hospital, have submitted a letter sharing their concerns. It is attached. AL TERNATIVES The Planning Commission has the following options available: 1. Approve the variances and recommend approval of the Special Use Permit with the following conditions: a. Improvements to the hospital site shall be in substantial compliance with the phased master facilities plan submitted by the applicant and included within the booklet entitled "Submittal: Special Use Permit. A Phased Master Plan. Lakeview Hospital. Stillwater, MN" and dated August 15,2008. b. Conceptual approval for all four phases is granted if the appropriate ordinance amendment is approved by the City Council to allow such conceptual approval. c. Unless an ordinance amendment is approved by the City Council that allows for an extension of the validity period for the requested Special Use Permit and variances, they shall conform to the current City Code standard that limits their validity to two years from the date of approval to the date of construction commencement. d. In order to assure that the level of service at the intersections of Churchill and Greeley as well as Everett and Greeley will continue to be satisfactory, those intersections shall be studied further. The parameters of the study shall be established by the City Engineer. This study shall be completed prior to City Council approval of the Special Use Permit. Lakeview Hospital Page 8 of 8 e. Middle St. Croix Water Management Organization (WMO) rules shall be satisfied in terms of stormwater management and erosion control. Prior to issuance of a building permit, the grading plan for the project must incorporate the WMO rules and be approved by the City Engineer. f. Prior to City Council approval of the Special Use Permit, a landscaping plan shall be submitted by the applicant. The landscaping plan shall show proposed landscaping for each phase of the project that will receive final approval. g. Prior to City Council review of the Special Use Permit, the property owner shall submit a complete and accurate legal description of the property to the city. 2. Deny the variances but recommend approval of the Special Use Permit with the conditions found in Alternative 1 above. Findings of fact should accompany a denial. 3. Deny the variances and recommend denial of the Special Use Permit. Findings of fact should accompany a denial. 4. Table the requests for more information. RECOMMENDATION Since more traffic information is expected from the applicant's engineer prior to the public hearing on this case, staff would like to see that information prior to offering a recommendation. cc: Peter Smith, BWBR Architects attachments: Poshek Letter Traffic Engineer Review Memo Zoning Map Certificate of Survey Application Booklet Patrick & Jo Ann Poshek 1302 Everett St S Stillwater Mn 55082 September 4, 2008 City of Stillwater Planning Commission Stillwater City Council Re: Special use permit for Master Plan Lakeview Hospital The Planning Commission will be considering this case at a hearing on Monday, September 8th 2008. I would like to share our concerns regarding this request. . We live in an adjoining neighborhood with RA zoning. . RA should protect consistency of improvements with no variances. . Will we be encroached upon by inharmonious uses in the future? . The future need for more parking. . Future occurrences of noise disturbance and traffic problems. . Views from Brick Pond with height of building. . This variance does not ensure stability of our neighborhood. Examples Rented Houses, Pride of ownership, Desirable location, Stable Market Value. . What will be the use of this building when the Hospital finds it no longer suitable for their needs. We have one request regarding this variance; it should be stated on each permit for this Master Plan and or variance the current Hospital Complex land will not be allowed to expand beyond its existing boundaries of this Master Plan. Thank You Patrick & J 0 Ann Poshek Jt. SEH MEMORANDUM TO: Shawn Sanders, City of Stillwater Thomas A. Sohrweide, PE, PTOE ~ September 4, 2008 FROM: DATE: RE: Traffic and Parking Review of Lakeview Hospital Expansion Plan SEH No. ASTILL080200 At your request we have reviewed the traffic and parking information provided by BWBR Architects in an August 15, 2008 letter, for the proposed long term expansion plan for Lakeview Hospital. Traffic Based on our review the traffic forecasts appear to be understated. Traffic counts were taken of entering and exiting vehicles for eight hours at four of the five hospital parking areas. A two hour count (AM and PM peak) was taken at the employee parking lot. These counts showed a total of 1,675 vehicles entering and exiting the parking areas. The submittal estimated a daily traffic volume of 1,612 vehicles entering and exiting the hospital site. This was based on the Institute of TranspOliation Engineers (ITE) Trip Generation Manual average rate of 5.2 trips/employee. In addition to average rates by employee, this manual provides trip generation data based on hospital square footage and data based on formulas developed based on the variability of the data samples collected. The information in this manual is helpful, but ultimately the best information comes ti-om locally collected data. Attached are two tables summarizing and comparing the data collected to the manual. Table 1 shows a comparison between the ITE average rate per employee, used by the study, and the ITE formulas based on employees and square footage. The range of estimated existing daily traffic, while significant in size, 1,612 to 4,180, is being accommodated today and therefore does not appear to be of critical concern. More critical is what the future increase will be. Table 1 also shows a range in growth from 710 to 1,990 trips per day. To determine which may be more accurate, we developed Table 2. This table used the existing number of employees (310), the existing hospital square footage (l96.7 sq. ft.), the AM peak hour traffic volume (611), and the PM peak hour traffic volume (598) to calculate trip generation rates. As shown in the table, the rates from the study compare favorably to the rates from the ITE manual based on hospital square footage. Conversely, the rates based on number of employees are significantly different. Based on this analysis we recommend that hospital square footage and not number of employees be used to develop traffic projections. Therefore as shown in Table I, the estimated traffic growth based on the proposed expansion plan would be l,990 vehicles per day. This is a relatively small increase in traffic volume and would likely be able to be accommodated on the existing streets. However, the ability of streets to accommodate traffic is best determined by analyzing street intersection operation with peak hour traffic volumes. At some point peak hour intersection analysis should be done. This analysis should include the ultimate planned expansion and forecast traffic growth on the access streets for the future expansion completion year. Short ElJioll Hendrickson Inc., 3535 Vadnais Center Drive. St. Paul, MN 55110-5196 SEH is an equal opportunity employer I www.sehinc.com I 651.490.2000 I 800.325.2055 I 651.490.2150 fax Traffic and Parking Review of Lakeview Hospital Expansion Plan September 4, 2008 Page 2 Parking In reviewing the parking supply, we consulted the ITE Parking Generation Manual. This manual presents parking supply and demand information gathered from various uses. For hospitals information is based on number of beds and number of employees. Based on the number of beds, the existing parking supply shou ld be 369, with an increase of 198 to accommodate the planned growth, for a total of 567. Based on the number of employees, the existing parking supply should be 279, with an increase of 145 to accommodate the planned growth, for a total of 424. The proposed expansion has an ultimate total of 680 parking spaces. When comparing to the above ITE data, this appears to be an adequate number of spaces. This is further confirmed because the number proposed appears to have been calculated base on specific planned use of the expansion phases and not just general numbers as from ITE. ts Attachment ~:\pL\.s\.'ilillkoll1mull\:'mllucrs-hospilal-\N040X.dtlc La.keview Hospital Trip Generation Comparison Table 1 Estimated Daily Traffic Volumes Study (per employee ITE (per employee ITE (per Sq. Ft. avg.) formula) formula) ExistinQ Expansion Existinq Expansion Existina Exoansion Daily Traffic 1612 717 2075 710 4180 1990 Volume Table 2 Trip Generation Rates Based on Counted Peak Hour Traffic Volumes Per Employee PerSq.Ft. Study ITE Study ITE Manual Manual AM Peak 1.97 5.18 3.11 2.60 Rate PM Peak 1.93 6.02 3.04 2.61 Rate SEH - 9/04/08 ~ Cit)/ of f lakeview Hospital Current Zoning SURVEY PREPARED FOR: Lakcvicw Memorial Hospital 927 Churchill Street West Stillwater, MN 55082 <l'/ ?~ 4Q..'f ,0V'/ l' "!' oJ' , it ~$ ~...f}1 / J~' #fl~ : ~ ~ ~ ~v \, &/'tcY r------jtl / / / / L CERTIFICATE OF SURVEY LEGEND NOTES o DENOTES ~ INOi IRON PIPE MONUMENT MARKED 'MTH A PLASTIC CAP INSCRIBED "FREEMAN LS 16989", UNLESS SHOWN OIHERWlSE DENOTES FOUND l6: INCH IRON PIPE WITH PLASTIC CAP INSCRIBED RLS 9232, UNLESS SHOWN QTHER'MSE 1) ORIENTATION OF THIS BEARING SYSTEt.l IS BASED ON THE NORTH LINE OF BlOO< 22, HOLCOMBE'S 2ND ADDITION TO STIllWATER, WHICH IS ASSUMED TO BEAR N69'29'31"E, 2) FEATURES SHOWN ON THIS CERTIFICATE Of SURVEY HAVE BEEN lOCATED BY A COMBINATION or RECENT FIElD MEASUREMENTS; 2005 WASHINGTON COUNTY AERIAL PHOTOGRAPHY; CONSTRUCTION PLANS; AND INfORMATION SHOWN ON PRIOR SURVEYS. THE BOUNDARY AS SHOWN IS BASED ON A COMPLETE RETRACEMENT AND BOUNDARY SURVEY OF THE PROPERTY 'MTHIN HOLCOMBE'S ADQIT10N AND HOLCOMBE'S 2ND ADDITION. BY BRUCE A. FOll, LS 92J2, IN 1982. . J) THERE ARE A NUMBER 01=" GAPS OF RECORD, CREATEO BY DESCRIPTION, 'MTHIN THE BOUNDARIES OF THE PROPERTY SHOVlN ON THIS CERTIFICATE OF SURVEY. THE MAJORITY Of THE INTERNAL GAPS \'i[RE CREATED BY DESCRIPTION/DEED SCRIVENORS \\tiO MADE THE ASSUt.4PTION THAT LOTS 'MTH1N THE UNDERl'rlNG PLATS MEASURE EXACTlY AS PLAITED. THERE IS ALSO A SUBSTANTIAL GAP THAT EXISTS BETVI[EN THE RECORD PLATS OF RITZER'S SUBOI'v1S10N AND HOLCOMBE'S AOOITION. THESE ISSUES ARE INDlCATEO ON A CERTIFICATE Of SURVEY PREPARED BY BRUCE A. FOLZ, LS 92J2, IN 1982. IT IS MY RECOMMENDATION THAT THE OWNER MAKE APPLICATION TO THE DISTRICT COURT TO RECISTER THE TITLE TO THE PROPERTY 'MTHIN THE EXTERIOR BOUNDARY AS SHOW ON THIS CERTlF'ICA TE. 4) OWNER DID NOT PROVIDE TITLE INfORMATION. THIS BOUNDARY SURVEY WAS PERfORMED FROM INFORMATION CONTAINED IN THE FILES Of fOLZ. FREEMAN, ERICKSON, INC. B1.CC.J\~ 27 ':<' n/')....- LL.vV'I' :;1 " ::' s [5 '" 'U 72 "C; ,,~ " A ," ~:c ,~, J.hOIf LINL OF TIlL SrWTlf ztJ HEI " iN ~) ~S////'.375//.W 11//./1.3 ~ / j... ~ \ r") L' ,c/ f\ ItA 11/1 '-~ I\JVV I ""'--1 A {1 1...I1r ~ VV 1/ " f UI pONO 1 L. /' f ,; I fI 11 I')' I \J 1/ ?-J .......-..-.. ./ / - . --' ........ pet/V /_!pGiOF._.. -- " ~y.- ./ /..j-.......-. L_EM! of Pc!/'lP " ~t ~ l'i ~~~ ~ ~~. ~~"). ~ V) "1 ~~~ 'li\~ ~ I,) ~ " / ./. /- ./ PONO - f ~ ~-------- ~ ~ " '-. \ " SOVT;.' LINC N TIfL MJ.RT# ilL ~_____ 0;: TfI! SJ1l/I~ tJF TflC MV1/~ /~ SLCTION 33, 730N, ,RLOW --. -- 5J6.72 S//51'.3Z.3rW . 6251/15 Folz, Freeman, Erickson, LAND PLANNING . SURVEYING . ENGIN IDHJ' 12445 55TH STREEl "y' LAKE ELMO, MINM:SC 5 Phone (65]) 439-8833 Fax (6 ~ N W+E ~ ORIGINAL SCAlE 1 INCH .. 50 fEET ,!., SCALE IN FEET ----r- I I I I I I I I B: A " " " -L ;-r. ANPE,eSON ~ r-- Sr. --r IT ~ I 1:< I . I ~ I I ~ I L S : ;:~ ~ I ,j I ::0 + ::' I I I I I I I I I L .--J 29 SOVTfI&lST CoAWLR OF __) \ Lor .30, IV7ZEKS SL//51JMSION - - - - - - - - - _\ 28 " J hereby certify that this surV/ry, plan or report was prepared, under my direct supervL~ion and that J am 0 duly License.d La. under the Laws 0/ the State ofAlinlle.wta. Augm OW-OR ARCHITECTS Architecture. Interior Design Lawson Commons 380 St. Peter Street, Suite 600 Saint Paul, MN 55102-1996 651.222.3701 fax 651.222.8961 www.bwbr.com 15 August 2008 Mr. Bill Tumblad Community Development Director City of Stillwater 216 N. 4th Street Stillwater, :MN 55082 RE: Lakeview Hospital City of Stillwater Special Use Permit Process BWBR Commission No. 2008.122.00 Dear Bill: We are pleased to submit this request for a Special Use Permit on behalf of Lakeview Hospital. We have been working with hospital administration over the past 6 months to define a longterm strategy for Lakeview on their existing campus. This effort began with an analysis of the current and long range departmental needs and the opportunities to meet those needs at the existing site at Greeley and West Churchill. The results were presented to the Lakeview Health System Board at a May 3,2008 workshop/retreat where approval was received to begin the detailed discussions with the city towards a longterm solution to their physical needs on this campus. The questions before the city are: 1. Lakeview Health System is requesting a Phased Special-Use Permit based on a 20-25 year conceptual master plan for their Lakeview Hospital Campus in Stillwater. a. Phase I: 2-story expansion (lower level, first floor) of 46,800 sq ft. Estimated Implementation 2009-2010 b. Phase II: 2-story vertical expansion (second floor, third floor) of 46,800 sq. ft. Estimated Implementation 2012-2013 c. Phase III: 4--story replacement of the Greeley clinic building (lower level, first floor, second floor, third floor) of 75,600 sq. ft. Estimated Implementation 2015-2020 d. Phase IV: 2-story expansion (lower leve~ first floor) of 64,000 sq. ft. Estimated Implementation 2020-2025 2. Lakeview Health System is requesting a variance from the existing zoning as it relates to building height and lot coverage. We are asking that we be allowed to build within previous height limits and coverage framework established by existing structures on site (50'-3" from Main Floor to Penthouse roof). Current Zo~g requirements are as follows for RA and RB districts: ... Mr. Bill Turnblad City of Stillwater Lakeview Hospital City of Stillwater Special Use Permit Process BWBR Commission No. 2008.122.00 Page 2 of2 Building Height: RA = 2-1/2 story not to exceed 35'-0'~ RB = not to exceed 35'.0" Existing Building Height = 50'-3" to penthouse roof Phase 2 and 3 height to be less than 50'-3" (aprox. 42'-0") Lot Coverage: RA = 30 percent; RB = 50% total (25% building, 25% surface) Existing site = 46.9% (15% building, 31.9% surface) Phase 4 total = 49.4% (16% building, 33% surface) We look forward to discussing this submittal further with both the Planning Commision and City Council. If you have any question on this information please feel free to contact Shannon Bambery, Project Architect 651.290.1979. Respectfully submitted, C:\Documents and Settings \2240\Local Settings \ Temporary Internet files \ Content_Outlook \3MN299BS\REVISED city submittal letter 200S-0S-14.doc 15 August 2008 BWBR Architects, Inc. . ;0 ,. LAKEVIEW HEALTH Submittal: Special Use Permit A Phased Master Plan Lakeview Hospital Stillwater, MN BWBR Architects / 2008.122.00/ August 15. 2008 ~-~........ - -. ,~- LAKEVIEW HEALTH Intra: What are we Lakeview Health System is requesting a Phased Speclal- Use Permit based on a 20-25 year conceptual master plan for their Lakeview Hospital Campus in Stillwater. ower first f . 1 or oor) eve (I a. Phase I: 2-story expansion 46,800 square feet. Estimated third oor, f mplementation 2009-2010 (second : 2-story vertical expansion 46,800 square feet. mated b. Phase floor) or Est mplementation 2012-2013 c. Phase 4-story replacement of the Greeley clinic building (lower level, first floor, second floor, third floor) or 75,600 square feet Estimated Implementation 2015-2020 or first floor) eve (lower Phase IV: 2-story expansion 64,000 square feet. Estimated d. mplementation 2020-2025 Lakeview Health System is requesting a variance from the existing zoning as it relates to building height and ot coverage. 2. 2 5.2008 BWBR Architects / 2008.122.00/ August ill ~-~........ ~- LAKEVIEW HEALTH · Building Framework and Massing Development 4-16 · Parking Needs Assessment 17-24 · Traffic Growth Analysis 25-30 · Greenspace and Stormwater Managment 31-32 · Building Design 33-40 · Support Documentation 40-48 i. Detailed Parking Analysis i. Traffic Projections i. Green space and Stormwater calculations. BWBR Architects / 2008.122.00/ August 15, 2008 3 E?IiEJ Site ~.:e"'" LAKEVIEW HEALTH Existing Building · Total Area = 196,700 sf . Building Footprint = 97,898 sf Building Height = 50'-3" from main level to roof of penthouse (64'-6" from lower level) Existing Set Backs . Greeley = 84' Churchill = 160 Everett = 24' . o / r~l I Existi ng Parking Deck ; I ; I 5 22.00/ August 15. 2008 BWBR Architects / 2008.1 ~~P"" - - ~ ~--- LAKEVIEW HEALTH Site 6 3))8 5 22. co I August ~+ 3XLS BWBR Architects I ~~......"". '='- LAKEVIEW HEALTH BUILD OUT TO Phase I: Original EXISTING SET-BACK · Horizontal Expansion RELOCATED ACCESS · Lower Level and First Floor · 2 Levels @ 33,000 sf ea. = 66,000 sf total 0 BWBR Architects / 2008.122.00 / August 15. 2008 7 Phase I: ~~......"". - - - ~~.. LAKEVIEW HEALTH . Phase I: Preliminary Height = 11 '-3" from main floor to roof PHASE I: Revised · Horizontal Expansion · Lower Level and First Floor ~Ee~~ ea.:=6o"',800"'st.:totaI ....--. ~ · 2 Levels @ 23,400 sf ea. = 46,800 sf total . ~ + EXISTING ACCESS o Churchi West 8 22.00/ August 15. 2008 BWBR Architects / 2008.1 ~~P"" - - ~ ~--- LAKEVIEW HEALTH Phase I 9 3))8 5 22. co I August 3XLS BWBR Architects I ~~......"". - - - ~~.. LAKEVIEW HEALTH Phase II: Phase II: Original · Vertical Expansion · 2nd, 3rd, and 4th Floors · 3 Levels @ 33,000 sf ea. = 99,000 sf total 0 BWBR Architects / 2008.122.00 / August 15. 2008 10 3 STORY VERTICAL EXPANSION - - - - - - -West-~FefIi~ -&r-eet- .2~/ \ ~~......"". - - - ~~.. LAKEVIEW HEALTH . Phase II: PHASE II: Revised · Vertical Expansion ~2~ an~~~ors~ · 3 Le~3;'tOO_Sf ea. = ~~ ;::99;000 sf total [J NCREASED SET BACK 2 STORY VERTICAL EXPANSION Church West · 2nd and 3rd floors · 2 Levels @ 23,400 sf ea. = 46,800 sf total · Preliminary Height = 41 '-8" from main floor to 3rd floor roof o 11 22.00/ August 15. 2008 BWBR Architects / 2008.1 ~~P"" - - ~ ~--- LAKEVIEW HEALTH Phase II 12 3))8 5 22. co I August 3XLS BWBR Architects I Phase III ~.:e"'" LAKEVIEW HEALTH PHASE III · Horizontal Expansion · Lower Level Parking · 1 st, 2nd and 3rd Floor · 3 Levels @ 25,200 sf ea. = 75,600 sf total I - . o West Church ill ~ +-' (f) :>. ill ill ~ CJ 13 · Preliminary Height = 41 '-8" from main floor to 3rd floor roof 22.00/ August 15. 2008 BWBR Architects / 2008.1 o ~~P"" - - ~ ~--- LAKEVIEW HEALTH Phase III 14 3))8 5 22. CO I August 3XLS BWBR Architects I ~.:e"'" LAKEVIEW HEALTH [J - PHASE IV · Horizontal Expansion · Lower Level and 1 st Floor · 2 Levels @ 32,000 sf ea. = 64,000 sf total · Preliminary Height = 18'-0" from main floor to roof (32'-3" from 0 lower level to roof) BWBR Architects / 2008.122.00 / August 15, 2008 15 Church ill ~ +-' (f) in' ill ~ (9 West Phase IV ~~P"" - - ~ ~--- LAKEVIEW HEALTH Phase IV 16 3))8 5 22. CO I August 3XLS BWBR Architects I ~ ~~......"". '='- LAKEVIEW HEALTH Existing Facility · 572 existing stalls on site · 377 stalls required by current zoning · 338 stalls required by functional program analysis Parking Requirement Comparison I -' 72J - - I 175 350 525 700 0 BWBR Architects / 2008.122.00 / August 15. 2008 18 , f-------------West-Glwrel9tH-----------------t ------ , I i ~~......"". - - - ~~.. LAKEVIEW HEALTH 700 I 2 Level expansion for surgery, endoscopy and oncology site. Parking Requirement Comparison o · 114 additional stalls needed (60 staff, 54 patient/visitors) surplus on · 60 stall Phase . ---, . o 19 22.00/ August 15. 2008 BWBR Architects / 2008 ~~......"". - - - ~~.. LAKEVIEW HEALTH II 2 level vertical expansion for inpatient bed replace- ment · 18 bed total net increase - 53 additional stalls needed (20 staff, 33 patient/visitor) 7 stall surplus on site 700 Parking Requirement Comparison o Phase . - o 20 22.00/ August 15. 2008 BWBR Architects / 2008 ~~......"". - - - ~~.. LAKEVIEW HEALTH Phase III · 4 level expansion for under- ground parking, ambulatory selVices and inpatient bed replacement · 18 bed net increase · 61 additional stalls needed · 8 stall deficit on site Parking Requirement Comparison ,...LLU..L~ I I I I LLU..UJ....! LAvailable-,-! ' . . . I ! . : , . 558 O"IITIJ~ r-=1. : : : :1 : . : :"1 . I I I: I : I : I~-+Piagr. .!:. r" _ i I I I 1 I 1 I I I I I i I I . . : . o 175 350 525 700 o BWBR Architects / 2008.122.00 / August 15. 2008 21 ~~......"". - - - ~~.. LAKEVIEW HEALTH Phase III: Modified · 4 level expansion for under- ground parking, ambulatory services and inpatient bed replacement · 18 bed net increase · 61 additional stalls needed .....8-S1all-defiCfrt-tJn~it~ · Add 34 stalls (extension of existing parking deck) · 26 stall surplus on site 700 Parking Requirement Comparison o () 22 122.00/ August 15. 2008 BWBR Architects / 2008 ~~......"". - - - ~~.. LAKEVIEW HEALTH Phase IV Phase IV · 2 level expansion for underground parking, ED relocation, cafeteria and main entry relocation 94 additional stalls (35 staff, 59 patient/visitor) 83 stall . 700 deficit on site Parking Requirement Comparison . LLLU.Li 1..l.l.l.l..L~ ?-Availabl -i I 1 . 57i~ 'tE2:' +, E~~ ~. ~~ . .~ Zoning -l~i. , I:) J .;.- : L.l :. :~.II =1 L=IIIII=. - . Functi, '~gr. - 1. iD i T -~ I I ~ I i- . . : . o 75 350 525 o .... (I) ~ U3 >, ill CD ~ CD 23 122.00/ August 15. 2008 BWBR Architects / 2008 ~~......"". - - - ~~.. LAKEVIEW HEALTH Modified 2 level expansion for underground parking, ED relocation, cafeteria and main entry relocation 94 additional stalls (35 staff, 59 patientlvisitor) 20 stall -' 700 o o EP.:'83:Stall:Beficit . level deck @ · Add 1 03 stalls (2 NE corner) surplus Parking Requirement Comparison IV: Phase . . . 24 5.2008 22.00/ August BWBR Architects / 2008 ~ ~~......"". '='- LAKEVIEW HEALTH Existing 2008 0 · Greeley St. Average Daily Traffic (ADT) = 10,885 · Churchill St. ADT = 5,442 · Everett St. ADT = 1,450 · lakeview Hospital = 1,612 (9.1 % of total ADT) - o Churchill St. Access · ADT = 480 e Greeley St. Access - North · ADT = 377 o Everett St. Access · ADT = 418 o Greeley St. Access - So. (Staff only) · ADT = 224 e Everett St. - Staff Lot · ADT = 113 0 BWBR Architects / 2008.122.00 / August 15. 2008 26 Data Traffic ~~......"". - - - ~~.. LAKEVIEW HEALTH Phase I Traffic ,529 1,924 ADT So. (Staff only) 27 5.2008 Phase I 2010 Greeley St. Average Daily Traffic (ADT) = 11,478 Churchill St. ADT = 5,739 Everett St. ADT = 1 North 22.00/ August lakeview Hospital = (10.30/0 of total ADT) e Everett St. - Staff Lot · ADT = 135 o Churchill St. Access · ADT = 573 6 Greeley St. Access · ADT = 450 o Greeley St. Access · ADT = 267 e Everett St. Access · ADT = 499 BWBR Architects / 2008 . . . . o o o ~~......"". - - - ~~.. LAKEVIEW HEALTH Phase II Traffic C:::=-::::J__~ Phase II 2013 [J · Greeley St. Average Daily Traffic (ADT) = 12,429 · Churchill St. ADT = 6,215 · Everett St. ADT = 1,656 · lakeview Hospital = 2007 ADT (9.90/0 of total ADT) o Churchill St. Access · ADT = 597 e Greeley St. Access - North · ADT = 470 E) Everett St. Access · ADT = 520 o Greeley St. Access - So. (Staff only) · ADT = 279 e Everett St. - Staff Lot · ADT = 141 0 BWBR Architects / 2008.122.00 / August 15. 2008 28 ~~......"". '='- LAKEVIEW HEALTH - - ~ Phase III 2018 . 0 · Greeley St. Average Daily Traffic (ADT) = 14,192 · Churchill St. ADT = 7,096 · Everett St. ADT = 1,891 · lakeview Hospital = 2179 ADT (9.40/0 of total ADT) o Churchill St. Access · ADT = 649 e Greeley St. Access - North · ADT = 51 0 E) Everett St. Access · ADT = 565 o Greeley St. Access - So. (Staff only) · ADT = 302 e Everett St. - Staff Lot · ADT = 153 0 BWBR Architects / 2008.122.00 / August 15, 2008 29 Phase III Traffic ~~......"". '='- LAKEVIEW HEALTH - ~ Phase IV 2023 + 0 · Greeley St. Average Daily Traffic (ADT) = 16,205 · Churchill St. ADT = 8,103 · Everett St. ADT = 2,159 · lakeview Hospital = 2330 ADT (12.1 % of total ADT) o Churchill St. Access · ADT = 693 e Greeley St. Access - North · ADT = 545 E) Everett St. Access · ADT = 604 o Greeley St. Access - So. (Staff only) · ADT = 323 e Everett St. - Staff Lot · ADT = 164 0 BWBR Architects / 2008.122.00 / August 15, 2008 30 Phase IV Traffic E?IiI!J ~~......"". - - - ~~.. LAKEVIEW HEALTH MIXED VEGETATION TO SCREEN PARKING Master Plan . Underground Storagel Filtration Chamber · Phase I = 2,820 cf · Phase III = 1 ,505 cf · Phase IV = 6,660 cf OVERSTORY OR ORNAMENTAL TREES o 32 5.2008 22.00/ August BWBR Architects / 2008 ~ -=::;'..-'" - ..- ~ ~--- L.AKEVIEW HEALTH 34 ME 5, ~+ ME. 122.00 I August I BWB R An:. hitects ~ -=::;'..-'" - ..- ~ ~--- L.AKEVIEW HEALTH 3S ME 15 ~+ BWBR An:.hitects I ME. 122.00 I August 36 -- BWBR Architects / 2008 ~-~........ - -. ,~- LAKEVIEW HEALTH r I IlL /.11 I . 122.00/ August 15. 2008 ~ " . ~ ~ L.. - - ,. ~ -=::;'..-'" - ..- ~ ~--- L.AKEVIEW HEALTH 37 ME 5, ~+ ME. 122.00 I August I BWB R An:. hitects ~ -=::;'..-'" - ..- ~ ~--- L.AKEVIEW HEALTH Phase I and II 38 ME 5, ~+ ME. 122.00 I August I BWB R An:. hitects ~-~........ ~- LAKEVIEW H EA L TFI ::,......----- -.;:'~~---~ . BWBR Architects / 2008.122.00/ August 15. 2008 39 Phase I and II - - 40 ~-~........ - -. ,~- LAKEVIEW HEALTH 5,2008 BWBR Architects / 2008.122.00/ August -- ... ....<" ..-< Phase I and II fb~~~ nb ~~[iR[m IIfb ~ E;t'I:{~ fffiI!I ~:- i ~-~........ - -. ,~- LAKEVIEW H EA L TFI Long-Term Caml?us Parking EXPANSION TYPE SURPLUS/DEFICIT PARKING REQUIRED Functlona Program PARKING: Comparable Facilities LDING AREA BU PROGRAM USE PHASE Compa rable Facility Average (800sf/sta Current Zonl ng (Beds/Staff/ Clinic Net SF ncrease program'd Zoning program'd SF Overa 234 326 195 338 246 377 na 46,800 196,700 243,500 Existing 60 268 72 114 59 63 Surgery/Endo/Shel Exp Horizonta Phase 1 7 209 48 53 59 24 46,800 75,600 290,300 365,900 replacement Bed Exp Vertica Phase 2 42 26 20 5.2008 171 130 BWBR Architects / 2008.122.00/ August 87 139 61 94 95 80 44 32 64,000 429,900 Outpatient/Ambulatory c ED/Radiology/Pub Exp Exp Horizonta Horizonta Phase 3 Phase 4 ~-~........ - -. ,~- LAKEVIEW HEALTH Phase I ed Parking: Phase 1 BEDjCASE STAFF PATIENTj PARKING NET PARKING PROGRAMMED USE GSF INCREASE INCREASE VISITORS SUBTOTAL INCREASE COMPOSITE PARKING STATUS: Endoscopy Expansion 7,200 12 4 7.20 11.20 11 Available Parking On-Site 572 Oncology Expansion 7,200 6 1 3.60 4.60 5 Existing Functional Program -338 Surgery Expansion 17,000 27 42 16.20 58.20 58 Adjusted Parking Surplus/Deficit 234 Emergency Dept. Expansion 3,500 4.75 1 1.19 6.94 7 Building Footprint -60 MedjSurg Beds - 2 North 0 9 4.5 2.25 15.75 16 Functional Program -114 Shelll (Endo type use) 4,000 11.2 5 6.72 11.72 12 Total = 60 Shell 2 (One type use) 4,000 5.6 2 3.36 5.36 5 (Phase 1 complete = 60 stall surplus) 59.5 Total = 113.77 114 43 5.2008 BWBR Architects / 2008.122.00/ August Deta ~-~........ - -. ,~- LAKEVIEW HEALTH Phase II ed Parking: Phase 2 BED/CASE STAFF PATIENT/ PARKING NET PARKING PROGRAMMED USE GSF INCREASE INCREASE VISITORS SUBTOTAL INCREASE COMPOSITE PARKING STATUS: Med/Surg Beds - 2 North 0 9 6.75 2.25 18.00 18 Available Parking On-Site 512 Med/Surg Beds - 3 North 0 9 6.75 2.25 18.00 18 Existing Functional Program 452 Shell 1 (Endo type use) 4,000 11.2 5 6.72 11.72 12 Adjusted Parking Surplus/Deficit 60 Shell 2 (One type use) 4,000 5.6 2 3.36 5.36 5 Building Footprint 0 20.5 Functional Program -53 Total = 53.08 53 Total = 7 (Phase 2 complete = 7 stall surplus) 44 5.2008 BWBR Architects / 2008.122.00/ August Deta ~-~........ - -. ,~- LAKEVIEW HEALTH Phase III ed Parking: Phase 3 BED/CASE STAFF PATIENT/ PARKING NET PARKING PROGRAMMED USE GSF INCREASE INCREASE VISITORS SUBTOTAL INCREASE COMPOSITE PARKING STATUS: Med/Surg Beds - 2 North 0 9 6.75 2.25 18.00 18 Available Parking On-Site 512 Med/Surg Beds - 2 North 0 9 6.75 2.25 18.00 18 Existing Functional Program -505 Endoscopy Type Use 11,900 41 13.7 24.6 38.30 38 Adjusted Parking Surplus/Deficit 7 Oncology Type Use 11,900 21 6.8 12.6 19.40 19 Building Footprint -4 Backfill Space (Endoscopy) 4,000 13.8 8 8.28 16.28 16 Functional Program -61 Backfill Space (Oncology) 4,000 6.9 .1 4.14 8.14 8 Underground Parking 50 Women's Clinic (Deleted) -57.00 -57 Sub-Total = -8 46 Sub-Total = 61.12 61 Parking Deck Extension 34 Underground Parking -50 -50 Total = 26 Parking Deck Extension -34 -34 (Phase 3 complete = 26 stall surplus) Adjusted Total = -23 -23 45 5.2008 BWBR Architects / 2008.122.00/ August Deta ~-~........ - -. ,~- LAKEVIEW H EA L TFI Phase IV ed Parking: Phase 4 BED/CASE STAFF PATIENT/ PARKING NET PARKING PROGRAMMED USE GSF INCREASE INCREASE VISITORS SUBTOTAL INCREASE COMPOSITE PARKING STATUS: Endoscopy Type Use 16,500 57 19 34.2 53.20 53 Available Parking On-Site 592 Oncology Type Use 16,500 28 9 16.8 25.80 26 Existing Functional Program -566 Cafeteria Expansion 10,000 0 2 0 2.00 2 Adjusted Parking Surplus/Deficit 26 Waiting/Entry 4,000 0 1 0 1.00 1 Building Footprint -54 Backfill Space (Endoscopy) 2,500 8.6 3 5.16 8.16 8 Functional Program -94 Backfill Space (Oncology) 2,500 4.3 .1 2.58 3.58 1. Underground Parking 39 35 Sub-Total = -83 Sub-Total = 93.74 94 Underground Parking -39 -39 Surface Parking (NE) 43 Surface Parking (NE) -43.2 -43 Parking Deck (NE) 60 Parking Deck (NE) -60 -60 Total = 20 Adjusted Total = -48 -48 (Phase 4 complete = 20 stall surplus) 46 5.2008 BWBR Architects / 2008.122.00/ August Deta ~-~........ - -. ,~- LAKEVIEW HEALTH Traffic Method of Analysis · ADT of Greeley correlated from data from Washington County and MNDOT. · AM and PM peak hourly rates defined by site survey at each of the entrances, utilizing methods defined by the ITE Trip Generation Manual, 7th Edition. it · ADT of hospital phasing defined by 5.2 cars per day per employee, based on ITE Trip Generation Manual, 7th Ed on. · Distribution of ADT for Hospital at entrances based on PM Peak distribution of traffic levels at each entrance. · ADT of Everett is average of three day survey. ADT on Church provided by Washington County. 47 122.00/ August 15. 2008 · Future ADT of Greeley and Church based on MNDOT traffic projection factor of 1.7 for Washington County for a twenty year projection, which equates to approximately a 30/0 ncrease in traffic levels per year. BWBR Architects / 2008 ~-~........ - -. ,~- LAKEVIEW H EA L TFI IiiI Hospital Daily Traffic Projections - Per Entrance 48 5.2008 ENTRANCE EXISTING ADT PROJECTED AVERAGE DAILY TRAFFIC PHASE I PHASE II PHASE III PHASE IV CHURCHILL 480 573 597 649 693 EVERETT EMPLOYEE LOT 113 135 141 153 164 EVERETT 418 499 520 565 604 GREELEY PARI<ING STRUCTURE 224 267 279 302 323 GREELEY EMERGENCY 377 450 470 510 545 HOSPITAL TOTAL ADT = 1612 1924 2007 2179 2329 *NOTE: Hospital Generated Traffic calculated at 5.2 ADT per employee BWBR Architects / 2008.122.00/ August ~-~........ - -. ,~- LAKEVIEW HEALTH . Long-Term Campus Green Space/Storm Water Analysis TOTAL LOT GREEN PHASE CAMPUS BUILDING FOOTPRINT PARKING! CIRCULATION TOTAL IMPERVIOUS COVERAGE SPACE STORM WATER AREA Entire Entire Volume Control Area Increase Total Area Area Increase Total Area Surface Area Net Increase Property Property Required Existing 648,430 na 97,898 na 208,142 306,040 na 47.2% 52.8% na Phase 1 648,430 24,900 122,798 -22,311 185,831 308,629 2,589 47.6% 52.4% 2,820 d. Phase 2 648,430 0 122,798 0 185,831 308,629 0 47.6% 52.4% 0 Phase 3 648,430 2,100 124,898 0 185,831 310,729 2,100 47.9% 52.1% 1505 d. Phase 4 680,045 32,000 156,898 -14,512 171,319 328,217 17 ,488 48.3% 51.7% 6,650 d. BWB R "- AlIeU! Hl;U BWBR Architects / 2008.122.00/ August 15. 2008 49