HomeMy WebLinkAbout1995-01-31 CC Packet Special Meeting
.
.
.
AGENDA
CITY OF STILLWATER
CITY COUNCIL MEETING NO. 95-5
January 31, 1995
SPECIAL MEETING
7:00 p.m.
Council Chambers
CALL TO ORDER
ROLL CALL
1. Secretary\Dispatcher Position
A. Resolution 95-23: Approving Memorandum of Understanding Between City of
Stillwater and Council 14, AFSCME
B. Resolution 95-24: Approving reclassification of Margaret Seim as Secretary
Dispatcher II
C. Resolution 95-25: Approving employment of Jennifer Anne Bruner-Eddy as
Secretary Dispatcher I.
2. Assistant Fire Chief Position
Resolution 95-26: Approving appointment of Robert Barthol as Assistant Fire
Chief.
3. Discussion of permits issued to Stillwater Area Chamber of Commerce for Rivertown Art
Festival and Fall Colors Art Festival.
4. Workshop
A. 1995 Engineering/Public Works work programs.
B. Review of Pavement Management Program and proposed 1995 infrastructure
projects.
ADJOURNMENT
.
.
.
MEMORANDUM
TO:
Mayor and City Council
FROM:
City Coordinator
SUBJECT:
Items for Council MeetingIW orkshop
DATE:
January 27, 1995
Apologies for the amount of material enclosed in your packet for the meeting Tuesday (specifically
the issues of Assistant Fire Chief and SecretarylDispatcher I and II positions). We would have tried
to put these items on the February 7, 1995 agenda. However, COWlCilmember Bealka and
Councilmember Zoller will not be able to attend ~e 2n/95 meeting. Further these items were
previously reviewed by the Council and should be pretty straight forward.
Thank you for your understanding.
/JIfl
,
.
~
.
.
,
MEMORANDUM
TO:
Mayor and City Council
FROM:
City Coordinator
RE:
Secretary Dispatcher I & II Positions
DATE:
January 31, 1995
Discussion:
On October 14, 1994 the Council authorized the establishment of a Secretary Dispatcher I and II
position and to advertise for the Secretary I position. The intent was to hire a new employee for
the Secretary Dispatcher I position and to reclassify Margaret Seim from Secretary Dispatcher to
Secretary Dispatcher II. The enclosed resolutions including the resolution approving the
Memorandum of Understanding would finalize the process.
.
Recommendation:
Adopt attached resolution employing Jennifer Anne Bruner-Eddy as Secretary Dispatcher I,
reclassifying Margaret Seim as Secretary Dispatcher II and approving Memorandum of
Understanding between City of Stillwater and AFSCME, Council 14.
//I~if
~: ~ A-U- cU/V~ ~~~
'r"
DONALD L. BEBERG
_HIEF OF POLICE
to
.
.
THE BIRTHPLACE OF MINNESOTA
POLICE DEPARTMENT
TIMOTHY J. BELL
CAPTAIN
M E M 0 RAN DUM
TO:
MAYOR KIMBLE AND THE CITY COUNCIL
FROM:
D.L. BEBERG, CHIEF OF POLICE
DATE:
JANUARY 27, 1995
RE:
SECRETARY/DISPATCHER I POSITION
~
--------------------------------------------------------------------
WE WERE GIVEN PERMISSION TO HIRE A PERSON IN THE ABOVE WORK
CLASSIFICATION EFFECTIVE JANUARY 1, 1995. THE TESTING PROCESS DID NOT
GET DONE IN TIME TO GET EVERYTHING IN LINE FOR THE APPOINTMENT AND THE
NECESSARY RESOLUTION FOR THE HIRING BY JANUARY 1ST.
TO BRING YOU "UP TO SPEED" SO TO. SPEAK, WE HAD 121 APPLICATIONS
.
FOR THE POSITION. WE SCORED THE APPLICATIONS USING A 100 POINT RATING
SYSTEM, SCORING THE APPLICATIONS AGAINST THE PUBLISHED MINIMUM JOB
QUALIFICATIONS AND THEIR PERSONAL JOB EXPERIENCE AS IT RELATED TO THIS
CLASSIFICATION. THROUGH THIS, WE BROUGHT THE LIST DOWN TO 20
CANDIDATES THAT WERE INVITED TO TAKE A WRITTEN EXAM. AFTER SCORING
THE WRITTEN EXAM, THERE WERE 11 PEOPLE ASKED TO TAKE THE ORAL EXAM.
OF THOSE ASKED TO TAKE THE ORAL EXAM, 10 CAME IN FOR THE INTERVIEWS
AND FROM THOSE 10, WE SELECTED THE TOP CANDIDATE.
I AM ASKING FOR PERMISSION TO HIRE:
JENNIFER ANNE BRUNER-EDDY
1829 FURNESS STREET
APARTMENT #5
MAPLEWOOD, MN. 55109
AS A SECRETARY/DISPATCHER I, EFFECTIVE FEBRUARY 16, 1995 WITH SALARY
AND BENEFITS PER THE AFSCME LABOR CONTRACT.
95-09
212 North Fourth Street, Stillwater, Minnesota 55082
Business Phone: (612) 439-1314 · 439-1336 · FAX: 439-0456
Police Response I Assistance: 911
.
~
.
.
RESOLUTION NO. 95-23
APPROVING MEMORANDUM OF
UNDERSTANDING BETWEEN CITY OF STILLWATER
AND COUNCIL 14, AFSCME
BE IT RESOLVED, by the City Council of the City of Stillwater, Minnesota that the
Memorandum of Understanding between the City of Stillwater and Local 517, Council No. 14,
A.F.S.C.M.E. attached as Exhibit "A" is hereby approved.
Adopted by the Council this 31 st day of January, 1995.
Jay L. Kimble, Mayor
ATTEST:
Modi Weldon, City Clerk
EXHIBIT "A"
MEMORANDUM OF UNDERSTANDING
BETWEEN
THE CITY OF STillWATER
AND
AFSCME COUNCil 14
The salary schedules and the longevity pay schedules included in the Agreement bet'v'leen the City of
Stillwater and local 517, Council No. 14 of the American Federal of State, County and Municipal
Employees, AFl-CIO shall be amended to include Secretary/Dispatcher I and SecretaryJOispatcher
II positions. The schedules(amended Appendix A-2 and amended Appendix B) are attached hereto
and shall become effective January I, 1995. .
IN WITNESS WHEREOF, the parties have executed this memorandum of understanding on this_
day of ,199_.
FOR THE CITY OF STillWATER:
FOR AFSCME, lOCAL 517, ~OUNCllI4
....
.
.
. .
I
. ,
.
MlENDED
APPENDIX A-2
MONTHT.Y SA I.A RY SC'}l"FnTTT,F.
EFFECTIVE JANUARY 1, 1995
Part-time Employees 1040 2080 4160 6240
Hours Hours Hours Hours
Full-time Employee En try 6 mos. 1 Year 2 Years 3 Years
Sr. Account Clerk 2218 2356 2496 2634 2772
Jr. Account Clerk 1896 2014 2133 2252 2370
Secretary 2152 2286 2422 2556 2690
Clerk/Typist 1848 1964 2080 2194 2310
f. Secretary / Dispatcher II 2218 2356 2496 i 2634 2772
.. . l
Secretary / Dispatcher I 2179 2316 2452 2588 2724
Building Inspector 2476 2630 2784 2940 3094
Asst. Bldg. Inspector 1980 2104 2226 2350 2474
Janitor 1764 1876 1986 2096 2206
CSO 1896 2014 2133 2252 2370
Assistant Planner 2068 2196 2326 2454 2584
Planner 2586 2748 2908 3070 3232
Pking. Enforcement Off. 1716 1824 1932 2040 2146
Employees shall also receive longevity pay according to Appendix B.
.
16
17
.
..'
.
~
.
.
RESOLUTION NO. 95-24
APPROVING RECLASSIFICATION OF
MARGARET SEIM AS SECRETARY DISPATCHER II
BE IT RESOLVED, by the City Council of the City of Stillwater, Minnesota that the
employment of Margaret Seim as Secretary Dispatcher II from and after February 16, 1995
for a probationary period of six months, be and the same is hereby approved; and that the said
Margaret Seim shall receive a salary and employee benefits and shall be subject to the condition
of employment as specified in the employment agreement and Memorandum of Understanding
between the City of Stillwater and Local 517, Council No. 14 of A.F.S.C.M.E.
Adopted by the Council this 31st day of January, 1995.
Jay L. Kimble, Mayor
ATTEST:
.
Modi Weldon, City Clerk
RESOLUTION NO. 95-25
APPROVING EMPLOYMENT OF
JENNIFER ANNE BRUNER-EDDY AS SECRETARY DISPATCHER I
BE IT RESOLVED, by the City Council of the City of Stillwater, Minnesota that the
employment of Jennifer Anne Bruner-Eddy as Secretary Dispatcher I from and after February 16,
1995 for a probationary period of six months, be and the same is hereby approved; and that the
said Jennifer Anne Bruner-Eddy shall receive a salary and employee benefits and shall be subject
to the condition of employment as specified in the employment agreement and Memorandum of
Understanding between the City of Stillwater and Local 517, Council No. 14 of A.F .S.C.M.E.
Adopted by the Council this 31st day of January, 1995.
Jay L. Kimble, Mayor
ATTEST:
.
Modi Weldon, City Clerk
."'.
.
.
.
I I ~1,IUIIII~IHl"Illi IIIIII~~ III, II I I I
c:~1
.
..
.
MEMORANDUM
RE:
DATE:
New SecretaryiDispatcher position
il
i'
\
I
\
I
!
TO:
FROM:
Mayor and city Council
city Coordinator
October 14, 1994
J'
At the meeting of July 19th. the council authorized the temporary employment
of a secretaryiDispatcher position (67 working days). At the meeting. Chief
Beberg and I also informed the council of the need to hire a full-time
SecretarY/Dispatchet. and that we would provide you with a job description and
some other details related to the position.
The Secretary/Dispatcher I position would be an entry level position and would
receive work direction from the secretary/Dispatcher II employee. This is
similar to the Senior Account Clerk and Junior Account Clerk employee
relationship. Past experience has shown that a higher level classification is
important in order to provide work direction to someone in a very similar
position and yet not be considered a supervisory position.
#
I have discussed the proposed classification with Matt Nelson. Business Agent
for the AFSCME bargaining unit. Matt's initilll position was that the Secretary
I position's duties and responsibilities warrant the salary presently established
for the SecretarYiDispatcher position and that the secretarYiDispatcher II
position be compensated by at least 5% over the Secretary/Dispatcher position.
I suggested that the Secretary/Dispatcher II position receive the same salary as
the Senior Account Clerk position (or $40 - $50 more per month than the present
Secretary/Dispatcher salary). Matt appeared to be in acceptance of this
suggestioll.. and I would recommend the City establish a salary differentilll as I
have proposed.
L'hief Beberg and I wonid like to receive authority to advertise for the position
with the intention to hire someone full-time on or about January I. 1995. Don
and I can disCUSS this further with the Council at Tuesday's meeting.
~:
,{
'S,
:~
)
I
cl
'(:
.'b'
'''''''
, "'i,
! ~.
i
-..,.
~
c..
11~}/Ll
.
.
.
MEMORANDUM
TO:
Mayor and City Council
FROM:
City Coordinator
RE:
Assistant Fire Chief Position
DATE:
January 31, 1995
Fire Chief Ness is recommending the appointment of Robert Barthol to fill the position of
Assistant Fire Chief due to the retirement of Jim Stevensen. (Mr. Barthol was the only employee
who applied for the position during the position availability posting period). Mr. Barthol has
been a full-time member of the Stillwater Fire Department since April 1, 1973. Mr. Barthol is
very knowledgeable of fire suppression technique/operation, etc. and is also very knowledgeable
.
about fire prevention programs. Mr. Barthol has also been very instrumental in establishing an
effective fire code inspection program for the City. Further, Mr. Barthol, during the interview
process for the Fire Chief position demonstrated a high degree of knowledge of all aspects of the
Fire Department operations.
Therefore, I concur with Chief Ness.
~A
.
.
.
~ ,?tu ZJ~
'8~ tJ/ ~
~ '3fI. 'Jte,u, ?tu eM4
MEMORANDUM
TO: Mayor and City Council
FROM: Fire Chie~
SUBJECT: Promotion of Robert Barthol
DATE: January 26, 1995
.
Request that Robert Barthol be promoted from Captain to Assistant Fire Chief effective
February 1, 1995.
216 '1tMd- ?~ ~ SU~(<<" ?/en SSOK2
(612) 439-6120
(612) 439-131K
(612) 439-1313
~ (612) 439-0456
.
.
.
..
..
RESOLUTION NO. 95-26
APPROVING APPOINTMENT OF
ROBERT BARTHOL AS ASSISTANT FIRE CHIEF
BE IT RESOLVED, by the City Council of the City of Stillwater, Minnesota that the
employment of Robert Barthol as Assistant Fire Chief from and after February 1, 1995 for a
probationary period of twelve months, be and the same is hereby approved; and that the said
Robert Barthol shall receive a salary and employee benefits and shall be subject to the condition
of employment as specified in the employment agreement and Memorandum of Understanding
between the City of Stillwater and the Stillwater Managers Association.
Adopted by the Council this 31st day of January, 1995.
Jay L. Kimble, Mayor
ATTEST:
Modi Weldon, City Clerk
.
.
.
.
Memorandum
To:
Mayor and Council
From:
City Coordinator
Date:
January 26, 1995
Subject: Applications for permits - Art Festivals
At the January 3, 1995 meeting, Council approved the applications for permits submitted by
the Stillwater Area Chamber of Commerce for the Rivertown Art Festival and the Fall Colors
Art Festival.
Per my conversation with Tim Thomsen, permit applications prior to 1993 were processed by
Mr. Thomsen for approval by the Parks and Recreation Board. The applications were then
given to the council for final approval.
Beginning in January 1993, permit applications were processed by Administration and
approved by the City Council. Apparently this was done in order to let the Sesquicentennial
Celebration Committee coordinate/control activities in Lowell Park during the year of
celebration.
This latter process was also used for the permit(s) that were approved by the Council at the
meeting of January 3, 1995.
/~~
.
~
.
.
MEMORANDUM
TO:
Mayor and City Cm.U1cil
FROM:
//
Klayton Eckles, City Engineer y...-r. t
SUBJECT:
Public Works and Parks Workshop Items
DATE:
Januarv 27,1995
DISCUSSION
At this workshop I hope to provide Council with information on the various responsibilities and duties
of Public Works, Parks and Engineering. I have included a current organizational chart of the
departments, a data sheet for each of the sections of Public Works and Parks, background information
showing plow routes and streets maintained by the Street Department, and a 1995 Work Program for
the Parks Department.
An important aspect for these departments is having a "vision statement" or" 10 year plan" of where
this department should be headed. Therefore, I have included an "ideal" organizational structure, a
discussion on in-house versus cOnsulting for engineering service, and a 1995 Work Program for
myself From this information I am hopeful that we will begin to build a picture which we can all
agree on for where the Public Works and Engineering Department should be in the future.
A fmal item for discussion concerns the 1995 street improvement project. I have included a rough
draft of the SEH feasibility study for this project and a memo which discusses possible changes and
modifications to the assessment policy, which may be warranted for this project.
I intend to give the Council a presentation on this information and David Junker and Tim 'Thomsen
will be available for any questions or comments which the Council has for Public Works and Parks.
.
__L.'"H
~.~.I
Il:NGINEERINGI
I FUNC.T~9_N~._.","__1
I
~IAINTENA.'lCE
2
"T'
.
CURRENT ORGANIZATIONAL STRUCTURE
CITY ENGINEERJ
~~~~?~(~ OIRECW;-l
_L----.-j--
ASSISTANT PUBLIC WORKS
DIRECTOR
----
:
I~;~
-]
I~;;; .,
~~J
-----..- "
PARKS DiRECTOR J
PARKS
4-5
.
(
WA~~~J
BOARD
\\'XrER
.
~
.
.
PUBLIC WORKS SHOP
RESPONSIBILITY: Maintain heavy equipment for Public Works, Parks, Police and Fire
BUDGET:
$127,435
LABOR FORCE:
2
#
EQUIPMENT
PURPOSE
City Garage
Truck
Store and repair equipment
Get parts, transportation to location of problem
.
DUTIES:
. Repair and maintain heavy equipment
. Modif~i equipment to meet special needs of department
. Maintain records of vehicle repairs
. Maintain supply of parts
.
.
.
SEWER DEPARTMENT
RESPONSIBILITY: Maintain 75 miles of sanitary sewer, 30 miles of storm sewer, and 13 lift
stations
BUDGET:
$380,000 :t
LABOR FORCE:
2 (J3udget includes 1/2 salaries for City Engineer, Public Works Director,
Assistant Public Works Director, 2 Part-time Secretaries, Technician)
#
EQUIPMENT
PURPOSE
I Vactor Truck
1 Truck
1 Generator
Clean sewers and clear any blockage
Check lift stations, transport equipment
Emergency power for pumps during outage
DUTIES:
. Inspect and maintain lift stations daily, including weekends
. Respond to emergency lift station failures or sewer blockages
. Clean sewer mains and storm sewer lines
. Repair manholes and adjust manhole castings
. Clean storm sewer outlets
. Plowing and sanding during major storm events
.
.
STREET DEPARTMENT
RESPONSIBILITY: Maintain and repair 70 miles of streets, alleys and all public parking areas.
BUDGET:
$620,352
LABOR FORCE:
6 II2 Full-time, 1-3 Stunmer Part-time
DUTIES:
. Plow streets, parking areas
. Haul, mix, spread salt and sand
. Haul snow from downtown
. Sweep streets (Spring, Summer, Fall)
. Fill potholes, patch streets
. Seal cracks in streets, prepare streets for seal coat
. Trim brush and trees, pick up trash
. Install and maintain street signs
. Maintain gravel roads
. Paint no parking areas
CITY OF STILLWATER
SNOW PLOW DISTRICTS
\<;
"
{1} KUNDE (G)
.', .1 ..
.
. \
i
,..~
L .:__c.'-':'~::. .:...._-~;.~.-::.::::O:'::I .'i=.
;..'
I. =_-.~_'-:.:'~.=.:::'~:~..:.::.:.._..
e
'.
.
.
to
.
.
PARKS DEPARTMENT
RESPONSIBILITY: Maintain and improve City parks and trail systems
BUDGET:
$447,092
LABOR FORCE:
4 1/2 (Also 1 supervisor and 1-3 part-time)
#
EQUIPMENT
PURPOSE
3 Trucks
1 Van
5 Mowers
2 Lawn Sweepers
1 Tractor
1 Riding Sprayer
1 Water Truck
Plow snow, haul equipment to/from job site
Haul and store tools and equipment to/from job site
Mow parks, play fields, city property
Clean .parks
Blow snow and other miscellaneous
Spread fertilizer and herbicide
Water sod, flood rinks
DUTIES:
. Cut, trim, weed and feed grass in parks and play fields
. Pick up trash and leaves from parks
. Maintain and improve play structures and park, park facilities and play fields
. Clean do\\'ntown area and maintain park bathroom facilities
. Plow trail systems and parking lots in City parks
. Flood and maintain skating rinks
. Maintain City Hall and Library grounds
.
.
.
PARKS DEPARTMENT
PROJECTS FOR 1995
Pioneer Park
. Install new curbing
. Install irrigation
. Rebuild steps and rock gardens in pit area
. Install some ore up-to-date playground equipment for insurance reasons and AD.A.
McKusick Park and Path
. Install shelter on east side of McKusick Lake
. Install 2-3 benches and 1 picnic table along walking path
Benson Park
. Install basketball and volleyball courts
. Install playground equipment, shelter, drinking fountain and walking path
. Install seed, sod, flowers, shrubs and irrigation
Lily Lake
.
Install 2 BBQ grills in picnic ar~~_
New outfield on O'Brien softball fietd
Install 2 bleachers for Bonse softball field
.
.
Mini Park
. Install new slab under picnic shelter
Sunrise Park
. Move tot lot playground equipment from the wooded area to the open area
Washington Park.
. Update some playground equipment - AD.A
South Broadway Park
. Update some playground equipment - A.D.A
Schulenberg
Update some playground equipment - AD.A
Old Prison
.
Level out and seed
Install picnic tables, shrubs and flower beds
.
Approximate Labor Hours Per Day for Routine Park Maintenance from April 1st to October 31st:
Clean parks and restrooms
Ballfield maintenance
Large area mowing
Weeclwhip and trimming
Routine equipment maintenance
5
4
7
12
~
.
T otallabor hours per day
31
If _ full-time and 2 part-time persons =
48 total labor hours per day
This leaves only 17 labor hours per day to do new construction, equipment repair, flowers, seeding, painting,
tree and hedge trimming, vandal repairs, watering, raking, sweeping, fertilizing, weed control, sidewalk and
steps maintenance, special events, Lumberjack Days, Music In The Park, Art Fairs, fireworks, Wild West
Days, March of Dimes, United Way, public complaints, park buildings and shop maintenance. There are men
off work for vacation, compo time and sick leave.
Duties In the Winter (November 1 st to March 31st) - 4 people
.
Plow parking lots
Maintain about 6 miles of sidewalks and walking paths - City Hall walks, Ubrary steps and walks, Main
Street steps, Willard Street steps, Chestnut Street steps, Laurel Street Steps - clear off ice, snow and
sand
Cut dead trees in parks and City park land
Make, flood and sweep 10 skating rinks ,
Rebuild and repair equipment - picnic tables, bePlches and summer equipment .
.
.
.
.
.
.
..
.
.
.
Parks Department - Supervis9r's Annual Report 1995
FACILITIES
Lily Lake Recreation Center - South Greeley at Lily Lake - 14 acres.
Adult League softball field, fast pitched, 3 tennis courts, basketball court, (all above
lighted), swimming beach, boat launching area, fishing pier, parking lot, playground
equipment, indoor ice arena, automatic underground irrigation, boat dock, one
picnic shelter with six picnic tables.
Pioneer Park - Second and Laurel Streets - Three acres.
Restrooms, picnic tables, fireplaces, drinking water, band shell, playground
equipment, two picnic shelters, scenic view of valley.
Lowell Park - St. Croix river frontage, adjacent to business area, two acres.
Restrooms, picnic tables, flower beds, river front fishing, launching, drinking water,
community gathering area, scenic view.
Northland Park - Northland Avenue and County Road - 12 - 15 acres.
Lower Level - league softball field, three-lighted tennis courts, soccer, playground
equipment, horseshoe courts, lighted hockey and free-skating rink, warming house,
drinking water, parking lot.
Upper Level - Little league ballfield, soccer, playground equipment.
Washington Park - Greeley and Churchill Streets - 2-1/2 acres.
Ballfield, picnic tables, playground equipment, tot-lot, free-play area, drinking water,
one picnic shelter with four picnic tables.
Sunrise Park - Sunrise Avenue and Hidden Valley Lane - 18-1/2 acres.
Tot-lot, free-play area, ballfield, playground equipment, picnic tables, soccer field,
groves and Spruce and Pine trees.
Meadowlark Park - Crestwood Terrace and Fairmeadows Road - 3 acres.
,.
Ballfield, tennis court, basketball backboard, play equipment, picnic tables, skating
rink.
Ramsey-Grove Park - Bordered by Ramsey, Grove and Myrtle Streets - 1-1/2 acres.
Skating rink, ball playing area, basketball backboard, playground equipment.
Staples Field - Wilkins and Martha Streets - 2 acres.
Three lighted tennis courts, ballfield, playground equipment, basketball backboard,
two skating rinks, warming house.
South Broadwav Triangle - Broadway and Willard Streets - 1/2 acre.
Playground equipment, basketball backboard, free-play area, skating rink.
Schulenberg Park - Second and Hazel Streets - 2 acres.
Ballfield, playground equipment.
McKusick Park - Owens Street and McKusick Road - 1/2 acre.
Playground equipment and parking lot.
Kolliner Park - Wisconsin side of St. Croix River - 49 acres.
Closed to traffic by land because of extremely high vandalism. Accessible by boat
for picnicking. Nature area.
Nightingale Park - South end of Nightingale Boulevard - 13-1/2 acres.
Six acres open; balance wooded. Poor access. Borders Brewers Pond. Nature
area.
.
Undeveloped Area #1 - Croixwood - across from Nightingale Park - 6-1/4 acres.
Spruce and Pine Groves. Nature area. Borders bay on Long Lake.
Undeveloped Area #2 - Croixwood - Entrance off Nightingale and Northland Avenues - 14 acres.
Three acres open, balance wooded. Borders Long Lake. Nature area.
Undeveloped Area #3 - Croixwood - narrow strip between Northland & Fairlawn Avenues.
Entrance off Northland. Three and one-fourth acres. Bluff and drainage area.
Undeveloped Area #4 - Croixwood - Three and one-fourth acres west of Northland Avenue and
South of Interlachen drive.
No access. Drainage area. _
Miscellaneous Maintenance Load - assumed from Public Works Department.
Library grounds, walks and steps.
City Hall grounds.
Old Prison Site - historical marker.
Area around former Minnesota Department of Transportation building on North Main Street.
Landscaped areas at South Main Parking Lot.
.
.
.
.
..
.
.
.
Main Street steps, Willard Street steps, Chestnut Street steps, Laurel Street steps.
Vacant lots and right-of-ways at Pine and Owens Streets; Echo Lane; Harriet and Anderson
Streets; Linden Streets; Carnelian Street and area around pond by CUB Foods.
Three miles of walkways on McKusick off County Road 5.
Six+ miles of sidewalks and boulevards adjacent to public property scattered about town.
Senior citizens mini-park, located between Lowell Inn and Highrise. Picnic shelter and tables.
RECREATIONAL FACILITIES
Three adult softball fields
Seven kids softball fields
Ten tennis courts
Ten horse shoe courts
One fishing pier
One boat dock
One swimming beach
One soccer field year around
Three soccer and football fields for Fall use
Five picnic shelters
Ten parks with playground equipment with one foot of sand under all of the playground equipment
Approximately 142.25 acres of park land
'.
SUMMARY
OF
DOWNTOWN AREAS MAINTAINED BY PARKS DEPARTMENT
Areas Maintained:
Lowell Park
Old Prison (area adjacent to highway)
Main Street, Chestnut Street and Laurel Street stairs
North and South Main Street parking lots
All trees and shrubs in downtown area
About 4-1/2 blocks of sidewalks
Work performed in the areas listed above:
mowing
brushing
pruning
trimming
weeding
planting
cleaning
watering
vandalism maintenance
setting up for special events
snow lemoval
Total labor hours per year - 990 (this does not include snow removal).
Average labor cost per year - $18,000 - $20,000 (this above does not include flowers, shrubs, seed
or vandalism costs).
Snow removal, purchase of flowers, shrubs, trees, seeds and vandalism repair, varies from year
to year but averages about $1,500 per year.
\1;
4 ...
.
.
.
\-
.
.
.
MEMORANDUM
TO: Mayor and City Council
FROM: Klayton Eckles, City Engineer
SUBJECT: Roll of Engineering Department and Proposed Staffing
DATE: January 27, 1995
DISCUSSION
The most difficult issue I have dealt with since coming to Stillwater is detining the roll of the City
Engineer. My vision of the roll of City Engineering is based on past experience in other cities and
observations of what has been effective in various cities. At this point it is obvious that there is no
consensus on what the exact roll should be of Engineering. I believe it is imperative that we have
a vision of where we wish City Engineering and Public Works Department to be 10 years from now.
I view this issue as the top priority for my 1995 work program.
In order to define where we wish this department to be in 10 years, a good starting point would be to
look at what other cities have done. All cities need some form of technica'l support Some cities
.
accomplish this by using in-house engineers; others use a consulting service. However, there are very
few cities that rely pmdy on one form or the other. Most have a mix. of engineering staff and
consulting service.
There are advantages to both in:-house engineering and using a consulting service. The advantages
of in-house engineering are as follows:
. Objective is quality public service not profit
. Reliance on outside individuals is minimized
. Overhead for travel and marketing is eliminated
. Staff is available for public assistance
. Long-term approach to infrastructure management is possible
'The advantages of a consulting service are as follows:
. Flexible, pay only for what is used
. Responsive, large staff means fast service
. Knowledgeable, specialists available for unique projects
The most etIective method of providing technical support for a city is using a mixture of these two.
The in-house engineering staff provides quality public service and a proactive approach to managing
the City's infrastructure. A consulting service can be used for handling large or specialized
engineering projects or helping out on unusually busy construction years. The cost difference for the
two methods is not dramatic. It is more a matter of how we cut the pie. By finding the optimum
mL'\1ure of the two methods of service, hopefully the overall size of the pie can be reduced somewhat.
The two attached pie charts show the existing mixiure of service and a reconnnended mix1:ure of
Sef\lce.
An example of a city which has an effective mixture of service is the City of Hastings. Hastings does
roughly 2/3 of their engineering in-house on a typical year. Hastings has a Public Works Director
who is an Engineer, and is in charge of Engineering and Public Works, a City Engineer in charge of
the actual Engineering design fimctions and two permanent Technicians. On any given year, Hastings
will hire 2 - 4 part-time Technicians for six months of the year to handle the busy construction season.
I have attached an example which includes the make-up of the Hastings department and also the
make-up of the City of Hopkins. Hopkins has a smaller staff and does less of the Engineering work
in-house.
TECHNICIAN POSITION
The issue of increased in-house engineering was discussed as part of the 1995 Budget process. TIle
1995 Budget has money allocated for the hiring of an Engineering Technician. If the City of
Stillwater wants to move away from a reliance on outside consulting engineers, the first step would
be to hire an Engineer Technician.
Engineering technicians are the back bone of any engjneering operation. Technicians typically have
a two-year degree with training in the design and inspection of Public Works projects. Also,
technicians have the capability to write specifications and project contracts, review plans and perform
survey operations.
Specifically, for the City of Stillwater, a technician would be involved in the following:
The technician would complete plans and specs and inspections for small projects such as
sidewalk improvements, utility repair projects, seal coat projects, storm sewer outlet
improvements and small street overlays.
The technician would make field inspections oflarger projects nnderway by the consultant.
The technician would update the Pavement Management program.
The new technician would complete assessment rolls with assistance of the City Finance
Director, also update the plan storage system, inspect drainage plans and drainage as-builts,
eventually take over records management and GIS system.
BUOOET IMPLICATIONS
This new position should actually have a positive impact on the budget Currently, consulting
engineer acconnts for about 25% of the project costs. Therefore, if we can complete one $300,000
project a year in-house Oike the sidewalk project), we will see a reduction in consulting services of
"
.
.
.
\
.
.
.
approximately $75,000. Consultants charge the City approximately three times the hourly rate for
services. Ifwe charge projects 2.5 times our technician's hourly salary, we will more than pay for the
technician and reduce project costs (and therefore, reduce assessment costs). For comparison, in 1994
we spent over $750,000 on SEH services alone.
Ifwe do the sidewalk project in-house, we will pay for the technician's salary with that one project.
In addition, the technician should have sufficient time to completely update the pavement
management program. This is a task which needs to be done since the data is now five years old.
This would be approximately a $10,000 or more cost savings. In addition to the pavement
management program, an inventory of other City Public Works items needs to be completed in the
coming years. With an inventory, we can create a management program for other utilities, doing this
work in-house will realize significant savings. Also, the Finance Department needs Engineering
support to prepare a storm water utility program. This could be supplied the Technician and myself.
I am quite confident that there will be sufficient work in the coming years to keep a technician busy
and continue to more than cover the labor costs through savings on consultant fees.
SPACE IMPLICATIONS.
Although the City Hall and the Public Works garage are both very tight for space, there is still
additional space available in the Engineering and Public Works office to allow for additional staff if
the room is reconfigured and dividers are installed. . Eventually, either the Public Works garage or
City Hall will be remodeled. In either case, this wilt improve the situation as eventually the Public
Works Director can be relocated to the garage, which will provide more room for Engineering. In
tenns of equipment, there is not a great amount of equipment that will be required for an additional
technician. However, we would want to eventually provide another computer station and a printer,
which would allow us to complete plans in-house. 100 cost of these additional items have by-in-Iarge
been accounted for in the 1995 Budget.
An additional reason for hiring the technician now, concerns the staffing levels in the coming years.
In approximately two years there will be significant change in personnel as retirements take place.
Before this takes place, it is important that new people come on board to allow for the transition so
that knowledge and information can be passed on.
RECOMMENDATION
In summary, I recommend that we develop a vision for where the Engineering and Public Works
Department should be in 10 years. My vision for this department would include additional staff
members for providing in-house technical support and project design. The first step in this process
would be to add a new technician to the Public Works and Engineering Department. This will
improve om level of service to the public and have an overall positive impact on the budget. A new
person can be accommodated with the space available.
~
ENGINEERING SERVICE EXAMPLES
.
Example: City of Hastings
Staff: 1 Public Works Director (Engineer)
1 City Engineer
2 Full-Time Technicians
3 Part-Time Technicians
Budget: $290,000
Capability: $1.5 - 2 Million of improvements
Excess is given to one of several consulting firms
.
.
Example: City of Hopkins
Staff: 1 City Engineer
3 Technicians
Budget: Unknown
Capability: $500,000 - $1,000,000 Simple maintenance projects
Excess given to one of several consulting firms
.
'~
.
Current Engineering Service Mix
.
.
.'
.
Recommended Engineering Service
.
-..
.
.
.
.
PUBLIC WORKS GENERAUCITY ENGINEER
RESPONSIBILITY: Plan and manage the Public Works fimctions of the City and supervise the
work force. Also provide technical assistance to Council, staff and residents.
Oversee work of consulting engineers, coordinate projects with County, State,
and Federal agencies.
BUDGET: $177,751
LABOR FORCE: 112 Engineer, 1/2 Public Works Director, 1/2 Assistant Director (1/2 budgeted
for 2 Part-time Secretaries, I Technician)
#
EQUIPMENT
PURPOSE
2 Trucks
1 Computer
.
Transport
Geographic Information System, CADD
DUTIES:
. Supervise and provide direction to street and sewer employees
. Respond to Council and residents concerns
. Purchase new equipment and handle staffing issues
. Maintain technical records and files
. Provide technical input to Council and other departments
. Oversee consultants and hired contractors .
. Plan maintenance and capital improvement programs
. Prepare technical reports for Council
/
1995 Work Programs
I. Esta blish structure and role of the City Engineering Department and the role of the
Consulting Engineer.
2. Develop and provide Council with 19% infrastructurellocal improvement
recommendation.
3. Finalize the update of departmental work rules.
4. Update work safety program for Public Works Department.
5. Develop specs/ad, etc. for acquisition of capital outlay items for Public Works (e.g.,
sweeper, generator receptacle for lift stations).
6. Update pavement management program
7. Levee project (act as City representative).
8. Improve tiling system/record system for Public Works.
9. Develop five year capital improvement pr~am
.
10. Develop and administer a computerized vehicle/equipment maintenance program.
11. Develop personal and professional goals/objectives (including effective management
courses).
Other Projects
1. Brick Pond feasibility
2. Work with Finance to develop storm water utility
3. Complete 1995 sidewalk repair project
4. Work with Council to develop plan and schedule for Public Works garage
expansion/relocation
.
.
.
.
.
"IDEAL" ORGANIZATIONAL STRUCTURE
r.-"~~~~~fT;rtYl
.-..--.-.......---.-
DESIGN' \
TECH~~~~_
~~~nNJ
CITY ENGINEER/DIRECTOR
OF PUBLI WORKS
F~TARY7l
FIELD' SENIOR'
TECHNICIAN TECHNICIAN
MAINTENANCE
LEADPERSON
*lNDICAfES ADDITIONAL STAFF
.'
SEWER
LEADPERSON
.
PUBLIC W1~KS----1
SUPERINTENDENT
PARKS
LEADPERSON
6'
rf~~~~;~.~;'~J
7"
rWATERI
BOARD
-T
L WATliRJ
.
.
.
MEMORANDUM
TO:
Mayor and City CmUlcil
FROM:
K.layton Eckles, City Engineer \J.....{ /
SUBJECT:
Modifications To Street Reconstruction and Rehabilitation Assessment Policy
DATE:
January 27, 1995
DISCUSSION
Attached is a rough draft of the SEH 1995 street reconstruction feasibility study. This has been
provided for City COlmcils' preliminary review so that changes can be made prior to the next Council
meeting where Council could accept the feasibility study and order a public hearing. In order to
implement the feasibility study as presented, there may be a need to change our current assessment
policy.
In 1994 the City completed five street improvement projects using the new City Assessment Policy
to administer the financing of the project. Overall the assessment policy worked fairly well and there
were very few complaints about the program. 1bere were, however, a few problems; with some minor
modifications to our policy perhaps the problems could be eliminated. There are three specific
problems which I hope adjustments to our policy can rectifY.
'The first issue that should be addressed is the overall City assistance on street improvement projects.
In 1994 the City provided assistance on 50% of the total project costs. Given that we have 70 miles
of streets that need to be periodically rehabilitated, staff is concerned that it may be difficult to sustain
this type of assistance for the entire City.
The second issue which should be addressed is a method of splitting proposed assessments between
neighboring lots. The policy calls for splits to be made based on front footage. The current policy
also does allow for splitting on a per unit basis, but this technique has not been used. In areas such
as Croix'wood where all of the lots are similarly sized and are odd-shaped, splitting assessment on a
per lot basis would be more appropriate.
The third issue that should be addressed concerns the method of determining the assessment rate for
rehabilitation projects versus reconstruction projects. 1be currenfpolicy has two completely different
methods for splitting costs for a rehabilitation project versus a reconstruction project. The problem
occurs when a street is classified as a partial reconstruction. These streets do not fit into either
category very well, therefore, determining the assessment rate can be difficult. To rectify this
situation, one method of determining the rate of assessment should be used for all cases.
I would propose that instead of charging a flat rate, which we currently do for rehabilitation projects,
we set a new policy whereby all property owners, whether in a rehabilitation or reconstruction project
always pay for the final layer of blacktop and the milling of the existing. blacktop. This is equivalent
to the cost of a simple overlay project Then, all other costs above the mill and overlay cost would be
split on a 50/50 basis. Using this method, we will have a uniform formula for determining
assessment rates for all cases. This will also eliminate the problem of trying to determine whether
we should classifY a street as a reconstruction project, a partial reconstruction project, or a simple
rehabilitation project It will also adjust the total amount of City participation to a certain extent and
slightly decrease the amount of City assistance provided. This would then address the first Concern
listed above.
RECOMMENDATION
I recommend Council direct staff to modii)' the current assessment policy as follows:
1.
Eliminate the current flat rate assessment for overlay projects or rehabilitation
projects.
2. Add the requirement that the cost of the final lift of blacktop and the milling of the
existing blacktop be charged to the neighboring property owners at 100% of the total
cost All additional costs over and above the mill and overlay will be charged to the
neighboring properties at a rate of 50% of the total cost.
I also recommend that for the Croixwood area improvements of the 1995 street projects, we charge
the residents based on a per lot basis.
.
.
.
,
.
.
.
~SeH
3535 VADNAIS CENTER DRIVE, 200 SEH CENTER, ST. PAUL, MN 55110 612490-2000 800 325-2055
ARCHITECTURE ENGINEERING ENVIRONMENTAL TRANSPORT A TION
January 25, 1995
Stillwater, Minnesota
1995 Street Construction
L.I. 310
SEH No. A-STILL9506.00
RE:
Honorable Mayor and City Council
City of Stillwater
216 North 4th Street
Stillwater, MN 55082
As authorized on December 20,1994, we have prepared the Feasibility Report for the 1995 street
improvement project. The streets included in this study are:
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
Hidden Valley Lane between Sunrise A venue and Croixwood Boulevard
All the cul-de-sacs connected to Hidden Valley Lane
Marine Circle
Parkwood Lane between Wildpines Lane and Sunrise Avenue
Wild pines Lane between the County Road 5 completion and the dead end
The entrance to Lily Lake School from County Road 5 (Willard St. extended)
Driftwood Lane
Sunrise Avenue
Sunrise Court
Countryside Court
Drawing No.1 shows the project location.
Existing Conditions
These streets were rated along with all of the streets in Stillwater as a' part of the Pavement
Management Study. The ratings are based on a visual inspection which identified various problems
that affect the life of a street. Signs of distress include trench and curb and gutter settlements,
alligator cracking, map cracking and lack of crown. This type of damage is typically caused by
inadequate drainage, frost action, inadequate street section, groundwater or poor subgrade soils.
The Board of Water Commissioners has experienced higher maintenance cost and several breaks
in the water main between the intersection with the north cul-de-sac and the west end of Marine
Circle. This water main is indicated on Drawing No.3. The Water Board has had the soil tested for
corrosiveness and determined that the soils in the vicinity of the water main are corrosive. Also,
pipe that they have dug up is pitted badly. Pitted pipe is an indication of corrosive soils.
Corrosivity causes an imbalance in the electrolytes and corrodes metal away from the pipe, causing
weakness and eventually breaks.
SHORT ELLIOTT
HENDRICKSON INC.
MINNEAPOLIS, MN
CHIPPEWA FALLS, WI
MADISON, WI
ST CLOUD, MN
'lo
.
Honorable Mayor and City Council
January 25, 1995
Page 2
Also, Public Works has experienced breaks in the sewer forcemain on Marine Circle. Corrosive soils
are also suspected by Public Works.
The pipe used for both mains was cast iron and is more susceptible to the galvanic process or loss
of metal than the present day ductile iron pipe.
The entrance from Lily Lake School off County Road 5 (Willard Street extended) only services two
residential drives besides traffic to Lily Lake School. The school can be reached by West Street off
Pine Street.
The intersection of Willard Street extended and County Road 5 is not a very desirable location,
because of sight distances and grade.
The City should review this short street and discuss the need for maintaining the roadway with
both the School District and the property owners. If the City should determine it best to abandon
this roadway, access could be provided to the two residences from West Street.
f1J1..1' lAb Proposed Improvements
~~esurfa~ recommended for Hidden Valley Lane from Croixwood Boulevard to 2606-2636 cul-
. e-sac, Evergreen Court, Hidden Valley Court, 2606-2636 cul-de-sac, (Hidden Valley Lane) and
Sunrise Court and Sunrise Avenue. Under the resurfacing recommendation, trench and curb and
gutter settlements are repaired and leveled. Alligator and map cracking areas are excavated and
the cause for the cracking is determined, prior to patching. Large transverse and longitudinal
cracks are filled with a rubberized asphalt. The bituminous is milled along the entire length of the
resurface areas to provide a match at the gutter and driveways. The length of these areas are then
overlaid. Since the patching and subgrade work and the addition of storm sewer, these streets are
included as partial reconstruction since we anticipate not being able to save as much bituminous
surfacing as normal.
~jJ,fI--- iJft" ~construCtiOn]is recommended for Hidden Valley Lane from 2606-2636 cul-de-sac to Sunrise
~. venue, Knollwood Court, Parkwood Lane, Wildpines Lane and Marine Circle (south cul-de-sac),
Countryside Court and Driftwood Lane. Reconstruction indicates that the street is deteriorated and
needs to be replaced. The curb and gutter, for the most part, is in good. condition and can be saved.
The segments of curb and gutter that have settled will be replaced or mud jacked as a part of the
reconstruction. The subgrade will be inspected to determine the reason for the street failure as
reconstruction occurs. A one foot granularsubgrade is included with subgrade drains and storm
sewer added to improve drainage.
I APPf
~
.
Total reconstruction is tecomm--ei\ciea:>for the entrance to Lily Lake School from County Road 5
(Willard Street extended). Total reconstruction indicates that the street is deteriorated and needs
to be replaced. This street does not have concrete curb and gutter and should be constructed to City
standards including concrete curb and gutter. Curb and gutter reduces erosion and protects the
\
.
.
.
Honorable Mayor and City Council
January 25, 1995
Page 3
edge of the pavement from damage. With the added bus traffic, the section for this street should
be thicker than the City standard. It is recommended that the section should be 2" bituminous wear,
3" bituminous base and 8" Class 5 aggregate base. .
Drawing No.2 shows the proposed improvements. Drawing No.4 shows the typical sections.
The Water Board is proposing to replace the water main on Marine Circle and to protect it against
corrosion. Ductile iron pipe will be used with a polyethylene wrap for corrosion protection.
Public Works also proposes to replace the forcemain on Marine Circle with ductile iron pipe and
poly wrap.
The replacement utilities, storm sewer and subgrade drains are all indicated on Drawing No.3.
Estimated Costs
The estimated costs for the 1995 street construction, by segment for each street and type of
construction, follows with the engineer's estimate. The total cost is estimated at $734,900.00.
These costs include 5 percent for construction contingencies and 30 percent for engineering,
administrative, legal and capitalized interest costs. Enclosed is a detailed cost estimate.
Cost Recovery
The project costs for the construction of these improvements is to be recovered through special
assessments according to the City's Assessment Policy. The cost of water main replacement on
Marine Circle will be paid by the Board of Commissioners.
The sanitary forcemain replacement cost on Marine Circle will be paid from City Public Works
funds.
The assessments are proposed to be levied on a unit basis. The estimated assessment rate is $2,108
per lot, based upon 208 lots.
Cost recovery is proposed as follows:
1.
2.
3.
4.
Special Assessment
City Participation
City Public Works
Board of Water Commissioners
$438,444
260,781
14,755
20.920
TOTAL ESTIMATED PROJECT COST
$734,900
.
.
.
Honorable Mayor and City Council
January 25, 1995
Page 4
Proposed Schedule
The project will require a Public Hearing. We have estimated the following schedule for 1995
construction:
Council Accepts Report and Orders Public Hearing
February 7, 1995
Public Hearing and Authorize Preparation
of Plans and Specifications
March 1, 1995
Approve Plans and Specifications
and Authorize Advertisement for
Bids
March 22, 1995
Advertise for Bids
April, 1995
Receive Bids
April 17, 1995
Council Awards Contract
April 18, 1995
Begin Construction
May 15, 1995
Complete Construction
August 15,1995
Conclusions and Recommendations
The improvements outlined in this report are feasible. We recommend that the improvements be
constructed as proposed. We recommend that the replacement of water main and forcemain on
Marine Circle be included in this project.
We recommend the City review the need for the entrance to Lily Lake School off County Road 5
with the residents and the School District.
We recommend the City review the cost recovery proposed and consult with bond Council as
necessary .
.
.
.
Honorable Mayor and City Council
January 25, 1995
Page 5
We would be pleased to review this report with you and answer any questions you may have.
Sincerely,
Short Elliott Hendrickson Inc.
Richard E. Moore, P.E.
tlo
I hereby certify that this report was prepared by me or under my
direct supervision and that I am a duly Registered Professional
:m::;6f~~esom.
Date: J~I z.S; I tlf9 ~
.
Reg. No.
Reviewed by:
14691
Date
.
.
I
~5fH
DlGlNEERS8A1KN1Er:Ts.1'I..ANNERS
II
\ "
Co'
NRCEL. 3
L...
PROJECT lOCATIONS,
STillWATER, MINNESOTA
1995 STREET CONSTRUCTION
FILE NO.
STILL9506
DWG.NO.
l'
.
.
.
I
~~
,,0
+
;;
.,
::"
~
-
---
c(
i \ .
, ,
, \
\
L
MACH 3
, ----r
LEGEND
--- - - 4" DRAIN TILE
. PROPOSED STORM SEWER
I PROPOSED WATERMAIN REPLACEMENT
-F- PROPOSED FORCEMAIN REPLACEMENT
.
r
~ l-
\', . 1:
J
STillWATER, MINNESOTA
1995 STREET CONSTRUCTION
tiLE NO.
STIll9506
DWG.NO.
3
DKJ/NEERS_AlKHTrCTSllPU.NNERS
.
.
I"
'~
U'i
1i
I
I:
I
I
I
I
. r----J
~I
, (~
, : I
, I
I-
I
~(o
,,0
+
:;
'1
~
~
-.J
~
. ~
~
~
\
.
cc
~
"""CUS
""
!
I -r
i
LEGEND
V / / 11 TOTAL RECONSTRUCTION
PARTIAL RECONSTRUCTION
=set
STillWATER, MINNESOTA
1995 STREET CONSTRUCTION
FILE NO.
STILL9506
DWG.NO.
2
ENfINEE/tSIIAMHTEC"'1'LANNERS
.
.
.
.
32'
..---
PR01lCT EXIS1INQ
CUll
'"
,"
DIS'IING 041.
~ 1fT.
.ar hT~
ANE FUER AGQ.
.u:. 314I.2J
1/2 10 1
4- ..... PeE. PIPE DRAIiI
-/lOCK (EA. sa:)
1-lIr D40 TYPE 41A 1EAR COURSE
2J57 TAG( COAT
r 2340 TYPE 3t lASE COURSE
r a.ASS a AGGIIE8AlE BASE
1r SELECT GRNU.AR
PAlmAL RECONSlRUC11ON nPlCAL RESlDENllAL SEC110N
3r
---.--
PR01ECT EXIS'I1NG
~
11'
'"
DIllING 0.1'
....a'L 1fT.
.qr m~
PINE P1.1IR MIl
SfIIC. 3141.2.1
1/2 10 1
4- ..... PeE. PIPE DRAIN
-/lOCK (EA. SIDE)
r >>10 TYPE 41A WEAR COURSE
2387 TAG( COAT
r D40 TYPE 3t BASE COURSE
r Q.A8S I AGGRmAlE BASE
1r IElmr GRANULAR
PARllAL RECONSlRUC11ON TYPICAl. RESIDENlIAL SEcnON
PARKWOOO LN., Ye1LDPINE LN..
4'
WAlCH EX.
1"
8I11CflC
1.'
PROFU GRADE
8111 C . c
,0:1 hT~
.....f1'L 1fT.
r 2340 TYPE 41A IIEAR COURSE
2J57 TAG( COAT
yo 2340 TYPE 31 BASE COURSE
rt' cuss 5 AGCIREDA lE BASE
TYPICAl TOTAL RECONSlRUCllON SECllON
Yt1lLARD STREET
~c;e'H
FILE NO.
STlLL9506
.N
4
BB~_..,_1'tNiIIIIfS
1995 STREET IMPROVEMENTS
STILLWATER. MINNESOTA
ENGINEER'S ESTIMATE
STILLWATER, MINNESOTA
1995 STREET CONSTRUCTION
SEH FILE NO: ASTILL9506
L.I.310
WILLARD STREET HIDDEN VALLEY LN KNOLLWOOD COURT PARKWOOD LN
TOTAL RECON
ITEM UNIT SAC TO SUNRISE
NO. ITEM DESCRIPTION UNIT PRICE QUANT. TOTAL QUANT. TOTAL QUANT. TOTAL QUANT. TOTAL
1 COMMON EXCAVATION(P) CUYD 5.50 660 3,630.00 1500 8,250.00 690 3,795.00 1995 10,972.50
~---- .__.__.._-~
2 SELECT GR~~lJLAR BORROW (LV) CUYD 6.00 1100 6,600.00 505 3,030.00 1460 8,760.00
.. ~-- - ~~-_,_-_,"- -------- --
3 CRACK FILLING L1N FT 2.50
------ --.-. -'-'--'- -~._------
4 BITUMINOUS PATCHING MIXTURE TON 53.00
---~ . --- -- --~._---~- -'.--.--........--
5 MILL BITUMINOUS SURFACE SQYD 1.10 -
------ --..---" . ----- - -----------.- - --
6 CLASS 5 AGGREGATE BASE TON 8.00 435 3,480.00 915 7,320.00 420 3,360.00 1210 9,680.00
--- -~- .-----.--------- ---
7 TYPE 41A WEAR COURSE MIXTURE TON 25.25 110 2,n7.50 230 5,807.50 105 2,651.25 405 10,226.25
8 TYPE 31 LEVELING COURSE MIXTURE TON 24.25
9 TYPE 31 BASE COURSE MIXTURE TON 24.00 160 3,840.00 305 7,320.00 140 3,360.00 405 9,720.00
-
10 BITUMINOUS MATERIAL FOR TACK COAT GALLON 1.50 50 75.00 140 210.00 70 105.00 185 2n.50
11 ADJUST FRAME & RING CASTING EACH 150.00 4 600.00 2 300.00 9 1,350.00
12 ADJUST GATE VALVE BOX EACH 95.00 1 95.00 2 190.00
13 CONCRETE CURB & GUTTER B-618 L.F. 6.00 480 2,880.00
-
12 REMOVE & REPLACE C & G L.F. 12.00 200 2,400.00 50 600.00 150 1,800.00
~ --- -- ---~._- --.----- -- -- __ __.._____.u ----------.--
15 MANHOLE SUBGRADE REPAIR EACH 500.00 2 1,000.00 5 2,500.00
--- - --.-..-- ------- ...,-'-------- -----~
16 STORM MANHOLE EACH 1__1,250.()()
--- - -- -----,.. - ---.-- - - _u_
17 CATCH BASIN EACH 850.00
-.---.- .. . --- ---_.._-~ -----
18 12 RCP STORM SEWER L.F. 30.00
---- ------ _..._.__._-~-- --- ._-----
19 4" DRAIN TILE L.F. 5.00 400 2,000.00 200 1,000.00 600 3,000.00
-- - ----_..__'0 .-.--- - __ ______u__
20 MUDJACK CONCRETE CURB & GUTTER L1N FT 5.00 80 400.00 30 150.00 70 350.00
un ------ -- ---- ~
21 _SODDING, TYPE LAWN SQYD 4.00 450 1,800.00 70 280.00 20 80.00 50 200.00
22 REMOVE & REPLACE 6' FORCEMAIN L.F. 18.00
23 CONNECT TO EXISTING FORCEMAIN EACH 150.00
f--
24 6" D.I.P. WATERMAIN L.F. 18.00
25 6" X 6" TAPPING SLEEVE & VALVE EACH 1,500.00
26 CITY INSTALLED l' CORPORATION EACH 75.00
27 RECONNECT WATER SERVICE L1N FT 510.00
28 CONNECT TO EXISTING WATERMAIN EACH 150.00
~ -- - -- ---- --..- --~- --~-----
29 WATERMAIN FITTINGS POUND 3.00
SUBTOTAL
35% CONTIN., ENG., ADMIN. & LEGAL
ESTIMATED PROJECT
$18,482.50
6,468.88
$42,282.50
14,798.88
$18,431.25
6,450.94
$59,026.25
20,659.19
----------
------------
-----
------
--===
-----------
-----------
.
$24,951.38
PAGe
$57,081.38
$24,882.19
$~'.
ENGINEER'S ESTIMATE
STILLWATER,MINNESOTA
1995 STREET CONSTRUCTION
SEH FILE NO: ASTILL9506
L.1. 310
WILDPINES LN MARINE CIRCLE DRIFlWOOD LN COUNTRYSIDE COURT
ITEM UNIT SO. SAC
NO. ITEM DESCRIPTION UNIT PRICE QUANT. TOTAL QUANT. TOTAl QUANT. TOTAL QUANT. TOTAL
1 COMMON E)(~AVAT~~~(P) CUYD 5.50 300 1,650.00 1955 10,752.50 2410 13,255.00 755 4,152.50
-~-_. _".n'_'_' ~ ----~
2 SELECT GR~N!-J~R BORROW (LV) CUYD 6.00 1430 8,580.00 1760 10,560.00 550 3,300.00
-.-- ----~~ ~._- __ __._0"_'-----
3 CRACK FILLING L1N FT 2.50
--- I- ---._- f-------- - --~- ~--~_.- --~---
4 BITUMINOUS PATCHING MIXTURE TON 53.00 .__.------"-_.
---- I ----._---- ---
5 MILL BITUMINOUS SURFACE SQYD 1.10 ---
--- -- ---- -----
6 CLASS 5 AGGREGATE BASE TON 8.00 385 3,080.00 1185 9,480.00 1460 11,680.00 460 3,680.00
---- un ----
7 TYPE 41 A WEAR COURSE MIXTURE TON 25.25 130 3,282.50 300 7,575.00 490 12,372.50 115 2,903.75
8 TYPE 31 LEVELING COURSE MIXTURE TON 24.25
9 TYPE 31 BASE COURSE MIXTURE TON 24.00 130 3,120.00 395 9,480.00 365 8,760.00 155 3,720.00
10 BITUMINOUS MATERIAL FOR TACK COAT GALLON 1.50 60 90.00 180 270.00 225 337.50 70 105.00
11 ADJUST FRAME & RING CASTING EACH 150.00 6 900.00 13 1,950.00 1 150.00
12 ADJUST GATE VALVE BOX EACH 95.00 1 95.00 1 95.00
13 CONCRETE CURB & GUTTER B-618 L.F. 6.00 2 12.00
12 REMOVE & REPLACE C & G L.F. 12.00 50 600.00 200 2,400.00 280 3,360.00 80 960.00
----- __on -- _._----~._-_.- --" - --
15 MANHOLE SUBGRADE REPAIR EACH 500.00 2 1,000.00
-.--.. -..-.. ...--'--- ----,,-_._- --~ ----- -- .--'.---.'.----
16 STORM MANHOLE EACH 1,250.00 _.__.___.n____
--- n _ ~___ _...- -
17 CATCH BASIN EACH 850.00 --------
----.--- ------ -
18 12 RCP STORM SEWER L.F. 30.00 ---..-
------ --- ------ _______.___'u__. - -'--'---'-
19 4" DRAIN TILE L.F. 5.00 600 3,000.00 400 2,000.00 200 1,000.00
----- - --.-------..- ---- -~~--""--~- """
20 MUDJACK CONCRETE CURB & GUTTER L1N FT 5.00 20 100.00 80 400.00 130 650.00 20 100.00
--- ._u.__..__ ~- ----------- _.n u._____
21 SODDING, TYPE LAWN SQYD 4.00 20 80.00 70 280.00 90 360.00 30 120.00
22 REMOVE & REPLACE 6" FORCEMAIN L.F. 18.00 570 10,260.00
23 CONNECT TO EXISTING FORCEMAIN EACH 150.00 2 300.00
24 6" D.I.P. WATERMAIN L.F. 18.00 430 7,740.00
25 6" X 6" TAPPING SLEEVE & VALVE EACH 1,500.00 1 1,500.00
26 CITY INSTALLED 1" CORPORATION EACH 75.00 10 750.00
27 RECONNECT WATER SERVICE L1N FT 510.00 10 5,100.00
28 CONNECT TO EXISTING WATERMAIN EACH 150.00 1 150.00
_____m .. - - - -- --..-.. ------- 1--------- -
29 WATERMAIN FITTINGS POUND 3.00 85 255.00
SUBTOTAL
35% CONTIN., ENG., ADMIN. & LEGAL
$12,002.50
4,200.88
$79,267.50
27,743.63
$66,297.00
23,203.95
$20,286.25
7,100.19
--------.
----------
-------
--------
------
-------...
------------
-------------
.
.
$16,203.38
PAGe
$107,011.13
$89,500.95
$27'_
ESTIMATED PROJECT
ENGINEER'S ESTIMATE
STILLWATER, MINNESOTA
1995 STREET CONSTRUCTION
SEH FILE NO: ASTILL9506
L.1. 310
SUNRISE AVE SUNRISE COURT HIDDEN VALLEY LN HIDDEN VALLEY CT
ITEM UNIT CROIXWOOD TO SAC
NO. ITEM DESCRIPTION UNIT PRICE QUANT. TOTAL QUANT. TOTAL QUANT. TOTAL QUANT. TOTAL
1 COMMON EXC;~\JATION(P) CUYD 5.50
----- ---
2 SELECT GRANULAR BORROW (LV) CUYD 6.00
----- . ... _"'__n_~ --..---
3 CRACK FILLING L1N FT 2.50 4100 10,250.00 1150 2,875.00 4550 11,375.00 1750 4,375.00
--~_.- -. ,-"--.'- - -----.-.-.- --.---
4 BITUMINOUS PATCHING MIXTURE TON 53.00 545 28,885.00 150 7,950.00
---- ___.._.___.n ------ -------- ---
5 MILL BITUMINOUS SURFACE SQYD 1.10 3010 3,311.00 495 544.50 5080 5,588.00 720 792.00
---~- -----~- -- -_..__...~-_.- u.._
6 CLASS 5 AGGREGATE BASE TON 8.00 825 6,600.00 230 1,840.00
~._.--- - --- --_._--_._---,-~ ---- -----~ ~_.__ n__.._____._
7 TYPE 41A WEAR COURSE MIXTURE TON 25.25 960 24,240.00 185 4,671.25 1275 32,193.75 150 3,787.50
8 TYPE 31 LEVELING COURSE MIXTURE TON 24.25 270 6,547.50 50 1,212.50 320 7,760.00 70 1,697.50
9 TYPE 31 BASE COURSE MIXTURE TON 24.00
10 BITUMINOUS MATERIAL FOR TACK COAT GALLON 1.50 440 660.00 85 127.50 580 870.00 70 105.00
11 ADJUST FRAME & RING CASTING EACH 150.00 1 150.00 23 3,450.00 3 450.00
12 ADJUST GATE VALVE BOX EACH 95.00 1 95.00 8 760.00 1 95.00
13 CONCRETE CURB & GUTTER B-618 L.F. 6.00
12 REMOVE & REPLACE C & G L.F. 12.00 300 3,600.00 70 840.00 450 5,400.00 110 1,320.00
-~- --- - -- .---.--- -----
15 MANHOLE SUBGRADE REPAIR EACH 500.00 8 4,000.00 6 3,000.00 1 500.00
--~ -- ----.-.-. '------- -_._--~-----_. --- - ______m
16 STORM MANHOLE EACH 1,250.00 1 1,250.00
-----"-- --- ------.--------- ..u__' _
17 CATCH BASIN EACH 850.00 2 1,700.00
_._._-~ ---'- - - -- --,
18 12 RCP STORM SEWER L.F. 30.00 275 8,250.00
~ --.----.-...-.- -- ----- -------- --
19 4' DRAIN TILE L.F. 5.00
-- _ __ ______m_."_ u_____ ~--_. -,-----
20 MUDJACK CONCRETE CURB & GUTTER L1N FT 5.00 120 600.00 30 150.00 300 1,500.00 40 200.00
------- ______n___ ___ .,_,"__ --'----- ------ ---.--.. - - _._-~_._-
21 SODDING, TYPE LAWN SQYD 4.00 100 400.00 25 - 100.00 150 600.00 40 160.00
22 REMOVE & REPLACE 6' FORCEMAIN L.F. 18.00
-
23 CONNECT TO EXISTING FORCEMAIN EACH 150.00
24 6" D.I.P. WATERMAIN L.F. 18.00
~ --
25 6" X 6" TAPPING SLEEVE & VALVE EACH 1,500.00
26 CITY INSTALLED l' CORPORATION EACH 75.00
27 RECONNECT WATER SERVICE UN FT 510.00
28 CONNECT TO EXISTING WATERMAIN EACH 150.00 , _ ,n
------- ~ 1__ .-.---..
29 WATERMAIN FITTINGS POUND 3.00
SUBTOTAL
35% CONTIN., ENG., ADMIN. & LEGAL
ESTIMATED PROJECT
$53,608.50
18,762.98
$10,765.75
3,768.01
$119,181.75
41,713.61
$160,895.36
$23,272.00
8,145.20
-----------
-----------
-----
--------
============
.
PA.ii,.48
$14,533.76
$31._
ENGINEER'S ESTIMATE
STILLWATER, MINNESOTA
1995 STREET CONSTRUCTION
SEH FILE NO: ASTILL9S06
L.l.310
EVERGREEN COURT
ITEM UNIT
NO. ITEM DESCRIPTION UNIT PRICE QUANT. TOTAL
1 COMMON EXCAVATION(P) CUVD 5.50
.. _._n - -- ---
2 SELECT GRANULAR BORROW (LV) CUVD 6.00
----.- -- ---_._--_.~--_..-
3 CRACK FILLING L1N FT 2.50
---~ ---_.~--_.-
4 BITUMINOUS PATCHING MIXTURE TON 53.00 170 9,010.00
-- - --------.. ---~
5 MILL BITUMINOUS SURFACE SQVD 1.10 660 726.00
~_.- .. ..---- -------..-.--- -- ..____u_ -------
6 CLASS 5 AGGREGATE BASE TON 8.00 255 2,040.00
'-'-,- - --
7 TYPE 41A WEAR COURSE MIXTURE TON 25.25 235 5,933.75
8 TYPE 31 LEVELING COURSE MIXTURE TON 24.25 60 1,455.00
9 TYPE 31 BASE COURSE MIXTURE TON 24.00
10 BITUMINOUS MATERIAL FOR TACK COAT GALLON 1.SO 110 165.00
11 ADJUST FRAME & RING CASTING EACH 150.00 2 300.00
12 ADJUST GATE VALVE BOX EACH 95.00 1 95.00
13 CONCRETE CURB & GUTTER B-618 L.F. 6.00
12 REMOVE & REPLACE C & G L.F. 12.00 110 1,320.00
-----"._- ----- ~---_.~- .-.'.- -_..-. --,--- .----
15 MANHOLE SUBGRADE REPAIR EACH SOO.OO
--... - --- --._-- ".'_"0'__'_- ----.-..
16 STORM MANHOLE EACH 1,250.00
---- _.,,'_.on___..__ ----- --
17 CATCH BASIN EACH 850.00
-- ---...----- ---------
18 12 RCP STORM SEWER L.F. 30.00
- _._---~ .--
19 4" DRAIN TILE L.F. 5.00
-~-- ---- ----_.---
20 MUDJACK CONCRETE CURB & GUTTER L1N FT 5.00 50 250.00
- -"--- - , ----- - -, - -------.-. --.--
21 SODDING, TYPE LAWN SQVD 4.00 40 160.00
22 REMOVE & REPLACE 6" FORCEMAIN L.F. 18.00
23 CONNECT TO EXISTING FORCEMAIN EACH 150.00
24 6" D.I.P. WATERMAIN L.F. 18.00
25 6" X 6" TAPPING SLEEVE & VALVE EACH 1,500.00
26 CITY INSTALLED 1" CORPORATION EACH 75.00
27 RECONNECT WATER SERVICE L1N FT 510.00
28 CONNECT TO EXISTING WATERMAIN EACH 150.00
---,-- ------ - - ------ -- -- "----.,.,,---.. .----------
29 WATERMAIN FITTINGS POUND 3.00
SUBTOTAL
35% CONTIN., ENG., ADMIN. & LEGAL
ESTIMATED PROJECT
$21,454.75
7,S09.16
----------
-----------
.
J;;;:3.91
PAG_
.
ENGINEER'S ESTIMATE
STlllWA TER,MINNESOTA
1995 STREET CONSTRUCTION
SEH FilE NO: ASTlll9506
L.I.310
TOTAL PROJECT
ITEM UNIT EST. TOTAL
NO. ITEM DESCRIPTION UNIT PRICE QUANT. COST
1 COMMON EXCAVATION(P) CUYD 5.50 10265 56,457.50
_ -.-. -----~
2 SELECT GRANULAR BORROW (lV) CUYD 6.00 6805 40,830.00
~- ---- ______n___
3 CRACK FilLING L1N FT 2.50 11550 28,875.00
__n_ -.. - - ------._- _ - ----~-
4 BITUMINOUS PATCHING MIXTURE TON 53.00 865 45,845.00
~- -- -'------- ---~ _.
5 Mill BITUMINOUS SURFACE SQYD 1.10 9965 10,961.50
----- ---- _.._---_.~- ..--. -----~- --~_._--
6 CLASS 5 AGGREGATE BASE TON 8.00 n80 62,240.00
.--- - -------~._~ ----- -'--'-.~-
7 TYPE 41A WEAR COURSE MIXTURE TON 25.25 4690 118,422.50
8 TYPE 31 lEVELING COURSE MIXTURE TON 24.25 770 18,672.50
9 TYPE 31 BASE COURSE MIXTURE TON 24.00 2055 49,320.00
10 BITUMINOUS MATERIAL FOR TACK COAT GAllON 1.50 2265 3,397.50
11 ADJUST FRAME & RING CASTING EACH 150.00 64 9,600.00
12 ADJUST GATE VALVE BOX EACH 95.00 16 1,520.00
13 CONCRETE CURB & GUTTER 8-618 L.F. 6.00 482 2,892.00
12 REMOVE & REPLACE C & G L.F. 12.00 2050 24,600.00
--.--- "___'H_'.'_'___'__'___~ --. - ---'-- -----~--
15 MANHOLE SUBGRADE REPAIR EACH 500.00 24 12,000.00
---.- - ------ ---..--- - --- --'-'---~
16 STORM MANHOLE EACH 1,250.00 1 1,250.00
.. -_._~ ----- -
17 CATCH BASIN EACH 850.00 2 1,700.00
-- ---- ------- -----
18 12 RCP STORM SEWER L.F. 30.00 275 8,250.00
---- ----------- -.- --.---------
19 4" DRAIN TilE l.F. 5.00 2400 12,000.00
_._~ ------ ----._-- ------..-...- ._--.._~--- -----
20 MUDJACK CONCRETE CURB & GUTTER L1N FT 5.00 970 4,850.00
-- ~-- - ---- 0'__.__'__."'___ .---.-
21 SODDING, TYPE LAWN SQYD 4.00 1155 4,620.00
22 REMOVE & REPLACE 6" FORCEMAIN L.F. 18.00 570 10,260.00
23 CONNECT TO EXISTING FORCEMAIN EACH 150.00 2 300.00
24 6" D.I.P. WATERMAIN L.F. 18.00 430 7,740.00
25 6" X 6" TAPPING SLEEVE & VALVE EACH 1,500.00 1 1,500.00
26 CITY INSTAllED 1" CORPORATION EACH 75.00 10 750.00
27 RECONNECT WATER SERVICE L1N FT 510.00 10 5,100.00
28 CONNECT TO EXISTING WATERMAIN EACH 150.00 1 150.00
- - -----------..-- ..-.- H_ ~
29 WATERMAIN FITTINGS POUND 3.00 85 255.00
SUBTOTAL
35% CONTIN., ENG., ADMIN. & lEGAL
ESTIMATED PROJECT
$544,358.50
190,525.48
----------
-----------
.
~
.
$734,883.98
PAGe
.