Loading...
HomeMy WebLinkAbout1999-343 .) - ~- RESOLUTION NO. 99-343 A RESOLUTION APPROVING AGREEMENT BETWEEN THE CITY OF STILLWATER AND PARK CONSTRUCTION FOR THE MULBERRY POINT STORM SEWER MODIFICATIONS TO THE STILLWATER BEACH EROSION CONTROL PROJECT ST. CROIX RIVER STAGE II WHEREAS, on the 29th day of September, 1998, the City and the Department of the Army reached an agreement calling for construction of the Levee Wall system, St. Croix River at Stillwater, Minnesota (hereinafter the "Project"), as authorized by Section 363 of the Water Resources Development Act of 1992, Public Law 102-580; and, WHEREAS, pursuant to the Project Cooperation Agreement the Department ofthe Army duly advertised for bids for the Project and pursuant to that advertisement and solicitation awarded a contract to Park Construction executed by the Department of Army and Park Construction on June 30, 1999, and, WHEREAS, during the course of the Project, it was recognized by Boonestra, Roseen, Anderlick and Associates, engineers for the City, that a storm sewer appurtenance draining through Mulberry Point would be disturbed and rebuild since the sewer would be effected by the Levee Wall and other appurtenances in the Project. The engineers also recognized that it would be important to establish the Mulberry Point storm sewer in a size that would be sufficient to handle increased flows from the diversion structure construction on Browns Creek as part of the AUAR mitigation measures established by the City for the Annexation Expansion area; and, WHEREAS, the engineers designed a structure that would handle the increased outflow and subsequently reached agreement with the Department of the Army and Park Construction that an Addendum would be made to the contract between Park Construction and the Department of the Army allowing for a modification of the Contract to provide for the additional work as necessary to accomplish the needed capacity in the storm sewer; and, WHEREAS, the Department of the Army and Park Construction agreed to allow this modification on the condition that the Department of the Army be allowed to supervise and administer the construction of the storm sewer system provided that the costs associated with the work would be paid directly by the City; and, NOW, THEREFORE, BE IT RESOLVED as follows: 1. That the agreement between Park Construction and the City of Stillwater for payment of costs associated with the Mulberry Point storm sewer modifications be, and the same hereby is, approved according to the unit prices and estimates attached to this Resolution as Exhibit A. 2. That it is necessary for this work to be done immediately since the opportunity presents itself for a significant savings since if the Levee Wall were constructed without the -),.#- proposed modifications, it would require the completed Levee Wall to be tom up and reconstructed if the over-sizing of the storm sewer were to be done at a later time. 3. It is not practical or possible to advertise for bids since there is not sufficient time to allow formal plans and specifications to be prepared and advertised and further it would require the consent of Park Construction to allow an additional contractor to work in their Project. 4. The circumstances require that this agreement approved as negotiated. 5.That the Mayor and Clerk are authorized to sign the agreement on behalf of the City for direct payment of costs associated with the over-sizing of a Mulberry Point storm sewer as part of the contract between the Department of the Army and Park Construction all reached pursuant to Addendum Number 1 of the Project Cooperation Agreement between the Department of the Army and the City of Stillwater as Amended on the 29th of September, 1998. Enacted by the City Council of the City of Stillwater this 7th day of December, 1999. ~4- Ja . e, yor ATTEST: 2 12/06/'3'3 11: 13 MAG;'~USON LAW F: Rt-l ~ 43088e,9 ._-~~.- ~LI' vr ~I!LLWHI~~ t-.:O.904 v02 I"'A(;;t. e2 J' ." Stillwetll'" Beach Erosion Control · St. Croix Rlv,r · Stage 2 Mulberry pclnt Storm Sewer Modlflcat!on. F~e; 510-U.1 02 Stillwater. Mill 22-Nov.g9 Item Unl1 Total I Hum. item U ,,:tis QUlIlntltv Co., Coet C4,"",eAb Part, . P.,.1118142" 'ICle :n,!a~ 2n~ lt2"IilCP at retaining I Incl. 3/".gelpi1e, retaining wall modfflcatjo!'\:J line cutfalii 1 wall LS 1 $ 12.000 $ 12.m apron. A.sSLl",.$ apron 6'.8- d"" a/'ld ..2'4)" w ~ 1 42' ~Cp. slorrr $e-el'. CIaSoS ~. ! 2 8'.10' d.eu IF 25' $ 170 $ 42,B70 I 42" Rep, stem"! seINer. Cla~ 4, ! 3 10'-12' deep LF 8 S 110 $ 1,380 4 42. RC LR 1M1'ld. ClaSl~ 4 EA 1 S 100 $ 700 ! S Oewatefl excavation LS 1 $ 5.515 $ 5,575 I 6 lO"'i1u STMH~ l.S 1 S .1,100 $ 1.100 06Dlh j.,craeae 01 '9 feet t Total Pil1\' - Pa,.lIal 42. pil'8 S 63.405 p.rt 2. Lowe,. 38" "~/"odlty StrJctu.... Lower 36' from STMH-JO to OtO~ ;"C/U!G.ot 1.S' - 2.9', l.a~ 10 fM1laSl~ ~llO , STMH04 LF 77 S 10 S no be 24" ;.lOPE Diol! to ma~. of ort<1. aiTfarenc ApprCX, deolh irlcreut c12 feet As9ume de 61" I steel i5 ~o~~ete. elC\'~nC:term, Con8tI".Iet & t. I e L.ow.r Co,'trol Struc:vre '3 l5 1 $ 8,~O $ 5.500 see~g& key Q1'l base of boH~ col'l1roi !trUctU/1 'I' oral Part 2 - l.ower :IE" pipe/modify ItrlolCt\lres $ 7.210 Tatal Part ~ . Parallel 42- Pipe $ 83,405 Total Part 2 -l.ower 30" Dip';rTlQ(llfy SlrJCM'eS $ 7,270 Total ChIno. Orcs4lr S 70,875 R8c;.om~m;jed for approval ~y 60NISTROO ROSENE ANCPUK a A8S0~AT&S DATE . . Approvea 0'1 ConU3Ic:Dt Approved b~ o.....ner fillilRK CONSTRUCTION CITY OF 8TIU.WATER . - E~. \'A- I,