Loading...
HomeMy WebLinkAbout1996-278 :e . . RESOLUTION NO. 96-278 APPROVAL OF PROPOSAL REQUESTS NOS. 17 AND 19 A V CHANGE ORDER NO.2 CITY HALL BUILDING PROJECT NOW, THEREFORE, BE IT RESOLVED, by the City Council of the City of Stillwater, Minnesota, that Proposal Requests ( Change Orders) Nos. 17 and 19 and A V Change Order No.2, attached as Exhibit A, are hereby approved; and the appropriate councilmember and staff are hereby authorized to sign the necessary forms. Adopted by Council this 19th day of November, 1996. 4rjfi<< Attest: ~ - E bit.N Res.u96-278 f/?. 'IJ f~S tfL",1J. ~l!t?S 1 ~ /,7 .17-1.C ng~ c~~~ction per attache~ detail PR17-A1 and PR17,-A2. ~ (Add) , ~.. ' . '$ -J. .2.1 2:; ~ ariginated by Approval ~ ~7-2. Toilet Room 138 - Provide VeT, Mannington Essential 102, for flooring in lieu of ~ ~.ga~~~is~~ . fl (Add)~~ iil Originated by , $ i-489 N :;] Approval -~.5 &-L~-t 17-3. A. B. pl Plastic Laminate revisions at City Hall: Rm. 103 - Case Study: All p.lam. to be PLAM 3. Rm. 319 - Kitchen: Countertop p.lam. to be PLAM4. Cabinet face p./c;m. to be PLAM3 C. Rm. 323 - Conference: Countertop p./am. to be PLAM4 Cabinet face p.lam. to be PLAM3 /Je b ~ ~:l :'1 ;J "I :! ill ~~,>>(NO Change) Originated by _ Approval $ "l f 17-4. Provide three 2" empty conduits in existing tunnel between the City Hall and Fire ~. . Station. These conduits shall stub out into tt!e Pi~tol Range Room #027 in City Hall ! and stub out above the ceiling for conference/Diriin~om #159~~e Sta1ion. _/ a .d)(De~uct)(No Change) . ..s:=-L lh..CJjJo.Jc-1L ?1l.Lb.1 $ 4r- -# /15 l ~ginated by ... Approval ~ -to fA-L -?Q 1 P:!L ~ Attachments: PR17-A1, PR17-A2 I OoZ " " END PROPOSAL REQUEST 17 p. :> :=.------- w ~ iJ ?J ~ ..l' S"""ISollc 500 aGl. Miaac-.. 55101 "I: 612 ~.J701 fu: 612 m-8961 BWl3R No. 95057.01 19-5cp-% PR 17- Pace 2 l__" ...__,.~_ r i I . ~ .~ ~ i I i I I i i ~ , ; . . , .:. .. -- -- - . ,:.. .. po.~ltc i....: _..... ~..' <Tll~' ~Add}~ : e Originated by Owner 19-2. Install cold water line to refrigerator. (Add)~~ Originated by Owner A~UBST.JI.lf dO $ + /f.3/- Approval $ -I- 6 j'fg9. Approval 19-3. Change size of fire dampers servicing three ducts to Council Chambers to a smaller' size that will fit between trusses. (Add)(~~ Originated by $ -I- jE(oo ~ Approval 19-4. Change color of carpet type 2 to Mannington Belvedere, color Holly Hok. Change made as original color not available. (Add)~)~ $ -f 3S'f Q.!? Originated by Approval 19-5. Wrap all above ceiling supply and return ductwork that extends from the Council Chamber and conference room wall along grid D to the penetration of the gypsum board installed on the bottom of the wood trusses. Wrap duct with 3M fire barrier t: . FireMaster duct wrap or equal. . . W M-k /l'<-o (Add)(Deduct)(No Change) $ I-t-'~' ~ Originated by Approval 19-6. Provide a 2-gang box above control room window as indicated on drawings. This box is for an "ON AI R" light that will be furnished by the A V Contractor. Provide 120 volt power to this light from nearest circuit, and wired to a switch in the AV control room in location as indicated on the drawings. (Add)~~ $ + 0 J rL Originated by Approval 19-7. Provide a 2-gang 3~" deep box for a portable monitor as located on the drawings. ~rovide a 3/4" empty conduit from this box back to the VCR rack junction box in the AV - control room. Refer to attached drawing {Add}~ Originated by $ + 3::L,! Attachments: PR19-E1 thru E4 ---I 0 ,--tt- L END PROPOSAL REQUEST 19 Approval ~ 3r;~ ~::::=------ ~ . Sibley S~l SUlle 500 SL P.u1. MinD:oola 55101 reI: 612212.3701 r.. 612 212 .8961 aWB R No.9 5057 .01 16-O<t.96 PR 19. I'>.&e 2 .. ^...._""_..,~$',,~-':O'~~!';.:--~:i:.~,.:~."'l.:-..''''.:;''>..,',/'..._-:"~":"-'._;.;:,,;.,.~ NUV- O-~O WtU lli~O r.u~ Ray Voss Audiovisual Systems Inc. 6253 Bury Drive Eden Prairie. MN 55346 ~~\'. -,"\ 'f #1' \.a.~"""'f" l' November 6. 1996 City of Stillwater City Hall 216 N. Fourth Street Stillwater MN 55082 Attn.: Nile Kriesel Dear Nile: Enclosed for your files Is Change Order #2, covering a change In the microphone shock mounts and the addition of the "Request to speak" system. The change in microphone mounts follows our review of a sample of the mount and discussions between Brad Nelson and Don Fixmer. The Request to speak system is a result of your request to Brad. We are going forward with these changes as requested, but' wanted to provide confirming paperwork for your files. If you have any questions, please call. co: Brad Nelson g!;~~~:.,:_;.~t.~'''I:;~~.I:.. 1';,;0: I.::', ~':.: ;.~"~:".::!..'.I: t. /, ", 11, / ~. '''i :/:~,,\l" ,:.: i~,.~..~~.;~t'\t~~:;~)~t,~~~:,~L tf" . 6253 Bury Drive Eden Prairie, MN 55345.1720 Tel. 61 ~.949.3700 Fax 612'949'6000 All EqUIIOppottuttifyEmplc~, e . . NOV- 6-~6 WED 11:25 P.04 - . . a . CONTRACT CHANGE ORDER .N. Systems Ex1om-1 BlIltnIl: [Xl. In'.rnal 81l1lng: 0 '!{I~Jjj mIL! -J. ,,' Job Name;J. +:,-/1 """.... ~""' COL1.Y\~J/ ~^"'MJ(vt I Rev. #:;? I Customer: C rh, 0';" f .J- rll WI+. /-l ~ Customer No.: i"' S S ~ Title of Change: C/"'a.~ M :-c..hJr J ",14 fL,.1..1A. (j ""'/~ t t-.Ic. Date: I' l"b /9 (. SALES REP ORDER NO. 7 Oc.- :'] N~ EQUIPMENT CHANGES . Sales Contract /I ~ ~ i'r UNIT QTY DESCRIPTION PRICE AMOUNT 1'-\ i or.... D I()() c,..,l,"Q _I (.c..I..""fC... &-r fI~! L o (t. . M..... ....J..r_ Subtotal Equipment Add Sales/Use Tax Add ShippIng TOTAL EaUIPMENT (. ,; I)~ (.. Lf ~ I't..<<s h.)< t-JJ...rr~j '" ~ I I IMPLEMENTATION CHA~...~ES ~ ~Ob # UNIT PRICE DESCRIPTION OR RATE (;)0 ~ PHASE # aN Subtotal Implementation Changes Add I(Deduct) ToIDI Equipment 6 Implementation F iotal Contract Before this Change Order _ TOTAL REVISED CONTRACT 600 00 ~ _ ~'l ( :::s:~~ ~ Date: / t/ ~ ('1' A:,PROVAL _ CUSTOMER: By: Pi ~ . . ~V~ l!d -- ~vI?41 J BVL~ ~I.(.,fl ~ '\ Dillie: CITY HALL PROJECT CONSTRUCTION COST UPDATE Ori~inal Cost Estimate General Construction Other Contingency November 19, 1996 e $ 3,238,512 676,132 161.925 Total Original Estimate 4.076.569 ****************************************************************************** Current Estimate General Construction: Base bid~ Additions- Approved change orders- No.1 No.2 (pR 1 thru 8) No.3 (pR 9) No.4 (pR 10) No.5 (pR 11-12) No.6 (pR 13) No.7 (pR 14- 16) PR #18 A V Co #1 Pending change orders- A V Co #2 PR #17 PR #19 Fire Station exh. Miscellaneous Total Additions $ 3.238.512 5,500 22,426 32,120 2,151 20,158 9,487 9,728 4,655 -2S.Q . 106.775 * 555 * 782 3,860 ** 56,748 ** 18.788 80.733 182.311 Total General Construction 3,426.020 Other: Owners Construction Items- Per schedule A 689.742 Total Current Estimate ~J 15.762 . * Recommended for approval this meeting (11/19/96). ** To be determined at a later date. , . SCHEDULE A e OWNERS CONSTRUCTION ITEMS Original Estimate Current Estimate State surcharge 3,500 1,300 SACIWAC 3,000 Water hook-up fees 500 Site survey 1,300 1,300 Soil tests 1,632 1,632 Concrete testing 10,000 10,000 Janitorial clean-up 1,000 1,000 Builder's Risk insurance 4,200 2,834 Asbestos removal 25,000 29,676 Furniture 66,000 70,000 Audio/visual 90,000 110,000 Rental and storage 10,000 5,000 Architectural 410,000 407,000 Bonding/fmancing 50.000 50.000 . Total 676.132 689.742 .