Loading...
HomeMy WebLinkAbout1997-272 . . . RESOLUTION NO. 97-272 RESOLUTION ORDERING PREPARATION OF REPORT ON CURVE CREST BOULEVARD STREET REHABILITATION IMPROVEMENT (PROJECT 9803) WHEREAS, it is proposed to improve Curve Crest Boulevard, between Greeley Street to Washington Avenue and to assess the benefited property for all or a portion of the cost ofthe improvement, pursuant to Minnesota Statutes, Chapter 429, NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF MINNESOTA: That the proposed improvement be referred to the City Engineer for study and that he is instructed to report to the council with all convenient speed advising the council in a preliminary way as to whether the proposed improvement is necessary, cost-effective, and feasible and as to whether it should best be made as proposed or in connection with some other improvement, and the estimated cost of the improvement as recommended. Adopted by the council this 18th day of November, 1997. .~ J# ATTEST: ~~ r.u~ Modi eldon, City Clerk .