Loading...
HomeMy WebLinkAbout1997-173 , ~ . . . .~ RESOLUTION NO. 97-173 APPROVAL OF PROPOSAL REQUESTS NOS. 33, 34, 35, and 36 CITY HALL BUILDING PROJECT NOW, THEREFORE, BE IT RESOLVED, by the City Council of the City of Stillwater, Minnesota, that Proposal Requests Nos. 33, 34, 35, and 36, attached as Exhibit A, are hereby approved; and the appropriate Councilmember and staff are hereby authorized to sign the necessary forms. Adopted by Council this 5th day of August, 1997. Ja~ Attest: Modi ~n . ) . (pR ~ >#33-#34-#35-#36) Proposal Request Item Prol'osal Request #33 33-1. Refer to Drawing EI0, Room 224: Furnish one . receptacle on cast wall south of door at 12" above floor. Power shall be obtained from panelboard NLP-21, one 20 amp single pole breaker dedicate circuit for owner telephone equipment 33-2. Refer to Drawing E10, Room 224: One existing receptacle on north wall was removed when new door was cut in. Re-install this receptacle on north wall below panel NLP-21 at 12" above floor. Power shall be obtained from panel NLP-21, one 20 amp single pole breaker dedicate circuit +$ . 33-3. Provide one (1) splash block 2'0" x 3'0" at the roof drain south side of main entrance. To -r It L PR - 33 Proposal Request #34 34-1. Install handicap urinal in 2nd floor toilet All other toilet fixtures to be non-handicap. Third floor toilet room fixtures to remain as installed. +$ 34-2. Furnish and install 4" concrete block filled with concrete under reception counters Room 112 in lieu of metal stud and gypsum board. Finish of wall to remain as shown. +$ 34-3. In lieu of wood windows shown above reception counters in Room 112, furnish bulletproof glass Guardian 500 included in PR as shown on attached drawings PR23-A1 and PR 34-A2. 24"W bulletproof glass to be centered in opening on room side. Glass to overlap lobby side glass 3". Include deal tray. +$ . Amount Rejected Pending +$ 445 Accepted ~~ NjC By Owner L[ Lt S - - 254 Accepted 293 Accepted 2,311 Accepted Proposal Request . CHANGE ORDER #11 (pR #24-#33-#34-#35-#36) . Item Accepted Rejected Pending Amount Proposal Request #34 (cont.) 34-4. Provide mortise key pad in Door 168 in lieu of latchset Proposal Request #35 35-1. Reverse swing of Door 322A to allow for adequate locking capabilities. 35-2. 35-3. 35-4. 35-5. 35-6. 35-7. 35-8. 35-9. 35-10. +$ 644 Accepted 350'1.- TtJ "(A L P e.. -3 Lf T.B.D. On Hold Repair existing face brick at SE comer of Fire Station at overhead door and SE comer of City Hall. +$ 1,196 Accepted Relocate existing lintel at Council Chamber. +$ 2,307 Accepted Install insulation at piping elbows where . asbestos was removed. Original Quote was $5,500.00 +$ 4,675 Accepted Furnish and install two new water closets and flush valve on 1st floor. +$ 463 Accepted Issue credit for blacktop allowance included in contract. (- $ 10,000) Accepted Issue credit for east sidewalk, south end. T.B.D. Waiting for Pricing Change handicap urinal on 1st floor to standard height +$ 254 Accepted Issue credit for landscape allowance included in contract A. Landscaping -($ 6,349.00) B. Retaining wall + $ 3,170.00 Note: Retaining Wall railing to be determined late. ( -$ 3,179) Accepted Furnish and install concrete bases for exterior lighting. . +$ 3,120 Accepted " . Proposal Request CHANGE ORDER #11 (PR #24-#33-#34-#35-#36) Item Proposal Request #35 35-11. 35-12. 35-13. . 35-14. . .. Furnish and install pressure relief valve on fire protection line. Provide vcr in Corridor 202 as indicated on attached sheet PR 35-Al. Provide wall mounted light fixture per following specification:. Make: Model: Color: Reference: BEGA 6493 White lCj A7, east elevation Electrical revisions. Reference 1jE10. A) Room 224, Comp.jStorage: 1. North wall, left of door, provide recessed raceway along width of wall at 10" AFF. See electrical Note 1 for raceway description. Remove and patch portion of existing furred-out wall as required. Caulk wall along top and bottom of raceway. 2. North wall, right of door, provide one fourplex receptacle. Remove and patch portions of existing furred-out wall as required. 3. South wall, remove existing surface mounted raceway, remove portion of existing furred-out wall as required, remount existing raceway, provide additional raceway to width of wall, patch wall to match existing. Caulk wall along top and bottom of raceway. +$ (-$ Amount 264 NjC 39) Accepted Rejected Pending Accepted Accepted Accepted CHANGE ORDER #11 (pR #24-#33-#34-#35-#36) Proposal Request Item Proposal Request #35 (cont.) 35-14. Electrical revisions. Reference 1jE10 (cont). A) Room 224, Comp.jStorage(cont): 4. West wall, provide one fourplex receptacle. Remove and patch portion of existing furred-out wall as required. B) Room 226, Copy jW orkroom: 1. East wall, provide one fourplex receptacle at north end of wall. Not to Exceed -M"Tf}'- p~-~S Proposal Request #36 36-1. As shown in attached sheets PR 36-A1 and PR 36 -A2, remove existing pencil drawers and associated assembly where indicated and provide p.1am. drawers, file drawers and cabinet as indicated in drawings 3Ej All, 4Ej All and 5D j A12. Shallow drawers will be 3" deep on the insicit: ,-~~ar - Room #209 (Reception). Total ( .:t;~ 5 A ~ Amount +$ ~ ~) +$ 1,514 ~ Accepted Rej~cted Pending ~ ~ted ' Accepted -/) . . . , , .. . CITY HALL PROJECT CONSTRUCTION COST UPDATE August 5, 1997 Original Cost Estimate General Construction Other Contingency $3,248,512 676,132 161.925 Total Original Estimate $4,086,569 Current Estimate General Construction: Base bid Additions: Approved change orders- General (Schedule B) $ 3.248.512 142.736 . Pending change orders PR #33 PR #34 PR #35 PR #36 Fire Station exhaust Other revisions *445 *3502 *(939) *1514 **30,000 **20,000 Total pending $54.522 Total Additions $197.258 Total General Construction $3,445,770 Add: Owners Construction Items- (Schedule A) 719.049 Total Current Estimate $4,164,819 * To be approved this meeting - August 5, 1997 . * * To be determined at a later date. , ' t SCHEDULE A . OWNERS CONSTRUCTION ITEMS AUGUST 5, 1997 Original Estimate Current Estimate State surcharge 3,500 1,300 SAC/WAC 3,000 Water hook-up fees 500 Site survey 1,300 1,300 Soil tests 1,632 1,632 Concrete testing 10,000 4,000 Janitorial clean-up 1,000 2,000 Builder's Risk insurance 4,200 4,670 Asbestos removal 25,000 29,979 Fumiture 66,000 70,000 Audio/visual 90,000 128,000 . Rental/ storage/moving 10,000 5,000 Architectural 410,000 416,000 Bonding/financing 50 000 35,000 *Landscaping 8,000 *Blacktopping 5,000 OSHA Compliance 7.168 Total 676.132 719.049 * Formerly part of Original Contract, now deleted from contracts and assigned to Owners Construction Items via change orders. . . . ... . SCHEDULE B SUMMARY OF APPROVED CHANGE ORDERS AUGUST 5, 1997 General NO.1 5,500 NO.2 (PR 1 turn 8) 22,246 NO.3 (PR 9) 32,120 NO.4 (PR 10) 2,151 NO.5 (PR 11 & 12) 20,158 NO.6 (PR 13 thru 16) 21,483 NO.7 (PR 17 thru 19) 9,926 NO.8 (PR 20, 21 and 23) 625 NO.9 (PR 22, 24, 25, and 26) 20,576 PR #27 3,761 PR #28 (494) PR #30 2,260 PR #32 1,314 . Total General $141,176 Audio Visual AV#1 550 AV#2 555 AV#3 -0- AV#4 455 Total AudioNisual *$1.560 Total $142,736 * Included in "Owners Construction Items" estimate and not included in "pending change orders" on Construction Cost Update schedule. .