RESOLUTION NO. 97-159
APPROVAL OF CONTRACT BETWEEN CITY OF STILLWATER AND
EQUIPMENT SUPPLY INC., FOR HV AC PREVENTIVE MAINTENANCE
BE IT RESOLVED by the City Council of Stillwater, Minnesota, that the Contract for
preventive maintenance services for heating and air conditioning systems for City Hall and the
Stillwater Public Library for the period July 1, 1997 - June 30, 1998, attached hereto as
Exhibit A, by and between the City of Stillwater, Minnesota, and Equipment Supply, Inc., is
hereby approved, and the appropriate city staff is authorized to sign said Agreement.
Adopted by Council this 15th day of July, 1997.
ATTEST:
~/~
Ja L ." e, or
EGUIPMENT SUPPLY INC.
SALES & SERVICE
FAX: 646-2971
24-HOUR PHONE: 646-2571
593 NO. FAIRV1EW AVE., ST. PAUL, MN 55104
Mech"",':cal Contractors: HEATING. AIR CONDITIONING - REFRIGERATION
June 18, 1997
City of Stillwater City Hall
216 Fourth Street North
Stil~water MN 55082
SMC-239
Attention: Mr. Nile Kriesel
Dear Mr. Kriesel,
Please find enclosed a copy of your new Preventive Maintenance Contract.
The contract price will be $3168.00 per year.
.
I have attached a copy of the contract which has the equipment list and the
check list we use when we do your maintenance checks.
We currently have maintenance checks scheduled for January, April, July,
October. Please cali if you have any questions or if we can be of any further
servIce.
Yours Truly,
Rod Charlton
Sales Representative
Accepted by: 17 ~
Date: 7/ J5~
.
~ ........ ~ ....... .-," -.
E. ...,. EGUIPMENT SUPPlY INC.
SALES & SERVICE
FAX: 646-2971
24-HOUR PHONE: 646-2571
593 NO. FAIRVIEW AVE., ST. PAUL, MN 5510
Mechanical Contractors: HEATING - AIR CONDITIONING - REFRIGERATION
June 18, 1997
City of Stillwater Public Library
225 North Fourth Street
Stillwater MN 55082
SMC-238
..,
Attention: Mr. Nile Kriesel
Dear Mr. Kriesel,
Please find enclosed a copy of your new Preventive Maintenance Contract.
The contract price will be $2856.00 per year.
I have attached a copy of the contract which has the equipment list and the
check list we use when we do your maintenance checks.
.
We currently have maintenance checks scheduled for January, April, July,
October. Please call if you have any questions or if we can be of any further
servIce.
Yours Truly,
Rod Charlton
::::P::::::~~.= . "
Date: 7 / J" ~
/
.
AFFIRMATIVE ACTION' EOUAL OPPORTUNITY EMPLOYER
.
.
.
SERVICE AGREEMENT GUIDELINES
EQUIPMENT SUPPLY, INC. will service all equipment listed under this service agreement.
All work will be done by Qualified Service Technicians. We will also provide a selected
preventive maintenance service of all the equipment covered under this agreement. The
equipment is to be in good operating condition at the start of this agreement.
This Rgreement is based on a regular 8:00 a.m. to 4:30 p.m. work day, 5 days per week.
However, we will be available for service 24 hours per day, 365 days per year. Overtime
calls will be done at an additional charge, but at a reduced service customer rate. This
includes nights, weekends & holidays. Any call placed with us prior to 3:00 p.m. on a nor-
mal weekday will be done at no additional charge.
This agreement does not include the following:
1) Equipment damage caused by failure of any utility service such as damage
caused by power failure, low voltage, lightning, single phasing or other abnormal
electrical problems.
2) Equipment damage caused by carelessness or vandalism.
3) Equipment damage caused by fire, flood, freezing or other Acts of God.
4) Replacement of evaporator coils, condensers, furnace heat exchangers & com-
pressors, Should anyone of these items require replacement it will be done at a
reduced service customer price.
5) Cabinetry to include gaskets, hindges & latches.
6) Power Supply to the Equipment including the disconnect.
7) Obsolete equipment for which parts can no longer be obtained.
8) Equipment Supply will not be responsible for any product loss.
Terms on all billable services will be net 30 days. If payment is not received within 30
days, service will not be provided until payment has been received.
The service agreement payment is due prior to the start of each quarter and must be kept
current. Payment must be received on or before the 1 st day of the service period. If pay-
ment is not received within 12 days after the start of that period, service will not be provid-
ed until payment has been received. This is an annual agreement to be paid quarterly, or
monthly and may be cancelled by either party upon 30 days notice after the initial year.
EQUIPMENT SUPPLY, INC.
PREVENTIVE MAINTENANCE AND SERVICE PROGRAiV1
...
PLA1~ B:
1. MAINTENANCE SERVICE:
PROVIDES Al~ EXTENSIVE INSPECTION,
CLE~G,ADJUSTING,AND
LUBRICATION PROGRAM, (SEE THE
PREVENTIVE MAINTENANCE SERVICE
SECTION.)
2. PARTS & LABOR COVERAGE:
PROVIDES PROMPT EMERGENCY
SERVICE AT A DISCOUNTED RATE.
THERE WILL BE A 10% DISCOUNT
SHOWN ON THE BOTTOivf OF EACH
INVOICE.
.
.
.
:::mE 3illmg Address
Contrae:
:lumber
"',,~E'Y OF STILLiiATER CITY la.LL
.'~uR; ~~-r NORTI!
~,ciiif.~ ~ 53082-
SrlC-239
CITY OF STILLWATER CITY lilli
?OLIC3 .1lID 2IRE
2 ~ 6 ?OURTII STREET ~ICRTI!
_~c:.::on :
.~iDe
:.~:0..]rr
~J:.CQ
J}llE
'J..;1~NE ;:0
~.J18 ;':0
::~;llffi co
=-~2iRS ~4
:~B3S ~~
:l?~'fES :1
-:!)liE C0
':f..CD
],(0
iTILLiiATER
'1CDelCCDe
30 11ER
?lJ}!'p
20IT,~R "\
.:TILLER
CCMP?lSSCR
COMPRESSOR
:1iJSERCCMEX
!!USEP.CC~
\mSERWfR"i
.U?.EAJ.'IDI1R
?1]t,(.P
iTIRLJiG JNE ill
?TlliP
. "J.:um=~J
.~\- ,:0
. ~".~;~:. -"
.: ':.i~s ~
:1SliES :1
:'~lj"2S ~
?3 - ~C/ TIG
?J.~C/8:G
;,mSERCCMRX
:illS~CCMEX
:illSERCCMRX
:1N ;5'J82-
~C<iel
L-~8-?D
3B30086 . :BSB2C'l'LO
~00125al0031
ITAA070A11QL~D13F
~~roJSF_~CN043A
CEEN035F_~N043A
'iEBK08L
7E3K08L
7RS;c3PIUTIF.20S2Cl
C22007EJJ~.B8j 7
CE2007EJJil.E837
"[GJ090CJEGE
'[GG~8CEGE
SR3J129DliEONJJTl 0 2.~.iJ
VEBK08L
:iEBK08L
'iEBKIQLElljjll0SPCl
C Q n t r act I n f Q r ] .~ : ~ J J
I~e 3
Star: )7/01/97
3nd Q6/JO/93
.l:!ilcunc 3168.00
Status Act.ive
:"'\,.. "\'
jll1. JL3!'::
3ill Cycle
3ill Cat:gcr[ 2
Sve Star: ~)7 /01/97
S7C Cycle ?ic.~;~e~~s
Svc Call '~~e ~~ ~a~l.
Ccnc:.c: ~. :TILE IRI3SEL
~a~:2:'1
3:mr:::
j2~:~i jUJ:!:e~
J7 ;01/97
?b.cne
,1Si: ?o
3uver
?b.cne
(ol2) ~J9-;l21
~':C2.c:Jrr
:uS TItIESEL
"~i~\lla-~i;'!
"'-_, .....1 ....__
~cne
-.---------------------------------------------------------------------------------------------------------------------------------
256:0
DC. i32E3
G95.J.J6iS6
J)~62S:3
'Pr.62619
S03S5: .J01
,,"".. '0-
aUJ::J':". 'j to
50J5ol.JOS
r9624134~
~26~G~204D
j2':~iJ45IJ8D
t16U3:408
,/
i
503561.304
503:51.303
50355;'.J05
:========~==================================================================================================================~=======
.
Service Checklists for ESI
Run Date 06/11/97 15:13:06 Page
1
.===============================================================================================================================
.
~~~~ist Description
SMC-239 SMC-239 CITY OF STILLWATER P/F MAINTENANCE ClIIlCKS TO BE DONE IN: JANUARY, APRIL, JULY, OCTOBER
WE WILL CLEAN I ClIIlCK & INSPEcr THE FOLLOWING:
"
,
AIR CONDITIONING AND HEATING SYSTEM
_Condenser coils, evaporator coils, drain pans (pressure wash)
_Air handler blowers to include tension and allignment of
belts (replace with customer provided belts as needed)
_Lubricate blower motors, air conditioner and heat
_Suction and condensing pressures
_Refrigeration charge and leak test system
_Starter contacts and coils
_Solenoid valve operation
_Expansion valve operation
_Lubricate motors and bearings
_Controls, to include electrical
_Compressor oil level, also acid testing
_All units for vibration and noise
_Air conditioners started & checked (spring) shut down (fall)
_Filters cleaned or repaced if needed (customer provided)
WATER AND STEAM BOILERS
_Fill & start boiler in fall & drain & flush in the spring
_Safety controls and unit operation
_Gas pressure at burner
_Combustion burner
_Low water cut off
_Operating pressures I water level and temperatures
_Relief valve
_System for leaks
_Combustion fire box
_For scale and corrosion
_Servie circulating pump
_Drain expansion tank as needed
--....:....Prepare boiler for annual inspection
.
GAS AND OIL BURNERS
_Flame safeguard system
_Combustion air to burner frOlD outside
_Blowers and draft controls
_Combustion efficiency
_Adjust gas and oil pressure
PUMP-BOILER, GLYCOL, CHILLER, AND CONDENSER
_Motor bearings
_Pump coupling
_Lube motor and bearing assembly
_Pump bearing as sembI y
_Amp draw
______Overall visual inspection
.
I - ._._---~
I . .
Service Checklists for ESI Run Date 06/11/97 15:12:56 Page 2
e Description
~===============================================================================================================================
GAS OR ELECTRIC HOT WATER HEATER
_Pilot
_Burners
_Stack
_Spark ignition
_Temperature settings
_Overall visual inspectio
\'lATER AND STEAM BOILERS
_Fill and start boiler in t he fall & drain & flush in the
"' spring
_Safety controls and unit 0 peration
_Gas pressure at burner
_Combustion burner
_Low water cut off
_Operating pressures, wate level and temperatures
_Blow down the low water c t off and water legs
_Relief valve
_System for leaks
_Combustion fire box
_Mud legs
_For scale and corrosion
e _Feed water pumps
_Check for leaking stem trcps
_Prepare boiler for annual inspection
GAS AND 01L BURNERS
_Flame safeguard system
_Combustion air to burner f om outside
_Blowers and draft controls
_Adjust gas and oil pressur)
_Combustion efficiency
MAKEUP AIR, AIR HANDLING SYSTEMS SUPPLY & EXHAUST
_Controls
_Fan pulleys, motors, wheel I drives and bearings
_Belts
_Vibration isolation mounts
_Airs ide heat ransfer surf~ s
_Condensate drains
_Shaft assembly
_OUtside air dampers
_Air distribution
COMMENTS:
.
-.....-........... --............. -...... --... --........ --............................... -- --....... --.............. --........................................... ... --... --.................................................... ..-_...................................... --....
JUL-15-1997 15:32
;e!'ric~ Contract Master llst for ESI
~~0lIler Billing ..l.ddress
\Cc~t
Contract
/l1mb~r
-:'!{ , STILL CITY OF S'r!trmER
roBt.!C LIBiARY
m nom POllRTlI STRm
S'rI1LliA'l'llR Mi 55082.
s;l1':.238
:i~!'TlC~ L<Jcatioll: elT'! OF mLLl1A1ER
~L!C LIWY
m NORTH ~mIRTH STREET
ST!LL'~~m MIl 55082.
...
lnit
l'ype Madel Celie
.\fomW mr Fftli
TACO PUMP
aARBBRl COL PNEUM COIrr
30NBYWHLL .lll DRIlii
QUIHCY AIR COOR
AM S'rAh'D \lAm STR
~ 6X!l F~
.\I+l!!2MAN m! ~
~'ij m ,~s/C
1m! co CONO UNIT
8lJPJID.M 80 Ira
iiOUJIIH . -
00"mM WATBR aTe.
TACO m
'.0
.ft
J
.1
-~
~~
1
!
1
Mod~l
n065
lli82TIilR,734m
NOT LIS'l'EO
8010
106
GJOAGL
m6S
91065
rm ~6
mesa
K-SOl4B
\'&I \Q20
llO'r LISTllIJ
Smt0G4111
612 646 2971 P.02/04'
FJm Date 06/11/97 14:03:QO Page
Contract [nEorlEation
.
'l"r'Pe a
Start 07/01/97
End 06/30/98
Amount 2856.00
Status Active
Contact illF.. NILE WESBL
Warranty
~lres
I I
I I
I I
! J
I I
/ J
I J
I I
! I
( f
/ i
1 i
/ 1
I I
Bill Stare fl7/0l/97
Bill Cycle
Bill Citegcry B
Svc Stan '. 01/01/97
SVc Cycle eic.'<ileeks
31ft Call 'l'tpe PM MlOO'.
CUst Po
Buyer Ml\. mB m!lSBL
?nOlle {612J4J9.1615
Phone (612l439-1615 Zone STI1LWATBR
Serial ~r
1m USTED
OOT LISTSD
NOT LI5m
030l\-40 -8807.
343340
6'l'U46~8DE
NOT mm
NOT iJSTED
ocmm
L2F657lS0
7703155
nas
Nor LI~
!iOT i.ISi.'Eil
Lolcatia:l
116 ffP
3/4 ill' 172S RllM
...
.,
............ --......... ....-..... .... ------- -.. --..-- ..... ............ --..... ---.."... ..'. -..... ..-..'"' -...... -...-.....-.... .......... .....-.... ---............. --.. --- --.................. "'.........
:-:~ ~~':' :;.;;,=: :;;;;;:: ~;;:==:C'= ~S.C..."w.=:==========2=:~;; .;;:;::::=::=:.:::: ~=::::;;:::::::::=::::=~:=:;::;;=====:=:.:=~~::=;; ~ ======:=====:%~::
.
JUL-15-1997 15:32
Serfice ~eck1ists filr ESI
-----\
612 646 ~9"1 ::>.0.3/04
Run Date 06/11197 15:12:56 PQge
_. ist Description
=;;;=::==%~~s:=:;;_;:::=~~!~~:::;_.;::==::~:~::#:;;.;:=:=~:~~-;;;:::===~~'!~~~~~=:;;;;:=::!:::~.S'~:=..;:==;:==;:;=..=::::::===.::~~=;!';;;;.;
. 8 SJIC.238 CITY OF STIWlATBR LIB WH'l'Bll1INt'3 ClInS 10 BB DOllll1N: JAWARY, APRIL, JULY, OCT06ER
'lIB W!LL CWIII, t'H!C! & IllSPgcr TBB FOLLOImlG:
UR COWrnODOO AND !!BATING sysms
_Condenser coils, e~aporato: coils, drain pans (pressure wash)
_Air nandler blowers to include tension and aligment of belts
_Water cooled units for proper water flow and head pressure
_Lubricate blower illCtors, air cOnditioner and heat
_S'Jction and condensing pressure
_Refrigeration charge and leak test system
_Sarter contacts and coils
______Solenoid valve operation
_Rxpallsion valve operatioo
_WDrieate matotS aDd bearings
_Controls, to include electrical
_Cllttlpressor oil level, also acid testins
_All \lIlits for 'iuraticn and noise
_Air colldi.tioners started. checked (sprinS) shut down irall)
_Filters cleaned or replaced if needed (cust~r provided)
e
.
C'dlLlJRS
_Clliller flow switch
_Chiller safety freeze thermoEtat
_Chiller control thermostat
PlJ1UlS - SOIUR, GLYCOL, emLER, AND COlIDllNSBR
''''''''"cr.-
--J- ,,;;.;,;,Z
.~~
~Lube motor and bearing assemJl y
_Pump bearing assembly
_~ draw
_Overall visual ilIspectioo
PNEJJ1.IATIC CO!1I'!!Ot SYSTEM - PmOO.TICS. COORB.Ssm -nt.1lmi
& AIR COORESSOl
_Air sta~ion
_Compressor rJIl till'.e aIDi oil level
-Air intake, airline filter atd oil 5epamor
_Calibrat roou theIU'Ostats
_Calibrate fan systelll controls
_Calibrate heating system controls
_Calibrate cooliDg system controls
_Lubricate. accuators alld liOOge
_Lubricate valve actuatoI'3 and packing
_Clean condenser
_Moisture blow d01lll
_Refrigerant charge
_Belts
_O\'erall visual inspection
JUL-1S-1997 15:33
~mice OlECklists for ESI
.:necklist Description
612 646 2971 P.04/"M - , . .
Run Date 06/U/91 15:13 :23 Page 2
::~=::;=.: =::::;::::;= =~::::=::::.:::;=~~:== ===;;'~:=:~==::;::::=:::::::s:~:::-;=.;:=u:==:s=:=:~:::==::=::=::==::==: ~::=;:.:~::==::.::::~
.
RmIGWT!ON Sysmt
_Air cooled CO!IdeIlsers
_Lubricate condenser fan !lOtors, beuings & blades
_Bvaporators ~ draill pans on walk"in & mch in coc1ers ~
freezers
~."age & voltage
_Refrigeration charge & roisture indicator
_ClJItPressor CI'alIkcase beaters
_Read presStU'e & suction pressure
_Check superheat
_Visual inspection of all units for lines rubbing & loose
nlCU1\ting usa check for vibration & noise
_Systems are clleded for refrigeratiOlll~s
_Teuperatures 00 coolers & freezers
_Defrost tilllerS
_Electrical for loose II! burnt ccr.nections
_Operating & safety controls
_Motor pulleys & belts checked for pm~ tension & alignment
_1ubriate all moving parts
_Ice IIichine systems cleaned & production cycle checked
COM4l!NTS :
e
.
TOTAL P. 04