Loading...
HomeMy WebLinkAbout1997-111 . . . RESOLUTION NO. 97- 111 ACCEPTING FEASIBILITY REPORT AND ORDERING PREPARATION OF PLANS & SPECIFICATIONS, FOR PIONEER PARK RETAINING WALL WHEREAS, a resolution of the City Council adopted the 18th day of February, 1997, authorizing Short, Elliott, and Hendrickson (SEH) to prepare a feasibility report on Pioneer Park Retaining Wall; NOW, THEREFORE, BE IT RESOLVED BY THE COUNCIL OF THE CITY OF STILL WATER, MINNESOTA: 1. Such reconstruction is hereby ordered as proposed in the council resolution adopted the 6th day of May, 1997 and shall be known as Job No. 9720. 2. Such reconstruction is necessary, cost-effective and feasible as detailed in the feasibility report. 3. City of Stillwater Engineering Department. is hereby designated as the engineer for this improvement. They shall prepare plans and specifications for the making of such improvement with technical assistance from SEH. Adopted by the Council this 6th day of May, 1997. Ja~ Attest: