Loading...
HomeMy WebLinkAbout1997-033 " . . . .. RESOLUTION NO. 97-33 ACCEPTING PROPOSAL AND APPROVING AGREEMENT BETWEEN THE CITY OF STILLWATER AND EGAN, FIELD & NOWAK, INC. FOR PREDESIGN SURVEY AND FINAL PLAT FOR ST. CROIX V ALLEY SPORTS COMPLEX BE IT RESOLVED by the City Council of Stillwater, Minnesota, that the Agreement between the City of Stillwater and Egan, Field & Nowak, Inc., for predesign survey and final plat for the St. Croix Valley Sports Complex is hereby approved, and the appropriate city staff is authorized to sign said Agreement. Adopted by Council this 2pt day of January, 1997. ~~ Ja . e, or ATTEST: ~ 11J,-Pb Modi eldon, CIty Clerk MEMORANDUM Mayor and City Council Steve Russell, Community Development Director r~ January 16, 1997 RE: AUTHORlZA TION TO OBTAIN PROFESSIONAL SERVICES FOR ST, CROIX SPORTS COMPLEX The attached proposals for services are required as a part of the project design and development process for the St. Croix Valley sports complex. The proposals include services to obtain accurate boundary, topographic and survey information, $5,940 and environmental review information, environmental assessment worksheet preparation, $3,500 - $4,500. Attached are proposals for both services. These costs would be paid directly by the city to the contractor's as reimbursable costs as described in the contract with Ankey - Kell Architects. Recommendation: Approval of service agreements for survey and environmental services. Attachments: Proposals ~~~ ~ ~coE~~FIE;~v~v~~~~A, ~ -- Il~ 7.15 WAYZATA BOULEVARD E F MINNEAPOLIS. MINNESOTA 55.26 Phone: 1612} ~6-0837 FAX:: 1612\ $.l6-0839 December 20, 1996 Steve Russell City of Stillwater 216 North Fourth Street Stillwater, MN 55082 Re: Surveying services proposal for the proposed Stillwater Community Center Dear Mr. Russell: We have reviewed our file information on the subject property and have visited the site. Outlined below is a proposed scope of work and an estimated cost for the above referenced project: Predesi~m survey $3,960,00 * Research appropriate sources to determine utility locations and horizontal and vertical control. * Perform a boundary survey based on a provided property description. * Perform a topographic survey sufficient for one foot contour interval mapping. * Perform a tree survey locating and identifying each tree six inches in diameter and larger by size and species. * Provide a certificate of survey showing existing conditions, property boundary, topography, trees and any provided easements. Final plat $1,980,00 * Prepare a final plat, based on the approved preliminary plat, according to state and county requirements. * Perform staking of final property corners. I r. I f r I Steve Russell City of Stillwater Page two Our proposed costs cover only those items outlined above. Revisions, changes, additional requests or needs of the city, or restaking will be provided on an hourly basis. Some costs to be incurred, not included in this proposal, are city subdivision fees, engineering costs, county plat checking fee, reprographics costs, title examination, deed taxes, recording fees and payment of 1997 taxes. To conform to exact property boundaries of record, to show any easements affecting the property, and to meet county requirements it would be necessary that we be provided a copy of a current title commitment or title opinion prior to the preliminary plat phase. We look forward to working with you on your subdivision. If you have any questions or if we can assist you in any way please do not hesitate to call me at 546-6837. sp~ Jack Boike Vice President, COO . eny, Kelt Architects 1 Raymond Avenue. Suite 400 '1. Paul, Minnesota 55114 612) 645.6806 612) 6-15-0079 FAX FAX Transmittal Company: To: Fax: Phone: City of Stillwater Steve Russell 439-0456 From: DateITime: Project No; Project: Eric Lagerquist Jan 16, 1997 96089.01 St. Croix Valle~ . Pages Sent (including this one): 5 Original to follow by mail: 0 ; Remarks: ~l J'. :_>.f&-_: i~: .;Jf ?"i' C~;' ~! ;~ 5'. C.to: Fax: Steve, r ollowing is a more in-depth proposal and description of the Environmenlal Assessment WorkSheet that is needed. Thj~ will be taken care of through our office. but we will not be marking up HKS's fee. Please note that this proposal does not include reimbursable expenses on EAW process. The reimbursable cost snould be in 1M range of $900 to $1,500. If you have any questions please let me know. 645-6806 Eric N. Lagerquist. AlA By: