Loading...
HomeMy WebLinkAbout2024-071 (Ordering Preparation of Feasibility Report for Myrtle Street Improvement Project (Project 2024-05))City of Stillwater Washington County, Minnesota RESOLUTION 2024-071 RESOLUTION ORDERING PREPARATION OF FEASIBILITY REPORT FOR MYRTLE STREET IMPROVEMENT PROJECT (PROJECT 2024-05) BE IT RESOLVED BY THE CITY COUNCIL OF STILLWATER, MINNESOTA: That the proposed improvement be referred to the City Engineer for study and that he is instructed to report to the Council with all convenient speed advising the Council in a preliminary way as to whether the proposed improvement is feasible and as to whether it should best be made as proposed or in connection with some other improvement, and the estimated cost of the improvement as recommended. Adopted by the Stillwater City Council this 18th day of June, 2024. CITY OF STILLWATER 7�� k�� . Ted Kozlowski, Mayor ATTEST: Beth Wolf, City ClerIV