HomeMy WebLinkAbout2022-147 (Ordering Preparation of Feasibility Study for 2023 Sidewalk Along Maryknoll Dr. from Interlachen Dr. to Oakridge Rd. (Project 2023-03))City of Stillwater
Washington County, Minnesota
RESOLUTION 2022-147
RESOLUTION ORDERING PREPARATION OF FEASIBILITY
STUDY FOR 2023 SIDEWALK ALONG MARYKNOLL DR.
FROM INTERLACHEN DR. TO OAKRIDGE RD.
PROJECT 2023-03
BE IT RESOLVED BY THE CITY COUNCIL OF STILLWATER, MINNESOTA: That
the proposed improvement be referred to the City Engineer for study and that he is instructed
to report to the Council with all convenient speed advising the Council in a preliminary way
as to whether the proposed improvement is feasible and as to whether it should best be made
as proposed or in connection with some other improvement, and the estimated cost of the
improvement as recommended.
Adopted by the Stillwater City Council this 15th day of November, 2022.
CITY OF STILLWATER
£ k----P
Ted Kozlowski, Mayor
ATTEST:
Beth Wolf, City Cler